HomeMy WebLinkAbout3344 Adopting the Capital Improvement Plan for 2025 Through 2030Ordinance 3344 Page 1 of 2 Ordinance No. 3344 AN ORDINANCE OF THE CITY OF PORT TOWNSEND, WASHINGTON, ADOPTING THE CAPITAL IMPROVEMENT PLAN FOR 2025 THROUGH 2O30 WHEREAS, the City of Port Townsend has adopted a Comprehensive Plan and has amended it in accordance with the requirements of the Growth Management Act ("GMA") (Chapter 36.70A of the Revised Code of Washington); and, WHEREAS, the GMA requires a capital facilities plan as a mandatory element of the City's Comprehensive Plan and the City has adopted such a plan, commonly referred to as the City's Capital Improvement Plan; and, WHEREAS, the Capital Improvement Plan provides the six -year capital facility program for the City, subject to appropriation by the Council of funding for the projects contained in the Plan; and, WHEREAS, RCW 36.70A.130 and Port Townsend Municipal Code Section 20.04.030A(7) allow the city to adopt changes to the Capital Improvement Plan concurrently with the adoption of the city's budget; and, WHEREAS, the City Council passed Ordinance 3301 adopting the 2023-2028 Capital Improvement Plan on December 5, 2022; and, WHEREAS, the a number of changes to the City's Capital program have occurred since the last plan with the adoption of the last plan and staff has updated the plan for 2025-2030; and, WHEREAS, a determination of non -significance for a non -project action was issued on November 13, 2024; and, WHEREAS, the City Council held a workshop on November 12, 2024 and held a public hearing on December 2, 2024, on the proposed 2025-2030 Capital Improvement Plan; and, NOW THEREFORE, the City Council of the City of Port Townsend do ordain as follows: Section 1 1 in,ding .rind Cqnqlusions. The proposed 2025-2030 Capital Improvement Plan is consistent with and implements the currently -adopted Capital Facilities and Utility Elements of the Comprehensive Plan are consistent with RCW 36.70A.070(3) and the Comprehensive Plan, and are in the public interest. Section 2. The City adopts the 2025-2030 Capital Improvement Plan as substantially shown at Exhibit A. Ordinance 3344 Page 2 of 2 Section 3. Severability. If any sentence, clause or phrase of this Ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause, or phrase or work of this ordinance. Section 4 1a�,attai tcMl:)gartment of Commerce. The City Clerk shall transmit a copy of this Ordinance to the State Department of Commerce (DOC) within ten (10) days of adoption of this ordinance. Section 5. Effective Date. This Ordinance shall take effect and be in force 5 days following its s publication in the manner provided by law. ADOPTED by the City Council of the City of Port Townsend, Washington, at a regular meeting thereof, held this 16th day of December 202 David) Fa ......... Mayor Attest: lys <; ode It.)L . City Jerk City of Port Townsend Capital Facilities Plan 2025-2030 Report Date: Adoption December 16, 2024 Adopted: Ordinance 3344 December 16, 2024 December 16, 2024 Information Technology.,. ...... ... _ ....... ...... Housing, Economic Development, and the Environment...........................................................................60 Impact Fees ......... ............. .......................................................m................,,.....................,.,,...,..,,.,.....,,,,.....66 Conclusion.....:..................................................................a.......,.....,,.,..,....,......,,,........,.....,.........,...........,... 67 Appendices.. __ . . _ ___ . ...... ....... ......,.,,,......, ,.... ,... 68 Appendix A: 2025 Capital Project Budget Sheets.. ..... 68 Appendix B: 2025-2030 Six Year Transportation Improvement Program..............................................68 Schedule The following schedule is typical with the every other year development of a Capital Facilities Plan. • Start assembling the tables in August • Initial Draft presented to the City Council with capital budget for the next calendar year • City Council Workshop November 12, 2024 • SEPA Determination of Non -significance for non -project action published in November 18, 2024 • Public Hearing and City Council Adoption anticipated On December 2, 2024. 3 December 16, 2024 forecast of the future needs for such capital facilities; (c) the proposed locations and capacities of expanded or new capital facilities; (d) at least a six -year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes; and (e) a requirement to reassess the land use element if probable funding falls short of meeting existing needs and to ensure that the land use element, capital facilities plan element, and financing plan within the capital facilities plan element are coordinated and consistent. Park and recreation facilities shall be included in the capital facilities plan element. This capital facilities plan draws upon other city planning documents included by reference and included in the city's comprehensive plan. Examples of these plans include but are not limited to the Water System Plan, General Sewer Plan, Six Year Transportation Improvement Plan, Rainier Subarea Plan, Non -motorized plan, Parks Recreation and Open Space Plan, and many more available on the City's website at Ikttofws � �..i; ?off q„ &J wain ,i1 ppyoj�a.�,y plans These plans are where inventories and further detail can be found concerning existing city infrastructure. Periodically, the City updates the Comprehensive Plan to address land use elements and other state requirements. In summary, capital facilities planning is a component of the Comprehensive Plan and serves as a tool for a community to strategically address existing and future conditions of the community while planning for growth as required by the State. The final purpose of this plan is to facilitate procurement of grants. Often, granting agencies will not allow for the application of funding unless projects are specifically identified in an adopted plan of the City. Some projects included in the Capital Facilities plan do not have a home in other adopted plans, but are community priorities and may be emerging issues. These projects are included in this plan to the extent that information is available. Definitions Capital is defined in the City's purchasing policy as capital equipment having an initial value of $1,000 or more and a useful life of 3 years or more. For the purposes of this plan, Capital is defined at having an initial purchase value of $10,000 or more and a useful life of 5 years or more. This keeps most of the repair and maintenance capital items outside of this plan. Capital Facilities Plan is defined as an overall assessment of the City's capital needs. The term facilities when included inside the title of the plan includes all city infrastructure and not just city buildings. Comprehensive Facilities Assessment means an evaluation of the condition and capital needs of the City buildings. Comprehensive Plan means the most recent version of the City adopted Comprehensive Plan as required and identified in Chapter 20.04 PTMC. Facilities means city buildings for the purpose of this plan. This definition is not confused with the overall name of the plan. December 16, 2024 Table 8-2 Transportation Level of Service Standards Stormwater and A level of conveyance, detention, and treatment that meets the Department Surface Water of Ecology (DOE) Stormwater Manual adopted by the City or as defined in the City's Stormwater Master Plan These standards should then be applied to additional population and employment growth anticipated. Jefferson County selected a medium population growth, which sets the 2045 growth target at 40,486. The City of Port Townsend is allocated 40% of that population growth, resulting in 12,931 people in 20245, which is an additional 2,781 people from the 2020 US Census count of 10,148 people. The Housing Action Planning Tool in the 2025 Port Townsend Comprehensive Plan to be updated in 2025 projects the 20-year housing forecast to add an additional 1,648 housing units by the year 2045 from the current count of 5,371 households for a total of 7,018 housing units. 2020 US Census counted 10,148 people and the 2021 WA Office of Financial Management estimates 2021 population at 10,220. The 2016 update projected a need of 55 acres over 20 years to support the high wage jobs projected. The Rainier Street and Upper Sims Way Corridor is intended to provide this need with approximately 82.5 acres of fully served, shovel -ready industrial acreage. Each development must meet the aforementioned level of service standards prior to issuance of a building permit; however, it may demonstrate meeting the standards for transportation facilities within six years issuance of a building permit (Chapter 8, Policy 4.1). The City may condition development permits to provide for appropriate facilities, services, and utilities not subject to concurrency such as EMS, parks, law enforcement, and schools (Chapter 8 Policy 4.2). A development that cannot meet the minimum concurrency requirements can mitigate impacts on levels of service, revise to reduce impacts, or phase the development coincident with the availability of services (Chapter 8, Policy 4.3). All development must pay its proportionate share of the cost of new capital facilities and utilities needed to serve that development. Under the Growth Management Act and Chapter 8 Goals 6 of the City's Comprehensive Plan, the Capital Facilities Plan must also be coordinated and consistent with CFP's of other public facility providers. Other public facility providers include but are not limited to Jefferson County Transit, East Jefferson Fire and Rescue, Port of Port Townsend, Jefferson Health Care, Jefferson County PUD, the Port Townsend School District, and Jefferson County. The City engages in partnerships with these other providers in an effort to coordinate the procurement of limited resources. December 16, 2024 Policy 5.5: Ensure that developers provide capital facilities and utilities concurrent with new development or provide a contractual agreement for the phasing of facilities and utilities, subject to approval by the City. Current Revenue Sources Current revenue sources for infrastructure include the following sources. These sources are listed from top to bottom from