Loading...
HomeMy WebLinkAboutBLD10-177City of Port Townsend Development Services Department Correction Notice PERMIT NUMBER BUD 10-17 7 OWNER __ Ko(Y— JOBLOCATION 2225 23774 St. Inspection of this structure has found the following violations: Electeicc| a be ‘indtolled Cuadk oper direct by Shite LZTt pcior “tp FRfewn tiny “inspcition , Aiso structive +5 he Cried in Widows , doors, ete.) enya, olumbing ivy A Ercwaiing inspecton Cell $a, euinspec tT You are hereby notified that no more work shall be done upon these premises until the above violations are corrected, unless noted otherwise. When corrections have been made, call for inspection. Date_ “7 / 2 | Ju Inspector = Wa DSD Main Office (360) 379-5095 INSPECTION REQUEST (360) 385-2294 THIS NOTICE MUST BE KEPT WITH APPROVED PLANS ON SITE Suzanne Wassmer From: John Watts Sent: Friday, October 29, 2010 4:07 PM _— To: Suzanne Wassmer b Cp ( 0 | T 7 Subject: FW: Easement Document for City of Port Townsend Suzanne — the condition for granting the easement (which came after I talked with Dave Peterson) is set forth in my email to Kees below — I will draft the covenant. Could you make a note in DSD computer system not to final the ermit on Kees’s howe without first checking with City Attorney. le —_ VA uoith SJzenne. OF 4 Let me know if I need to notify Rick, Fred, etc. Thanks. From: kkolff [mailto:kkolff@olympus.net] Sent: Friday, October 29, 2010 1:32 PM To: John Watts Ce: Kees Kol ff Subject: Re: Easement Document for City of Port Townsend 1 Thanks John. The condition you state below is OK with me. When the easement is completed and signed, please fax to: Kitty Ogg 360-475-7013 and then mail original to Puget Sound Energy 6522 Kitsapway Bremerton, WA 98312 ATTN. Kitty Ogg Thanks again. Kees Kolff President, Port Townsend EcoVillage On Oct 29, 2010, at 1:26 PM, John Watts wrote: Kees — as we discussed, City will grant this easement on condition that EcoVillage would, prior to first home building permit being elevated: in the future to accommodate — in the City’ s decision — a future City project, the cost of relocation would be borne by Eco Village (and not the City), Issue is if depth of PSE lines interfere with grade/depth of a future City line. If this is OK, please email back with “OK” or similar, and [ will email you the signed easement. Let me know any questions. Thanks. John From: kkolff [mailto:kkolff@olympus.net] Sent: Friday, October 29, 2010 11:10 AM To: John Watts Subject: Fwd: Easement Document for City of Port Townsend Hi John. Kitty says you could specify that the power lines are placed in conduit, and that should then allow the city to use their property without causing any problems. It is of course a "non-exclusive" easement. Please check with Kitty. Thanks, Kees Office phone 1s 360-475-7078 Begin forwarded message: From: "Ogg, Kitty" <kitty.ogg@pse.com> Date: October 29, 2010 9:26:09 AM PDT To: "kkolff" <kkolff@olympus.net> Subject: Easement Document for City of Port Townsend Attached is the easement document that I sent out the first part of September to Kenneth Clow. Alex Angud told me to send it to him as it then had to go before the Council for approval. Once the easements have been signed before a notary public, you can fax me a copy (360-475-7063) and I will let Dave Mauldin know that he can schedule the precon meeting. Please print out on legal size paper. Let me know how things go. CONSTRUCTION PROGRESS RECORD CITY OF PORT TOWNSEND Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 POST THIS CARD IN A SAFE, CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. PARCEL NO. 001031005 PERMIT NO. BLD10-177 ISSUED DATE 09/23/2010 EXPIRATION DATE 03/22/2011 ADDRESS 335 37TH ST CONSTRUCTION TYPE V-B_ OCCUPANT LOAD OWNER KOLFF CORNELIS A PROJECT DESCRIPTION New Single Family Residence CONTRACTOR OWNER BUILDER LENDER INSPECTION INSP DATE COMMENT INSPECTION INSP JATE | COMMENT EROSION CONTROL INSULATION wt hey | ee \ IZ cS SETBACKS SURVEY Pint bin GWB Mi U-FEIZ FOOTING way 13675 FINAL PUBLIC WORK hie UFER —— FINALBLDG/COFO | fad SLAB INSULATION FA [PY FOUNDATION DRAIN [A |40/, SLAB A KL MISCELLANEOUS FLOOR FRAMING SHEARWALL & HOLDOV FRAMING oni hija AIR SEAL SA PLUMBING AT, PLUMBING WTR PIPIN | —|_-—~ MECHANICAL TO REQUEST AN INSPECTION CALL (360) 385-2294. INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO 3:00 PM FOR NEXT DAY INSPECTION. 3605829602 9:54:29 07-06-2012 2/2 TRACY’S INSULATION INC. “Insulating your Community” PO. BOX 567 PORT ANGELES, WA 98362 INSULATION CERTIFICATE THE INSULATION HAS BEEN INSTALLED IN CONFORMANCE WITH THE CURRENT THERMAL PERFORMANCE STANDARDS (WASHINGTON STATE ENERGY CODE) OR PER APPROVED PLANS, AT THE ADDRESS LOCATED BELOW. ADDRESS ae aah St SUB- CONTRACTOR: TRACY’S INSULATION INC. CONTRACTOR'S REG. NO. TRACYII917BT MANUFACTURER THICKNESS R-VALUES zs ti EXTERIOR WALLS brs f 2°. 13.4 Type of material: Fiberglass Ienanwk LO AQ ATTIC BATTS ~ Flat. Bask | 2 3 13.1 Type of material: Fiberglass —Knawl [O's 323 HD jj Hy a , . _ SLOPE/VAULTED CEILINGS bot 2 + 5 r P13, . Type of material: Fiberglass Ain CiUi q ]d. R44 ATTIC BLOW ; Type of material: Fiberglass Ww. ~~ \ FLOORS Type of material: Fiberglass \\ A _— a . \ PIPE WRAPS Type of material: Fiberglass YES N\ NO _=¥ VAPOR BARRIERS CEILING N | WALLS _N | fi __ FLOORS NI ig Lads, Mandy @ T-@ 12 AUTHORIZED SIGNATURE TITLE DATE we WEP" SE CLYV EY" Wy INS AWE CITY OF PORT TOWNSEND BLDG PERMIT ACTIVITY LOG PERMIT #_[OLD(O~ 17 | patereceivep_“~!~\0 mre lo-073 SCOPE OF WORK: New SPR DATE ACTION INITIALS GAO ENTERED INTO CHET Mi) C-=1© __ | CHECKED FOR COMPLETENESS Mu Plan Review # Bedroom(s) = # Bath(s) = Heat Type: A-D NAP 0 bc SOprN a lates NS Wee Mud G-"-lo |[mrr RRP So bheoted = — Ya | m L a__f\ 4-206 - | “HAN Keeler Ce Wet SEPTIC? Ko Df . KSA Y Zoning: E CmAllape UU Setbacks OK? pla per CUD CORE RS BV= 0 on NW, EvW and |/0 wn Satara Lot Size: 3 oe $4 oF Building Size: a Lot Coverage: ELE/ ot thy lof 2,%% of M Fare FAR OK? sails | Height OK? ANT, wl 6 on- piel resnbrhdl | Parking OK? + (all ated Za ae packiip tothe east] 9h pry Critical Area? | ’ (Check Not mopped. ie ru “pon 2 ee al ‘ Impervious Wi ae Y artel an We J) - ACCL.. Surface limits eile dalle Se _ t J See Covrenny, 19.05.050D4(a) = 35% of Lot, (39S (2. 