Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2242 Supplemental Budget AppropriationsRevised
ORDINANCE NO. 2242
AN ORDINANCE APPROPRIATING THE SUM OF $23,350
TO THE CURREB~ EXPENSE FUND, $1,900 TO THE
STREET FUND, $7,000 TO THE LIBRARY FIFND,
$125,000 TO THE LIBRARY RENOVATION AND
~DITiON FUND, $30,450 TO THE PARK FUND,
$105,000TO~"'nEAR~ERIALS~P-EE~FUND, $267,584
TO THE HOTEL/MOTEL TRANSIENT TAX FUND,
$525,140TOTHELOC~Y.I}JPROVE}JEN?DISTHIC?NO-
1 FUND, $70,000 TO THE F.A.U.S. CONSTRUCTION
PROJEC~ I~GND, $805,532 TO ~ WATER-SEWER
FUND, $$96,000 TO THE STORM AND SUI~ACE WATER
FUND, AND $46,500 TO ~HE 1956 TI~%NS]JISSION
LINE REPLACEMA"NT FUND, MAKING FINDINGS AND
DECI~RING AN E~fLq~GENCY
THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, UPON REVIEW OF THE
1991 BUDGET FOR THE CITY MAKES THE FOLLOWING FINDINGS:
A) It has been determined that a representative from the Historic
Preservation Commission should attend the Washington State
Governor's Downtown Revitalization Training Institute.
B) Freeze damage has occurred to City Hall and maintenance
requirements are beyond the scope projected in 1990.
C) The Health and Safety Committee is finding it difficult to
fulfill its mandate without an operating budget.
D) With the retirement of the lead person in the street crew, it is
necessary to supplement the salary of another employee to take that
role.
E) In order to accurately evaluate the traffic flows within the
city, traffic counters need to be regularly available.
F) Landscape work around the new library addition in order to
finish the work at the site.
G) Final funding sources have yet to be determined requiring
interfund loans be made to finance the unfunded balance for
construction of the library renovation and addition.
H) A salary adjustment is in order for the position of Parks Crew
Foreman.
I) Storm damage occurred over the winter to the city parks.
1
J) Freeze damage occurred over the winter to arterial streets.
K) Improvements for Kearney Street have been approved for grant
funding which require matching funds.
L) Advertising in "Destination Washington" was approved by the City
Council at their regular meeting on April 2, 1991.
M) Additional support for the transportation of the Rhody Float was
approved by the City Council on April 2, 1991.
N) Interfund loans have been necessary as interim financing of the
Balloon Hanger until a bond issue purchase is completed from Farm
Home Administration.
O) Additional engineering and project administration has been
required to complete the Seaview Sewer line installation and
cleanup work.
P) Interfund loans to finance the construction of the Seaview Sewer
line are needed until the final assessment role is established and
bonds are issued to finance the balance of the construction.
Q) Salary adjustments are needed for Public Works administrative
staff.
R) A GIS study is needed to complete the mapping of city utilities
and create an adequate data base.
S) The moving of offices to the Porter Farm
telephone and radio installation, landscaping
construction as well as additional furnishings.
House requires
and parking lot
T) In November of 1990 the City Council approved a rate study, an
update of the Water Comprehensive Plan, and certain legal fees
which were not billed until 1991.
U) Current appropriations were not sufficient topurchase a vehicle
for Water Quality along with testing equipment.
V) The city's chlorine system was found to need replacement.
W) A fee must be paid to the USDA to provide monitoring services in
the watershed.
X) Loans to other fund are a sound investment for the Water-Sewer
reserves and were approved by Ordinance No.2237 adopted on April
16, 1991.
Y) A salary adjustment is necessary for the position of Treatment
Plant Operator.
2
Z1) The purchase of an emergency generator for use at the sewer
treatment plant and other locations within the system is necessary
for use in the event of a prolonged power outage.
Z2) Additional value engineering and legal services were needed in
order to settle a legal dispute with Sensible Sewer.
Z3) Design work is needed to prepare the necessary bid
specifications for a storm drainage improvement project on
Washington Street.