least restrictive to most restrictive as required by laws and city code. ... ........... ..._......, ...... General Fund, Fund ...... . There are four categories of fund balance: restricted, committed, assigned, and Balance. unassigned. Restricted — Amounts reserved to specific purposes by their providers (such as grantors, bondholders and enabling legislation); Committed — Amounts reserved to specific purposes by a government itself, using its highest level of decision -making authority; Assigned — Amounts a government proposes to use for a specific purpose; intent can be expressed by the governing body or by an official or body to which the governing body delegates the authority; and Unassigned — Amounts that are available for any governmental purpose; these amounts are reported only in the general fund. Limited Tax General w , ._. ... ,.... _. Backed by general fund revenues, the City Council can issue debt for Obligation Bonds: infrastructure. The amount of Debt is limited by law and practicality. As discussed above, debt takes away from operating funds and other capital funds and thus use of debt is a strategic choice. Transportation rease crease for In 2023the voters of Port Townsend approved a 0.3% Sales Tax inc , Benefit District for Streets improvements and repairs. The majority of funding is dedicated to street repair, grant match, and non -motorized improvements as outlined in the Transportation Benefit District fact sheets. This revenue source is estimated at approximately $800,000 per year. Banked Capacity. In February 2019, residents approved adding Port Townsend to East Jefferson Fire & Rescue (EJFR) fire district. EJFR now collects the dedicated Fire and EMS levies from City property taxpayers directly. In addition to the dedicated levies, the City was funding fire service through the general property tax levy. The City no longer makes payments from the general fund for fire protection. The City agreed to suspend the collection of an equivalent amount of property taxes it would have paid EJFR from the general levy — a reduction of the City levy or a "banked capacity" of about $908,000. An agreement with the fire district and a policy adopted by City Council spelled out an approach that allows increased levies of the banked capacity over the course of four years. For the first three years, funding is restricted to four main uses consistent with existing plans: local roads, parks and trails, the City's housing trust fund and utility tax relief. In 202Q the City deeded not to y ......... _ the Y... decided ... levy any of the possible... 9 December 16, 2024 counties to collect shares of revenue from document recording ������� o to fund affordable housing and homeless housing programs. The City and County have a joint Interlocal Agreement on administration of these funds authorized. The City collects funds from HB 1406 and provides them to the county for deposit in the 148 Fund for budgeting and allocation subject to the interlocal agreement. System Also known as SDCs, these charges for new utilityconnections help fund Development system expansion for growth. Charges for Utilities: ...Street Fee -in -lieu In 2023, the City Council adopted a fee in lieu program to allow developers to voluntarily contribute fees instead of building improvements. This program is primarily directed at requirements to build sidewalks. The fee in lieu program provides equity in transportation infrastructure and fees are used in places that serve the development as well as the rest of the public. Fee in lieu investment in sidewalks will be dedicated to creating connections where sidewalk gaps exist. This plan documents fee in lieu collection and investments ...._ . ...... ........_ .... w_.......... .........�......._...... Utility .. Rates: ........ ._...... ..prise funds tha..._..... Utilities are enter t are specific independent business units within the City. Utilities are required to set rates for services that ensure payment for operations and capital to address system needs. This business model is set forth to ensure essential public services such as water, sewer, and stormwater are addressed. _ Donations and Fund b the public, volunteerismand donations are all sources Fund raisin p of g y , , Raising revenue the city has utilized for capital improvements historically. ....... Library Foundation The foundation has the opportunity to fund capital programs if in concert with Library capital improvement needs and planning. Quimper Parks and Created in 2024, this foundation provides an opportunity for the public to Tree Foundation donate to improvements in sustaining and growing parks and tree on the Quimper Peninsula, Future Revenue Sources Future revenue opportunities are available to the City to address capital needs. Below are a few of the more common revenue sources used by cities across the State. As the City looks toward financial sustainability, additional revenue sources may be recognized and brought forward for consideration. In 2023, the City completed a Financial Sustainability Initiative to strategize stabilizing city government finances recognizing that revenues typically do not keep up with inflation. The Financial Sustainability Initiative evaluated a number of options to generate revenue necessary to sustain city services. Depending on the success of these initiatives, the City may be able to enhance services identified in various City strategic and functional plans. Fundamentally, the tax system in Washington State is set up with growth as a necessity. Local Governments struggle to sustain services accordingly. 11 December 16, 2024 appropriate and to what level of debt should be on the city's books. The following considerations should be considered in the development of a debt policy: • General Obligation vs. Revenue debt • Principle, payoff date, and revenue sources • Term of debt should not exceed the lifespan of asset. le 20-year bond for 15- year roof. • Debt term should generally not exceed 20 years • Evaluation of opportunity cost for issuing debt. What is this interest rate differential and how does it compare to projected inflation. • Should general obligation debt be limited to a specific percentage of revenues. The following table provides a summary of the city's debt, NonVoted General Obligation Debt Outstanding LTGO2017A (2008 Refi) NonTaxable Bond 9,155,000 9,155,000 9,155,000 9,155,000 9,155,000 LTGO2017B (2008 Refi) Taxable Bond 1,060,000 1,060,000 1,060,000 1,060,000 1,060,000 LTGO 2020 (Refi 2010 LTGO) 4,273,350 4,073,350 3,868,350 3,658,350 3,356,900 LTGO Refi 2012 (PORTOWGORE12) 3,165,000 2,680,000 2,175,000 1,660,000 1,135,000 LTGO 2018 Homeward Bound Debt Svc 834,000 834,000 834,000 808,104 781,069 NonVoted GO Debt Outstanding 18,487,350 17,802,350 17,092,350 16,341,454 15,487,969 Voted General Obligation Debt Outstanding LTGO Refi 2015 (PORTOWUTGO15) 3,205,000 3,020,000 2,835,000 2,640,000 2,440,000 Voted GO Debt Outstanding 3 205,000 . 3,020,000 2.835,000 2,640,000 2,440,000 Total General Obligation Debt Outstanding 21,692,350 20,822,350 19,927,350 18,981,454 17,927,969 Revenue Debt Outstanding (excluded from General Purpose Debt limits) Amount Outstanding at End of Year 2018 2019 2020 2021 2022 Actual Actual Actual Forecast Budget SRF 2002v DOE Wastewater Conveyance Sgts 337,212 291,098 244,376 196,950 148,811 --PWTF 2002: Morgan H41 Ur Stem linpr. 333,510 266,808 200,106 133,404 66,702 P'WTF 2012 City Lake Loan 736,842 684,211 631,579 578,947 526,316 DWSRF 2012 LT2 Water' Treatment Paco 2„917,945 2,782,025 2,627,468 2,472,911 2,318,354 "DWSRF 2012LT2 Water Treatment Facility 1,566„900 1,454,978 1,343,057 1,231,135 1,119,214 f'W'TF 2013: L"F2 UV Oisinfectkan 3,69 ,963 3,450,499 3,204,035 2,957,571 2,711,107 PWTF 20115 GAG Reservoir Replaccerr nl 1„125,937 1,050,875 975,812 900,750 825,687 ICERB DWSRF 2015: 5MG ReseNor Repiacernent 4„414,363 4,196,495 3,986,670 3,765,189 3,543,707 DWSRF 2015: Mandated Drink4iq Water Treaty 3„537„275 3,360,411 3,183,548 3,006,684 2,829,820 Rev Bond 2020: LT2 & Big Quil 1,914,980 1,834,800 2015: Howard St Corridor Public Wrastruclure 1,200,,000µµ� 1,165,407w........ 1,119,007 ... µw 1071216 18,666,947 18,737,400 17,562,058 18,277,528 16,995,734 13 December 16, 2024 Facilities (Buildings) This section of the Capital Facilities Plan is dedicated to city buildings, lands, and art. The term facilities is confusing due to its name duplicated in the overall plan. This section is also applied to facilities which are under the purview of the General taxation as compared to facilities that are directly tied to the utilities such as the water treatment facility. Looking forward, facilities represents a significant public investment. The City Council recognizes the liabilities on future generation of failure to proactively maintain buildings and thus included in the 2025 budget funding for the development of a facilities repair and replacement program which mirror the City's fleet equipment repair and replacement program. Buildings City buildings are a major asset of the community. City buildings also carry significant financial liability in terms of maintenance and upkeep. A facilities assessment is needed to accurately identify building needs and estimate time frames for periodic preventative maintenance such as rehabilitation of roofs, HVAC systems, carpets, elevators, weather protection, and other maintenance needs. The larger maintenance projects are classified as capital investments and thus need to be included in the Capital Facilities Plan. The following narrative describes each of the City facilities and includes known and unknown placeholders for significant needs. The City Hall Annex- Owner: City of Port Townsend, 12,000 square feet renovation was finished in 2006. Total construction costs of $4,626,000. It sits at 250 Madison Street quietly beside the stately 1894 Historical City Hall in downtown Port Townsend. Their adjacency is intentional; the Annex was designed to seismically support the historic structure, thus minimizing aesthetically invasive upgrades to its fagade. The Annex design references the materials and proportions of its Victorian neighbor, including strong vertical lines, tall narrow windows, and precast details. Close collaboration with the Port Townsend Historic