2000 max. )\t# 2 Aint. Shorelines . Jurisdiction? Vo pou cef bf /1 my ee j ral) /3, SQ SG Demo? K/o Eva pape bss ul hus ix b YG Y Historic Rev/ Design Rev? Notice to Title? Lots of Record? | \// P:\DSD\Forms\General Use Forms\Activity Log Bldg Permit.doc July 12, 2010 Suzanne Wassmer From: John Watts Sent: Friday, October 29, 2010 4:07 PM __ To: Suzanne Wassmer BLD ( @ | T 7 Subject: FW: Easement Document for City of Port Townsend Suzanne — the condition for granting the easement (which came after I talked with Dave Peterson) is set forth in my email to Kees below — I will draft the covenant. Could you make a note in DSD computer system not to final the ermit on Kees’s house without first checking with City Attorney. , Voth Suzanne_ Of Let me know if I need to notify Rick, Fred, etc. Thanks. From: kkolff [mailto:kkolff@olympus.net| Sent: Friday, October 29, 2010 1:32 PM To: John Watts Cc: Kees Kolff Subject: Re: Easement Document for City of Port Townsend 1 Thanks John. The condition you state below is OK with me. When the easement is completed and signed, please fax to: Kitty Ogg 360-475-7013 and then mail original to Puget Sound Energy 6522 Kitsapway Bremerton, WA 98312 ATTN. Kitty Ogg Thanks again. Kees Kol ff President, Port Townsend EcoVillage On Oct 29, 2010, at 1:26 PM, John Watts wrote: Kees — as we discussed, City will grant this easement on condition that EcoVillage would, prior to first home me building permit being finaled, sign a covenant that in the event PSE’s conduits need to be relocated in the future to accommodate — in the City’s decision — a future City project, the cost of relocation would be borne by EcoVillage (and not the City). Issue is if depth of PSE lines interfere with grade/depth of a future City line. If this is OK, please email back with “OK” or similar, and I will email you the signed easement. Let me know any questions. Thanks. ~ John From: kkolff [mailto:kkolff@olympus.net] Sent: Friday, October 29, 2010 11:10 AM To: John Watts Subject: Fwd: Easement Document for City of Port Townsend Hi John. Kitty says you could specify that the power lines are placed in conduit, and that should then allow the city to use their property without causing any problems. It is of course a "non-exclusive" easement. Please check with Kitty. Thanks, Kees Office phone is 360-475-7078 Begin forwarded message: From: "Ogg, Kitty" <kitty.ogg@pse.com> Date: October 29, 2010 9:26:09 AM PDT To: "kkolff" <kkolff@olympus.net> Subject: Easement Document for City of Port Townsend Attached is the easement document that I sent out the first part of September to Kenneth Clow. Alex Angud told me to send it to him as it then had to go before the Council for approval. Once the easements have been signed before a notary public, you can fax me a copy (360-475-7063) and I will let Dave Mauldin know that he can schedule the precon meeting. Please print out on legal size paper. Let me know how things go. Wa t e r Wa s t e Wa t e r St o r m Wa t e r 1 in c h = 50 fe e t FILE COPY Carissa as Structural Engineente PELC 2322 NE 103” St Seattle, WA 98125 206.683.3197 SEP -1 2010 IU) fLD10~ 1n9 | CITY OF PORT TOWNSEND Structural Calculations for: Dsp Kolff Residence Project Address: 325.345 37" St Port Townsend, WA 98368 Design per 2009 International Building Code Contents: Framing Design.......... F1—F5 Lateral Design............ L1-L6 FLoot- DLs Iz tiz= 4 D- EQ. Zoor thossts Ozt se a« . DESIGNED Hy OTHE SVN FiPrerS La lat . w=isl'a P)tase'= HZ We 45 af, 24.6 /[IS* a 4 Aris ne 478 ~Uss| . ZxI0(O 24 0< Born Papeete Hb¢E =" ee Uo= Ap 5 2220 : TM) = dl S- ST VWIS= 485 A+ Bas 28" par WZo 94 ID Hi (0 pitt ~2s2h eS & oF} : W,2 Vo. (40) ui (2: W2= 40(13') = Ps 47O0%2= ZBCO pis. \l = 4206 R 2 = 993/2003-44 Gv ~ NZ 5 4¢ bad ~ Ars sett ee 61" GLSYE KIT cA 5 =.b4% — (oh y [34 (fern SEH 4, +pACT pe = PETG OO a L=F! W= 40 x Fi = SED Wz 232% Bye Lt 7) AND ~24—-d-y uit —~130 2322 NE 103RD ST SEATTLE, WA 98125 . ph: 206.683.3197 CARISSA FARKAS STRUCTURAL ENGINEERING, PLLC prosect: KOLEE DATE: S/iw/10 PROJ. NO: 1018 SHEET: F ( 2D 1716 eove (cers) 2. DotkMNeac ADL f= [480 = (4+6S =a GVH Z5, 2/45 ~ ZI (2) 258 Sve FBIM CO oF Ke. Ren = 221% (831/24) UPhead ELD FEMNO) AO(STS —— a" = 50 heat: ) W m= (24% Cy = \4.b . Ape 24.9/1>,25 2 157e pres 41h 2x12 @ lu" Deck JOlST= C= )2! 36.3 lV) = [2A<¢ F 4pvelte 2s IO D/o" STRIL SORTS C= 6} W= 697.2 M= 345 Or S.6 Zn S@llo'se E.veCk TOISTS -) 27P?F 362 lt re © (ody L=74y 4e-yl2Z— V= 67.3 . N= tet DOL hwoss ters SUF L224 ASL= Bly = o(6 W- 403s i270 Bete (Dlio* Brcr> = /020 (We /ici>) = pece ey.n Gtiib & #be Te Ae 7 Vv “oe ; =o \ 442. ye e/lis« tas wor 195 ob e/ A TOP KR ¢ C1) for” N= 1974 ave ZF LD . ie — CARISSA FARKAS PROJECT: |“OL FE STRUCTURAL ENGINEERING, PLLC pate. @iblio 2322 NE 103RD ST fof SEATTLE, WA 98125 PROJ. NO: _ 13 ph: 206.683.3197 SHEET: FZ o8) roe 2 ; wi vi V [Y¥ om 1S) end ae: owe T4702 * aie 300° W, = 52 xb'= SIZ, wy Il0 f= 22S V\ = 876 £6797 = [Se Sc (40 Jats = /22 — bre l2 2015 GOS ! STE ee ihe 5 IND-exT a sae pe lS 27 23 elf wee? p Cel ze plt ire 9K a2KF Ot ocr] ¢ INT Vect tri Wz 27S0 Ke 3° = 750 V\ , ge A" HeRpee = tT © Le S puke p= Gat W= S2x1B = OF M - Gwe ns Thee. el Po Sz 10 pak. a be pat 12) ( (Z)2co G . fat Lepage -FLr—- {< dO Fa 52uG'=slo bh STUD © 24% 624 lb/ahd #10 =I0| Zr} ie"les> Ao - AY v3" = ZAO as = Mee, rex 0/4) LOLOA T Tuba jen = oA S peor tte L=S'-6 LJ, Sle (= ueo SY = let M2xb HEA ra oa ee Er 22 BS, Are Bis (N2xQ | CARISSA FARKAS proJect: FOLFE SS STRUCTURAL ENGINEERING, PLLC pate: 2 /Io/o 2322 NE 103RD ST SEATTLE, WA 98125 ph: 206.683.3197 proy.no: /O/8 SHEET: FS EFouUdPArTIOdSS WES =1.S CPS 11 5b p< BA psf = SS? IN CARLING, WROL (29 0.4 = 150 [D4e We LIV PIE + Hvltk2)= 476 ee pe APE22 W||Bo FG | AZ FB EOS! 700 of HB Afi 2" > PG, SUC foeTS (D7, we Foes P2tsbt T= (SFB wiles 22 a> ZR. a2 ft® EPS Ol Bb =518 ysF ae , 2TD~Ok = I. se: ZS ExT wonrels | [YT wht Gj ~ : Gio | - S30 PLet BH = 72 BUDE USd+15D= 8 fF Y eg D- 2ROt3I2< 59z 4295 + Bot veo 24 w/ Te thee Po - 280+ FI0e CFO 1219 > 145 4 tT OPS 22 uol Ow #71q teal OW END OF W-D GMD 2A V BAZ wh PeZ005 . A> 28 lx 29 ole cfs Peat - ¢/2,| =o r= WeZ O16 34 KS 581 sqft FIG 2-4 eZ Poor Bm Pe - Post C.|/4 4 C.1/4,( P= 4M + IBGO =bS2e whepssa tS 4.29 to IG aes! 2322 NE 103RD ST SEATTLE, WA 98125 ph: 206.683.3197 CARISSA FARKAS STRUCTURAL ENGINEERING, PLLC provect: bo) F& pate: © liefo proy.no: /O/6 SHEET: — 4 ae SCUMe ELD ws] PS 21.5 CoeFE oF FECTION edad cada 2g a wf MEMeLRe ~~ (23 (2/ FS =15) DEAD WADS | reo t+ 10D + ISO (Net +- 23% 2") =42| ~2e'= |B ¥, IGS — (56S 4 \493r(ivo =“ w )2B'= U6 jo Sa. 5 a DIZ % G20" 415 6 Fe JOP THA 100K 2 LON < = SIFO + 123° 7 Et" 2 os am oe ye ' | 2 2? =~ ) =e ) Be I2nexndo + (6(7'H10!) 