HomeMy WebLinkAbout2580 Public Works FeesOrdinance No. ~~
AN ORDINANCE OF THE CITY OF PORT TOWNSEND REPEALING AND
REPLACING SECTION 020, PUBLIC WORKS SERVICE FEE SCHEDULE OF
CHAPTER 3.36, PERMIT, APPLICATION AND APPEAL FEES OF THE PORT
TOWNSEND MUNICIPAL CODE, ESTABLISHING NEW FEES FOR PUBLIC
WORKS (1) INSPECTIONS; (2) ENGINEERING; (3) TECHNICAL CONFERENCE
REVIEW; (4) A MINOR ACTIVITIES PERMIT; AND (5) REVISING UTILITY AND
INSTALLATION CHARGES; AND REPEALING SECTION 3.36.015 IN ITS
ENTIRETY, AND AMENDING 3.36.018 TO REMOVE BCD FEES FROM CHAPTER
3.36
1. WHEREAS, the City has adopted an updated and revised water, sewer, and
stormwater ordinance; and
2. WttEREAS, connection fees and development charges are necessary in managing
the City's public utility services; and
3. WHEREAS, the City Council desires to set an inspection fee for inspecting utility
improvements at a level to help offset the City's administrative costs; and
4. WHEREAS, the City Council desires to make the Public Works preapplication fee
more accurately reflect the costs of increased review by the city and service to the developer
because of the hiring of a development review engineer, and to therefore limit the ability to credit
the preapplication fee to the street development permit fee; and
5. WHEREAS, the City Council desires to adjust the water meter drop-in fees to
more accurately reflect administrative cost to the public of providing public utility services; and
6. WHEREAS, the City Council desires to set a modest fee for waiver of the
engineering design standard requirements of the Public Works' Engineering Design Standards
manual, and Titles 12 and 13 PTMC; and
7. WHEREAS, the City Council desires to set a reduced fee for a street and utility
development permit - minor activities, to reflect the lower administrative cost of reviewing and
processing permits for minor activities on existing streets; and
8. WHEREAS, the City Council desires to specify a fee for water quality tests not
specifically listed in 3.36.030; and
9. WHEREAS, the City Council desires to set a fee for city-engineered utility and
street design drawings at a significantly reduced level in Tier 1 (defined as areas served by existing
infrastructure) in order to reflect the City absorbing a share of engineering design costs in Tier I
based on the policy directive in the Comprehensive Plan to promote "infill" development and to
develop an infrastructure tiering strategy, and in doing so incorporates by reference all the
Comprehensive Plan Policies related to the City's tiering strategy and all the findings related to
tiering in the following newly adopted ordinances: Transportation and Rights-of-way ordinance
(Title 12); Water, Sewer and Stormwater ordinance (Title 13); City Zoning code (Title 17); and
City Land Division ordinance (Title 18); and
10. WHEREAS, Chapter 3.36.015 is repealed in its entirety in that PTMC Chapter
20.09 sets forth all applicable BCD fees; and
11. WHEREAS, fees for appeals from administrative decisions of the BCD director
is deleted from Section 3.36.018, in that such appeal fees are covered by PTMC Chapter 20.09,
12. WHEREAS the City council desires to delete the penalty provisions in 3.36.020
since they are now covered by the Enforcement code, Chapter 20.10 PTMC,
NOW, THEREFORE, the City Council of the City of Port Townsend ordains as follows:
SECTION 1. Section 3.36.015, Fees - Building and land use, is repealed in its entirety.
SECTION 2. Section 3.36.018, Appeal fees is hereby amended to read as follows:
3.36.018 Appeal fees.
appealing ........... "--'-' -- -' ...... -' .... ' ..............
Fees for any I/aid asa aiid .......... OtlIIUIII[ I~illii[ 'nlJlJii~t&Uii UVCUiliilllatlUll UI 4~liy ULii~l
I~,~,~OU~ ~W,W. llll~ ~p~ 1~ ~ll~l -~-~V ~ ----IIJv~iU ~UUUII 1} El U~ ~W fUlL
......... '--~ ..... by
~. ,,~, ~p~ ~ ~,~ ap~able d~isions made ~e public wor~ dir~tor or
design~,$2~.~
} 2, 1997; Ord. 2507 } 2, 1996; Ord. 2492 } 1, 1995; Ord. 2431 } 3, 1994).
