PORT TOWNSEND LIBRARY BOARD
MAY 2, 1989 /MINTITES
Present: Gwen Howard, Sue Sidle, Mike Mortenson, Lars Watson, A
Steurer, Lucille Watson, Bev Lamb, Les Tonkin
This meeting is a continuation of the May 1, 1989 Board meeting.
The Board reconvened at 6 :30 p.m.
Les discussed the presentation he planned to make to the City
Council.
The Board reviewed the alternates as presented by Les.
It was moved and seconded to approve the figures for changes,
deletions, and alternates ( see attached) in order to go out for bid
Motion passed.
Meeting adjourned, 7:15
lop
•
0
Tonkin /Koch /Architects Inc, ,
PORT TOWNSEND CARNEGIE LIBRARY EXPANSION AND RENOVATION
PROPOSED ADDITIVE ALTERNATES, 28 April 1989
LIBRARY BOARD BUDGET: $569,000
27 APRIL 1989 ESTIMATE: $6055,000
PROPOSED ADDITIVE ALTERNATES: Overhead, profit and unknowns are included in
the numbers, which are approximate only. It remains to prioritize them.
$ 700 a. Substitute a solid stair rail for the balusters.
1,200 b. Substitute rubber base for wood baseboard throughout.
3,600 C. Skylight and ceiling glazing.
3,600 d. Substitute flat for raised ceiling in library room.
3,000 e. One pair of windows on east and west sides are optional.
2,400 f. Hook drop optional.
1,800 g. Back porch optional.
6,000 h. Cornice work with two simpler options.
1,800 i. Rolling grille optional.
1,200 jl. Lavatory sink in staff toilet.
The following items are to be additive alternates to possibly be provided by
"in kind" work in the community.
3,000 k. Paint Gypsum Wall Board.
9,000 1. Circulation Desk.
2,400 M. Shelving in Work Room.
1,400 n. Cabinet in Staff Room.
The following items are to be deleted altogether, and to be done by a work
party.
1,800 0. Remove Ramp
3,000 p. Removing carpet, demolition of floor framing.
45,900 TOTAL
ESTIMATE LESS ALTERNATES: $560,000
204 FIRST AVENUE SOUTH SEATTLE, WASHINGTON 98104 206624 7880