7 16D 6204556 FONE: auth yleo 7 [40 50-( txlh2 +,298 Need Prcsire | Z17Be— S&B = Glo lca pe Ve (220) lh? (14') > HET hs 2 — Heep VO" suo Gerd] IS CARISSA FARKAS prosect: (FF STRUCTURAL ENGINEERING, PLLC pate: 2 /Jo/lo 2322 NE 103RD ST : les SEATTLE, WA 98125 PROJ. NO: Ipié ph: 206.683.3197 sHeet: 1/2 Seismic Design Loads (ASCE 7-05) for a Wood Framed Structure OCCUPANCY CAT. II Table 1-1 USE GROUP | Table 11.5-1 IMP. FACTOR 1 Table 20.3-1 SITE cuss5D_) Table 11.6-1 R=6.5 Table 12.2-1 h= 25.5 ft Ss= 1.329 USGS design paramets for site class B S,= 0.485 USGS design paramets for site class B Fa=1 Table 11.4-1 Fy = 1.5 Table 11.4-2 Sps= 0.886 for site class D Spi= 0.485" for site class D Period, T= 0.226953 Eqn. 12.8-7 C.= 0.136308 Eqn. 12.8-2 Cgmax= 0.328771 Eqn. 12.8-3 Cgmin= 0.038984 Eqn. 12.8-6 |Base Shear, V= | 4226 Ibs | Shearwalls DL (psf) | A(sq.ft.) | W (#'s) h, (ft) Wh, Cy Lat. Load (Ibs) 2nd Fir Shearwalls 20 969 19380 17:5 339150 | 0.618943 2615 1st Flr Shearwalls 20 1044 20880 10 208800 | 0.381057 1610 Sum= 40260 Sum= 547950 cfse Project: Date: 7/23/2010 2322 NE 1031rd St. Kolff Residence Project #: 1018 Seattle, WA 98125 Design: CAF P 206.683.3197 Sheet: L| Wind Design Loads (ASCE 7-05) Method 2 - Analytical Procedure Exposure_B Roof Angle = 45 degrees ME 85) / mph Ground to top of roof 25.5 ft Ka= 0.85 Table 6-4 Bottom of roof to top of roof 7.67 ft = 1 Table 6-1 (mean roof height) h= 21.665 ft G= 0.85 6.5.8.1 Ky = 1.00 Pressure Coefficients from Figure 6-6: Bldg Face Cy Windward Wail 0.8 Leeward Wall -0.5 Windward Roof 0.4 Leeward Roof -0.6 *Note= Cp values are conservative worst case values Pressures: Ht K, qz Pw wails Piwwalls Pwais (psf) 0-15 0.57 8.96 6.09 4.41 10.50 15-20 0.62 9.75 6.63 4.41 11.04 20-25 0.66 10.38 7.06 4.41 11.47 25-30 0.7 11.01 7.48 4.41 11.89 30-40 0.76 11.95 8.12 4.44 12.53 Proot (pSf) 8.82 Project: Date: 7/23/2010 2322 NE 103rd St. Kolff Residence Project #: 1018 Seattle, WA 98125 Design: CAF P 206.683.3197 Sheet: Lele * HeyWhatsThat Path Profiler HeyWhatsThat Path Profiler Page 1 of 1 @heywhatsthat Comments? PF cio se_simulations and beta versions of the main site and Path Profiler b 2.5 miles i Wa nk , 48.121184° N 122.722263° W i} 20's 2D 40' Ly z 22" t = le C.2 Ln htto://www.heywhatsthat.com/profiler.html Note: bearings are true, not magnetic HeyWhatsThat runs most reliably on Firefox 1.5 or later at this time & | [oott=be70' a #2 Ho FS lord we tH, X.2 No LS ° hd = iA?) _Find: 510 1/2 35th St, port townsend, w: (Cl show grade 48.142952° N 122.784061° WO ft 176° 1.2 miles 1 total 48.125768° N 122.782345° W 62 ft 175° 1.4 miles 3 total 48.105712° N 122.779942° W 16 ft LS 7/26/2010 . Hey WhatsThat Path Profiler HeyWhatsThat Path Profiler Page 1 of 1 Main site FAQ / Site Map Sign up @heywhatsthat Comments? $8 cciose simulations and beta versions of the main site and Path Profier 2.5 miles %, 48.127487° N 122.719517° W Note: bea HeyWhatsThat runs most htto://www.hevwhatsthat.com/profiler.html rings are true, not magne tic reliably on Firefox 1.5 or later at this time Find: | 510 1/2 35th St, port townsend, w: Backspace Clear Smooth route Checkpoint Draw profile [2] show grade 48.124966° N 122.822514° W 217 ft 89° 1.9 miles 2 total 48.125309° N 122.782001° W 49 ft 90° 1.1 miles 3 total 48.125424° N 122.757797° W 39 ft LZ 7/26/2010 “=a eases : et a op a a“ vs —=fe +10 \ K-S Fe B.B2 (V7 F eeB BY + HEF 2x 2x?) 4+ [hoa (g!oy 18')+ (0.50143 x 18) }- Ss J ie alg es lp | Rerchs Pe = BS2 (Ne? Gt ex ¥'uB') + IGF 1B + xB +4749 +5) mom Ger} #15¢) eé-WO Y e 8.828 ¥ Pz i iP 42% 88) + {404 (2-4 x a V2%e2) = |@O0| Poet It? (Iox2y Stony) + 1.04( 9x BE) + 10534 H28' 4 530) = Fo (4 wile) SCIEINC coNTELS Dorme EO poemer CN D wortle CIC fe? “apa X 2S = 9B pRovect: KOLEE CARISSA FARKAS STRUCTURAL ENGINEERING, PLLC pate: tH23lie 2322 NE 103RD ST - fh SEATTLE, WA 98125 PROJ.NO: |i) ph: 206.683.3197 SHEET: LA LATEILAL DOIG wpe \V £2 viyglf) sw UP LIET Hocbowe! We NS a Vie > 99t2 2! BO Syl py Tbs S1Byste — HN PER'P A its. ee onl 5 Thw [U2BE “A y 5 425 ||! ae n é 4 E-) Db TOW 7 [244 Do | FS w (1) CSI Fog € ZO [400 € AWD plo Jo0. .. Ade [250 w mt 4Be 27| 259 [A00e MAI AS | 2®o 7'2 2%. spr 2360 STHD{O 4 331 12! 24 GPL 7shO rN 5 loa [kt 4 Ae h es p 2055 o' jal owl \A\o M kK e565 |H48 zl ed Zyl A | ae ae Fy Aste v v a is t eu T T 3-3 We =100 (we = Mb tof Pree =4|°) Powe = e,45 FO en \P R\ < LA Cn Ry = [245 Pa 23H Cy ~ 228% Pg ~ lee Pex Ol CsSSA TEMERAS PROJECT: FOLFI- C STRUCTURAL ENGINEERING, PLLC pate: 1/2zllo 2322 NE 103RD ST . Ins _ SEATTLE, WA 98125 PROJ.NO: _/O© ph: 206.683.3197 SHEET: Ly BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name New SFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Names Associated with this Project License Type Name Contact Phone # Type License # Exp Date Applicant Kolff Cornelis A Owner Kolff Cornelis A Contractor Owner Builder O- STATE exempt 12/31/2010 *** SEE ATTACHED CONDITIONS *** Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Print Name Wier Pere Date Issued: 09/23/2010 o ee f Issued By: MWAY Signature (\ aa [ _ Date | [o>/ to Date Expires: 03/22/2011 if T bith 4 Co 4 ae BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Fee Information Project Details Project Valuation $174,003.18 Decks — Residential 368 SQFT Plan Review Fee 918.94 ee a a ; , ; coer Energy Code Fee - New Single 100.00 wermes ~ 1 YPe oe stam’ ; Q Family int . Units: 1 Heat Type: PROPANE Mechanical Permit Fee per Dwelling 150.00 : ‘ : ; : 5: Bedrooms: 2 Construction Type: V - B Unit - New Residential ; . ; Bathrooms: 2 Occupancy Type: R-3 Plumbing Permit Fee per Dwelling 150.00 Unit - New Residential PLAN REVIEW DEPOSIT 150 150.00 PLAN REVIEW REFUND 150 -150.00 Building Permit Fee 1,413.75 State Building Code Council Fee 4.50 Technology Fee for Building Permit 28.28 Record Retention Fee for Building 10.00 Permit Site Address Fee 3.00 Total Fees $ 2,778.47 Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Date Expires: 03/22/2011 Print Name Signature Date BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name New SFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 10. Property corner survey pins must be located at time of footing inspection to verify setbacks. 20. This dwelling unit proposed on Residential Site RS#4 is dwelling unit number | on Parcel B. It is the first new building permit for PTEV after PUD approval. Other existing buildings include the residence on Residential Site #5 addressed as 345 37th Street. This building permit does not trigger any development conditions. 30. Per PTEV PUDA Item #2: each residential site will be limited to 2,000 square feet of impervious surface development. This residential site will have 1395 sq. ft. of impervious surface. Parcel B is limited to 13,500 square feet of impervious surface. With this residence, Parcel B will have a total of 5,494 square feet of impervious surface. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. | certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature 7 —_ Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name New SFR Site Address 335 37THST Parcel # 001031005 Project Description New Single Family Residence Conditions 40. Per PTEV PUDA Item 18: Vehicle Access: 35th and 37th Street — Special Restrictions Applicable Prior to Construction of Full Roadway Improvements on 37th: The following access and restrictions apply to 35th and 37th Streets until such time as full roadway improvements for 37th Street are provided as required by this Agreement: Note: Failure to operate consistent with the provisions of this condition may result in the revocation of the use of 37th Street for events. a. Residents of the first two residences constructed on Parcel B and their guests may use 37th Street for vehicle access without restriction for activities taking place at a residence on Parcel B. b. Residents of residences constructed on Parcel A and their guests shall use 35th Street for vehicle access and shall not use 37th Street for vehicle access to their dwelling units or PTEV events. c. An “event” is advertised and includes non-residents. d. Guests for PTEV sponsored activities or events on Parcels A and/or B shall not use 37th Street for vehicle access or parking, except: If an owner of a residence in Parcel B sponsors or co-sponsors an event at the PTEV, then the following shall apply: * Up to nine vehicles may access 37th Street for the event, but only after all of the 16 spaces provided for guest parking on Parcel A have first been utilized. * Cars shall park in the off-street resident and/or reserve parking areas on Parcel B. No cars shall park within the 37th Street right-of-way. * Co-sponsored events shall not occur more frequently than 12 times per year. * Prior to events in which over 25 non-resident cars are expected, the PTEV shall submit an event-parking plan for review and approval by the Public Works Department describing how traffic and on-site parking would be handled. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature —__ Date Date Expires: 03/22/2011 Print Name __ BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 50. Per PUDA Item #20: Exterior Lighting Plan: a. There shall be no streetlights installed on 35th or 37th Streets and no general outdoor lighting on the common land, including in the parking areas other than at ADA parking spaces. Exterior lighting on the outside of buildings, greenhouses and other structures is allowed but only as needed to provide safe use, and will be turned off when the outside area is not in use. b. Exterior illumination intensity shall be kept to a minimum, and shall comply with the existing National Electric Code (NEC). c. All exterior lighting fixtures shall be shielded and pointed downward. The lighting shall include proposed average illumination levels and be designed so as not to cause glare or light spillage to adjacent streets or other off-site properties. d. To reduce off-site glare impacts, exterior mounted light fixtures shall not exceed 15 feet in height. No mercury vapor or halogen lights shall be permitted. 60. Per PTEV PUDA Item #22: General Construction Regulations: a. Building construction actiivties on private property by contractors shall be limited to the period betwen 7:00 am and 6:00 pm Monday through Friday. Owner/builders and their friends may work on private dwellings and structures from 9:00 am to 7:00 pm on weekends and holidays as well, if neighbors do not complain about the noise. Any exceptions made necessary by special and unusual circumstances must be approved in advance by the DSD director. b. Construction access shall be the same as the final driveway access and fire lanes. c. To mitiate disposal of vegetative material, the developers shall grind and distribute it on-site. d. During construction, the Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature _ 7 : Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 70. PTEV Item #22 Continued: g. Prior to certificate of occupancy for each residence, infrastructure and parking shall be approved by Public Works. h. Since residential development is planned in phases, each dwelling or area under construction shall be roped off using sturdy stakes and rope. i. Each tree to be preserved shall be protected and flagged (see tree construction plan). j. To minimize erosion during construction, the developers are required to follow the Temporary Erosion and Sediment Control (TESC) Best Management Practices (BMPs) outlined in the construction Stormwater Polution Prevention Plan (SWPPP). It will be the contractor's responsibility to install and maintain the construction TESC BMPs throughout the construction project. The TESC measures are set forth in the Stormwater Drainage Plan prepared by engineering firm Northwest Territories Inc. (NTI). Regardless of the reason, if construction is suspended for more than 30 days, the developers will be required to install permanent Erosion and Sediment Control Best Management Practices on-site and within the City's rights-of-way as needed. The construction SWPPP shall be on-site during construction at all times. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. | further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name New SFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 80. PTEV PUDA Item #22 continued: k. Should dust become a problem during construction, water will be applied as a suppressant (See Construction SWPP BMP). 1. To mitigate impacts to groundwater with home construction activities, wash water from paint and wall finishing equipment should be deposed of in a way that will not adversely impact waters of the state. Untreated disposal of this wastewater is a violation of State Water Quality laws and statutes and as such, would be subject to enforcement action. m. New power and telephone lines must be placed underground where feasible, as determined by the Public Works Director. The developers must contact the private (franchise) utilities themselves. n. To avoid environmental health hazards during construction, emergency spill and cleanup procedures shall be explained to all workers on the site and a point of contact will be designated. o. All construction contracts shall specify that all diesel, gasoline and air-powered equipment must be properly muffled or silenced. p. To mitigate potential impacts to archeological resources that may be discovered during excavation, work should be stopped immediately if such materials are discovered and the State Historic Preservation Officer contacted immediately. Work may not resume until approval is obtained from the DSD Director. 