Loading...
HomeMy WebLinkAboutBLD10-126CONSTRUCTION PROGRESS RECORD CITY OF PORT TOWNSEND Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 POST THIS CARD IN A SAFE, CONSPICUOUS LOCATION. PLEASE DO NOT REMOVE THIS NOTICE UNTIL ALL REQUIRED INSPECTIONS ARE MADE AND SIGNED OFF BY THE APPROPRIATE AUTHORITY AND THE BUILDING IS APPROVED FOR OCCUPANCY. STAMPED APPROVED PLANS MUST BE AVAILABLE ON THE JOBSITE. PARCELNO. _ 989705504 PERMIT NO. BLD10-126 ISSUED DATE 06/25/2010 EXPIRATION DATE ___ 12/22/2010 ADDRESS 714 WASHINGTON STREET CONSTRUCTION TYPE OCCUPANT LOAD OWNER FINNIE JOSEPH B PROJECT DESCRIPTION TEMPORARY TENT - EXACT SAME AS 2009 CONTRACTOR LENDER INSPECTION INSP ATE COMMENT INSPECTION INSP DATE COMMENT FRAMING $22 SPECIAL Lad pee FINAL BLDG./C OF O Coy THe fe] SRR NGOS OT 20° ae LesT Sons Seuwe Leen TO REQUEST AN INSPECTION CALL (360) 385-2294. INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO 3:00 PM FOR NEXT DAY INSPECTION. permir# VCD Io - (ZG CITY OF PORT TOWNSEND PERMIT ACTIVITY LOG DATE RECEIVED C “etn 1D SCOPE OF WORK: ‘ Bisho? verEL TEmPocacy TENT DATE ACTION INITIALS (>-2z -'o__| ENTERED INTO CHET SF CHECKED FOR COMPLETENESS L _ _ a (op -Z2—-10 Plan Review - EMA: U-JO TOM Wu mock. SE spoes he. Want 7D Kevien? # Bedroom(s) = # Bath(s) = Heat Type: Zt <> “22-19 TTom Sys 2SVEC . Ske L — 4 i. = Lf? 2 LBZ Y- TOW UGLIER fT 6 FOLD #-/71. Zoning: Setbacks OK? Lot Size: Building Size: Lot Coverage: FAR OK? Height OK? Parking OK? Critical Area? Demo? Historic Rev? Notice to Title? Lots of Record? BUILDING PERMIT City of Port Townsend Development Services Department 250 Madison Street, Suite 3, Port Townsend, WA 98368 (360)379-5095 Project Information Permit # BLD10-126 Permit Type Commercial Miscellaneous Project Name TEMPORARY TENT Site Address 714 WASHINGTON STREET Parcel # 989705504 Project Description TEMPORARY TENT - EXACT SAME AS 2009 Names Associated with this Project License Type Name Contact Phone # Type License # Exp Date Applicant Finnie Joseph B (360) 385-6122 Owner Finnie Joseph B (360) 385-6122 Fee Information Project Details Project Valuation $1,390.00 Entered Bid Valuation 1,390 DOLL Plan Review Fee 50.00 nis Heat Type: State Building Code Council Fee 4.50 Bedrooms: Construction Type: Technology Fee for Building Permit 5.00 Bathrooms: Occupancy Type: Building Permit Fee 50.00 Record Retention Fee for Building 3.00 Permit Total Fees $ 112.50 Call 385-2294 by 3:00pm for next day inspection. Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180 days. Work is verified by obtaining a valid inspection. The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify Signature that I am the TB agent of the owner. Print Name WJ —Date Date Issued: 06/25/2010 Issued By: MWAY Date Expires: 12/22/2010 han Scottie Foster From: taumock [taumock@cablespeed.com] Sent: Tuesday, June 22, 2010 9:04 PM To: Scottie Foster Subject: Re: FINNIE TENT PERMIT Yes ----- Original Message ----- From: Scottie Foster To: 'taumock@cablespeed.com' Sent: Tuesday, June 22, 2010 12:51 PM Subject: FINNIE TENT PERMIT Tom, Joe Finnie has brought in his once a year temporary tent permit application. Joe says that it is the exact same tent as used in 2008 & 2009. Shall | just issue the permit and set up an inspection time for your or do you want to come in and review the application? Let me know your preference, Scottie Foster Administrative Assistant Development Services Department (360)344-3057 Development Services 250 Madison Street, Suite.3 Port Townsend WA 98368 Phone: 360-379-5095 Fax: 360-344-4619 www.cityofpt.us Commercial Building Permit Application Parcel # G39 705 Sot/ Project Address & Zoning District: Legal gee (or Tax #): Office Use Only TIAL WASHINGTON ST | Addition et eT. Permit io ¢ Block: shel IPLDIO- Lot(s): A+ 3 Associated Permits: Project Description: Exeter Yo'xdo! TENT Fog. 44 monthS > Applications accepted by mail must include a check for initial plan review fee of $150 > See the “Commercial Building Permit Application Checklist” for details on plan submittal requirements. Property Owner: : . Name Cindy + DDE Cane Address: TIAL Logashiniattn Citysvzip. HT loR ISSSE Phone: DeO-~ BRS - (|S