Preservation Committee resulted in a respectful yet modern new Annex and a sensitive rehabilitation of the historic City Hall that included seismic and technology upgrades 15 December 16, 2024 In 2005, as part of the construction of the new City Hall Annex, contractors replaced the roof with a flat rubber membrane. Much needed repairs to the exterior brick and mortar on the south facing and waterward side as it begins to show signs of deterioration. The public elevator has experienced a few major repairs and needs to be replaced in the next 10 years depending on the outcomes of an assessment. Most of the original single pane windows are beginning to fail as the glass thinks and frames begin to break. There is no forced air or ventilation system in this building which is a concern for the displays and the preservation of the artifacts. The need for soundproofing on the first and second floors is of concern as the original wood flooring and lath and plaster walls do not absorb the acoustics of the room. In 2023 the city invested in significant upgrades to the historical council chamber's audio and video systems. At that same time new furniture was added, and ADA access to the chambers was improved. In 2024 Jefferson County Historical Society was awarded a grant to upgrade and improve the ADA access to the museum. Construction to begin in 2025. Looking forward, minor upgrades are planned for improved ADA access and improved HVAC/energy operations. Mountain View Campus- 7.6 Acres. Owner: Port Townsend School District. Located at 1925 Blaine St, Mountain View houses many nonprofit entities including the Red Cross, Food Bank, KPTZ, YMCA, the ReCyclery and New Image clothing. Mountain View is also home to the City of Port Townsend Police Department and other administrative offices. The land parcels, buildings, and facilities all remain owned by the Port Townsend School District and are only leased to the City for management and operations. Mountain View Pool and Park exist at the site of a former school, Mountain View Elementary. Mountain View Pool is an indoor aquatic facility that is now operated by the YMCA and consists of a non- competitive 20 yard "L" shaped pool that provides programming and classes for swim lessons, aquatic fitness, lap swim, open swim, and special events. YMCA's lease agreement at Mountain View remains in effect until December 31, 2028, or until a new aquatic facility is completed and the current facilities are demolished, whichever is sooner. Mountain View Park is anchored by a 1-acre fenced dog park, a playground, open field, and sport courts for basketball and newly resurfaced pickleball court sponsored by the Port Townsend Pickle Ball Club. Beginning in August of 2009 the City of Port Townsend entered into a five-year lease agreement with the Port Townsend School District for the property known as Mountain View Campus. In 2014, the City expanded the lease agreement with the School District to 15 years with an option for an additional 15- year renewal. This extension positioned the City to qualify for grants and other funding opportunities to 17 December 16, 2024 BARTLETT/COTTON BUILDING 607 Water St. built in 1888 by Charles C. Bartlet was a three- story, one bay brick building. In 1889, the first tenant was the Bartlett House, considered as the focal point of the city. It had a saloon, wine parlor, clubrooms, cigars, and sporting newspapers. In 1932, Water Street Garage took over and then in 1939 Olympic Pile Driving Company office and later, the Cotton Corporation (George Cotton) stayed until 1974. In 1955, George Cotton removed the top two floors, which needed repair after a windstorm caused irreparable damage. The City of Port Townsend Police Department moved to the site in 1975 until moving to Mountain View Campus in the early 2000's. The Cotton Building renovation project had its genesis in the planning to relocate the Police Department away from the Downtown Historic District waterfront and its associated tsunami and seismic hazards. It was recognized that the Department had to continue to operate effectively during an emergency event that may otherwise destroy the Police operations center and restrict access to/from the rest of the City. The move of the Police Station raised the question of what to do with the Cotton Building. The historic character of the building precluded its demolition so a plan for an alternate use was pursued, but it was clear that the unreinforced masonry building needed structural improvements to make it safe for continued use. In 2010 the building was completely renovated for city, civic and community uses. The project was funded through a 2008 City Council bond, along with funds from the Washington State Military Department, FEMA and the Department of Ecology. The initial total project cost with construction, design, overhead and technical support came in at $980K. Once construction and demolition began in the fall of 2009 it became apparent that the condition of the building was far worse than anticipated. Issues developed around the rotting floorboards, crawl space, lead based paint and additional asbestos were found in the ceiling, roof, floor and walls. Unknown until the time of demolition were four large underground fuel tanks which were half full at the time. Outstanding repairs: Depending on the outcomes of an assessment, the rubber membrane roof will need to be replaced in the next five years, estimated to cost $75K. Brick and mortar work on the waterward side. 19 December 16, 2024 pump and controls were installed in 2022. The cost to develop the well was $450,000. The well will also serve as an emergency water supply if the city's Olympic Gravity Water System is not functional. Library - Owner City of Port Townsend The historic Carnegie Library building is a jewel in the community. The library is the most frequently and heavily used City facility. The Port Townsend Public Library was established in 1898 by a group of "leading community ladies." By 1913 they had acquired the land, secured City funding, and received a grant from the Carnegie Library Foundation to construct a new building in keeping with Carnegie architectural design standards of the period. The Port Townsend Carnegie Library served its community so well that a 4,500 sq. ft. addition was added in 1990 to accommodate the high volume of use that continues to increase significantly each year. In 2014 a major renovation was completed. Click here to view a slideshow of the project. Read A Source of PT F)rid(-,! -- History of the Port Townsend Carnegie Library by Pam McCollum Clise for more in-depth history of the library and historic Carnegie building. From the library's website http ..: °ptp blmichIr4.�, org/.i gar.y .g jhis o N, TN Ly,. This beloved building is in great condition given its age. Nevertheless, several repairs are needed including replacement of the HVAC system which experiences problems every winter season and the anticipation of replacement/ modernization of the elevator car. The addition of an AC and air filtration unit would help address equity issues for the community during a time of climate change allowing the library to serve as a climate resiliency center. The annex part of the building is still waiting for much needed window replacements. The bathrooms are also waiting to be remodeled. Permits and plans for the windows and bathrooms have been issued and completed and the library is waiting to hear back about a Department of Commerce Library Capital grant to help with the costs. Along with this grant, funds from the Port Townsend Library Friends and Foundation and bond proceeds are planned for this project. The Carnegie building needs to be included in an overall building assessment to ensure that preventative maintenance is not overlooked in order to preserve this beloved community treasure for another one hundred years into the future. Project History: 21 December 16, 2024 Charles Pink House- Owner City of Port Townsend The Charles Pink House is a unique asset for the library. Constructed in 1868 in the Late Greek Revival style of architecture, it is one of the last remaining houses of its kind in the state. Built by Horace Tucker, who is known for building many of the oldest houses in Port Townsend, the house was purchased by Charles Pink in 1874. The house remained in the Pink family for the next 92 years. In the late 1880s the Pink family expanded the house, rebuilding the porch and adding Victorian bays. Near the turn of 20th century, the house was once again renovated, with the original pillars and front doors replaced by substitutes in the style of the Arts and Crafts movement that was popular at the time. These changes made the Pink House a unique building architecturally in Port Townsend. Because it was difficult to peg down as an example of a specific style, the house sat neglected for most of the latter half of the 20th century. The City of Port Townsend purchased the Pink House in 1981 for the purpose of serving as an expansion to the adjacent Carnegie Library. Because of difficult economic times, the City lacked the funds to rebuild the dilapidated structure. In exchange for a complete restoration of the building, the City gave a long-term lease on the building to Litt... and Little onstructian. After a massive renovation, the building was leased out until 2003 when the lease expired, the City regained control of the building. It then served as the administration house for the local fire department. The library took over the house in 2007 and uses it to supplement the Carnegie Library. First floor program and meeting spaces and second floor offices give the library needed flexibility in offering services to the public. In 2012 the Pink House underwent another renovation, this time focused on making the first floor interior spaces better suited for public programming and meetings. The project included interior wall removal and structure repairs, fireplace removal and chimney repairs, bathroom and kitchen renovations, new carpet, paint, flexible furniture and technology systems for presentations. 2018/19 saw the restoration of the of the rcfc µretainup WLiq fronting Lawrence and Harrison Streets. Much care was taken with this project by reusing the historic rocks from the original wall that fallen over the years. 