Loading...
HomeMy WebLinkAbout2619 Public Works and Utility Billing Service Fee ScheduleOrdinance No. c9 ~' / ~ AN ORDINANCE OF THE CITY OF PORT TOWNSEND AMENDING SECTION 3.36.020, PUBLIC WORKS AND UTILITY BILLING SERVICE FEE SCHEDULE, CHAPTER 3.36, PERMIT, APPLICATION AND APPEAL FEES OF THE PORT TOWNSEND MUNICIPAL CODE, AMENDING FEES FOR CITY-ENGINEERED DESIGN DRAWINGS, WATER METER INSTALLATION, AND DOCUMENT AND LABOR COSTS WHEREAS, on April 21, 1997, the City Council adopted Ordinance 2580 at a regularly scheduled Council meeting, whereby Chapter 3.36, Permit, Application and Appeal Fees was broadened to consolidate all fees for public works and utility billing services; and WHEREAS, when Ordinance 2580 was adopted, the City estimated the cost to contract for city-engineered drawings charges for street, water, and sewer utility improvements. The City now has better information and experience upon which to base charges for these services; and WltEREAS, the City Council desires to increase fees for city-engineered design drawings for property development proposals in the "Tier 1" area of the city, to reflect more accurate, actual costs to the individual property owner that exceed what the city originally anticipated for: (1) street drawings from $200 to $600; (2) water main extension/replacement from $200 to $400; and (3) sewer main extension/replacement from $200 to $400. These new fees remain below- market value to promote the City's policy of encouraging infill development in "Tier 1," but more accurately reflect the cost to the City's taxpayers and ratepayers; and WHEREAS, the City Council desires to increase the water meter installation charges under Chapter 13.16 PTMC to reflect increased costs of providing public utility services; and WHEREAS, the City Council desires to revise document and hourly drafting/GIS labor charges and other charges set forth in Chapter 3.36 PTMC to reflect changes in administrative costs of these services, NOW, THEREFORE, the City Council of the City of Port Townsend ordains as follows: SECTION 1. Chapter 3.36, PERMIT, APPLICATION AND APPEAL FEES Section 3.36.020, "Public works and utility billing service fee schedule," subsections 4, 14, 23, and 25 of the Port Townsend Municipal Code is hereby amended to read as follows: 3.36.020 Public works and utility billing service fee schedule. The fees and charges listed in this section for services of the public works department and the finance department for utility billing are established. The fees and charges shall be paid in advance unless an alternate method of payment is specifically approved by the director of public works. The continuance or establishment of water and/or sewer service by the city shall be contingent upon payment of all fees and charges contained in this section. The following schedule of fees and charges shall be used: Table 3.36.020 Description Charges 1. Public works technical conference fee $180.00' 2. Street and utility development permit application fee $180.00' *If more than four and one-half hours of total review and process time is required, an additional hourly charge based on the rates set forth in this chapter shall be made. In the case of Type I projects in Tier 1, the technical conference fee of $180.00 shall be credited against the street and utility development permit application fee when an application for the same proposal is filed within 12 months of the date of the written review. No amount beyond the $180.00 will be credited. 3. Street and utility development permit Minor activities $35.00 area of the city, pursuant to PTMC Titles 12 and 13 Street Water main extension/replacement Sewer main extension/replacement Fee for city-engineered design drawings for pro_t~erty development proposals in the Tier 1 $200.00600.00 $200.00 400.00 $200.00 400.00 5. Street and utility development permit variance under PTMC $180.00 Titles 12 and 13 6. Waiver/modification request under PTMC Titles 12 and 13 $50.00 7. Administrative appeal of decisions of the director $200.00 8. Street and utility development permit inspection fee $70.00* *If more than two hours of inspection time is required, an additional hourly charge based on the rates set forth in this chapter shall be required. No inspection fee is charged for a street and development permit minor activities. 9. Water reservation fee (county) $300.00* except for one building site adjacent to an existing main $150.00 Water reservation extension $50.00 *If more than seven and one-half hours of total review and process time is required, an additional hourly charge based on the rates set forth in this chapter shall be made. 10. Latecomer agreement administration fee: Water Sewer $200.00 $200.00 2 11. 12. 13. 14. Storm drainage Street $200.00 $2OO.00 Bond administration fee $200.00 Testing Fees Pressure (insp~tor) Bacteria (lab) Any other water quality test administrative fee $50.00 $40.00 cost plus 10% Limited hydrant use charge and permit fee under Chapter 13.13 PTMC Contractors: -- Permit fee $50.00 Monthly fee (bulk water) $1.75/1,000 gallons Cash deposit for meter $100.00 Water meter installation charges under Chapter 13.16 PTMC 5/8" x 3/4" Dig -- City $1,070.00 County $I,~,""~',,.,,~, ~'~' 1.335.00 1" Dig -- City $ I,~, ,.,.,,,," ~" 1.. 