Eman CELLY BLO-S3l-lol7 Lender Information: Lender information must be provided for projects over $5,000 in valuation per RCW 19.27.095. Name: NZ A Project Valuation: s TEMPO eae STE Contact/Representative: Name SAME OS Cwnee Address: City/St/Zip: Phone: Email: Contractor: Name: OUMEeTe Address: City/St/Zip: Phone: Email: ye s le State License #: Exp: fs i OF F 4 -——————$—- Construction Type: Cy 1K Cus TENT Occupancy Rating: Building Information (square feet): 1* floor Nox &O Restrooms: 2" floor Deck(s): 3° floor Storage: Basement: Is it finished? Yes No Other: New 0 Addition Remodel/Repair 0 Change of Use 0 ‘Total Lot Coverage (Building Footprint): Square feet, % Bai his Surface: City Business License #: Square feet: | hereby certify that the information provided is correct, that {am either the owner or authorized to act on behalf of the owner and that all activities associated with this permit will be in accordance with State Laws and the Port Townsend Municipal Code. _ oe Print Name: N 6. Fieve Signature: QYxe———_—— Date: i COMMERCIAL BUILDING PERMIT APPLICATION CHECKLIST This checklist is for new construction, additions, and remodels O Commercial building permit application. O Non-Residential Energy Code forms: xt Lighting xt Mechanical xt Envelope QO Three (3) sets of plans with North arrow and scaled, no smaller than %” = 1 foot: O Title Page/Cover Sheet: i pa fo ) Project identification Project address, legal description, location map, tax parcel number(s) All design professionals identified including addresses and phone numbers Name, address, and phone number of person responsible for project coordination Design criteria, including occupancy group, construction type, allowed floor area vs. proposed, occupant loads, height and number of stories, deferred submittals, etc. Designate compliance with all applicable codes O A site plan showing: OA N D A R W N > Legal description and parcel number (or tax number), Property lines and dimensions Setbacks from front, sides and rear in accordance with a pinned boundary line survey On-site parking and driveway with dimensions Street names and any easements or vacations Location and diameter of existing trees Utility lines If applicable, existing or proposed septic system location Delineated critical areas boundaries and buffers O Foundation plan: 1 2: 3. 4 5 Footings and foundation walls Post and beam sizes and spans Floor joist size and layout Holdowns . Foundation venting O Floor plan: NO O h W N = Room use and dimensions Braced wall panel locations Smoke detector locations Attic access Plumbing and mechanical fixtures Occupancy separation between dwelling and garage (if applicable) Window, skylight, and door locations, including escape windows and safety glazing O Wall section: £0 G0 I Go On ee PO Footing size, reinforcement, depth below grade Foundation wall, height, width, reinforcement, anchor bolts, and washers Floor joist size and spacing Wall stud size and spacing Header size and spans Wall sheathing, weather resistant barrier, and siding material Sheet rock and insulation Rafters, ceiling joists, trusses, with blocking and positive connections Ceiling height 10. Roof sheathing, roofing material, roof pitch, attic ventilation O Exterior elevations with existing slope of the land in relation to all proposed structures O If architecturally designed, one set of plans must have an original signature O) If engineered, one set of plans must have one original signature ~ O) For new dwelling construction, Street & Utility or Minor Improvement application . comer 1 aR, T 4 Frame Poles IN | A \ | / Description Size Color Qty. Rafter 21710.5° Red 8 KM ie %——al Hip Rafter 144" Red 16 Corner Rafter 10'6” Green 8 “<+—Hip Rater —p Sway Crowne Spreader 9'4° White 22 Mee — + Legs 6'8" (7'8") | Brown (Black) 20 6 Way Side Tee - Rafter Bar 14'4" Red 1 t FIIGWST Ridge Crown “44: | a | Frame Fittings - — Jy Description Qty. Shee Carner 4 +——— Spreader ———_—> Side Tee 10 6 Way Crown 2 6 Way Hip Joint Pe Base Plates 20 R Pin (Pin & Bail) 170 | 6 Way Side tee 6 6 Way Hip Joint 4 | INI N Ridge Crown 1 prey 40' Cable 3 4.8 Ridge Support 2 Brackets 1. The layout begins with the frame parts being laid out on the ground in the approximate Jocation that they will be when the frame is assembled. The perimeter parts are laid out to form the perimeter, and the roof support parts are placed in the interior in their general locations. Laying out the parts in this way facilitates the assembly. (See Diagram) 2. Begin with one of the 6 way crowns. Attach the rafters (21°10.5” red) to the 6 way crown at points 1, 3, & 5 by sliding the pole over the fitting and lining up the holes in the pole with those in the fitting. Place a pin in the first hole to secure the pole in place. 