Z4) Study of the dam at the source of the city's water system begun
in 1990 is being billed in 1991.
Z5) There has been storm damage to fencing and other facilities
connected with the supply source for city water.
Z6) The foregoing emergencies were not reasonably foreseeable at
the time of filing of the city's preliminary budget and requires
expenditure of money not provided for in the annual budget for
1991.
THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, IN REGULAR SESSION
ASSEMBLED, DOES ORDAIN AS FOLLOWS:
Section 1- The sum of TWENTY-THREE THOUSAND THREE ~DRED FIFTY
DOLLARS ($23,350.00) is here and hereby appropriated as a
supplement to the 1991 budget for the City of Port Townsend in the
Current Expense Fund for Mainstreet contract increase, city Hall
repairs, and Safety Committee expenses to be funded from
contingency funds as set forth in Exhibit "A" attached hereto as
though fully set forth herein.
Section 2. The sum of ONE THOUSAND NINE HLFNDRED DOLLARS
($1,900.00) is here and hereby appropriated as a supplement to the
1991 budget for the City of Port Townsend in the Street Fund for
salary increases and a traffic counter to be funded from
unappropriated beginning fund balance as set forth in Exhibit "A"
attached hereto as though fully set forth herein.
Section 3., The sum of SEVEN THOUSAND DOLLARS ($7,000.00) is here
and hereby appropriated as a supplement to the 1991 budget for the
City of Port Townsend in the Library Fund for landscaping and other
building expenses to be funded from unappropriated beginning fund
balance as set forth in exhibit "A" attached hereto as though fully
set forth herein.
Section 4. The sum of ONE HUNDRED TWENTY FIVE THOUSAND DOLLARS
($125,000.00) is here and hereby appropriated as a supplement to
the 1991 budget for the City of Port Townsend in the Library
Renovation & Addition Fund to repay interfund loans from transfers
in from other funds as set forth in exhibit "A" attached hereto as
3
though fully set forth herein.
Section 5. The sum of THIRTY THOUSAND FOUR HUNDRED FIFTY DOLLARS
($30,450.00) is here and hereby appropriated as a supplement to the
1991 budget for the City of Port Townsend in the Park Fund to pay
for a salary increase and repair for storm damage from grants and
unappropriated beginning fund balance as set forth in Exhibit "A"
attached hereto as though fully set forth herein.
Section 6. The sum of ONE HUNDRED FIVE THOUSAND DOLLARS
($105,000.00) is here and hereby appropriated as a supplement to
the 1991 budget for the city of Port Townsend in the Arterial
Street Fund to repair freeze damage and provide for the match to
F.A.U.S. funds for Kearney Street improvements from unappropriated
beginning fund balance as set forth in Exhibit "A" attached hereto
as though fully set forth herein.
Section 7. The sum of TWO HUNDRED SIXTY SEVEN THOUSAND FIVE
HUNDRED EIGHT FOUR DOLLARS ($267,584.00) is here and hereby
appropriated as a supplement to the 1991 budget for the City of
Port Townsend in the Hotel/Motel Transient Tax Fund to pay for
additional advertising in Destination Washington, provide for
additional Rhody Float travel, and pay back interfund loans from
bond proceeds and unappropriated beginning fund balance as set
forth in Exhibit "A" attached hereto as though fully set forth
herein.
Section 8, The sum of FIVE HUNDRED TWENTY FIVE THOUSAND ONE
HUNDRED FORTY DOLLARS ($525,140.00) is here and hereby appropriated
as a supplement to the 1991 budget for the City of Port Townsend in
the Local Improvement District No. 1 Fund for engineering and
contract administration as well as to repay interfund loans from
assessments and bond proceeds as set forth in Exhibit "A" attached
hereto as though fully set forth herein.
Section 9. The sum of SEVENTY THOUSAND DOLLARS ($70,000.00) is
here and hereby appropriated as a supplement to the 1991 budget for
the City of Port Townsend in a new fund to be known as the F.A.U.S.
Construction Project Fund for improvements to Kearney Street to be
funded from grants and transfers from other funds as set forth in
Exhibit "A" attached hereto as though fully set forth herein.