SECTION 3. Section 3.36.020, Public works and utility billing service fee schedule,
is hereby repealed and recodified to read as follows:
2 Ord.
3.36.020 Public works and utility billing service fee schedule.
The fees and charges listed in this section for services of the public works department and the
finance department for utility billing are established. The fees and charges shall be paid in
advance unless an alternate method of payment is specifically approved by the director of
public works. The continuance or establishment of water and/or sewer service by the city shall
be contingent upon payment of all fees and charges contained in this section. The following
schedule of fees and charges shall be used:
Table 3.36.020
Fees and Charges Summary
Description Charges
1. Public works technical conference fee $180.00'
2. Street and utility development permit application fee $180.00'
*If more than four and one-half hours of total review and process time is required, an additional hourly charge
based on the rates set forth in this chapter shall be made. In the case of Type I projects in Tier 1, the technical
conference fee of $180.00 shall be credited against the street and utility development permit application fee
when an application for the same proposal is filed within 12 months of the date of the written review. No
amount beyond the $180.00 will be credited.
3. Street and utility development permit - minor activities $35.00
4. Fee for city-engineered design drawings in Tier 1,
pursuant to Titles 12 and 13 PTMC
Street $200.00
Water main extension/replacement $200.00
Sewer main extension/replacement $200.00
5. Street and utility development permit variance under $180.00
Titles 12 and 13 PTMC
6. Waiver/modification request under Titles 12 and 13 $50.00
PTMC
7. Administrative appeal of decisions of the director $200.00
3 Ord.
I
s. IStreet and utility development permit inspection fee ]$70.
00'
*If more than two hours of inspection time is required, an additional hourly charge based on the rates set forth
in this chapter shall be required. No inspection fee is charged for a street and development permit - minor
activities.
9. Water reservation fee (county) $300.00*
except for one building site adjacent to an existing main $150.00
Water reservation extension $50.00
*If more than seven and one-half hours of total review and process time is required, an additional hourly
charge based on the rates set forth in this chapter shall be made.
10. Latecomer agreement admlni~tration fee:
Water $200.00
Sewer $200.00
Storm drainage $200.00
Street $200.00
11. Bond admini~ration fee $200.00
12. Testing - Fees
Pressure (inspector) $50.00
Bacteria (lab) $40.00
Any other water quality test administrative fee cost plus 10%
13. Limited hydrant use charge and permit fee under PTMC
13. 13
Contractors: --
Permit fee $50.00
Monthly fee (bulk water) $ 1.75/1,000 gallon
Cash deposit for meter $100.00
4 Ord.
14. Water meter installation charges under PTMC 13. 16
5/8" x 3/4" . Dig --
City $1,070.00
County $1,270.00
1.. Dig --
City $1,115.00
County $1,315.00
1.1/2" - Dig --
City $2,000.00
County $2,200.00
2"- Dig --
City $2,275.00
County $2,475.00
4,,, 6,,, 8.. Dig *
5/8" x 3/4" - Drop in --
City $135.00
County $160.00
1,. Drop in --
City $185.00
County $215.00
1-1/2" drop-in --
City $465.00
County $480.00
2" drop-in --
City $615.00
County $630.00
Manifold tap *
Customer requested downsizing of tap *
· Charges based on actual cost established by public works director at rates contained in subsection 25 of this
section.
15. Request to locate water or sewer lines received less than $40.00
48 hours before excavation
16. Side sewer tap under PTMC 3.36.030 and 13.22 PTMC
Residential (per uni0 $150.00
Nonresidential $150.00'
· (plus .01 sq. ft. of floor space, not to exceed $300.00)
5 Ord.
17. Hot taps/nmln line extensions
Main line to main line tap $330.00
Extension of main line *
· Charges based on actual costs established by public works director at rates contained in subsection 25 of this
section.
18. Turn-on/shut-off charge:
Working weekdays 8:00 a.m. to 3:30 p.m. at convenience of
the City --
City $20.00
County $25.00
After-hours or immediate, emergency turn-on/shut-off charge --
City (except as set forth in Chapter 3.15 PTMC) $60.00
County $75.00
19. Removal and rein~mllation of water meter $35.00
20. Water meter testing charge (customer request)
City $52.00
County $65.00
Water meter reread -
City $20.00
County $25.00
21. Final reading/disconnect
City $20.00
County $30.00
22. Returned check charge $15.00
23. Document reproduction charge
Copy machine $0.15/page
Computer-generated report staff time $5.00 min. or $20.00/hr.