23 December 16, 2024 Public Works Shops- Owner City of Port Townsend Located at 1818 Beach Street, this site houses the Public Works Department, Fleet Department, Storm Water and Admin offices. The Main Public Works Shop building features an attached open-air canopy, storage mezzanine, automotive lifts, mechanics shop, and storage area. The facilities are aging and in poor condition. Two modular units serve as office space. The City has explored in the past relocating City Shops to the Water Treatment Facility located on 20th Street. Relocation would allow for the property at the current location to be cleared on surpluses for housing or another use. No further plans have been developed, other than when the Water Treatment Facility was constructed, space was set aside for the possibility of relocating City shops. The next step in vetting a plan for relocation would be to do a schematic design process which would quantify the space needs and provide a rough layout of buildings while establishing an approximate cost estimate and ensuring feasibility. The City of Port Townsend 2025 budget includes schematic design of a Municipal Service Center that would house our Public Works team (Feet, Streets and Stormwater division, Water crews, and Parks and Facilities team. This is a first step to long range planning for the likely relocation and construction of new public works shops. If approved and successful, the current shop property could be redeveloped into housing. W December 16, 2024 Developing a pipeline of City property to support the mandated and community desires of developing affordable housing is a key work item in 2025. In the next Capital Facilities Plan Update, the pipeline of properties will be documented below. Ill The City owns public art and also facilitates the display of art on loan. An inventory of the City's art collection is below. Installation of new art is generally funded by grants, through the community, or through the 1% for the arts program. Chapter 3.50 PTMC establishes a public arts policy for the visual, written, and performing arts. This chapter also establishes a funding source for the creation of art in the amount of 1% of the capitalized cost of the project. Chapter 3.50.030 defines exemptions and clarifications for how capital is determined. The primary factor impacting the amount of funds generated through this program is the exclusion of grants, utility projects, and repair projects. Eligible capital projects dedicate 1% of the capitalized costs to the art fund to be used for art or artwork as part of the projects. A potential source for increased funding for the arts is to include utility projects within the definition of capitalized costs. Port Townsend also has a Creative District named by the Washington State Arts Commission in 2020. The Port Townsend Creative District encompasses Downtown, Uptown, and Fort Worden with the intent of supporting the creative economy. The help steward the City's art collection and participation in the arts, an Arts Commission was created through Chapter 3.50.050 PTMC. The Arts Commission's mission, as an appointed City Commission, is to facilitate public arts programs that enhance the cultural life of community residents. The Arts Commission promotes and encourages public programs to further the development and public awareness of and interest in the arts and acts in an advisory capacity to the City government in connection with the artistic and cultural development of the City. Members are selected based on their knowledge and expertise with respect to the performing, visual and literary arts. In the PROS Plan the Port Townsend Arts Commission prepared a Public Art Plan adopted by the City Council in 2019. The plan serves as a guide to sites for their readiness and appropriateness to site art. Each site evaluated was rated based on: Readiness of location based on current zoning and development. Viability and appropriateness for public art. Each site was then rated either as a site ready within the short-term or long-term or as not recommended. Sites can be re -visited regularly. Of 70 survey sites, the Public Art Plan identifies 26 that are suitable in the short term. Beyond the site suitability each piece of art will come with its own set of requirements around infrastructure, safety, maintenance and security. The sites in the categories were not ranked in the plan. Below is a list of the sites that immediately overlap with the City's Park inventory: Long-term: City Entrance Triangle Park III at Kearney/Sims Way Short m December 16, 2024 Leafwing Russell Larry 2006 City has maintenance plan Y Jaqua Scott from Willene Jaqua McRae Trail near and Jim Garrett. Boat Haven For Willene Russell Visitors' Installed City has maintenance plan Donation Y Jaqua Informati in 2019 from Willene Jaqua McRae agreement with (installed on Center and Jim Garrett. Willene Jaqua by Jim Plaza on McRae dated Garrett) Sims Way January 18, 2017 and Installation contract with Garrett Metals dated July 12, 2019. Milestones Sara Mall Three 2002 Maintenance info provided N :Stream of Johani locations in email from Dan Consciousn on F Groussman on 2/11/22. ess Street; one on Discovery Quimper Max Children' 2002 "Don't put it outside. Dust May not meet N Coho Grover s section it.,, criteria for public of the art in Public Art library I Policy. Solish Sea Gerard Pope 2011 Youtube video transcribed Agreement for Y Circle Tsutakaw Marine by Dan Groussman July Commissioned a Plaza 2021. Artwork dated 2010 Two Cats Georgia Outside 1992 General information on N from Gerber library bronze care provided by Clinton entrance artist's husband, Randy Hudson. Public art not owned by City Creative Jonah Two 2021 N/A Commissioned, N/A District art Trople downtow owned, and markers n, two in maintained by Uptown, Port Townsend one at Main Street Fort Program Worden Girl with Jim Gateway Installed N/A Considered a park N/A the Wheel Davidson Park by memorial by City, Barrow (mass Soroptimi not public art. produced sts 2006 Owned and maintained by the Soroptimists 29 December 16, 2024 Source of 2031+ PROJECT NAME 2029 2026 nazi zaza zazs 2o3o Funded Library Windows and Grant Bond Restroom Rehab ARPA 16q A0q 160 000 ,. Water PW s Distribution 210000 ,,.,.,.,...,..... ....... .. ...., �.....�....... ..,...... .....,..... .,,..., ....... , ...,...................,. .................� Facilities Strategic .._............ Mena ement Plen ARPA „ Upgrades Phase III, & Carpel 1.3 floor ARPA Pink "Pause & Pope ARPA, Don afron ...... . .......�,...... 240„000 240 000 �,Marine ..._...............,.�_ New Restroom Lodging Tax Downtown 4, wer Cfii4 185 000 315 000 . .... ......... ....�.�. .. �.�.�.�.. .... .. .... ... .,,..,,.., ..... ..a .., .....� .... . ,,, _ ....,,._City Hall ADA and ....................... ...,,,._.._...... 31,000 ..�.�.... ..,,,..... _,. ... ..... ...... .._, ......,,,. ...,,,. ........,.,..,, .._,......._ ........ ....',,. .,..,,.HVAC......... ............... Cherry 5L Property Bond Disposition„_........�„ �.� 69 249 ,,. ,.�.�...... ...... ....... ... ........m....., .., .. ..,,,,.. ,,.. Subtotal Funded ...... ......... ......895 249 315 000 ,6.Vtuf!�t1rkaf.. .............. ..... ,,,.... ,,,..,. .,,,,,,, ,,,,,,,,, „ ., ,,, ..... _. ,,,.�...,,,,,. .,.,.. ...,.... ,,,,,, ..... Mountain Yew Campus Gen Fund, Campus Gen Fund, RedevoloPment Bond. Grant ,,, . 1q.00U�400 ':. Mountain View Pool Gen Fund, RooF Assessment REST .. �.. ..,,,.m. ......... .., w.�,,,,,.. .......................... .. .....�. ..... ......., ......u.. ....... � . Mr.4 ivU4fr4 W0wf""Fa'8.�d . Gen Fund.......,. ...............Roof Replacement REET ..,,,, - .„ ...2U0 000., ..,,.., .. .,,,,...... ....... .... ... .,,......, ,.2Q(},g00 .... Mountain View Pool Gen Fund, Liner ep acemen RE .. „ . ...... ...w ......... ._....., ....... .................... _..,v..... ...,,. 7Fa.004 ..._� ....... .75«0U0 _._ . ... ............ ...... .. ._..,,, Boiler Pipe Gen Fund, Replacement REET Parking Lot Go Fund ........ Resurfacin.�.�.�.�.�.....,.�M.� R.T..ww.......,....... .�....._,......... �.....,.�.�.._.� .............................�..,,..............,„_ ...........�.5,�,000 ,,.........., 150.00,��.� ,,......_..... Ci Hall City Hall Elevator Gen Fund, ',,. 20� 000 .. ....... Exterior Brick and Gen Fund, Work REET.,.................... ... ......... ._,,, ...,.. _.. .,,,,, 75000.,. ,....,., .,,,,,,,....... �. ... .......,. 5 000 .. . 7.. .... ......, ..._ ...... Geri Fund, .....Cilk'Hall Roof REET............. ...............__.,. ,,... _ .. ...... ..��� ... .250 w000... ..., .......,. .... ,,,, 250 000 ........_...,,.,,. .. .... ,.. .,..., Library HVAC Geri Fund, ....,�..Mr.P9,rades�_�..,,. REET............... ..,,, ........ ........ 100M4➢.O(➢.. __„_. ,. ..w,,..... ....._ ....... .............. ...... ............. ., Library Elevator Gen Fund, Replace. REET ......._,. ... ........... .. ..._..... ..,.,.,..........„..,., 00000 ., .. Pope Marine Buidling ....... Gen Fund,. REET 60000 ..... ,. , , _. ,... 60,000 Gen Fund Public Works Shops REET w' tq 000 000 PW City Shop Gen Fund, Predesin .,.,. REET 250 000 Colton Bufldin� Cotton Building Roof Gen Fund Cotton Roof Gen Fund, Replacement REET 75 000 75 OUO Gen Fund, Barn RePa,lrs...,.,. REF,�.,..,.�.....�.� ......����� ...... ..� .. �.......... ..............1000, ...�.......,�,,,,....., .,..........._.. �.�..,.,.,..., .�.�.�...... t00r000.. .�„_.�..,._�.......��, ,.........Water Gen Fund, '....., Land REE7,,,......_.___. .,,,,...... .�.......... ......... ....... ...........�. ...... ...., ..�....... Gen Fund, Gen Fund k x4r u TT aarAs4xVitl.a RELr '2 MrbMfah Unfunded 60 000 450 000 850 000 250 000 225 000 1 835 000 000 000 ....,... 1...`.:,u,.,,� ,, ,a .. .,... R. .,aa ::rsarKaa .aauaaa z!