Section 10. The sum of EIGHT HUNDRED FIVE THOUSAND FIVE HUNDRED
THIRTY-TWO DOLLARS ($805,532.00) is here and hereby appropriated as
a supplement to the 1991 budget for the City of Port Townsend in
the Water-Sewer Fund for salary increases, a GIS Study, phones and
radio for the Porter farm, furnishings for the Porter Farm,
landscaping and parking lot for the Porter Farm, a rate/impact fee
study, attorney's fees, a vehicle, water quality testing equipment,
services from the USDA, Chlorine system replacement, interfund
loans, a generator for the Sewer Treatment Plant, and value
engineering from loan repayments and unappropriated ending fund
4
balance as set forth in Exhibit "A" attached hereto as though fully
set forth herein.
Section 11. The sum of NINETY SIX THOUSAND DOLLARS ($96,000.00) is
here and hereby appropriated as a supplement to the 1991 budget for
the City of Port Townsend in the Storm and Surface Water Fund for
design work on the Washington Street to be funded from
unappropriated ending fund balance as set forth in Exhibit "A"
attached hereto as though fully set forth herein.
Section 12. The sum of FORTY SIX THOUSAND FIVE HUNDRED DOLLARS
($46,500.00) is here and hereby appropriated as a supplement to the
1991 budget of the City of Port Townsend in the 1956 Transmission
Line Replacement Fund for storm damage repairs and a study of the
dam to be funded from unappropriated beginning fund balance as set
forth in Exhibit "A" attached hereto as though fully set forth
herein.
Section 13. There is here and hereby found and declared to be an
emergency requiring the foregoing appropriations to the 1991 budget
for the City of Port Townsend.
Section 14. This ordinance shall take effect upon its passage,
approval and publication in the form and manner provided by law.
READ fOr the first time on May 7, 1991. Read for the second and
third times, passed by the Council and approved by the Mayor on May
21, 1991.
Attest:
City Clerk
Mayor
Approved as to form:
City Attorney
C:~BUDGET~91BUDAME.ORD May 20, 1991
5
Current Expense
RESOD~CES
010.00.587.000.70.700
TOTAL
EXPENDITURES
Non-Payroll
010.01.511.100.51.487
city Hall
010.32.519.500.48.436
Safety Committee
010.41.524.100.21.206
010.41.524.100.31.301
010.41.524.100.31.308
010.41.524.100.31.309
010.41.524.100.43.425
010.41.524.100.49.445
010.41.524.100.49.451
TOTAL
Street Fund
RESOURCES
110.272.000.00
TOTAL
EXPENDITURES
110.11.542.310.11.101
110.11.542.640.63.613
TOTAL
.Library Fund
RESOURCES
120.272.000.00
TOTAL
EXPENDI~JRES
120.12.572.500.48.436
TOTAL
EXHIBIT "A"
1991 BUDGET ADJUSTMENTS
Contingency
($23,350)
$23,350
Main Street Contract
city Hall Repairs
$ 350
20,000
Safety Committee Hats, etc. 200
office Supplies, Letterhead, etc. 100
Publications, Books, Video Tapes 500
Training Supplies, equipment 500
Safety Committee Meals & Travel 1,000
Dues and Memberships 400
Registrations 300
Beginning Fund Balance
Salary Increase for Joe Fields
Traffic Counters
Beginning Fund Balance
Landscaping
6
$23,350
$1,900
$1,900
$ 900
1,000
$ 1,900
$7,000
$7,000
$ 7,000
$ 7,000
Library Renovation & Addition Fund
RESOURCES
125.397.000.00
125.381.100.00
Operating Transfers In
Interfund Loans Received
$50,000
75,000
TOTAL
$125,000