3. Attach the hip rafters (14°4” red) to the remaining points of the 6 way crown using the same technique as in step 2. 4. Attach a spreader (9’4” white) to the 6 way crown, and connect it to the second 6 way crown. Repeat steps 2 & 3. 5. Attach the 6 way Hip Joint fittings to the 4 hip rafters (14’4” red) by sliding the pole over the fitting. Line up the hole of the pole with those of the fitting and place a pin. Attach hip rafters (14’4” red) to the hip joint fitting at points 1, 3, and 5. Attach corner rafters (10°6” green) to the hip joint fitting at points 2 and 4. (See 6 way hip joint figure on page 2) 6. Attach the comer fitting to the hip rafters (point 3 only) by sliding the pole over the fitting. Line up the hole of the pole with those of the fitting and place a pin. Attach the 6 way side tees to the rafters (21°10.5” red) and to the hip rafters (points I & 5). 7. Attach the side tee fittings to the corner rafters (10°6” green) by sliding the pole over the fitting. Line up the hole of the pole with those of the fittings and place a pin. — 8. Now, the perimeter is ready for assembly. Connect the side tees to the comers and 6 way side tees using the spreaders (9°4” white). Slide the poles over the fittings, line up the holes, and pin the pole and fitting together, When all of the spreaders have been secured in place, the frame will be complete. had une Godentconnecuubuots ken | Page 1 of 3 enn! vd LEZLE6HSTY sjejuey juaaq jeloeds oqy dgo:v0 80 02 unr 10 0 ’ IS O M E T R I C EL E V A T I O N 40 ° x 10 0 ° JU M B O T R A C SI D E EL E V A T I O N . FR A M E : JU M B O T R A C FI T T I N G S : —= — — = = | 14 ) 7’ ° - 8 ” / 9 ' - 4 ” 3- T R A C (L E G S ) 4) CO R N E R S 14 ) JU M B O T R A C BA S E PL A T E 2) 21 ’ - 1 0 " 1- T R A C BE A M 2) 8- W A Y CR O W N S 4) AS S E M B L Y CA B L E 8) 21 ’ - 1 0 ” 3- T R A C BE A M 2) 4- W A Y CR O W N 14 ) RA T C H E T TE N S I O N E R S 16 ) 14 ’ - 4 ” 1- T R A C BE A M 2) SP E C I A L J FI T T I M G Nn CA P ) 14 ) MI D - S P A N TE N S I O N E R S 17 ) 19 - 4 ” 1- T R A C BE A M OR A N G E 8) SP E C I A L T FI T T I N G (W I T H CA P ) 18 ) 5/ 8 ” RO P E WI T H SN A P 4) HI P IN T E R M E D I A T E 14 ) ST A K E WI T H HE A D 18 ) BE A M BR A C E 1) FA B R I C TO O L | 10 0 ’ 20 ’ 20 ’ 20 ’ 20 ° 20 ’ = 19 ' — 4 " 19 ° - 4 " 19 ' — 4 " 19 ' - 4 ” 19 ' - 4 ” 2) a X y, i —_ ro s ) 21 - 1 0 " . 19 ' - 4 " 19 ° - 4 " 19 ' — 4 " ¥ 21 ' = 1 0 " + (1 3 3 3 z . an t s z = =| 40 ’ o| a to ) 2 2b al * “| FL OK ® & ® ® » | FR O N T EL E V A T I O N : 19 ' = 4 " = 19 ° = 4 " : 19 ° — 4 " : 19 ' ~ 4 ” = 19 ' — 4 ” PL A N EL E V A T I O N 1 MIDDLES ST Aa MN Co *£~ FR CS JUMBOTRAC STRUCTURE / STANDARD 40’°W x 100°L x 20’ JMBTRCG JAZ4AO1 COO S8- JUMBOTRAC #8 ] Is Ja c k ta d ) 4B ) <} S Su t 7 wh <i =a ( 3 | NG se i t |i ne u e |S OE E |, aE ab o t 8 sl i t 8 es i 24 es , 8 Ls z® ee ae 2g a 8 e i " 8 8 0 |G iu y c i g a i e s d |e eh at s 2 oa Per SRT Flame Resistance REGISTERED ISSUED BY: Date treated or PELE AZTEC TENTS iron csufncaes! CONCERN NO. 490 ALASKA AVENUE TORRANCE, CA 90503 05/2006 CAL COMB F-419.01 (310)328-5060 This is to certify that the materials described below hereof have been flame retardant treated (or are inher- ently nonflammable). FOR ABC PARTY RENTALS aporess 4333 HARBOUR POINTE BLVD. SW City MUKILTEO "STATE WA, 98275 Certification is hereby made that: (check “a” or “b”) (a) The articles described below this certificate have been treated with a flame retardant chemical approved " and registered by the State Fire Marshal and that the application