�! �vu < ���w�w����aa ?rs� 11 19 �. Facilities (Buildings) 31 December 16, 2024 The purpose of a capital facilities plan for parks is to identify priority investments to sustainably maintain safe and accessible parks throughout the City. In addition, it allows the City to accommodate projected population growth in accordance with the growth management act (GMA) of Washington State. The City's Parks, Recreation and Open Space Plan (PROS plan) is used as a guide to identify and plan for these priorities. It is required to be updated every six years. The latest adoption was in March 2020. The Comprehensive Plan Capital Facilities Element provides a level of service for parks in two parts: 7.6 acres/1000 residents Local service standards for equitable access, distribution and function as outlined in the PROS plan. A. Provide parks and recreation facilities within a 10-minute walk (approximately a half mile) to reach over 90% of Port Townsend's population by 2036. Currently, based on the Trust For Public Land's Park score, about 68% of current Port Townsend residents are within a 10-minute walk of a park. This objective would increase the percentage of residents with equitable access over the Comprehensive Plan period. B. Ensure parklands are within a 10-minute walk meets minimum standards for the park classification. C. Prioritize neighborhoods with higher concentrations of families with children or seniors living alone. D. Target filling of gaps in central and western city limits by 2036 From the current identified gaps in the PROS plan, the following is a list of CFP projects that need to be prioritized. 1. Land Acquisition, development of parks: central and western Port Townsend. 2. Trail connections, open space connections, trail improvements: a. Near Fairgrounds — 49th and San Juan Avenue b. Discovery Road — West of Sheridan c. SR20/Sims Way — West of Sheridan d. Improvements at Lary Scott Trailhead and better wayfinding from ferry. e. City Watershed — Connect to Olympic Discovery Trail 3. Improve amenities within trails 4. Kah Tai Lagoon Rehabilitation 5. Port Townsend Golf Course, Mountainview Commons concept planning and subsequent development. 6. Master Plan for 35th street park and subsequent development 7. Improvements at Bobby Mcgarraugh Park, including play and fitness, trails, restrooms, ADA, upgraded 8. Connected trail loop Projects that provide capacity at existing parks, allowing more people to enjoy Port Townsend Parks include: 33 December 16, 2024 capital onk Parks Impact Fees 1 $10,000s A&�y Council action ,;x required $1,000,000s Metropolitan Parks District" AL vote required Parks Levy A & $1,000,000 vote required Financing OpOons Parks and Open Space GO $1,000,00 vote required, Debt A Os capital only "AF',E,� zrj (one ,: rti;� J �,,w uu .,uu d , cmv up�k)iw, do a E.r. k YPlreo „rro a" , wove mom"', l r� ugl,o lle �a,us nuE4'K, The following table provides a list of park capital investments derived from the PROS plan along with needs identified by staff and placeholders for the parks strategy projects currently underway for the Golf Course/Mtn View study as well as an aquatics center. 35 December 16, 2024 City utilities of wastewater, water, stormwater, and garbage collection are enterprise activities within the city structure. Enterprise funds must operate on a cost neutral basis. This means that rates are set to ensure that costs are covered. Part of covering costs, includes investment in capital infrastructure. Typically, utilities are infrastructure intensive such as with the Water Treatment Facility, Wastewater Treatment Plant, Compost Facility, and miles of pipe. Typically, the City adopts periodic updates to utility plans and follows up with rate studies to ensure that funding meets projected expenses. The rates are balanced with the needs to operate the system and invest in capital. The Capital investments included in this Capital Facilities Plan is based on the investments included and funded from adopted rates generated from rate studies. Waste Collection Services The City currently contracts with Olympic Disposal to provide waste collection services. A new contract went into place in 2020 and expires in 2030. The new contract includes rates that upgraded equipment and individual carts. The services include pickup of Trash, Recyclables, and Yard Waste. No specific capital improvements are included in this plan at this time. However, the City may want to consider the following topics concerning waste collections. • The City currently leases Big Bellies for downtown at a cost of approximately $25,000 per year. This lease includes maintenance and capital. Additional Big Bellies may be helpful in controlling trash overflows as they include a solar operated trash compactor within them. • The end of Tyler Street at the foot of the Tyler Stairs is a problem area for waste collections. PT Main Street and businesses often complain about the look and congestion of multiple cans. The most effective solution would be to install a joint use trash compactor. This could be funded by the City, Waste Connections, and the business owners. Typically they are funded by the businesses. The cost for a compactor is on the order of $150,000. • The City has numerous garbage receptacles throughout town. These are unique and decorative and developed by a local foundry. These cans will need to be replaced or rehabilitated at some point. Staff estimates that there is at least 5 years of life remaining. • Jefferson County is currently going through the process of planning for an upgrade to the existing transfer station on Jacob Miller Road or new transfer station at a different location. The city is a large user of this station and thus, there may be a request for city participation in funding the transfer station. This could come in a cash contribution or through our contracted tipping rate fees. Olympic Gravity Water System -M December 16, 2024 was estimated to be $4.5 million from the Mill and $450,000 from the city's retail water system. The rate model will be updated every five years to establish rates for the following five-year period. The capital spending plan will be updated at the same time as the rate model. The rate model does not contemplate that the city will issue any OGWS debt in the next 20 years and that any capital costs will be paid from revenues received by the OGWS fund. In lieu of debt, the city will fund capital costs using the capital sinking fund approach to build OGWS reserves to an amount sufficient to fund the capital costs identified in the capital spending plan. The OGWS fund shall maintain a minimum balance of $2,000,000 to provide for emergency repairs. 39 December 16, 2024 Wa1Ler Periodically, the City adopts a water system plan update outlining the condition of the existing system and planning for the future consistent with the City's Comprehensive Plan. In this plan, a capital improvement plan is outlined to project for the capital needs of the system. The water system plan can be viewed on the City's website at h tp mpL�jgr�. A general overview of the water system is as follows: An ultrafiltration membrane filtration system with chlorine disinfection treats raw surface water to drinking standards. After treatment, a 5-million gallon reservoir and 1-million gallon standpipe provide required storage while serving different elevations zones within the service area. The city maintains approximately 110 miles of distribution pipelines delivering water to over 5100 service connections. In addition, the city maintains over 756 fire hydrants and 1800 valves as part of the distribution system. The priority for Water Distribution capital improvements during this planning period will be the replacement of aging distribution system waterlines. Funding will be significantly less than what is ultimately needed for pipeline replacement at the end of anticipated useful life. Focusing main replacement activities on the sections of pipeline in the poorest condition and on those that are known to have substantial leakage can maintain the overall distribution system in a good serviceable condition. Replacement of pipelines and service lines will also be prioritized where street work is planned. The level street improvements will impact the extent of utility improvements. For example, a chip seal treatment is anticipated to last about 15 years, thus underground utility work would only be performed if the expected life of the pipe and services lines is less than 15 years. Water utility revenues fully support capital infrastructure and operations of water treatment and distribution. Monthly base rates include a fixed operation and maintenance rate and a capital surcharge based on meter size for water service inside City limits. The capital surcharge was adopted to pay for a new water treatment facility and 5-million gallon reservoir, which cost more than $24 million. Water service for customers outside the city limits is based on the same fees at a 20 percent higher rate. Utility rates vary on income level, meter size, type of service and are based on usage per 1,000 gallons. The city also charges a water system development charge (SDC). The one-time new customer SDC is assessed based upon the customer's fair and equitable share of the general water facilities. The SDC is determined by multiplying the total number of equivalent residential units (ERUs) based on meter size for the service(s) to be installed. The city may allow deferral of payment of SDCs for a private or public nonprofit organization which is developing or constructing low-income single-family housing units for low-income individuals or families. The financial health of a utility may be judged by employing four financial viability tests including operating cash reserves. Reserves must be greater than one eighth of annual operating expenses. According to the DOH Financial Viability Manual, operating expenses do not include debt or capital 41 December 16, 2024 The City completed and adopted the sewer plan in 2024. This plan gives directions to the city for updates to the sewer system for the next 20 years. Due to growth and changing regulations the aeration ditches, that we currently operate at the treatment plant, will not be able to fulfill the needs of treatment of the City's sewer. This will be a major upgrade to the treatment system which will require some land acquisition and major construction. This work is required to be done when the plant reaches 85% flow or BOD loading thereby mandating the start of planning for and designing an upgrade. For flow that is projected to be 2038, for loading (BOD) that is projected to be 2029. This will also require us to build additional clarifiers to handle the volume. At this time, rebuild the headworks building will be undertaken. Staff