This estimate also provides for new wooden mains on all streets in the present system as
follows:
6" WOOD LINES on the following streets:
i
k `
From
Harrison to Kearney Stroot.on Lawrence Street
"
Monroe to Kearney Street on Clay Street
` #
Taylor to 'eValker on Franklin Street
y'
Monroe to "dams on Jefferson Street
"
Taylor to Kearney on Jefferson Street
"
Monroe to Thayer on Nashington Street
"ashington to Jefferson on Thayer
It
Thayer to Benedict on Jefferson
It
"ashington to Lawrence on Walker
It
Lawrence to "F Street on Cass and Willow Streets
Cass to Pierce on Blaine
it
Blaine to Garfield on Pierce Street
"
Cass to Harrison on Lincoln Street
It
Garfield to Lincoln on fan Uuren Street
Taylor to Monroe on nlaino Street
Garfield Street
It°
It
" " Lincoln it
It
"F" Street to "U" Street on Cherry Street
Cherry Street �o Fir Street on J Street
"
"J" Street to U" Street on Fir Street
"U" Street to Fort Worden on Walnut Street
"
Hastings Avenue to 24th Street on Discovery Road
'j
It
Washington to Lawrenoe on Van Burnn Street
.4" 'd'OOD PIPE
4.
From
Monroe to Jackson on Lawrenco Street
Lawrence to Garfield Street on Jackson Street
Jackson Street to Monroe on Garfield Street
?
Jackson Street to Clallam Street on Roosevelt Street
++
?'
"
Roosevelt to McKinley Street on Clallan Street
!-
„i
Taylbr to Oak Street on Taft Street
�+
"
raft to "F" Street on Oak Street
Taylor to F" Street on Roosevelt and Tyler Sts.
Harrison to "F" Street on Van Ness Street
"
to,Tyler on Blaine Street
to Tyler on Barfield Street
!
"
Lawrence to Uarfield Street on Polk btroet
f:
"
Willow Street to "F"Street on "B" and Fir Streets
Taylor to Madison Street on Franklin Street
"
Franklin to Lawrence Street on Madison Street
"
"U" Street to 45th on San Juan Avenue
"
San Juan Avenue to 49th Street on 45th and through Fair Grounds
Landes Street to Hendricks on 49th Street
"
WFW to "J" on Rose Street
San Juan Avenue to Beech on Tremont Street
Tremont St. to SIN" on Beech
"
Beech to Cherry on "N" Street
"
"U" to "W" Street on Cherry Street
San Juan 'venue to Kuhn Street on 37th Street
I
"
Discovery Road to 0heridan Avenue on 25th Street
Haines Street on 24th Street
24th Street to 20th Street
Hastings Avenue to Corona Street on Sheridan and Silver Street
The estimated cost of this work as outlined above with Cast Iron Pipe as noted with balance
untreated wood pipe
together with the necessary valves, fittings, valve boxes, and manholes, fire
hydrants, etc., is
M,1176.67
Repa.ir.to
"eservoir 9647.82
$193824.49
Estimate
I the same as No. 1 but with Creosote pipe instead of the untreated wood pipe;
,
v189342.99
i
Repairs to reservoir -jrl 9647.82
4s
$198990.81.
i
Estimate
43--12" Cast Iron Pipe South of the North side of Lawrence Street to _'+ater Street
t
on Kearney
From Kearney to Monroe on Water Street
"
Water to Roosevelt on Monroe
1'?
"
Monroe to Jackson on Roosevelt
Roosevelt to Hoot Street on Jackson
Jackson to the Reservoirs on hoot
10" C.I.
Pipe from the reservoirs on Root and Quincy to Cosgrove Street on Quincy Street.
From Quincy to Taylor on Cosgrove Street
if
Cosgrove to Jefferson on Taylor Street
11
I
r
iV
F 5
41 w
1
407,
From Taylor to Adams on Jefferson Street
ItJeffersonto stater Street on Adams Street
8" C.I. Pipe from Monroe to Harrison Street on Lawrence Street, also the connections
between Reservoirs #1 and #2.
Balance untreated Wood Pipe together with the necessary Valves, fittings, valve Boxes,
Manholes, Fire hydrants, etc. $155506.68
Repairs to Reservoir #-1 9647.82
165164.50
Estimate IY4 Same as No.3 but with creosote pipe instead of untreated wood pipe
4166325.73
Repairs to Reservoir trl 9647.82
$ 74-943.55
Estimate 1r5 12" U.I. pipe South of the North side of Lawrence Street to eater Street
on Kearney, from Kearney to Monroe on Water Street.
from 4ater Street to the North side of Lawrence Street on Monroe Street.
10" C.I. :Pipe from the forth side of Lawrence Street to Jefferson Street on Taylor
Street. From Taylor Street to Adams Street on Jefferson Street. From Jefferson Street to Water
Street on Adams Street.
8" untreated sood pipe together with -the necessary valve, fittings, valve boxes,
Manholes, fire hydrants etc., $152646.58
Repairs to Reservoir No. 1. 9647.82
$169963.11
Estimate #7
12" C.I. Pipe on Water Street from Kearney to Monroe Street and connections between
reservoirs #1 and T2.
The balance untreated wood pipe together with the necessary valves, fittings, valve
boxes, Manholes, fire hydrants, etc. 0146644.89
Repairs to Reservoir #1 9641*82
166292.71
Estimate ;)8 same as TG but with Creaeoted pipe 4158030.62
Repairs to Reservoir 4.1 9647.82
167T 678.44
Estimate
Single 16 untreated wood pipe line from the City Limits on the line of the present
intake line with the necessary valves, fittings, etc., together with Cast Iron Pipe connections
at Reservoirs $50064.58
Repairs to Reservoir #1 9647.82
595 9712.40
r'stimate 410 Same as #9 but with Creosote pipe $54155.15
Repairs to Reservoir #1 9647182
63802.97
Estimate if'll Same as--#10 but with Cast Iron Pipe 480281.01
Repairs to Reservoir 7fl 9647.82
489928.
The contract price for this work should be around these figures but to cover cost of
Engineering, Inspection, Legal work, publishing, Ordinance, Printing, Bonds and the necessary L.I.D.
Books, 10% must be added to each of these estimates.
If the loop system is adopted I do not think that it is necessary to build a cast
iron line from the City Limits to Lawrence and Kearney Strects or on Sheridan Avenue to Hastings
Avenue, Discovery Road and North on San Juan Avenue and Bast on "U" Street to Walnut Street, and
Southwesterly on Walnut to Root and the Reservoirs. But I think that from the north side of
Lawrence Street south on Kearney to 'water Street from Kearney to Monroe on 'later Street, from 'later
to Lawrence Street, from Monroe to Harrison on Lawrence Street, from Lawrence Street to Jefferson on
Taylor Street, from Taylor to Adams on Jefferson Street, from Jefferson Street to Water Street on
Adams Street it should be Gast Iron Pipe. This would, in my opinion, at the present be the portion
of the city that the most improvements such as paving etc., will be done and will, I think, always
be the most thickly settled portion of the city and these lines as outline would be the base for
a Cast Iron distribution system in this portion of the City.
It is now a matter to determine hoer much of an improvement you want to make and for th
City Attorney to decide how much of,a district you can access the proportion of assessment, etc.,
If the work done by the L.Z.D. method, maps will have to be made showing the amount
assessed against each parcel and tract of land affected. This assessment must come within a certain
per cent of the total cost of the work including everything.