90. Alternative Tree Conservation Plan: Development of RS#4 does not trigger planting of a fedgerow. No trees are proposed for removal on the site. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 100. Non-Motorized Transportation, Vehicle Parking and Vehicular Access Plan: The Association shall provide 1.25 parking spaces in common parking areas for each dwelling unit, up to the required 28 spaces on Parcel A and 6 on Parcel B. No driveway access shall be provided directly to Residential Sites or dwellings, and no on-site parking other than those provided in designated parking areas shall be allowed. An updated on-site parking plan will be submitted with each building permit application indicating how each dwelling unit is being provided a minimum of 1.25 parking spaces. Driving surfaces in parking areas will be on gravel, but parking may be on grass, except for ADA parking spaces. Wood or concrete bull rails or wheel stops shall delineate stalls for resident parking and each stall with compact car dimensions shall be clearly labeled "COMPACT". Overflow parking for guests may be on unmarked grassy areas adjacent to residential parking areas and driveways, as shown on the Parking Plan Maps, phases I and II. ADA parking spaces shall be constructed to comply with the accessibilty requirements of chapter 11 of the International Building Code (IBC): Two spaces on Parcel A in phase II and one on Parcel B when the potential commercial parking area is constructed. Some on-street parking along the North side of 35th Street along the PTEV property for occasional events would be anticipated, but for frequent meetings all parking shall be accommodated on-site. Prior to events in which over 25 cars with outside people are expected, the PTEV shall submit an event parking plan for review and approval by the Public Works department describing how traffic and on-site parking would be handled. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 110. Non-Motorized Transportation, Vehicle Parking and Vehicular Access Plan continued: There shall be 3 “no parking” signs posted along 37th Street where the roadway has not been paved. They may be removed along that portion of the road when and where paving occurs. In addition, there shall be “no parking” signs, fencing and/or landscaping to prevent parking adjacent to or alongside any buildings built within ten feet of the right of way until 37th Street improvements are completed. The 37th Street right of way shall be measured as including the ten-foot phased dedication along the northerly edge of Parcel B. b) Vehicle Access — 35th and 37th Street — Special Restrictions Applicable Prior to Construction of Full Roadway Improvements on 37th: The following access and restrictions apply to 35th and 37th Streets until such time as full roadway improvements for 37th Street are provided as required by this Agreement: Note: Failure to operate consistent with the provisions of this condition may result in the revocation of the use of 37th Street for events. 1) Residents of the first two residences constructed on Parcel B and their guests may use 37th Street for vehicle access without restriction for activities taking place at a residence on Parcel B. 2) Residents of residences constructed on Parcel A and their guests shall use 35th Street for vehicle access and shall not use 37th Street for vehicle access to their dwelling units or Ecovillage events. 3) An “event” is advertised and includes non-residents. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: (3/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 120. 4) Guests for Ecovillage sponsored activities or events on Parcels A and/or B shall not use 37th Street for vehicle access or parking, except: If an owner of a residence in Parcel B sponsors or co-sponsors an event at the EcoVillage, then the following shall apply: * Up to nine vehicles may access 37th Street for the event, but only after all of the 16 spaces provided for guest parking on Parcel A have first been utilized. * Cars shall park in the off-street resident and/or reserve parking areas on Parcel B. No cars shall park within the 37th Street right-of-way. * Co-sponsored events shall not occur more frequently than 12 times per year. * Prior to events in which over 25 non-resident cars are expected, the PTEV shall submit an event-parking plan for review and approval by the Public Works Department describing how traffic and on-site parking would be handled. c) Fire Lanes: The Consulting Fire Code Inspector for East Jefferson Fire and Rescue has granted the following: 1) A twelve-foot Emergency Vehicle access as a variance from the Ordinance 2947 (2006 International Fire Code) requirement for sixteen (16) feet of travel path as the geography and planning for this project allow for a reduction of the required width; 2) The use of "Grass Pave" or equivalent (to be accepted by the City of Port Townsend) in the form of two (2) linear travel tracks four (4) feet wide separated by four (4) feet for emergency vehicle access. The fire lanes shall not be blocked at any time. d) 37th Street Setback: Setbacks of structures on common land on Parcel B shall be at least 15” from the existing 37th Street ROW but may be only 5’ once the 10’ ROW dedication along 37th Street is made. Building setbacks may be increased by City staff along intersections as found necessary to provide for safe vehicular site distance. 130. Parcel B, Phase I Parking Plan There shall be 6 on-site residential, grass parking spaces provided off 37th Street. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 140. This residential site is subject to the CC&Rs recorded under AFN #554169. Portions of Section 5, Residential Site Restrictions, which may only be amended with prior City approval, are copied below: The following covenants and requirements shall apply to and govern the development and use of Residential Sites and are in accordance with the PUDA agreement and the PUD Site Plan: a) Site Team Authority: The Site Team must certify that house plans meet all PTEV limits, requirements and regulations before they are submitted to the City for permits. Solar access to and views from all Residential Sites will be safeguarded to the extent possible, with review of heights, orientation, and location of all structures, as more specifically described in Article VII below, Architectural Control. b) Residential Site sizes: There will be 12 Residential Sites of about 4,000 square feet each and their sizes may not be changed without City approval. c) Maximum EcoVillage Development as set by the PUDA with the City: 1) No Residential Site may have more than 2,000 square feet of impervious surface. 