of said chemical was done in confor- mance with the laws of the State of California and the Rules and Regulations of the State Fire Marshal. Name of chemical used SdWisSSecneanansddbaséececareacer Chem. Reg. No. oc. eeeeeeeeeees Meathod of application ....0..0.....0......08 (b) The articles described below hereof are made from a flame-resistant fabric or material registered and approved by the State Fire Marshal for such use; Fabric has been tested and passes NFPA701-96. Trade name of flame-resistant fabric or material used., “@minated Fabric - Reg. No. ......F41900.0.., The Flame Retardant Process Used .WILL NOT Be Removed by Washing (will or will not) David Bradley . Chuck Miller - President Name af Applicator or Production Superiniendent Tite CUSTOMER ORDER NO. R160322 ITEMS MANUFACTURED: 2- 40'x40° (2 PC.) JUMBOTRAC TOP ONL Y- ULTRA WHITE 3- 40'x20" JUMBOTRAC MIDDLE TOP ONLY- ULTRA WHITE 2- 40'x10" JUMBOTRAC MIDDLE TOP ONLY- ULTRA WHITE 2- 30°x30" (2 PC.) JUMBOTRAC TOP ONL Y- ULTRA WHITE 2- 30°x20' JUMBOTRAC MIDDLE TOP ONLY- ULTRA WHITE 2- 30'x10" JSUMBOTRAC MIDDLE TOP ONLY- ULTRA WHITE 31- 10°x10' (1 PC.) FESTIVAL TOP ONLY- ULTRA WHITE 8- 10°x20' (1 PC.) FESTIVAL TOP ONLY- ULTRA WHITE od LECLEBVSCH sjejuay juerq jeloeds oqy déb:70 80 bb unr No 34233 Safety Supply ' a : (360) 598-3300 P.O. Box 1744 « Poulsbd, WA 98370 Toll Free 1-888-214-3473 Fax (360) 598-3303 Co- AS <P BILLING LOCATION JA wD ~ fh Vee AC Ae ed” trie beet | (A—Co 4 ae “Z| 1 | 40 £. ne 1S L ZALO Le Lie? See == WB P| Rive Za Ain Ke WEEN 2 Day) Tia Sea Pie |=S [ Z a I tif IA h HA L os MN IME TD TO.) VV "7 7 U\ I Rd , i ( 7 wei wall) Kab |2 [so a IY “7 Wax |wo [3 ~ oP capi! L833 |\OF a —ee ei VE a ie Od ¥oa Ruoff eee it An { HLA see ee TT IS . { Please pay from this invoice. S are 30 days Acco}its 30 days-_pas deRpare subject to COD status. i 1.5% on unpaid balangavATebiling tee will be added to invoices over 30 days. We accept Visa, MasterChrd and Americar’ Bie ee Bertsch ~The Bishop The Swan Rainshadow Properties, Inc gz 2010 Date: J une 20,2008 To: Development Services Department, Subject; Temporary Membrane Structure Permit request Enclosed you will find a schematic of the 40’ x 60’ membrane tent structure we will use to support weddings and other group events in the gardens at the Bishop Hotel during the summer and fall of 2008. As you may know the membrane top of the old circus style tent was badly warn by years of wear combined with being put up and taken down by in- house staff. Consequently we have replaced this structure with a more user friendly tent purchased from ABC Special Events Rentals of Mukilteo, Washing ton. Our contract with ABC provides for them to professionally install the tent and liner, remove it in early October after the PTFF weekend and the PT Wedding Show, return it to ABC’s storage site, do annual preventative maintenance and store it for us until next summer. Enclosed are; ; 1. Specification sheet for the 40 x 60 PC JUMBOTRAK tent 2. Copy of Certificate of Flame Resistance 3. Digital color photographs of the tent in place in the Gardens For your information, the side curtains we own are compatible and will be used as needed during chilly summer and fall nights. The structure and side curtains contain labels confirming they meet the same California Fire Code as the old Tuft Trak structure. The biggest differences are the; light weight of the structure, the low aspect ratio, and new technologies that allow roof sections to be put in place and removed without taking down the entire structure. I am requesting that the fire department inspect the new structure sometime this week and am at Tom’s disposal so I’m available to answer any questions. 