HomeMy WebLinkAbout100725 HPC Meeting Minutes
,
, Zhenya Lavy
September
Lonnie Mickle
moved to
Kathleen
minutes. Walter
Motion passed
irtual)
v
2025
Michael D’Allesandro
City Clerk Action Motion: Knoblock approve the 2Galitzki seconded.Vote: unanimously.
Deputy
MINUTES
ABSENT:
In person and
(
and
Land Use and Community Consulting LLC
Kathleen Knoblock, Monica Mader
-
EETING
City Hall
M
MEMBERS
Mader
Lindsey Sehmel,
minutes. Walter Galitzki
ETHOS PNW
LOCATION:
,
Monica
:, 2025
EXCUSED
September 2
Chair Craig Britton
p.m.
0
0
Adrian Smith, Senior Planner
:
MEMBERS
-
3
pm by
6
3:0
provided the Port Townsend Community Center Gym
(None)
Craig Britton (Chair), Walter Galitzki (Vice Chair),
Long Range Planner Adrian Smith
the format of the meeting.
HISTORIC PRESERVATION COMMITTEE
moved to approve the
Gates,
START TIME:
September 2, 2025
Monica MickHager
minute time limit):
-
Community Center
-
2025,
(3
,
:
(None)
011
-
:
PRESENT:
was called to order at
MEMBERS PRESENT:
Kathleen Knoblock
October 7
HPC25
Motion passed unanimously.
a)
TopicCall to Order The meeting Chair Craig Britton explained Approval of Minutes: Motion:seconded. Discussion ensued around correcting the spelling of Zhenya Lavy’s last name in minutes.
Correspondence/Attachments: Public Comment There was no public comment. Old BusinessNew Business Long Range Planner Adrian Smith
Vote:
DATE:VOTING Michael D’Allesandro COUNCIL LIASION:CITY STAFF Planning Manager Jacob Contracted Support for City of Port Townsend Community Development
Walter Galitzki
Motion passed
Action Motion: moved to approve as presented. Zhenya Lavy seconded. Action: unanimously.
no
-
Jacob
-
and
and Council,
sections, Lighthouse
beams,
,
three
Better Living Through Coffee
managed
PTCC Gymnasium Existing
and
Comprehensive Planning
-
for Planning Commission
012 Water Street, Window Replacement
-
012 Description for 955 Water Street regarding
-
Proposal’s Alignment with Historic Preservation
.
and
HPC25
.
Window Replacement
-
, permit for Tyler Plaza side,
proposal
.
and
restore vs replace in kind.
PTCC Gymnasium Proposed Elevations,
12 pane window appropriate for current application and recommendation going
and
012 Water Street
-
windows on second story, bay window, windows to be replaced are double paned,
Walter Galitzki moved to approve as presented. Zhenya Lavy seconded.
.
Motion passed unanimously.
five
HPC25Gates, Planning Manager
.
b)
Topic Renovation presentation which included Staff Presentation Outline, Administrative Review, HPC Review of Proposed Infilling of Windows, CodeThe Applicant Studio Bracket Architect
Becca Caddick presented PTCC Gymnasium Project Background/History, Conditions, and Eave Details. In response to HPC’s questions applicant and staff explained ramp not coming back to
HPC, original windows, window frames, North vs East Elevation windows, foundation below window, concrete, door frame, wood windows, funding, County project, location of future ramp,
storage room, vandalism, Discussion ensued around appreciation for how project is being performance center history Motion: Discussion ensued around window guideline timelineoriginal
windows,
Action: Planning Manager Jacob Gates presented HPC25Comprehensive Planning which included replacing windows due to saltwater damage In response to HPC’s questions the applicant Devin
Cohn explained where they are currently at in the process, Better Living Through Coffee first floor windows damage, Café, Waterfront Pizza, Devin Cohn presented the proposed window
replacement, distinction between historic and original, replace replacement windows proposedwindows
Action
and
three
.
process for window guidelines
at 4:26pm.
structure was put in place.
the
which projects will come back to HPC, written
was adjourned
date
g
approve the application for replacement of the
historic color palette, stone white exterior matches current the
C
,
understanding of discussion.
to
, 2025
e
application to reflect HPC recommendation
ing
, windows, waterside windows, and character.
adher
applicants
amend
November 4
and
having to
applicant proposal is 6 and 1 pane windows,
(None)
:
Walter Galitzki moved that HP
, painting a fiber glass windows
Motion passed unanimously.
Topic forwardwindows and trim, Public comment:Josh Kout spoke about building Jacob Gates stated Motion: windows that are facing water upstairs providing the applicant goes with 12
pane configuration. Kathleen Knoblock seconded. Discussion ensued around Vote: Other Business Upcoming Meetings:Kathleen Knoblock stated she would be absent, and Craig Britton stated
he may be virtual. Adjourn: There being no further business, the meetin
HPC involvement, 12 pane windows and view, proposal to vote on,