2) Parcel A may have no more than 26,000 square feet of impervious surface. 3) Parcel B may have no more than 13,500 square feet of impervious surface. 4) No more than 35% of each parcel may be covered by impervious surface. d) Residential Site setbacks: 1) Most of the setbacks may be changed by the Association WITHOUT City approval. Those marked with an * may only be changed WITH City approval: Res. Site # North setback’ East setback’ South Setback’ West setback’ 10000 25* 0150 3 10* 5150 400100 5005*0 Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. | certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 65* 000 710000 8100100 910500 105500 1110000 12 10000 Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date Date Expires: 03/22/2011 Print Name BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-177 Permit Type Residential - Single Family - New Project Name NewSFR Site Address 335 37TH ST Parcel # 001031005 Project Description New Single Family Residence Conditions 150. CC&Rs Section 5 continued: 2) There is a 10’ wide private sewer easement across the northern end of Residential Site #3 that allows sewer access for Residential Site #2. 3) Any development in lots #2, 3, 5, and 6, and developments on commonly owned land, must allow not only a set back of 5’ from the city tax lot #34, but also a cumulative north and south setback of 15 feet at any one location along tax lot #34, to provide the city with 31.5 feet of unobstructed access to their property for maintenance and/or other work on the sewer line. 4) Setbacks of structures on common land generally shall be 10-feet from all PTEV property lines unless otherwise specified. 5) Setbacks of structures on common land on Parcel B shall be at least 15’ from the existing 37th Street ROW but may be only 5’ once the 10’ ROW dedication along 37th Street is made. Building setbacks may be increased by City staff along intersections as found necessary to provide for safe vehicular site distance. e) Number of Dwelling Units (DUs): 1) The maximum number of DUs in the EcoVillage, including those on common land, shall not exceed 27, as specified in the PUDA with the City. Any detached bedroom shall have a bathroom and shall be counted towards the total number of DUs. 2) Any residential site may have on it up to two 2 (two) dwelling units (DUs), either as a duplex or as a single- family residence with an ADU (Accessory Dwelling Unit, either attached or detached). 3) Any 2 adjacent Residential Sites with no setbacks between them (sites #2 and #3, sites # 10 and #11, and sites #11 and #12) may have a duplex, triplex or fourplex spanning both Residential Sites. 4) Residential Sites #4 and #5 may only have more than one Dwelling Unit with permission from the Association. Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify that I am the owner of the property or authorized agent of the owner. Date Issued: 09/23/2010 Issued By: MWAY Signature Date __ Date Expires: 03/22/2011 Print Name Port Townsend EcoVillage Building Permit Addendum Permit #_BiLD | 0 —| 77 The Port Townsend EcoVillage is allowed to construct a total of 24 new dwelling units after the date of signing a PUD Agreement with the City in September of 2010. As part of that agreement (copied below) the following information must be submitted: 1. Building numbers a. Overall new building number_\_ b. On Parcel_B c. New building number on this Parcel_\__ 2. Phased Development Matrix (On next page) Requirements triggered? Yes _X_No If yes, what: ° 3. PUD Site Plan (Attached) Suh nictted og eon 4. Parking location (Attached) \ N 5. Comments: Fharbs ) (\ CT , PUDA Building Permit Submittal Requirements: In addition to a building permit application, a Minor Improvement Permit application shall be submitted for any building that connects to city sewer and/or water and the following shall be provided: a. The dwelling unit number (i.e. the sequence from the first to the twenty- fourth residence to be built); b. The full PUD Site Plan with the building's location clearly indicated; c. A copy of the phased development matrix with the appropriate building phase highlighted; and d. A description of the water and sewer connections, the stormwater plan, and on-site parking location required for that building. " e. Prior to issuance of a certificate of occupancy for any dwelling or other building, landscaping as per the approved landscape plan shall be installed or a performance security device shall be obtained. All improvements as specified by the approved Street and Utility Development Permit shall be installed, inspected and approved by the Public Works Department. These improvements shall include but are not limited to water and sewer connections, pathways, and storm water facilities. f. Final Street and Utility Development permits must be submitted for each phase so each phase can be ‘finaled’. = =) Rev. 9/10/10 anne CITY OF PORT 7 Phased Development Matrix: City requirements triggered by EcoVillage requests. PRIOR TO THE THE FOLLOWING REQUIREMENT MUST BE FOLLOWING: COMPLETED: Within Parcel A: Issuance of the building permit for the 5" new dwelling unit on Parcel A. Completed trail in 35" Street right-of-way from the west end of the sidewalk that ties into the completed trail on the west side of Parcel A and Parcel B. Issuance of the building permit for the 12" new dwelling unit on Parcel A OR issuance of the Club House Certificate of Occupancy (whichever comes first). 1) The second half (14 spaces) of residential parking on Parcel A bonded for or installed.* 2) Six (6) reserve parking spaces installed on Parcel B. (Continued on next page) Issuance of the Certificate of Occupancy for the first dwelling on Residential Sites 6, 7, or 8. Three 25-foot fedgerows planted to the east of Residential Sites 6, 7, and 8. Issuance of the Certificate of Occupancy for the first dwelling on Residential Sites 9 or 10. One 25-foot fedgerow planted to the east of the fire lane near Residential Site 9. Issuance of the Certificate of Occupancy for the first dwelling on Residential Site 11 or 12. Two 25-foot fedgerows planted to the south of Residential Sites 11 and 12. Issuance of the Certificate of Occupancy for the last dwelling on Residential Sites 6 through 12. Placement of 3 bollards (one movable) at the entrance of the East fire lane. PRIOR TO THE THE FOLLOWING REQUIREMENT MUST BE FOLLOWING: COMPLETED: Within Parcel B Issuance of the building permit for the 2™ new dwelling unit on Parcel B. 1) Dedication of the northerly ten-feet of 37" Street from San Juan Avenue to the west end of the property. 