EXPENDITURES
125.00.581.200.70.701
125.00.581.200.70.702
Interfund Loan Repay Principal
Interfund Loan Repay Interest
$120,000
5,000
TOTAL
$125,000
Park Fund
RESOURCES
130.272.000.00
130.334.019.00
Beginning Fund Balance
State Grants
$ 5,450
25,000
TOTAL
$30,450
EXPENDITURES
130.13.576.680.11.101
130.13.576.680.65.639
130.13.576.680.64.666
Salary Increase for Steve Corra
Storm Damage
Furnishings for Senior Center
$ 450
25,000
5,000
TOTAL
$30,450
Arterial Street Fund
RESOURCES
140.00.272.000.72.703
Ending Fund Balance
$105,000
TOTAL
$105,000
EXPENDI~JRES
140.00.541.000.65.639
Construction Projects
Freeze Damage
Kearney Street Match
$65,000
40,000 $105,000
TOTAL
$105,000
Hotel/Motel Transient Tax Fund
RESOURCES
150.00.382.800.00
150.00.272.000.72.703
Intergovenmental Loan
Ending Fund Balance
$250,000
(17,584)
TOTAL
$267,584
7
EXPENDITURES
150.00.573.200.44.460
150.00.562.500.41.411
150.00.581.200.70.701
150.00.581.200.70.702
Advertising (Destination Wash.) $4,084
Professional Services (Rhody Float) 1,500
Interfund Loan Principal 255,000
Interfund Loan Interest 7,000
TOTAL
$267,584
Local Improvement District NO. 1
RESOURCES
360.391.100.00
Proceeds from Bond Sales
$ 525,140
TOTAL
$ 525,140
EXPENDITURES
360.00.501.351.41.402
360.00.501.351.65.639
360.00.581.200.70.701
360.00.581.200.70.702
Engineering/Contract Admin
Construction Projects
Interfund Loan Repay Principal
Interfund Loan Repay Interest
$ 13,140
50,000
450,000
12,000
TOTAL
$525,140
F.A.U.S. Construction. Project
RESOURCES
370.334.019.00
370.397.000.00
State Grant
Operating Transfers In
$ 35,000
35,000
TOTAL
$ 70,000
EXPENDITURES
370.00.541.000.65.39
Kearney Street Improvements
$ 70,000
TOTAL
$ 70,000
Water/Sewer Fund
RESOURCES
411.00.272.000.72.703
Ending Fund Balance
($805,532)
TOTAL
$805,532
EXPENDITURES
Public Works Department
411.14.501.300.11.101
411.14.501.300.41.411
411.14.501.300.42.420
411.14.501.300.63.
Salary Increases
Francesca Cheslik $1,229
Elizabeth Yates 153
GIS Study
Phones & Radio for Porter Farm
Landscaping, Parking Lot
$ 1,382
10,000
8,000
3,000
8
411.14.501.300.64.617
Water Department
411.15.501.341.41.402
411.15.501.341.64.619
411.15.501.341.64.
411.15.501.341.48.436
411.15.511.202.41.411
411.15.581.330.71.518
Furnishings 10,000
Rate/Impact Fee Study $50,000
Legal Fees - Hadlock Water 20,000 $70,000
Water Quality Vehicle 2,000
Water Quality Testing Equipment 35,000
Chlorine System Replacement 7,000
USDA Soil Conservation Service 3,700
Interfund Loans 420,000
Sewer Treatment Plant
411.38.501.351.11.101
411.38.501.351.64.661
411.38.501.351.41.402
411.38.501.351.41.403
TOTAL
Salary Increase for John Merchant $ 450
Generator 40,000
Value Engineering Study $10,000
Redesign of Plant 150,000 160,000
Legal Fees - Sensible Sewer 35,000
$805,532
Storm and Surface Water Fund
RESOURCES
412.22.272.000.72.703
TOTAL
EXPENDITURES
412.22.542.400.41.411
TOTAL
1956 Transmission Line Replacement Fund
RESOURCES
417.272.000.00
TOTAL
EXPENDITURES
417.00.501.341.41.402
417.00.501.341.48.436
TOTA~
Ending Fund Balance
Washington Street Project Design
Beginning Fund Balance
Dam Study
Storm Damage Repairs
($96,000)
$96,000
$96,000
$96,000
$46,500
$46,500
$40,000
6,500
$46,500
C:~BUDGET%91BUDAME.ORD May 20, 1991
9