Loading...
HomeMy WebLinkAbout2678 Amending Public Works and Utility Billing Services Fee Schedule, Permit, Application and Appeal Fees, City-engineered design, drawings, water meter installation, document and labor costsOrdinance No. 0.9 ~a "7 ~ f AN ORDINANCE OF THE CITY OF PORT TOWNSEND AMENDING SECTION 3.36.020, PUBLIC WORKS AND UTILITY BILLING SERVICE FEE SCHEDULE, PERMIT, APPLICATION AND APPEAL FEES CITY-ENGINEERED DESIGN DRAWINGS, WATER METER INSTALLATION, AND DOCUMENT AND LABOR COSTS OF THE PORT TOWNSEND MUNICIPAL CODE. WHEREAS, on December 15, 1997, the City Council adopted Ordinance 2619 at a regularly scheduled Council meeting, whereby Chapter 3.36, Permit, Application and Appeal Fees were modified to reflect a higher percentage of actual costs; and WHEREAS, the City Council desires to increase Public Works development review fees to better reflect the actual costs of the services; and WHEREAS, when Ordinance 2619 was adopted, the City estimated the cost to contract for city-sponsored engineering drawings for street, water, and sewer utility improvements. The City now has updated information and experience upon which to base charges for these services; and WHEREAS, the City Council desires to increase fees for city-sponsored engineering design drawings in Tier 1, to reflect the actual costs to the City for the services; and WHEREAS, surveying and preparation of topographic base maps is required for preparation of all water, sewer and street designs; and WHEREAS, the City Council desires to add a water meter installation charge under Chapter 13.16 PTMC for a dual service to reflect the actual cost of providing public utility service; and WHEREAS, the City~ Council desires to revise document and hourly drafting/GIS labor charges and other charges set forth in Chapter 3.36 PTMC to reflect changes in administrative costs of these services; and WHEREAS, the City Council desires to add a bulk discount rate for compost sales to commercial haulers to encourage compost sales, NOW, THEREFORE, the City Council of the City of Port Townsend ordains as follows: SECTION 1. Chapter 3.36, PERMIT, APPLICATION AND APPEAL FEES Section 3.36.020, "Public works and utility billing service fee schedule," subsections 1, 2, 4, 14, 23, 25, 27 and 33 of the Port Townsend Municipal Code is hereby amended to read as follows: Table 3.36.020 Description ~ Charges 1. Public works technical conference fee $250 .00' 2. Street and utility development permit application fee $180.00' $250.00* *If more than six hours of total review and process time is required, an additional hourly charge based on the rates set forth in this chapter shall be made. If the project being reviewed has frontage on exiSting water, sewer and streets and requires four hours or less of review time, a credit of $70.00 will be returned to the applicant with the findings from the Public Works review. In the case of Type I projects in Tier 1, the technical conference fee of ,~o~,.~, $250.00 shall be credited against the street and utility development permit application fee when an application for the same proposal is filed within 12 months of the date of the written review. No amount beyond the ,.o~,.,~, $250.00 will be credited. The credited street development permit includes up to-four six hours of staff review time including time spent on the technical conference review.. 3. Street and utility deVelopment permit- Minor activities $05 o$5o.oo Fee for city-engineered design drawings in Tier 1, pursuant to PTMC Titles 12 and 13 Survey and Topographic Maps Street Water main extension/replacement Sewer main extension/replacement $1,500.00 $600r0051,000 $400.O05500.00 $400.OO$500.00 5. Street and utility development permit variance under PTMC $180.00 Titles 12 and 13 6. Waiver/variance request under PTMC Titles 12 and 13 $50.00 7. Administrative appeal of decisions of the director $200.00 8. Street and utility development permit inspection fee $70.00* *If more than two hours of inspection time is required, an additional hourly charge based on the rates set forth in this chapter shall be required. No inspection fee is charged for a street and development permit minor activities. 9. Water reservation fee (county) $300.00* except for one building site adjacent to an existing main $150.00 Water reservation extension $50.00 *If more than seven and one-half hours of total review and process time is required, an additional hourly charge based on the rates set forth in this chapter shall be made. 2 10. Latecomer agreement administration fee: Water Sewer Storm drainage Street $200.00 $200.00 $200.00 $200.00 11. Bond administration fee $200.00 12. Testing Fees Pressure (inspector) Bacteria (lab) Any other water quality test administrative fee $50.00 $40.00 cost plus 10% 13. Limited hydrant use charge and permit fee under Chapter 13.13 PTMC Contractors: -- Permit fee $50.00 Usage fee (bulk water) $1.75/1,000 gallons Cash deposit for meter $100.00 ¸14. Water meter installation charges under Chapter 13.16 PTMC 5/8" x 3/4" Dig -- City $1,070.00 County $1,335.00 1" Dig -- City $1,180.00 County $1,380.00 Dual Service (includes one meter drop in only) City. $_L2_40_3~ County. $1,505.00 1-1/2" Dig -- City $2,000.00 County $2,200.00 2" Dig -- City $2,275.00 County $2,475.00 4", 6", 8" Dig * 5/8" x 3/4" Drop-in -- City $135.00 County $160.00 1" Drop-in -- City · 185.00 County $215.00 