714 Washington Street, Port Townsend, WA 98368 phone 360-385-6122 fax 360-379-1840 web address www.rainshadowproperties.com City of Port Townsend Development Services Department 250 Madison Street, Port Townsend, WA 98368 TENTS, MEMBRANE, CANOPY & AIR STRUCTURES — CODE COMPLIANCE CHECKLIST PERMIT NUMBER: BLD |6 - | ZC PROPONENT: G@ANwe, IDe STRUCTURE LOCATION: 1t4 WwoashiMd7ouHl ST. CONTACT PERSON: Ave Zb6o0- 531-1017 JURISDICTION AND PERMITTING Jurisdiction over all tents, canopies and membrane structures is derived from Section 2404 of the International Fire Code, 2006 Edition. A permit is required under Chapter 1, Section 105.6.4.4, for a temporary membrane structure that is in excess of 200 square feet, or a canopy structure that is in excess of 400 square feet. Jurisdiction over air-pressurization supported structures intended for human occupancy are subject to additional standards of safety in Chapter 31 of the /nternational Building Code. TYPE OF STRUCTURE [_] Membrane structure: An air-inflated, air-supported, cable, or frame-covered structure, and not W nan defined as a tent, canopy, or awning. Tent: structure, enclosure or shelter constructed of fabric or pliable material supported by any manner except by air or the contents it protects. [-] Canopy: structure, enclosure or shelter constructed of fabric, or pliable materials supported by any manner, except by air or the contents it protects, and is open without sidewalls, or drops on 75 percent or more of the perimeter. [_] Awning: a shelter supported entirely from the exterior wall of a building. [_] Air-Supported Structure: a structure, wherein the shape of the structure is attained by air pressure, and occupants of the structure are within the elevated pressure area. CODY PROVISIONS Tents, canopies or membrane structures shall not be located within 20 feet of lot lines, parked vehicles, or internal combustion engines such as generators. Support ropes and guy-wires are considered as part of the temporary membrane structure, tent or canopy. (Wy Copy of certificate which certifies the flame resistance as determined in accordance with NFPA 701, which includes: Names and address of the owners of the tent, canopy or air supported structure; Date the fabric was last treated with flame-resistant solution; Trade name or kind of chemical used in treatment; Name of person or firm treating the material; Name of testing agency and test standard by which the fabric was tested a Vr 1/23/09 ra A permanently affixed label bearing the identification of the size and fabric or material type shall be present for membrane structures, tents, or canopies. Ee Fire Retardant Appurtenances. Structure sidewalls, drops, curtains, tops, floor coverings, buntings, decorative materials and effects, of membrane structures, tents, and canopies shall be composed of certified flame-resistant material or shall be treated with flame retardant in an approved manner, and/or bear an approved label as meeting the requirements of flame resistance under NFPA 70/, and that such flame resistance is effective for the period specified by the permit. W Hay, straw, shavings or similar combustible materials shall not be located within a membrane structure, tent, or canopy containing an assembly occupancy, except materials necessary for the daily feeding and care of animals. Sawdust and shavings utilized for a public performance or exhibit shall not be prohibited provided the sawdust and shavings are kept damp. Combustible materials shall not be permitted under stands or seats at any time. "4 Areas adjacent to the tent or air-supported structure shall be maintained clear of all combustible materials or vegetation that could create a fire hazard within twenty [20] feet from the structure. "A Combustible trash shall be removed at least once a day from the structure during the period the structure is occupied by the public [_] “No Smoking” signs shall be conspicuously posted. [-] Spot or effect lighting shall only be by electrical power service, and all combustible construction located within six [6] feet of such equipment shall be protected with an approved non-combustible insulation no less than 9.25 inches thick. [_] Safety film. Motion pictures can only be displayed with safety film. [WA minimum clearance of at least three [3] feet between the fabric envelope and all contents located inside the tent or membrane structure is required. [_] Portable fire extinguishers shall be provided at each exit, with a minimum rating of 2-A:10-B:C. [_] Occupant load requirements shall be posted, as assigned by the fire code official or building official. Structure