Loading...
HomeMy WebLinkAbout100725 HPC Meeting Minutes , , Zhenya Lavy September Lonnie Mickle moved to Kathleen minutes. Walter Motion passed irtual) v 2025 Michael D’Allesandro City Clerk Action Motion: Knoblock approve the 2Galitzki seconded.Vote: unanimously. Deputy MINUTES ABSENT: In person and ( and Land Use and Community Consulting LLC Kathleen Knoblock, Monica Mader - EETING City Hall M MEMBERS Mader Lindsey Sehmel, minutes. Walter Galitzki ETHOS PNW LOCATION: , Monica :, 2025 EXCUSED September 2 Chair Craig Britton p.m. 0 0 Adrian Smith, Senior Planner : MEMBERS - 3 pm by 6 3:0 provided the Port Townsend Community Center Gym (None) Craig Britton (Chair), Walter Galitzki (Vice Chair), Long Range Planner Adrian Smith the format of the meeting. HISTORIC PRESERVATION COMMITTEE moved to approve the Gates, START TIME: September 2, 2025 Monica MickHager minute time limit): - Community Center - 2025, (3 , : (None) 011 - : PRESENT: was called to order at MEMBERS PRESENT: Kathleen Knoblock October 7 HPC25 Motion passed unanimously. a) TopicCall to Order The meeting Chair Craig Britton explained Approval of Minutes: Motion:seconded. Discussion ensued around correcting the spelling of Zhenya Lavy’s last name in minutes. Correspondence/Attachments: Public Comment There was no public comment. Old BusinessNew Business Long Range Planner Adrian Smith Vote: DATE:VOTING Michael D’Allesandro COUNCIL LIASION:CITY STAFF Planning Manager Jacob Contracted Support for City of Port Townsend Community Development Walter Galitzki Motion passed Action Motion: moved to approve as presented. Zhenya Lavy seconded. Action: unanimously. no - Jacob - and and Council, sections, Lighthouse beams, , three Better Living Through Coffee managed PTCC Gymnasium Existing and Comprehensive Planning - for Planning Commission 012 Water Street, Window Replacement - 012 Description for 955 Water Street regarding - Proposal’s Alignment with Historic Preservation . and HPC25 . Window Replacement - , permit for Tyler Plaza side, proposal . and restore vs replace in kind. PTCC Gymnasium Proposed Elevations, 12 pane window appropriate for current application and recommendation going and 012 Water Street - windows on second story, bay window, windows to be replaced are double paned, Walter Galitzki moved to approve as presented. Zhenya Lavy seconded. . Motion passed unanimously. five HPC25Gates, Planning Manager . b) Topic Renovation presentation which included Staff Presentation Outline, Administrative Review, HPC Review of Proposed Infilling of Windows, CodeThe Applicant Studio Bracket Architect Becca Caddick presented PTCC Gymnasium Project Background/History, Conditions, and Eave Details. In response to HPC’s questions applicant and staff explained ramp not coming back to HPC, original windows, window frames, North vs East Elevation windows, foundation below window, concrete, door frame, wood windows, funding, County project, location of future ramp, storage room, vandalism, Discussion ensued around appreciation for how project is being performance center history Motion: Discussion ensued around window guideline timelineoriginal windows, Action: Planning Manager Jacob Gates presented HPC25Comprehensive Planning which included replacing windows due to saltwater damage In response to HPC’s questions the applicant Devin Cohn explained where they are currently at in the process, Better Living Through Coffee first floor windows damage, Café, Waterfront Pizza, Devin Cohn presented the proposed window replacement, distinction between historic and original, replace replacement windows proposedwindows Action and three . process for window guidelines at 4:26pm. structure was put in place. the which projects will come back to HPC, written was adjourned date g approve the application for replacement of the historic color palette, stone white exterior matches current the C , understanding of discussion. to , 2025 e application to reflect HPC recommendation ing , windows, waterside windows, and character. adher applicants amend November 4 and having to applicant proposal is 6 and 1 pane windows, (None) : Walter Galitzki moved that HP , painting a fiber glass windows Motion passed unanimously. Topic forwardwindows and trim, Public comment:Josh Kout spoke about building Jacob Gates stated Motion: windows that are facing water upstairs providing the applicant goes with 12 pane configuration. Kathleen Knoblock seconded. Discussion ensued around Vote: Other Business Upcoming Meetings:Kathleen Knoblock stated she would be absent, and Craig Britton stated he may be virtual. Adjourn: There being no further business, the meetin HPC involvement, 12 pane windows and view, proposal to vote on,