1-1/2" Drop-in -- 3 City County 2" Dropqn City County Manifold tap Customer requested downsizing of tap *Charges based on actual cost established by public works director at rates 25 of this section. $465.00 $480.00 $615.00 $630.00 contained in subse~ion 15. Request to locate water or sewer lines received less than 48 hours before excavation $40.00 16. Side sewer tap under PTMC 3.36.030 and 13.22 PTMC Residential (per unit) Nonresidential *(plus .01 sq. ft. of floor space, not to exceed $300.00) $150.00 $150.00' 17. Hot taps/main line extensions Main line to main line tap Extension of main line *Charges based on actual costs established subsection 25 of this section. by public works $330.00 , director at rates contained in 18. Turn-on/shut-off charge: Working weekdays 8:00 a.m. to 3:30 p.m. at convenience of the city:-- County After-hours or immediate, emergency turn-on/shut-off charge: City (except as set forth in Chapter 3.15 PTMC) County $20.00 $25.00 $60.00 $75.00 19. Removal and reinstallation of water meter $35.00 20. Water meter testing charge (customer request) City County Water meter reread city County $52.00 $65.00 $20.00 $25.00 21. Final reading/disconnect city County $20.00 $30.00 '4 22. Returned check charge $15.00 23. Document reproduction charge Copy machine Computer-generated report staff time Documents sent by facsimile (fax) $0.15/page $5.00 min. or $20.00/hr. $1.00/page ($2,~Lm.inimum) 24. ecial review and inspection ww~, u,,~, ~,,~ ~,~lj *Charges based on service actual cost established by the public works director at rates contained in subsection 25 of this section. 25. Hourly labor and equipment charges: Personnel (includes overhead): Engineer Inspector Public works director/operations manager Crew chief/Lead equipment operator Equipment operator Maintenance personnel Administrative staff Engineering Technician GIS Coordinator $50.00 $35.00 $50.00 $40.00 $30.00 $35.00 $40.00 $25.00 $25.00 Equipment: Tractor-mounted mower One-ton truck with utility box John Deere grader John Deere loader Street sweeper 5-yard dump truck Street roller John Deere backhoe Ingersoll-Rand compressor Vactor sewer jet and truck Without operator With operator $30.00/hr. $60.00/hr. $15.00/hr. $45.00/hr. $110.00/hr. $140.00/hr. $90.00/hr. $120.00/hr. $115.00/hr. $145.00/hr. $40.00/hr. $70.00/hr. $30.00/hr. $60.00/hr. $40.00/hr. $70.00/hr. $20.O0/hr. $60.O0/hr. $140.00/hr. $180.00/hr. 26. Septage Collection Charge 9.5 cents per gallon* *This equates to a rate of $22.78 per wet ton. Jefferson County may add an additional charge to cover its administrative, handling, and collection costs as provided by contract with the city. 27. Charge for compost produced at the city's biosolids composting facility .(llp_Iml0_y~t0~ Bulk rate for 10 yards per load or greater $10.00 per cubic yard in-bulk- (includes state sales tax) $7.00 per cubic yard (includes sales tax) 28. Charge for department of health water system evaluation $550.00 for each application, project review and approval fees (WAC 246-290-120 or such other amount and 246-290-990) as required by department of health pursuant to WAC 246-290-990* *The city will make an effort to forward all applications for water system installation, extension, or improvement to department of health in order to minimize charges to each applicant. However, in the event it is not possible to forward more than one application, the applicant will be required to pay this amount in its entirety prior to the city processing any such applications. 29. Charge for Department of Transportation approval pursuant to Chapter 47.32 RCW and Chapter 468-34 WAC $500.00 for each applicant or such other amount as required by Department of Transportation 30. New utility account set-up charge $10.00 31. Duplicate utility bill $5.00 32. Special utility bill (requested outside of regular billing cycle) $10.00 33. Charge for the sale of planning and facilities maps E size (Existing Maps) $10.00 per map C Size (existing Maps) $3.00 per map Special Map Requests * · charges based on actual costs of service based on rates contained in subsection 25 of this section 34. Engineering Design Standards Manual, City of Port Townsend, $50.00 per copy Department of Public Works, April 1997, ($20.00 per update) or as amended $20.00 disk copy ($10.00 per update) (Ord.2619 § 1, 1997; Ord. 2580 § 3, 1997; Ord. 2526 § 2, 1996; Ord. 2516 § 1, 1996; Ord.2492 § 1, 1995; Ord. 2449 § 1, 1995; Ord. 2423 § 1, 1994; Ord. 2396 81, 1994; Ord. 2391 § 1, 1993; Ord. 2383 § 1, 1993; Ord. 2290 § 1,1992; Ord. 2050 § 2, 1986). SECTION 2. Severability. If any clause, sentence, paragraph, section or part of this Ordinance or its application to any person or circumstance is held to be invalid or unconstitutional by a court of competent jurisdiction, such order or judgment shall not affect the validity or constitutionality of the remainder of any part of this Ordinance. To this end, the provisions of each clause, sentence, paragraph, section or part of this law are declared severable. This ordinance shall take effect January 18, 1999. Read for the f~rst, second, and third times and passed by the City Council of the City of Port Townsend, Washington, at a regular meeting thereof, held this 4th day of January, 1999. Attest: Para Kolacy, City Cl~k ~ CMC:\COUNCIL\ORDINANC\FEES98 Julie~lcCulloch, Mayor Approved as to Form: ~~l~aha~, City Attorney 7