2) 37" Street road improvements to the vacated Oxford Street easement. 3) Installation of six (6) reserve parking spaces on Parcel B Issuance of the building permit for the Farm Stand, Learning Center, Commercial Greenhouse, or any other commercial building. 1) Dedication of the northerly ten-feet of 37" Street from San Juan Avenue to the west end of the property. 2) On-site parking, the number of spaces to be determined by the use, and approved by City. 3) 37" Street road improvements to the on-site parking. 4) Installation of a fire hydrant at corner of 37" and San Juan Avenue. Issuance of the Certificate of Occupancy for the Farm Stand or any other home occupation or commercial use structure within 100 feet of San Juan Avenue. Three 25-foot fedgerows planted at the East end of Parcel B, two along San Juan Avenue and one along 37" Street. Within Parcels A and B: Issuance of the 21“ new dwelling unit building permit at the PTEV, Parcel A and B combined. 1) Dedication of the northerly ten-feet of 37" Street from San Juan Avenue to the west end of the property. 2) 37" St. road improvements to Oxford St. easement. 3) A fire hydrant at corner of 37" and San Juan Avenue. 4) Installation of six (6) reserve parking spaces on Parcel B. ECEIVE a/1/10 SEP - 1 2010 To: Development Services Department, City of Port Townsend CITY OF PORT TOWNSEND DSD From: Kees Kolff oZva Re: Building Permit Application We are hereby submitting a building permit request for a new residence to be built on a parcel that will soon be part of the Port Townsend EcoVillage (PTEV), with a Property Use and Development Agreement (PUDA) hopefully to be signed by the City in early September. The conditions that will spelled out in that PUDA, and those of the CC&Rs of the planned homeowners’ association of the PTEV, are all satisfied by this proposed residence and the documents presented here. Specifically, the conditions include: 1. Upgraded fire hydrant on 37" Street. (Done) 2. An updated Site Plan indicating location, number of dwellings and parking. (Attached) 3. Gravel driveway and grass parking area off 37" Street. (Done) The reason that we are applying PRIOR to the final approval of the PUDA is that: 1. We hope to start building this house before the end of September, and 2. We are designing and hope to submit soon several other houses with many engineered construction techniques similar to those shown in the drawings for this house and need your review of these plans before we can proceed on the others. In addition, even if the PUDA were delayed or did not go through at all, we should be able to build this house at anytime since: 1. We currently own the entire parcel, 2. There is currently only one dwelling unit on this parcel, and 3. The existing dwelling unit on the parcel is less than 700 square feet and would be considered the ADU of this new house, which will have a total of 1,446 square feet. When the PUDA goes through, these 2 dwellings will be on separate private lots, neither one would be considered an ADU, and their sizes will merely be limited by the PUDA to a footprint of under 2,000 square feet. Please call Kees at 206-295-2275 if you have any questions. Development Services "ax: 360-344-4619. ~~“ www.cityofpt-us- Residential Building Permit Application Project Address: Hi Legal Description (or Tax #): HT SBE StreeX, ASSitOT “Tao #F ape Block:__© 010 3) 05" Lot(s): ( ‘Tax lstat 22) | Parcel # cO(o3\ee5 . oo gs . ‘ ° bY Project Description: w 55 ‘ i Q ro \ 2 > Applications accepted by mail must include a check for initial plan review fee of $150 | > See the “Residential Building Permit Application Requirements” for details on ; plan submittal requirements. Property Owner: Lender Information: Name:_Corpelis + Helo Ke LEF Lender information must be provided for projects Address: Ftp Beth oe. over $5,000 in valuation per RCW 19.27.095. cityisvzip:_ PT, wy 48368 Name: P/A Phone:_2O6 - 245 -22%5° Project Valuation: $ Email. _Kkotft @ Key purr inet Building Information (square feet): ie Vo eee 1° floor L, 212. Garage:__ Pb bug Name: Ae ee hy OUS2e 2™ floor 44e Deck(s):_ ot Address: 3° floor Porch(es):_ [52 City/SUZip: Basement:_ so Is it finished? Yes No Phone: Carport, Ke Other: Email: al Manufactured Home L[] ADU 0 New x Addition 0 Remodel/Repair U Contractor: Name: Pro pects ere Address: * Total Lot Coverage (Building Footprint): City/St/Zip: Square feet:_ 1,292 % Zi ys TeTAL LOT 3,204 ¢ Phone: Impervious Surface: Email: Square feet: 1,345 fOTAL toe 5,494 or 4 Je State License #: Exp: Any know tlands on th rty? YQ) | City Business License #: y nwe <—_eee Any steep slopes (>15%)? YQ. | hereby certify that the information provided is correct, that | am either the owner or authorized to act on behalf of the owner and that all activities associated with this permit will be in accordance with State Laws and the Port Townsend Municipal Code. Print Name: Co RKELIS KocEF Signature: Chet) Date: a /\ Neo g \ J / RESIDENTIAL BUILDING PERMIT APPLICATION CHECKLIST This checklist is for new dwellings, additions, remodels, and garages. The purpose is to show what you intend to build, where it will be located on your lot, and how it will be constructed. L] Residential permit application. _] Washington State Energy & Ventilation Code forms L] Two (2) sets of plans with North arrow and scaled, no smaller than %4” = 1 foot: (J A site plan showing: Legal description and parcel number (or tax number), Property lines and dimensions Setbacks from all sides of the proposed structure to the property lines in accordance with a pinned boundary line survey On-site parking and driveway with dimensions If creating new impervious surfaces, indicate measures utilized to retain stormwater on-site Street names and any easements or vacations Location and diameter of existing trees Utility lines If applicable, existing or proposed septic system location 40. Delineated critical areas boundaries and buffers _| Foundation plan: i Zz. 3. 4. 