Loading...
HomeMy WebLinkAbout26-018 Declaring an Emergency, Waiving Public Bidding Requirements, and Ratifying the City Manager's Approval of All Applicable Documents to Allow for the Immediate Repair of Damage to Sewer Beneath Valley Trail Near 3105 Sage LaneResolution 26-018 RESOLUTION NO.26-018 A RESOLUTION DECLARING AN EMERGENCY, WAIVING PUBLIC BIDDING REQUIREMENTS, AND RATIFYING THE CITY MANAGER'S APPROVAL OF ALL APPLICABLE DOCUMENTS TO ALLOW FOR THE IMMEDIATE REPAIR OF DAMAGE TO SEWER BENEATH VALLEY TRAIL NEAR 3105 SAGE LANE. WHEREAS, Section 3.46.090(E) of the City of Port Townsend Municipal Code (PTMC) and Section 39.04.280(1)(C) of the Revised Code of Washington (RCW) allow exemptions to competitive bidding requirements under emergency conditions; and WHEREAS, RCW 39.04.280(3) defines "emergency" as unforeseen circumstances beyond the city's control, that either presents a real, immediate threat to the proper performance of essential functions, or will likely result in material loss or damage to property, bodily injury, or loss of life if immediate action is not taken; and WHEREAS, on September 171", 2026, City staff conducted a closed-circuit television (CCTV) inspection of the 18-inch concrete sanitary sewer main between maintenance holes Al2 and All beneath Valley Trail near 3105 Sage Lane, downstream of the force main that runs through Port Townsend Golf Park, and observed severe deterioration and extensive loss of concrete throughout the pipe interior consistent with hydrogen sulfide corrosion; and WHEREAS, the severe deterioration has materially reduced the structural integrity of the 18- inch sewer and presents a real and immediate risk of pipe failure or collapse, which could interrupt sanitary sewer conveyance and cause a sanitary sewer overflow, release untreated wastewater, damage public or private property, and adversely affect public health and the environment; and WHEREAS, City staff determined that immediate action is necessary to establish and operate temporary sewer bypass pumping to maintain uninterrupted sanitary sewer service; excavate, remove, and replace the deteriorated 18-inch concrete sewer pipe segment; and WHEREAS, on September 17t", 2026, the City Manager determined that the condition described herein constitutes an emergency, as defined in RCW 39.04.280(3), based on the need to immediately contract for temporary sewer bypass and replacement of the deteriorated 18-inch sanitary sewer; and WHEREAS, PTMC Section 3.46.090(E)(3) requires the City Council to concur with the City Manager's declaration of emergency by passage of a resolution declaring the emergency, reciting the facts constituting the emergency, and waiving the public bidding requirements; and WHEREAS, for the reasons stated herein, the City Council finds that it is in the best interest of the City to declare an emergency, waive public bidding requirements for the public work to be undertaken, and authorize the execution of all necessary documents required to initiate repairs to the sewer. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend, Washington, as follows: Section 1. The recitals above are hereby adopted by reference as the City's findings in support of the emergency declaration, as if fully set forth herein. Section 2_. The City Council hereby declares an emergency justifying the waiver of certain contracting processes, including public bidding requirements. Resolution 26-018 Section 3. All prior actions taken in conformance with this resolution, including the actions of the City Manager and the Public Works Director, as described in the Memorandum dated September 17th, are hereby ratified and confirmed. Section 4. The City Manager may take any additional administrative actions consistent with this resolution. ADOPTED by the City Council of Port Townsend, Washington, at a regular meeting thereof, held this 21 st day of September 2026. _...�._..................... m �..... Co R Mayor Attest: Alyss Y c c gues City ,1 ".