does not see a need to change the office and lab facilities along with the current dewatering equipment which is functioning well. Continuing proper maintenance extends the life for the near future until the plant upgrade planning begins. Future upgrades to the chlorine contact basins may be required to insure sufficient flow capacity to continue to disinfect properly before the effluent is discharged back to the environment. These are all projects that will need to be done in the not -too - distant future, but outside of the 6 year horizon. These projects could be moved to a closer date depending on new regulations and the new Nutrient Reduction Permit that the Department of Ecology implemented in 2023. This permit will be updated with new regulations in each new 5-year permit cycle, and we will have to comply with the new regulations and limits when they come to us. Soon we are going to be doing some maintenance work on our influent wet well and replacing our non -potable water pumps. We will also look at different ways of operating our ditches and air delivery to them in order to meet new regulations, until loading requires major upgrades. The City continues to work with Jacobs Engineering, resource agencies, and Dearment of Ecology to come up with the best plan at the time for upgrading our sewer outfall pipe.The updated plan also evaluated the collection system extensively and recommended a number of sewer system capacity improvements as well as rehabilitation work on an annual basis. Kuhn St House: Built in 1901 the Kuhn Street house known as the Wastewater Treatment Plant office building was an old two-story home that has been converted to serve as office space. Major renovations include heat pump replacement in 2019 and new roof was added in 2020.Outstanding repairs- Exterior decking needs replaced along with siding is showing signs of rot. Carpet and windows are also showing their age. The Kuhn St House is separated from the Wastewater Treatment Plant by a right of way. The right 43 December 16, 2024 1990 and new parts for our system are not being made, so we must look at the used market to get repair parts for what we have. That market will end one day. Many of the original pumps and other equipment are still in use today, yet they are operating on borrowed time. In the next 6 years, the General Sewer Plan outlines a series of Wastewater Treatment Plant upgrades to extend the life of aging equipment. Most of these upgrades are not the result of capacity upgrades as described above, but simply replacing worn out equipment. Rehabilitation of the influent wetwell, replacement of the Supervisory and Data Acquisition system, and replacement of pumps and motors are all planned in the next 6 years. Compost The Composting Facility was constructed at the same time as the WWTP. It was designed as a way for The City to manage its own bio-solids and be a place for Jefferson County to have the required place to manage septage that gets pumped in Jefferson County. The Compost facility has seen a few upgrades since it was built but it is also running on the original SCADA system and still has a lot of original equipment that needs to be looked at getting replaced. The Composting Facility where three waste streams (bio-solids, septage, and yard waste) are combined to make an extremely useful and beneficial product that we are able to sell to the public and use in many areas around the City. A Few Places Around Town Where Our Compost Has Been Used Jefferson County Health Department (who issues our compost permit) is looking at options of managing septage from Jefferson County. The County funded a preliminary study as to best options for the Compost Facility to be able to accept and manage double, (8000 gallons per day) what it was originally designed to do, (4000 gallons per day). The County, in cooperation with the City, has applied for a grant 45 December 16, 2024 ... ........ -,— . ...... Funtletl VA-606-.V..... OWI.Rate.. C 362.200 397488 . 413,368 429�2O 4...... -att5licns --�.. Annua(Ciftgiaia ... . ... ... ......... 1-11111AMd!a... .. Wilsory , Horem a r yp,i, Sewer I- .......... .......... M2P,Tp WtjGof 4'Vumr,9~f Loan/Gran[, 2,013,1200 0 a., Saw., 1;'lap Rat.. 436600 ow-rcl St/S, Park Rates �i !-- --11. -11,11,11,11,111,11-1- -- .. ............ Sims Way/3rd/Gise Rates 1,755,206 !!!9n . - alasLoan ........ .. .......... 4 335499 Headworksr —,Rsbabililatoin .......... 191 623 1424243 ..... ... 1615,06 C!aq!ler #1RehpIb Rates, Loan ............ . .... . . . ........ . . . . ......... Clarifier #2 Rehab ............. Rates. Lgan 191 823 831 078 822 74J41 WWI P Near 'Perm Ooddatlon Ditches Rates. Loan 110,000 -- ........M!P 491.341 191,623 1,424,243 i— o��la --- -- - -------- 60.:000, 26TPDO. 327 O�.q Flash - --- ----- Kuhn Street land Rate. WWTP Influent Welwell Bales Loan 301000 1 93,4,,, , 4 4 0 . ............... . .. V,r,VTP SCADA , , , , so Rates, Loan 164.000 1125,0019 i 289 000 .......... hqs 1 f VOWFP conipvM So ds 311.43eq 103�9 i3�pi� :�08.245 Batas Rates 300000 300,000 327,600 96 coo ----98,000 s VI�-951,200 M Rates.......... .......... 4.109813 9.717,058 18.263,605 _1,019A,296 2,706,39f) . . ............ 9 Lawrence Street cq!!!cucu. Rates/L.- Louo-twuh Lill Stations - - ---------- - 1,118-100 Long -lens Compost. Rates/Loan Kuhn St House Windows,,, t. _ _ .] .... 000 ..... . -- .. ........ Kuhn Sl. H.... Dock RalsWLoa. I I 10=0 V 1 1 10,000 6 -7T-7t 777 '77`7 777- Wastewater Treatment and Sewer Collections 47 December 16, 2024 Ensuring Sustainable Growth and Equity The goal of the Urban Forestry Plan is to guide Port Townsend's growth in a way that is both environmentally sustainable and equitable. As the city develops more affordable housing, it is important to ensure that residents —especially those from low-income communities —have access to green spaces and the many benefits that come with a healthy urban forest. By including goals for the city's tree canopy alongside new housing, the Urban Forestry Plan will help create a more livable, sustainable, and resilient community for years to come. Urban forestry fees will be used to support furthering the development of an urban forestry program and the replacement and planting of trees to help mitigate the impacts of impervious surfaces on stormwater. The Stormwater System Development charge is based on impervious area to incentivize smaller footprints of structures and impervious surfaces as follows. Impervious Area ESU SDC Up to 1,500 SF 0.25 $ 367.50 1,501 to 2,500 SF 0.67 $ 980.00 2,501 to 3,500 SF 1.00 _ $ 1,470.00 Above 3,500 SF Formula Formula ESU = Equivalent Service Unit Formula: SDC = (Impervious Area. SF%3,000 SF) X $1,470 Much of the stormwater investments are dedicated to the Streets and Collections maintenance efforts. This crew addresses stormwater conveyance and storage through ditch maintenance and raingarden creation. Work on this front is prioritized to accompany street maintenance work. Beginning in 2029, the City anticipates becoming an NPDES Phase II community meaning the City will be required to be permitted under the General Permit for Western Washington. Complying with these permitting requirements will put additional strain on the stormwater utility. In 2023 a rate study and plan for compliance with the General Permit will need to be performed in preparation for the first NPDES permit cycle. The following capital investments are based on estimates in the current rate study as well as emergency stormwater repair needs. The currentwas adopted for 5 years and runs out in 2029. Unfunded estimates of future water quality grants are included based on funding becoming available associated with becoming an NPDES Phase II community. 49 December 16, 2024 Transportation The City's transportation system is one of the largest assets and liabilities in terms of infrastructure. Streets, Trails, and public right of ways serve numerous public purposes. Port Townsend has established values for right of way such as to support non -motorized interconnected networks through the non - motorized plan, open space, tree preservation, in addition to traditional uses for utilities and streets. The City's right of ways comprise well over 1,100 acres of the City or nearly 2 square miles. The condition of City streets are very poor due to the lack of investments dating back to Initiative 695 in which transportation funding from the State was severely reduced. The City developed a Comprehensive Streets Program intended to develop an investment strategy balancing the demands for investments in the Streets and right of way networks. Note, that unimproved trails are part of the City's Parks Plan and are considered recreational assets even though they are often used for transportation purposes. With the development of a Comprehensive Street program, the City is pursuing funding sources with the goal of increasing revenues by $1.5 million. Additional revenue for streets was realized with a public vote in favor of a Transportation Benefit District 0.3% sales tax. The voters approved this measure with nearly 80% approval. This new revenue is estimated at $1,000,000 per year which is slightly higher than originally projected. Given condition of the City's streets is very poor, this revenue will help the City claw back to a good state of repair. The Transportation Section is broken down into four sections to define funding and how it is typically allocated to streets. The Transportation Benefit District yields approximately $1,000,000 of revenue per year. Revenues disbursed by the State Department of Revenue are deposited in fund 111, entitled Transportation Improvements Funded. These funds are then allocated to Streets Capital and Streets Operations for various capital projects and street repair. Real Estate Excise Tax (REET), can be used for capital only. REET is typically budgeted to support streets and parks projects. Presently, about $675,000 is the annual average for revenue associated with REET. A little over $510,000 is obligated to pay debt. This leaves approximately $165,000 per year to be allocated to either General Captial or Streets Capital. Grants make up approximate $1.5 million per year on average to fund street improvements. Fee in lieu is results in revenues collected for transportation improvements that benefit the propertry being developed. Fee in lieu is associated with development when the improvements required by code make are better invested in locations serving both the property being developed and other properties. Fee in lieu is most commonly associated with requirements to build sidewalk frontage. The following table illustrates funds collected to date. These funds must be invested by the City within 5 years. 