180.00 County $1,315.0,0 1,380.00 1-1/2" Dig -- City $2,000.00 County $2,200.00 2" Dig -- City $2,275.00 County $2,475.00 4", 6", 8" Dig * 5/8" x 3/4" Drop-in -- City $135.00 County $160.00 1" Drop-in City $185.00 County $215.00 1-1/2" Drop-in -- City $465.00 County $480.00 2" Drop-in -- City $615.00 County $630.00 Manifold tap * Customer requested downsizing of tap * 3 *Charges based on actual cost established by public works director at rates contained in subsection 25 of this section. 15. Request to locate water or sewer lines received less than 48 $40.00 hours before excavation 16. Side sewer tap under PTMC 3.36.030 and 13.22 PTMC Residential (per unit) Nonresidential *(plus .01 sq. ft. of floor space, not to exceed $300.00) $150.00 $150.00' 17. Hot taps/main line extensions Main line to main line tap Extension of main line *Charges based on actual costs established subsection 25 of this section. by public works $330.00 director at rates contained in 18. Turn-on/shut-off charge: Working weekdays 8:00 a.m. to 3:30 p.m. at convenience of the city:-- City $20.00 County $25.00 After-hours or immediate, emergency turn-on/shut-off charge: -- City (except as set forth in Chapter 3.15 PTMC) $60.00 County $75.00 19. Removal and reinstallation of water meter $35.00 20. Water meter testing charge (customer request) City $52.00 County $65.00 Water meter reread -- City $20.00 County $25.00 21. Final reading/disconnect -- City $20.00 County $30.00 22. Returned check charge $15.00 23. Document reproduction charge Copy machine Computer-generated report staff time Documents sent by facsimile (fax) $0.15/page $5.00 min. or $20.00/hr. $1.00/page ($2.00 minimum) 4 24. Special review and inspection (other than side sewer) * · Charges based on service actual cost established by the public works director at rates contained in subsection 25 of this section. 25. Hourly labor and equipment charges: Personnel (includes overhead): Engineer Inspector Public works director/operations manager Crew chief/Lead equipment operator Equipment operator Maintenance personnel Administrative staff Draftsperson GIS $50.00 $35.00 $50.00 $40.00 $30.00 $20.00 $20.00 $~00 35.00 40.00 Equipment: Tractor-mounted mower One-ton truck with utility box John Deere grader John Deere loader Street sweeper 5-yard dump truck Street roller John Deere backhoe Ingersoll-Rand compressor Vactor sewer jet and truck Without operator $30.O0/hr. $15.00/hr. $1 lO.O0/hr. $90.O0/hr. $115.00/hr. $40.O0/hr. $30.O0/hr. $40.O0/hr. $20.O0/hr. $140.O0/hr. With operator $60.00/hr. $45.00/hr. $140.00/hr. $120.00/hr. $145.00/hr. $70.00/hr. $60.00/hr. $70.00/hr. $60.00/hr. $180.00/hr. 26. Septage Collection Charge 9.5 cents per gallon* *This equates to a rate of $22.78 per wet ton. Jefferson County may add an additional charge to cover its administrative, handling, and collection costs as provided by contract with the city. 27. Charge for compost produced at the city's biosolids composting facility $10.00 per cubic yard in bulk (includes state sales tax) 28. Charge for department of health water system evaluation $550.00 for each application, project review and approval fees (WAC 246-290-120 or such other amount and 246-290-990) as required by department of health pursuant to WAC 246-290-990* *The city will make an effort to forward all applications for water system installation, extension, or improvement to department of health in order to minimize charges to each applicant. However, in the event it is not possible to forward more than one application, the applicant will be required to pay this amount in its entirety prior to the city processing any such applications. 29. Charge for Department of Transportation approval pursuant to Chapter 47.32 RCW and Chapter 468-34 WAC $500.00 for each applicant or such other amount as required by Department of Transportation 30. New utility account set-up charge $10.00 31. Duplicate utility bill $5.00 32. Special utility bill (requested outside of regular billing cycle) $10.00 33. Charge for the sale of planning and facilities maps $10.00 per map 34. Engineering Design Standards Manual, City of Port Townsend, $50.00 per copy Department of Public Works, April 1997, ($20.00 per update) or as amended $20.00 disk copy ($10.00 per update) (Ord. __ § 1, 1997; Ord. 2580 § 3, 1997; Ord. 2526 § 2, 1996; Ord. 2516 § 1, 1996; Ord.2492 § 1, 1995; Ord. 2449 § 1, 1995; Ord. 2423 § 1, 1994; Ord. 2396 81, 1994; Ord. 2391 § 1, 1993; Ord. 2383 § 1, 1993; Ord. 2290 § 1,1992; Ord. 2050 § 2, 1986). SECTION 2. Severability. If any clause, sentence, paragraph, section or part of this Ordinance or its application to any person or circumstance is held to be invalid or unconstitutional by a court of competent jurisdiction, such order or judgment shall not affect the validity or constitutionality of the remainder of any part of this Ordinance. To this end, the provisions of each clause, sentence, paragraph, section or part of this law are declared severable. This ordinance shall take effect January 1, 1998. Read for the first, second, and third times and passed by the City Council of the City of Port Townsend, Washington, at a regular meeting thereof, held this 15th day of December, 1997. Attest: Pam Kolacy, City Clerk (J 12/10/97 ca§ Ord\{336020.f97} Ju~jltdcCullo'ch, Mayor Timott~y/ as to Form: jMahan[, City Attorney