size in square feet, less required egress aisle[s], divided by occupancy factor: 1. Chairs only, not fixed = 7 square feet per person, net Total Occupancy 2. Standing space = 5 square feet per person, net Total Occupancy 3. Tables and chairs = 15 square feet per person, net Total Occupancy A twelve [12] foot fire break shall be provided beyond the guy ropes or other obstructions free of combustible vegetation. Anchorage is required for membrane structures, tents and canopies and their appurtenances-- adequately roped, braced and anchored to prevent collapse. The Fire Code Official or Building Official may ask for documentation as to structural stability as approved by a licensed engineer or hitect. ry Seatin and aisle[s] in temporary membrane structures, tents, or canopies shall be meet the aisle and seating arrangement requirements of International Fire Code Chapter 10, Section 1024.6: - 1. Forty-eight [48] inches for aisle with seating on both sides, exception: thirty-six [36] inches where the aisle does not serve more than 50 seats. 2. Thirty-six inches for aisle having seating on only one side . Converging aisles shal] combine the required aisle widths 4. Where seating rows have 14 or fewer seats, the minimum clear aisle access-way width shall not be less than twelve [12] inches measured as the clear horizontal distance from the back of the row ahead and the nearest projection of the row behind. 5. For rows of seating served by an aisle or doorway at only one end of the row, the minimum clear width of 12-inches between rows shall be increased by 5/8"-inches for every additional seat beyond seven[7] seats, but the minimum clear width is not required to exceed 22 inches. Ww 1/23/09 Exiting for a tent and temporary membrane structure or useable portion thereof shall be not less than the number required by code based upon size, configuration, and occupancy level from F.C. Table 2403.12.2, which includes: 1. Occupant load of less than 10, one [1] exit, not less than three [3] feet in width, or, 2. Occupant load of less than 199, two [2] exits, each with a width of 72 inches minimum, spaced at equal intervals around the perimeter of the structure, or, Occupant load of less than 499, three [3] exists, each with a width of 72 inches minimum, spaced at equal intervals around the perimeter of the structure 3 HY exit openings shall remain open unless curtains are provided on a metal support and contrast in color, or colors, with the color of the tent. Use of doors shall insure that the swing path is in the direction of xit travel. a? nia widths shall not be less than 44-inches in seating areas, and aisles shall be progressively increased in width to provide, at all points, not less than one [1] foot of additional aisle width for each fifty persons served by such aisle at that point. i The required width of exits, aisles and passageways shall be maintained at all times to a public way. [_] Exit signs shall be installed at exits and shall be self-luminous or internal or external illuminated. Exit signs shall depict the direction of travel when occupancy exceeds 50 persons. nw Exits shall be illuminated with light [not less than 11 Lux] while the structure is occupied. —}- Cooking and/or heating equipment shall be of a listed or approved type, and installed as specified in the International Mechanical Code and International Fuel Gas Code, and vented to outside air, and not located within 10 feet of an exit or combustible materials. However, use of solid flammables, butane or other similar devices, for warming of foods, cooking demonstrations and similar operations, which do not pose an ignition hazard, is allowed. 1. Patio Heaters and similar non-vented appliances are not approved for use inside structures, unless specifically listed or approved for use indoors. 2. LPG containers less than 125 gallons, may be eligible for a zero setback provided there is a 10- foot setback from ignition sources, and safety valves are aimed away from the structure. 