Loading...
HomeMy WebLinkAbout2207 Supplemental Budget AppropriationsORDINANCE NO. 2207 AN ORDINANCE APPROPRIATING THE SUM OF $5,775 TO THE STREET FUND, $1,750 TO THE PARK FUND, $90,000 TO THE ARTERIAL STREET FUND, $349,434 TO THE LOCAL IMPROVEMENT DISTRICT NO. 1 FUND, $568,227 TO THE WATER-SEWER FUND, $40,000 TO THE 1956 TRANSMISSION LINE REPLACEMENT FUND, AND $24,000 TO THE EQUIPMENT RENTAL FUND, MAKING FINDINGS, AND DECLARING AN EN~RGENCY THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, UPON REVIEW OF THE 1990 BUDGET FOR THE CITY, MAKES THE FOLLOWING FINDINGS: A) The State of Washington has required the public works department to install a hazardous materials storage building. B) Several streets were damaged from heavy use requiring asphalt patching and preleveling so that a seal coat may be applied during the regular season in 1991. C) On January 19, 1988, ordinance No. 2097 was adopted creating the "Local Improvement District No. 1 Fund" and in the spring of 1990 final specification were completed, bids were called for, and a contract was awarded to Inline Construction. D) On July 23, 1990, a major water main broke under Water Street. E) An engineering analysis of the earthquake stability of the earthen dam at Lord's Lake has been required by the State of Washington. F) Bids for the purchase of dump trucks exceeded the estimates used to establish the budget. G) During the summer water season several problems were found with the Port Hadlock area wells and water pipes. H) The foregoing emergencies were not reasonably foreseeable at the time of filing of the city's preliminary budget and requires expenditure of money not provided for in the annual budget for 1990. THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, IN REGULAR SESSION ASSEMBLED, DOES ORDAIN AS FOLLOWS: Sectio~ ~) The sum of FIVE THOUSAND SEVEN HUNDRED AND SEVENTY FIVE DOLLARS ($5,775.00) is here and hereby appropriated as a Ordinance No. 2207 2 supplement to the 1990 budget for the City of Port Townsend in the Street fund for construction of a hazardous materials building to be funded from unappropriated beginning fund balance as set forth in Exhibit "A" attached hereto as though fully set forth herein. Section 2) The sum of SEVENTEEN HUNDRED AND FIFTY DOLLARS ($1,750.00) is here and hereby appropriated as a supplement to the 1990 budget for the City of Port Townsend in the Park Fund for construction of the hazardous materials building robe funded from unappropriated beginning fund balance as set forth in Exhibit "A" attached hereto as though fully set forth herein. Section 3) The sum of NINETY THOUSAND DOLLARS ($90,000.00) is here and hereby appropriated as a supplement to the 1990 budget for the City of Port Townsend in the Arterial Street Fund for street improvements to be funded by reducing ending fund balance as set forth in Exhibit "A"attached hereto as though fully set forth herein. Section 4) The sum of THREE HUNDRED AND FORTY NINE THOUSAND FOUR HUNDRED AND THIRTY FOUR DOLLARS ($349,434.00) is here and hereby appropriated as a supplement to the 1990 budget for the City of Port Townsend in the Local Improvement District No. 1 Fund for engineering, construction, and billing for sewer service to the Seaview area from interfund loans as setforth in Exhibit "A" attached hereto as though fully setforth herein. Section 5) The sum of FIVE HUNDRED AND SIXTY EIGHT THOUSAND TWO HUNDRED AND TWENTY SEVEN DOLLARS ($568,227.00) is here and hereby appropriated as a supplement to the 1990 budget for the City of Port Townsend in the Water-Sewer Fund for waterline repairs, construction of a hazardous materials building, well repairs and improvements, vehicle purchases, and interfund loans, to be funded by reducing estimate of ending fund balance as setforth in Exhibit "A" attached hereto as though fully setforth herein. Section 6) The sum of FORTY THOUSAND DOLLARS ($40,000.00) is here and hereby appropriated as a supplement to the 1990 budget for the City of Port Townsend in the 1956 Transmission Line Replacement Fund for an engineering study of Lord's Lake to be funded from unappropriated beginning fund balance as setforth in Exhibit "A" attached hereto as though fully setforth herein. Section 7) The sum of TWENTY FOUR THOUSAND DOLLARS ($24,000.00) is here and hereby appropriated as a supplement to the 1990 budget for the City of Port Townsend in the Equipment Rental Fund to be funded from contributions from the Water-Sewer Fund as set forth in Exhibit "A" attached hereto as though fully set forth herein. Section 8) There is here and hereby found and declared to be an Ordinance No. 2207 emergency requiring the foregoing appropriations to the 1990 budget for the City of Port Townsend. Section 9) This ordinance shall take effect upon its passage, approval, and publication in the form and manner provided by law. READ for the first time September 18, 1990. Read for the second and third times, passed by the council and approved by the Mayor on October 2, 1990. Attest: city Clerk Approved as to form: ci y orney Ordinance No. 2207 ORDINANCE NO. 2207 EXHIBIT "A" Street Fund E 110.11.543.300.65.604 Buildings R 110.272.000.00 Beginning Fund Bal. P~rk Fund E 130.13.576.680.65.604 Buildings R 130.272.000.00 Beginning Fund Al. Arterial Street Fund E 140.00.541.000.65.639 E 140.272.000.72.703 Local Improvement District. NO, 1 Fund E 360.00.501.351.65.639 Construction Projects E 41.402 Engineering E 411 Professional Services E 360.00.584.000.90.707 W/S Pay Back E 360.00.501.351.61.601 Easements R 360.381.100.00 Loans Received Water/Sewer Fund E 411.15.501.341.65.604 Buildings E 66.654 Equipment Rental E 31.323 Plumbing Supplies E 65.639 Construction Projects E 581.330.71.518 Loans to other Funds E 411.16.501.351.65.604 61.602 E 411.14.272.000.72.703 Buildings Land Purchase Ending Fund Balance $5,775.00 $5,775.00 $1,750.00 $1,750.00 $90,000.00 (90,000.00) $236,936.00 48,600.00 5,000.00 58,038.00 860.00 349,434.00 $ 4,025.00 24,000.00 9,000.00 20,000.00 350,000.00 5,950.00 155,252.00 (568,227.00) transmission Line 1956 E 417.00.501.341.41.402 R 417.272.000.00 Equipment Rental E 500.17.548.380.64.619 R 500.397.000.00 Replacement Engineering Beginning Fund Balance Transportation Equipment Operating Transfers In $ 40,000.00 40,000.00 $ 24,000.00 24,000.00