Loading...
HomeMy WebLinkAbout091682� J • 9/16/82 The meeting was called to order at 7:45. There was general discussion about the budget (attached). Discussion revolved around building maintenance. It was decided that building maintenance.should stress three factors: 1. safety 2. prevention of deterioration 3. cosmetics Items discussed under these categories include: 1. main entry canopy 2. caulking, sealing and painting of windows 3. surface on the back entrance ramp 4. cornice cap leakage down the walls and painting of the cap 5. painting and patching the interior walls of the main floor 6. painting and patching ceiling of the main floor 7. new furnace burner It was decided to stress the following areas for the 1983 budget: 1. cornice repair and painting 2. front canopy 3. surface of the exterior ramp in the back of the building 4. new furnace burner A meeting with the Mayor will be held on the following Monday for preliminary budget discussion. The meeting was adjourned at 9 :10