Documents sent by facsimile (fax) $1.00/page
24. Special review and inspection (other than side sewer) *
· Charges based on service actual cost established by the public works director at rates contained in subsection
25 of this section.
6 Ord.
25. Hourly labor and equipment charges:
Personnel (includes overhead):
Engineer $50.00
Inspector $35.00
Public works director/operations manager $50.00
Crew chief/Lead equipment operator $40.00
Equipment operator $30.00
Maintenance personnel $20.00
Administrative staff $20.00
Draftsperson $20.00
GIS $50.00
Equipment: Without operator With operator
25. Tractor-mounted mower $30.00/hr. $60.00/hr.
(Cont.)
One-ton truck with utility box $15.00/hr. $45.00/hr.
John Deere grader $110.00/hr. $140.00/hr.
John Deere loader $90.00/hr. $120.00/hr.
Street sweeper $115.00/hr. $145.00/hr.
5-yard dump truck $40.00/hr. $70.00/hr.
Street roller $30.00/hr. $60.00/hr.
John Deere backhoe $40.00/hr. $70.00/hr.
Ingersoll-Rand compressor $20.00/hr. $60.00/hr.
Vactor sewer jet and truck $140.00/hr. $180.00/hr.
26. Septage Collection Charge 9.5 cents per gallon*
*This equates to a rate of $22.78 per wet ton.
Jefferson County may add an additional charge to cover its
administrative, handling, and collection costs as provided by contract
with the city.
27. Charge for compost produced at the city's biosolids $10.00 per cubic yard in
composting facility bulk (includes state sales
tax)
7 Ord.
28. Charge for department of health water system evaluation $550.00 for each
project review and approval fees (WAC 246-290-120 and application, or such other
246-290-990)* amount as required by
depariment of health pursuant
to WAC 246-290-990.*
*The city will make an effort to forward all applications for water system installation, extension, or
improvement to deparUnent of health in order to minimize charges to each applicant. However, in the event it
is not possible to forward more than one application, the applicant will be required to pay this amount in its
entirety prior to the city processing any such applications.
29. Charge for department of transportation approval $500.00 for each applicant
pursuant to RCW 47.32 and WAC 468-34 or such other amount as
required by department of
transportation
30. New utility account set-up charge $10.00
31. Duplicate utility bill $5.00
32. Special utility bill (requested outside of regular billing $10.00
cycle)
33. Charge for the sale of planning and facilities maps $10.00 per map
34. Engineering Design Standards Manual, City of Port $50.00 per copy ($20.00
Townsend, Department of Public Works, April 1997, or as per update)
amended. $20.00 disk copy ($10.00
per update)
(Ord. § 1, 1997; Ord. 2526 § 2, 1996; Ord. 2516 § 1, 1996; Ord. 2492 § 1, 1995; Ord.
2449 § 1, 1995; Ord. 2423 § 1, 1994; Ord. 2396 § 1, 1994; Ord. 2391 § 1, 1993; Ord. 2383
§ 1, 1993; Ord. 2290 § 1, 1992; Ord. 2050 § 2, 1986).
SECTION 2. Severability. If any clause, sentence, paragraph, section or part of this
Ordinance or its application to any person or circumstance is held to be invalid or
unconstitutional by a court of competent jurisdiction, such order or judgment shall not affect
the validity or constitutionality of the remainder of any part of this Ordinance. To this end,
the provisions of each clause, sentence, paragraph, section or part of this law are declared
severable.
This ordinance shall take effect and be in force five days after the date of its publication
in the manner provided by law.
8 Ord.
Read for the first, second, and third times and passed by the City Council of the City
of Port Townsend, Washington, at a regular meeting thereof, held this 21st day of April,
1997.
Attest:
Julie~:~ulloch, Mayor
Pam Kolacy, City ~Cldrk~~''~
Approved as to Form:
Timothy L. McMahan, City Attorney
04/17/97 CA § Ord\foos{336020f. doc}
9 Ord.