5. Footings and foundation walls Post and beam sizes and spans Floor joist size and layout Holdowns Foundation venting _] Floor plan: 0 OC O N H D A A R W N A S N A A R O N S Room use and dimensions Braced wall panel locations Smoke detector locations Attic access Plumbing and mechanical fixtures Occupancy separation between dwelling and garage (if applicable) Window, skylight, and door locations, including escape windows and safety glazing all section: Footing size, reinforcement, depth below grade Foundation wall, height, width, reinforcement, anchor bolts, and washers Floor joist size and spacing Wall stud size and spacing Header size and spans Wall sheathing, weather resistant barrier, and siding material Sheet rock and insulation Rafters, ceiling joists, trusses, with blocking and positive connections Ceiling height 40. Roof sheathing, roofing material, roof pitch, attic ventilation _] Exterior elevations (all four) with existing slope of the land in relation to all proposed structures _] If architecturally designed, one set of plans must have an original signature _] If engineered, one set of plans must have one original signature _] For new dwelling construction, Street & Utility or Minor Improvement application ial Construction Checklist CITY OF PORT TOWNSEND DSD Washington State Energy Code (WSEC) 2000 Residential Construction Checklist Complete this form in addition to WSEC forms for electric heat (on blue paper), other fuels (on pink paper) or a calculated WATTSUN form. Please answer the following questions: TYPE OF PROJECT: New construction, or addition over 750 sq. ft. Must meet whole house and spot ventilation requirements, and show full WSEC compliance as a stand-alone project. O A House addition under 750 sq. ft. Possible trade-offs are allowed with the existing building for WSEC compliance, such as increasing ceiling insulation. See WSEC compliance performance forms, or WATISUN calculation. NOTE: A house addition less than 500 sq. ft. does not require whole house ventilation. Spot ventilation is still required. TYPE OF HEATING -— Please check all that apply: 0 Electric 0 Wall Heater 0 Baseboard O Forced Air Furnace 0 Radiant Floor (Boiler) 0 Other O Non-Electric: O Propane - O Boiler (Hydronic) X{ LPG Stove O LPGFumace O Other LPG O Heat Pump 0 Oil Furnace 0 Woodstove (can only be used as secondary heat source) VAPOR RETARDERS: Vapor retarders shall be installed toward the warm surface as represented below. Select one option for floors, walls, and appropriate ceilings: e Floors: 0 Plywood with exterior glue ‘Poly plastic (greater than or equal to 4 millimeter thick) O Backed batts e Walls: xX. Poly plastic (greater than or equal to 4 millimeter thick) 0 Face-stapled, backed batts D Low-perm paint e Ceilings: CO Not required where ventilation space averages greater than or equal to 12 inches above insulation 0 Face-stapled, backed batts DA Poly plastic (greater than or equal to 4 millimeter thick) 0D Low-perm paint SEE BACK \\Bed_permits\forms\Residential Energy Code Checklist.doc Page 1 of 2 City of Port Townsend Building & Community Development Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 (360) 379-3208 Fax: (360) 385-7675 VENTILATION REQUIREMENTS FOR INDOOR AIR QUALITY: Type of ventilation used throughout the house: K Exhaust Option 0 HVAC Integrated Option For “Exhaust Option” complete the following: A Hy’ 1c e In what room is your whole house fan located? e What size is the whole house exhaust fan? 0 50-75 CFM (1-2 bedroom house) YK80-120 CFM (3 bedroom house) 0 100-150 CFM (4 bedroom house) O 120-180 CFM (5 bedroom house e Fresh Air Inlets are required for this option in each habitable room (includes all bedrooms, living and dining rooms but not kitchens, bathrooms or utility rooms). What type of fresh air inlet will be installed? (See figure below) O Window Ports O Wall Ports FRESH AIR DISTRIBUTION Fresh ale Each habitable space of the building must be provided (Gy L with outdoor air. (See Figure 8.5) Outdoor air distribution Burp (eof °7, can be accomplished using individual room inlets, sep- Yeu Ailahirn. arate duct systems, or by using the forced air heating system. Where the system provides ventilation through a fol Fe “vt a dedicated opening, such as a window or through-wall vent, these openings must: [V302.6-V302.6.4] * Have controllable and secure openings. - Be sleeved when installed through a wall or D EGCEIVE window frame. * Have a minimum of 4 square inches of net free SEP -1 2010 area or provide a minimum of 10 CFM @ 10. pascals tested by HVI. CITY OF PORT TOWNSEND DSD Outdoor Air Inlets INTEGRAL WITH WINDOW RQUND ’ THROUGH-WALL Figure 8.5 ~ RECTANGULAR \\Bed_permits\forms\Residential Energy Code Checklist.doc : THROUGH-WALL Page 2 of 2 Cc A le f \ fc ae , | > |i \ GE N D ew ic k = | UZ J EX I S T I N G BU I L D | __ _ } FU T U R E BU I L D I N 20 1 0 RE S I D E N T I A L Si R: “S E P -1 CI T Y OF PO R T TO W N S E N D OC K TR A I L , CI T Y _ O F PP TL X X DE S I G N NE W CR U S H E D NO T E S : 1. SE T B A C K S ZE R O FE E T EX C E P T WH E R E NO T E D OT H E R W I S E . 2. PA R K I N G AN D OT H E R DE T A I L S SH O W N AR E IL L U S T R A T I V E , AS PE R M I T T E D IN TH E PU D , AN D AR E NO T SU R V E Y E D , EN G I N E E R E D OR EX A C T IN LO C A T I O N . 3. (S ) = FI R E LA N E SI G N A G E ® = RE M O V A B L E BO L L A R D S PE R FI R E DE P T . SP E C . INC. NORTHWESTERN TERRITORIES Engineers - Lond Surveyors ~ Geologists Construction inspection ~ Materials Testing NTI ‘717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452-8401 4 an e er a t e Yo p yp R A I I A : ZY + Yy y eC me 3(50-1) ILLUSTRATIVE PUD SITE PLAN PARCEL A & B FOR: PORT TOWNSEND ECOVILLAGE _ _— _j t ST R E E T —— — — = — — et ae : SE S S SS | 1 rr oy ee pe | f Sh l l \ pa r e | 10 ° R- O - W DE D I C A T I O N ia ¥ i Bi e | ee e | -4 ot a - PO T E N T I A L FU T U R E | ' “i l s | i BI L so ex s e n e n r ho t s s o w 1 rH ! Sh | ; Ne ee le es es es ee es pe a KL ee i! - T rT aa WY | | || | 8 | I i I I ny N : 8 & & 3 x 2 a g 50 1 oe ” |! = SC A L E IN FE E T § $ ii is ] 2 & | rt % 3 He g 5 cE io 1 SCALE: AS SHOWN | DATE: Receipt Number: BLD10-177 001031005 Plan Review Fee $918.94 $918.94 $0.00 BLD10-177 001031005 Energy Code Fee - New Single Family | $100.00 $100.00 $0.00 BLD10-177 001031005 Mechanical Permit Fee per Dwelling U: $150.00 $150.00 $0.00 BLD10-177 001031005 Plumbing Permit Fee per Dwelling Uni $150.00 $150.00 $0.00 BLD10-177 001031005 PLAN REVIEW REFUND 150 -$150.00 -$150.00 $0.00 BLD10-177 001031005 Building Permit Fee $1,413.75 $1,413.75 $0.00 BLD10-177 001031005 State Building Code Council Fee $4.50 $4.50 $0.00 BLD10-177 001031005 Technology Fee for Building Permit $28.28 $28.28 $0.00 BLD10-177 001031005 Record Retention Fee for Building Per $10.00 $10.00 $0.00 BLD10-177 001031005 Site Address Fee $3.00 $3.00 $0.00 Total: $2,628.47 10-0716 09/01/2010 PLAN REVIEW DEPOSIT 150 $150.00 BLD10-177 CHECK 461 $ 2,628.47 Total: $2,628.47 genpmtrreceipts Page 1 of 1 Receipt Number: BLD10-177 001031005 PLAN REVIEW DEPOSIT 150 $150.00 $150.00 $0.00 Total: $150.00 ‘CHECK =—~C~SATZCt”*” $ 150.00 Total: $150.00 genpmtrreceipts Page 1 of 1