3. Butane gas containers used in the structure are limited to no more than two [2] 10-ounce containers connected directly to the appliance at any time, and not with a manifold or connected by hose. _—+-open flame or other devices emitting flame, fire, or heat or any flammable or combustible liquids, gas charcoal, or other cooking device or any other non-approved devices shall not be permitted inside or located within twenty [20] feet of the tent, canopy or membrane structure[s] while open to the public unless approved by the fire code official. _LJ_ULP-gas fuel containers shall be located outside of the tent, and meet the setback requirements from the structure based on container size, using the Jnternational Fuel Gas Code, 2003 Edition, and/or: 1. Containers of 500 gallons or less capacity shall have minimum separation between the container and the structure of not less than ten [10] feet, shall be secured to prevent unauthorized movement, and protected to prevent tampering, damage by vehicles, or other hazards. 2. Cylinders used temporarily inside buildings for public exhibitions or demonstrations, including use in classroom demonstrations, shall be in accordance with the following: (1) The maximum water capacity of a cylinder shall be 12 Ib [nominal 5 Ib LP-Gas]. (2) If more than one such cylinder is located in a room, the cylinders shall be separated by at least 20 ft 3. Cylinders used for training purposes related to the installation and use of LP-Gas systems shall be in accordance with the following: (1) The maximum water capacity of individual cylinders shall be 245 Ib [nominal 100 Ib LP-Gas capacity], but not more than 20 lb of LP-Gas shall be placed in a single cylinder. (2) If more than one such cylinder is located in the same room, the cylinders shall be separated by at least 20 ft . 1/23/09 (3) The training location shall be acceptable to the authority having jurisdiction. (4) Cylinders shall be promptly removed when the training class has terminated. 4. Cylinders used as part of approved self-contained torch assemblies or similar appliances shall be in accordance with the following: (1) Cylinders used in buildings shall comply with UL 147A, Standard for Non-refillable (Disposable) Type Fuel Gas Cylinder Assemblies. (2) Cylinders shall have a maximum water capacity of 2.7 Ib. 5. Cylinders used with commercial food service appliances shall be used inside restaurants and in attended commercial food catering operations in accordance with the following: (1) Cylinders and appliances shall be listed. (2) Commercial food service appliances shall not have more than two [2] 10-oz. non-refillable butane gas cylinders, each having a maximum capacity of 1.08 Ib. (3) Cylinders shall comply with UL 147B, Standard for Non-refillable (Disposal) Type Metal Container Assemblies for Butane. (4) Cylinders shall be connected directly to the appliance and shall not be manifolded. (5) Cylinders shall be an integral part of the listed, approved, commercial food service device and shall be connected without the use of a rubber hose. (6) Storage of cylinders shall be in accordance with 8.3.1. -=+ Flammable and Combustible liquids shall not be used in tents, canopies, or membrane structures, and stored outside in an approved manner not less than fifty [50] feet there-from. --+- Air-inflated or supported structures are regulated under Section 2403.10 of the /nternational Fire Code. -++Canopies have an automatic sprinkler requirement when the existing permanent structure is provided an automatic sprinkler system, and the canopies exceed four [4] feet in projection, and where combustibles are stored or handled [_] Additional Comments/Requirements of the Fire Code Inspector: WEST EXIT STAIRS — TWO CAR PARKING SPACES TO BE. OVWTIED PURNG EVENT ra be approvED A TO COMPLIANCE WITH THE INTERNATIONAL FIRE CODE TS ABOVE—RE-INSPECTION REQUIRED TIME: (470 1/23/09 Receipt Number: BLD10-126 989705504 Plan Review Fee $50.00 $50.00 $0.00 BLD10-126 989705504 State Building Code Council Fee $4.50 $4.50 $0.00 BLD10-126 989705504 Technology Fee for Building Permit $5.00 $5.00 $0.00 BLD10-126 989705504 Building Permit Fee $50.00 $50.00 $0.00 BLD10-126 989705504 Record Retention Fee for Building Per $3.00 $3.00 $0.00 Total: $112.50 CHECK 5005 $ 112.50 Total: $112.50 genpmtrreceipts Page 1 of 1