51 December 16, 2024 40% Drop i..�...�u n Qatityc Of) 75% of Life„ 12% i Terminal Serviceability Pavement Life Typical Pavement Life Curve One of the purposes of the Comprehensive Streets Program is to review how the City maintains streets to lessen capital burdens later. Presently all, street funding goes to the maintenance budget excluding a small portion going toward debt service. Capital purchases that will support streets maintenance includes equipment purchases such as a 10 CY dump truck, a small roller for patching, and pavement hot box. These capital requests are in the 2023 budget proposal in the fleet section of the plan. Pavement Rehabilitation and Preservation Presently, the City does not have a sustainable funding program to perform preventative work on streets. The only work done on streets in the last few years has been associated with large grant funded projects such as Discovery Road. Pavement preservation includes practices such as chip seal, pavement overlays, shoulder and drainage repair. Pavement rehabilitation means that the street requires complete rebuilding or special treatments that are more expensive than pavement preservation. Street Improvements 53 December 16, 2024 Fleet (Equipment Repair and Replacement) In July 1974, the Port Townsend City Council adopted Ordinance 1712 to establish an Equipment Repair and Replacement Fund (ER&R). The purpose of the fund is to maintain, repair & replace City vehicles and auxiliary equipment. The fund charges the appropriate department/fund annually based on expenses incurred two years prior for maintenance of equipment. The fund also charges depreciation for equipment based on an estimated life and replacement value to replacement of vehicles. By using the Equipment Rental Fund, the City developed an efficient, streamlined and coordinated method of dealing with vehicles and large pieces of equipment. When equipment is up for replacement or equipment repair costs become too high, the fund generally has accumulated enough capital over its life to replace the equipment. Equipment may be purchased earlier or later than initially scheduled due to the specific circumstance surrounding the equipment. Equipment that is not replaced may incur additional repair expenditures, experience increased breakdowns causing delays and become a safety issue for the City. The City of Port Townsends Fleet Maintenance Division maintains over 100 pieces of equipment for ten different departments. The Division provides multiple services including asset management, fleet replacement planning and purchasing, vehicle specification, used vehicle sales and maintenance. Repair work includes police cars, backhoes, dump trucks, pickups, mowers, portable equipment, welding and metal fabrication. The Division also conducts repairs back-up generators at several facilities. Replacement schedules for vehicles are influenced by industry standards, but are also based on other variables. Vehicles are also evaluated in replacement based on classes of standard replacement, such utility trucks (pickups) which are set up on a 15-year replacement schedule. The amount of replacement dollars invested is tracked by fund in order to prevent mixing of utility and general funds. In 2019, the City made a significant change to the replacement portion of the ER&R fund by removing general fund vehicles from the replacement funding schedule. This move was made to save the General Fund operating costs of paying for vehicle replacement. A full description of the change is included on the City's website at this City Council presentation link: chp._i 18 &rrng _Jw 0,3 Given, general fund (ie police, parks, engineering, planning, facilities) do not have replacement dollars in the fund and are not saving for replacement, the City is in the process of restoring the ERR program for these vehicles. In 2024, the process began restoring the program with year 1 of 5 equal installments as outlined below. The 2025 budget includes the 2°d of 5 installments. This restoration process is utilizing general fund reserves. Once all the installments have been made, purchase of general fund vehicle replacements can begin. It is noted that some general fund vehicle replacements have occurred through the ARPA funding. These vehicles are currently paying replacement and thus, the fifth installment may be less to account for these replacements. 611 December 16, 2024 Unfunded Police 820,451 114,752 35,631 368,777 190,842 1.530,453 Library 37 000 37 000 257z000 ..__..Parks,,, ............. .............................. _ ......... .. 166 000. ........ 39 000 ' .........��........... .. _ ........,..,,,_..�. ...,. 205,000 46,000 u.... ........ Facilities 55,000 55 000 Planning and Buildmg 38,800 36,800 PW Admin 66,500 66,500 Engin Subtotal Unfunded ............. 1,117,251 _.... ..., . 220,252 35,631 368,777 190,842 1,932,753 _...... 303,000 ToW I Pro a cts ,.mm..150 004. ; 11 T 251; 202 29 ' „ 33 631 W 368�777 180 842 2 U52 753 303 000 Fleet Needs with No Funoirry.for Vehicles Outside of the ER&R fund Information Technology The purpose of the I.T. Equipment Rental & Replacement Fund (ITERRF) and the I.T. Operations & Maintenance Fund (ITOMF) is to manage replacement and maintenance funds to ensure sufficient monies are available when needed. The ITERRF and ITOMF are designated as Internal Service Funds with three major functions. The Replacement function supports the process to provide for replacement of assets. The Administration function supports asset and operations management. The operations function supports maintenance and intergovernmental activities. During the budget process, the Information Technology Services Department will establish reserves for the replacement of assets. 1. Replacement charges are generally calculated based on the estimated cost of each equipment category, its useful life, and the anticipated replacement value. Replacement rates are sometimes adjusted for special purposes. Departments will be charged based on the number of devices. A calculation model shall be used to track each individual asset and determine the appropriate replacement charge. 57 December 16, 2024 December 16, 2024 In 2025, the City will be required to conduct a Periodic Update of its Comprehensive Plan. In 2023, the Department of Commerce provided a formulaic grant of $125,000 once the City can complete its periodic checklist and scope of work. This will not be enough to complete the project. Additional money through ARPA allocation was used to hire a limited term long-range planning position. The position would assist with the Comprehensive Plan Update, managing grants, and would support housing policy and other long range planning projects. The City also received a Middle Housing Grant of $50,000 to make policy and code amendment recommendations as part of the 2025 Comprehensive Plan Update that addresses middle housing initiatives aligning with HB 1110, which the City is not required to adopt, but chooses to explore as part of its housing strategy. Finally, in 2022 the City made investment to support technology upgrades to transition to paperless permitting to enhance predictable timely processing, and to ensure predictability and capability during the COVID-19 lockdowns and social distancing requirements. The City used ARPA funds to purchase Blue Beam Revu licenses for staff to markup development documents as well as a laptop computer so that the building inspector can update project records while in the field. Monitors to assist with digital review were also purchased. In 2023, the City further improved permit processing by purchasing an Application Programming Interface that merged Blue Beam markup with its Smartgov Permit database (where workflow, documents, fees, and status are stored on a project that can be reviewed internally and to a certain extent, externally. This automated some of the manual steps during project review. The funding also was used for an inkjet printer so that the Building Inspector can post site notices on the fly without returning to the office. The City's Finance Department purchased Paygov so that applicants can pay for permits by credit card online in the Smartgov database. In 2024, the City received a Paper to Digital Department of Commerce grant in the amount of $60,000 to transition its hybrid digital permitting system to fully digital. The remaining permit types to be transitioned are land use permit, such as subdivisions, that often are the first step in the housing pipeline. The grant completion date is in 2025 and includes a suite of customer training videos that teach applicants how to complete and submit permit applications. The City is currently behind on its Shoreline Master Program Periodic Review that was due in 2021. The City obtained a $222,890 Department of Ecology Shorelands Planning grant in order to complete the plan, update the SMP consistent with SB 5290 changes in permitting timelines, and to speak with stakeholders about sea level rise armoring downtown with specific emphasis on the Port's boatyard and waterwalk armoring, examining sea level risk target and protection levels. The work is intended to make changes to regulations that enable the appropriate armoring solution based on engagement and engineering analysis. This plan includes the addition of an additional Downtown restroom facility to be funded with Lodging Tax and Sewer funds in support of economic development. See the Facilities section of this plan for the project. The City has been awarded two significant U.S. Forest Service grants for planning and development of the City's urban tree canopy. The Urban & Community Forestry Future Grant will provide $403,269 towards the development of an Urban Forestry Plan and canopy assessment, an amended Tree Conservation Ordinance and Engineering Design Standards, community engagement, plan implementation activities for education and planting events with the Jefferson County WSU-extension. 61 December 16, 2024 T041rq it 0 + g ► -POFunded --... ..._..._.... -... ......__� . .... .._...._ ... _._....._,,,... .....w_ . �,,,....w.__- ....,,_.w.__.... ......... ..._......_--. Evan... Vi....... s sta - Final entitlements and RFP markeling General Lund 152„000 Cherry Street - Carmel Building Bond- .............. .50 p00 ....... ... ..... -.......... ......... ...._ .,..._,,,..,,._, .....a.. 50 0pp _.. ..,.-. w _.aa_ w Middle He usin Grant ... _..._.M............ Grant ..w ._.. .... 25 000 ..... .. _.. 25000 .......w,,........., Active Transportation Plan element 150.p00 ........... 150,Op0 _Updalo-Climate Shoreline Master Program uGrant Update Grant 62,640 m......... 62 64p 2025 Cam rehensroe Plan Grants Gen Update p., Fund ,...., _..,, 113.565 �......... .. 113 565 PROS Plan Update Gen Fund 47,000 0 47 pp CHIP - Dundee HIII SDC/utillty reimbursement to City Grant 58 055 58 055 Urban Forestry Plan Grant 110,319 189 065 299.384 Tech. upgrades: Timely permit processmq......... ARPA,-Grants ....,.45.000...... 10,00.0. _ 55-,000 ...., 20.000 Subtotal Funded $ 813.579 _ 199,065 ... _ BBOµ644 20 000 Housing, Economic Development and Environment 63 December 16, 2024 ..... Envlronmental Sea Covet Rlae Action Grants, µ� Gan .....,,,,» wv . ....... ., .....� ...., ,_....u..._.... 250,000 Plan ....�........ ,Fund.._,,,,._.. .. 260.000 ...�....... .........._.w.ww.......M_.w,,,v..,.................. _. Work wdlh Port W obtain guard hordmg for storm%vaaler, hoard, and Oc "oqujS %iu devolfbp"Wanq Nc d tv!� �Sa�a(and t a!r qv ...... ..._ ....__.......w_ ....... ... ........... so oao ._.............._ so.oao... so.000 Climate Action Committee Action Plan Support Marketing and Coordination with other entities (CP Economic Development Implementation Strategy No Housing, Economic Development and Environment W December 16, 2024 can be a revenue source for growth related impacts to parks, transportation, fire, and school public services. Note, in 2024 the City updated System Development Charges for Water, Sewer and Storm to $5,603, $5,258, and $1,407 respectively. This brings the City of Port Townsend to a total of $12,268. As reported above, these fees are reduced to incentivize smaller housing and multifamily housing consistent with the Comprehensive Plan Housing Policy 2.21 of the City to incentivize SDC's for low and moderate income housing builders. Util. System Dev. Charges local Fac. Sewer_ Charge ~Storm _Water_ $..........4,433 W$__. 9,860 $... ww6,418 $ 1,440...$ Port Orchard $ 11,571 $ 12,122 $ 5,569 $ - $ Mount Vernon $ 7,530 $ 7,859 $ $ $ Bend, OR $ 5,857 $ 5,223 $ $ $ Poulsbo $ 4,802 $ 10,965 $ 1,323 $ Sequim $ 8,184 $ 7,548 $ $ $ Lacy $ 5,449 $ 8,143 $ 6,083 $ $ Chelan $ 11,926 $ 5,531 $ 1,970 $ $ Wenatchee $ 600 $ 3,710 $ 6,389 $ $ Bremerton $ 6,291 $ 7,342 $ $ 1,510 $ Port Townsend $ 4,494 $ 3,758 $ $ $ Leavenworth $ 3,899 $ 2,620 $ $ 1,034 $ Oak Harbor $ 3,081 $ 1,680 $ $ $ Port Angeles $ 2,260 $ 2,260 $ $ $ If adjust for inflation at 3.2% Port Townsend 2015 $ 4,494 $ 3,758 Port Townsend 2022 $ 5,603 $ 4,685 Impact Fees ispww mm Firey . m Parks -MSchools Total 3,662 $ $ 5,581 $ 5,448 $ 36,842 4,977 $ $ - $ 1,371 $ 35,609 5,292 $ $ 855 $ 9,421 $ 30,957 8,543 $ $ 8,867 $ $ 28,490 5,324 $ $ 1,248 $ $ 23,661 2,491 $ $ 2,210 $ $ 20,433 - $ $ $ $ 19,674 - $ $ $ $ 19,427 7,500 $ $ $ $ 18,199 - $ $ $ $ 15,143 $ $ $ $ 8,252 $ $ $ $ 7,554 907 $ $ $ $ 5,668 - $ $ $ $ 4,520 $ 8,252 $ 10,288 Notes: Sequim include a 1.5 factor of facilities charges for outside the City Limts Wenatchee Local Facilities Charge applies only to pipe installed by the City for Sewer. Transp. Impact Fee is for a specific region of the City Chelan Local Facilities Charge depends on the location of connection Olympia Local Facilities charge is for the regional system. Conclusion This year's Capital Facilities Plan provides an attempt to look at the city holistically over time from a Capital improvement needs standpoint. The Capital Facilities Plan is a work in progress designed to coordinate with the adoption of the annual capital budget. The process of adoption is an iterative process to develop a comprehensive overview of capital needs in order to balance investments with available resources (revenue and staffing) as well as priorities. 67 .�....�..........ww.._....._........ CD ......�..,._........M..wwY. C. 6.� CD .��.--.. .... ........ OO C u®7 : t�L°1 G 00 K r r r 12 m N N. N n coLo n. m m O N N y O N O N Oi O . p [7 C6x CD G"x Qa et V m as' c9' Kyy m m m N N 0 CD CD CC+��k 04 N M7S Ni4 � M m rCx''Mrf C.i'x' O W14 4:5. .c N h N O O 0 q Lnoi °n C5 a .O a. O O b d '',",n p"a���Is c 0 v � tiM» aW�tlM aas, anHx '., car e¢x' '. to ., �. o .0 y kwPo, 0 0 o w VCLi O. 0 'a1 co. N w C = O 4) ® O C' 'O w a" 8 Gl' 7 : LLb 0'a+ �° .' O Cl)Csn Vl ro- a N c a 2 elf N o v a,aQi CcO o O n�i '... cmcn M o ud C .1" ',.. W ',,. CL W' IMp a.»................_.......�_,...... ................. Y ... _...... .,.._..,...... � .,»�..,... ....... _...,.,,....,....... _ ........... .............,..,.......�........... �. C) a) CD 0 C) CD yC C:5 C5 V) Lo c14 Ln w CD C,C� V5 . . ............ >E c4 LL C) cq (D 6 0) M tm 0 x IT cli CD 0) cli E r- CL 0 a E 0 0 a (L C, 0 Eo C.D a C, q C.� Luo "0' C, 45- (If O 40- > 0 r 0 0 0 O C C" 0 w -0 E Ch E o0 1, F— -F L CL 2 'D x E W 0 0 0 0 cl, 0 UCJ" 2 d5 'o r - 75 4) < m 114") 14 E O N y N N N N Cj N y �_ D � N .y y U � •'N y C y C C o d m N N -N ry y O O N C L L p, _ O V O y ,O N C C � V1 Yi (xl N i E .— w E N y y O = > E c of Y � O tJ y yyN U y � O O Ql Vi y y U C L f0 Y Y N O N N N Y Y co J y f0 !n O. •r+ O mas Y o'mm Y C _ nv w m 3 L a m m c c v fn f/1 N .+ N L O C YC U a po XX r O N J n W l I i r 1 � 1 t 1 I f I > I 1 •umriw:mwuu. n o .. y n....... p 0 iiw.. O xnrxrm � (7 O O,O O O O O O O. O,O O 0. O M MI MGM C'M (D j m N m N N N N W O N N m N N yN `i CD W N O C> N O t� UJr d 0 vvvvvv I- j gal C. O 0 41 CDx C) e r r fp �,,y A N Y 6 4 d?. W M N _ P b Y k p 4 B Go ♦— C5 fd:F CCJ a7 4"4 kd"b'. "i f0 o fO C7 Q = 0"dn1�iR tl� "L5 a>Y r- d',» m V ' 6 'Q gwA cl)i y CC F-- C 47 U) . _ a coi k' W t C } T O N >, cD N N O; O 0 oo a 4J b u ® a u q(,} n + b 4 tl co O rt,G,"b CO 95 Cl fi�ti C:; 6 {O ": d a O M d m en cd7 a N CD 04 N 04 0 s E� Ub a) c N W N W � a) W Cfl W m{ y _-+ c j a1 V' 4N N Y" o CD 04 C 04 O N tm d ab m m (D a'C-. R gf' 04 v .N N N C 'o aJ C O C Nr C N O N C) N O N aa E � N qd i a m } � Y > '' c 'rs as s c w co "— a c o a) o aE ., a 00 w m a oo ar " E am co m C Itz 04 rcw,r a 0¢ o Ya '.. LL 8dY6FP kn+°IN SSA Ns�'H. d'";b 4/ (D CCI = C O r a m F— N ..y 0 m N E a� o O N Q) C N O [a .— C` dr C (D Cticl k w L d, yyR1ID CDa"'b O C O e7 }r C a C O C O .� a w o a = O m .(",5 C. c 0 C3 Al o � _C. O CO W :. ',,. (!) ~ fb? fa2,0 a�U KA) O .c N N f�l N O � C c ^, ., ` CJ b fob U) d O m O a � > "C?b 3 N c` t C: Wtlt y a� C m C GD O O �L r g 1 d W O O l 61 F-- H d P% ;. Ci C.7 fi, CL > .. Sx a W CD C14 00 N O ^� a..^ N Q O 0 u LO N N 0 CS w O N 4 N d d > d cD n a ° m m � m c N o c h ro 'N N _ ma) Ell m y {p p_ N N aa- CV N N _ e NN m m O w tl` Nr O cn O E W N ,, N O n Q Q O_ cL O N d Q QS Q7 N ',. N N CY1 (V 4 M YK C lV ca C d% Rp cD CD d CL m aF'} co, m ELa c„ ao ura V9 m�rew N r � y iJ t c tm ' ®®; co n Qaperw °' o z CD H au m •;n r C N .,., C b .L LLy M 65 td ® c 0a' Cdµ m m 0i' Vn ¢a w d Q m 0 to cn E u F-- d C -.. P— C 'C.ilL> A. Lu r er CL ` cC a b W _... ... ........ LL LI) 7i E cq C5 cq Cl Cl 0) -C4 04 CD CD C', �21 0 0O F- 76 > 0 ICD CL 0 t 0 F C-) 0 C, 44 GJ wE T > E > 0 - —SL> OL o E o 7a Eo 0 0 CL m > W> 0 S CL mo .%3 FE O RI W mtj = 0 cli LM 0) E Cc 4) C3 i5 M o 2LJS Cl) 9L CL r CI OS t C) w > o C) 12 0) 0 oc 76 04 Cq I— O C4, 04 x C� CD E2 C:5 CD R E2 C�� C4 en cli CN CD C) Cl S ca U') C14 C3 -�r 'r an LO cli C5 CD v CD Cl E cl Q ,g ui CD C14 C, C4 C) C:, CD CD -0 C\j CN C') > U O C) Cj CD a, N IN 76 04 f (L CD E 0 o" E E a, 0 rw -0 C7,1 j2 ID W 0 co cla 04 Vq CO IL 69 f4 w u C) :3 C,4 -2t, 0 ID CL r CA ID CY) call 0 (D CL. 2. 1 -i 6 :�, C, di cj OL m a�i 0 o 0 o 0 0 I 0 a CD pp 04 1 m I f � � G � 1 I O O C7 4 to C m N N m41 LL f C(7 cOv N O E�� cc E c N r N W L1J td uj CD N } N 7 N N OI Ol O O N N a 04 cNV 0 N CA a er a O O 1N O O r m N {L1 cli .Q 1 IMP 7 qdA f c � N j �I U) G{tl p� YJ Atl I I of � I c GD � c o. > q� O X N Co O n r r o z o � a W� o y ca N LID 7 7 O ; O o C" O 00 CO _ Wco co co V) n:. O ',, N cli E O C N � , 'y WI •� w C w w N C14 OSr 04 47 N N ® CL U .m cn w N w CL d. 1 1 1 •r = c : C.,7'. Cl Cl O CY CD CD Im CD CD a' �c co SMw: �v�',nra cc df p m "1' C 0 C a m � m nr CD o e � ® c m CA w c E c o> V> c 0 O rn CL E a`> o co w an N � �OPI F' io c � 41 _m nw' "w+a. '.� awn. r- M E e`o d in — R EJ CO o�r,,. waw CD > C4, C'l gI CD C) � LL Cl C) C=� C) C) cl) C) cli cq cli CD CD E C) 1:D LLJ LLJ CD 04 C� cli C, C5 C� Lo cc cL w w a m a) 04 cDCVE EL 4) aci c4 Z5 clj @ Q) 0 0 aL C" CD CL C, > (D C: r�- >0 D :3 a tm t5 F- m 2 w E �E CL o O 7B 1 O. 0 r_ CL Z5 C/) !CD 'Dj CD , CD CDO W 0 CD CD m ui "i CT > Cli w LO q:, cN o C) cD LO u) C) c) j cD C) m r—, r— at ui a) .6 c'i� c) �lj a) oS; .o C' C-4 cyl cc� 04 cD 0u� u), c' c�l cl c� c'4 cl) co cv clj LO Cll rn C-4 04 cD 04 clj c' cD cD o Cl c) q (o mp coo U) cq T A > >! C=) C14 C4 C) Cl C:I c� c�� c� cm ct Co aC) In nr CN 04 C) C) clj CD S2 > o C14 C14 C) cD C4 C-4 o 7� E 4f cL u) (D Nttt I I F- 8 C) c7 lc'� o or S cc) cc C/) u CIJ C14 ID U'j c" o 04 f zra roll W o > Im c:- U" ta 0 cL 'ol W s,.2 FW4 cc 0 w rn t5 m 0 m o 42 m V4 E., w to cc j Wo z Ei L), A w 12 &! a� X,I o o C§ > 18 142 m2 1�11 Ct 14 7 E2 CD rn C> m Go C) C14 U) ICA C14 C) c. C� C=) j CD cli 04� C14 elA c14 clj 04 N 04 M Oz! lo 2 F a vi dl aGC.0 w E w mo w R 8: 3 59! Q j q 'E E- to v) co 40 v) j W4 &I w o if o c:i �c, C5 60 iw� co, to Im, co cm c) I 'a co Mi t m Ic4 Ic,,r a? F to iL o Go to cZ =m c o o Phi 11 3 s t Kv 2 cr t , ED CA E Ell >2 -a c a c, c', .r > o o cn u) CD C (D Co 00 C14 Z a) LIJ d) 04 Cq qu C:) CD C:): cz 4= 'W I CD C:) i § co is E E -Do M (714 >- cq C) cq CN C) C:l Cl C> C� m C; CO CIO O cq C14 76 C-4 CN C3 C14 CN 2 O t; CL 0 0 0 12 2 *A C) 0 U a 20 0 0 3 f a-6 w C. fA 76N CL —0 76 a) -0 a m 0 T L> E GO CL w c ca. t5 79 t5 :2 E IV. < 0 0 a . F- I 11 CD C� wi� Cw Cl cm J4 Iz 0 2, Eti 0 e � 9 CL M