HomeMy WebLinkAbout00469-1
V 111
j
r
f
=..J
l
1
i
y
312
Minutes of Aug. 20-29 continued
Present meter reading August 19 at 10:46 A. Me 3726300 Gale
Previous " " 12 at 10:68 A. Me 1657800
Total for week 2071500 "
Per day 29734793
Per hour 12389*47
Per min. 206.49
Water was off from 8:o5 A. Me August 18 to 7:30 P. Me
Water delivered through 20" Motor at mill per 24 hours as follows:
From August 9 to 10 14130000 Gale
10 to 11 13320000 "
11 to 12 13290000 "
12 to 13 13800000 !'
13 to 14 14050000 "
14 to 15 14560000 "
15 to 16 13950000
16 to 17 13810000 "
17 to 18 13810000
18 to 19 919000 "
Yours very truly,
We J. Sadler
WJS:OFP City Engineer
Said reports were referred to -the Water Committee.
REPORTS OF C0189TTEES
Police and License - Re Doe Tex:
The committee on police and license submitted the following written report:
Port Townsend, Washington Aug. 20th, 1929
To the Honorable Mayor and City Council
of the City of Port Townsend.
Gentlemen: •
Your Committee, on policeandlicense to whom was referred the matter of the Dog Tax
by the City would respectfully report as follows: we recommend the,00ntinuanoe of the dog tax by
the City the same as heretofore by the County and the tax therefrom be collected by one of the Polio
Officers.
Respectfully submitted,
Jacob Miller
We B. Smith
Harry We Robbins
The report was ordered filed and Acting
City Attorney.Daly requested to draw an ordinance
covering the subject.
Finance Committee on Blaine Street Extension:
Port Townsend, Washington, Aug., 16,1929
To theiHonorable Mayor and City Council,
Port Townsend, Wash.
Gentlemen:
In the matter,of the extension and
connection of Blaine street, entailing the passing
of certain deeds to and from the city, subject to
checking by the City engineer, we hereby respect-
fully recommend the execution of the deeds, to be
approved by the oity�attorneye
Respectfully submitted,
Clark Aldrich
Edwv.Quenell
Wine Lammers, Sre
Finance Committee.
It was moved by Councilman,Wuenell and seconded
by Councilman Peach that the report be
adopted and that the Mayor and City Clerk be authorized to execute said deeds when approved by the
City Attorney and the city Engineer. Upon roll call
all six councilmen present voted in the affirm-
ative, and motion was declared carried.
From S. J. Ask, to -wit:
To the Honorable Mayor and City Council, Port Townsend, Wash. Aug. 19, 1929
Port Townsend, Wash.
Gentlemen:
Permission is requested to build an addition, 4 x 12 feet to my dwelling 1006 Taft
Street. Cost is estimated at $25.00.
Respectfully submitted,
From Henry Le Wise, to —writ: Se J. Ask.
Port Townsend, Wash., August 14, 1929
1
313
To the Honorable Mayor and City Council, {'
Port Townsend, Wash. ;{+r
Gentlemen:
Permission is requested to tear down and remove as old dilapidated outhouse on my
promises at 308 E Street. I The building is a fire and health menses and the premises will be
j thoroughly cleaned up and all debris removed or destroyed. l "
Respectfully submitted,
Henry L. Wise. ;
From Francis J. Black, to -wits
!{ s4 Port lowneend, Wash.August 9, 1929
j to the Honorable Mayor and City Council, �'
Port Townsend, Wash.
rt, Gentlemen: B
Permission is requested to erect a frame garage and woodshed on Lot 4, look 82, Petty-
ir�groves 2nd Addition, at an estimated cost of 4200.00. 4arage will be set back at least three feet
$ from the street line.
Respeotfull ei:bmitted, !, r
r, Francis J. lack ti 9
From Wm. H. Hill, to -wit: *
5x Port Townsend; Washington, August 9, 1923
To the Honorable Mayor and City Council }, I i',I •,
, r
t Port Townsend, Wash.
uentlemen: "
Permission is requested to remodel the front entrance and to make minor general repair
to the.briok building at 1004 'dater Streq#„ at an estimated coat of 4150.00. +`t
Respectfully submitted,
Wm. He Hill
}{1
From G. W. Heldriok' to -wit:
dtxfta F' ,
Port Townsend, Wash., August 9, 1929 r
7' To the Honorable Mayor and City Council,
Port Townsend, Wash.
Gentlemen:
Permission is requested to do the following work in the storeroom at 914 Water Stree :
Enclose show windows, out arch through wall to connect adjoining store on easterly side and to build
Sts;Ai = a mezzanine floor over front windows for an office. Cost of work is estimated at $300000
Respectfully submitted,
G. We Heldriok
From G. We Heldriok, to -wit:
ks Port Townsend, Washington, August 9, 1929
"e<J
To the Honorable Mayor and City Council,
I CY i kz}yr S6 Port Townsend, Wash.
Gentlemen:
Permission is requested to erect a frame garage on Lot 6, Block 43, Dundee Place, at
an estimated cost of $260,00. Sixd of Garage will be 12 x 20 feet and will be set back three feet.
from the street line. t
1
Respectfully oubmitted,
G. W. Heldriok
; From Danis R. Axon, to -wit:
C MiF Townsend, 16, 1929
w' Port Washington, Aug.
FEaxY"yp. µfir" :
To the Honorable Mayor and City''Couaoil,
_
yw k wti Port Townsend, Washington
78 , Gentlemen:
{
Permission is requested to erect a frame cottage of the East half of Lots 7 and S.
Block 27, Eisenbeis Addition, at an estimated cost of $250.00.
Respectfully submitted,
,
Denis R. Axon
J
P }< It was moved by Councilmen Lammers and seconded by Councilman Peach that said permit
be granted. Motion declared carried.
" COMMUNICATIONS
Taylor Street Terrace Committee
Il�
j A communication from Walter Rutz of the Port Townsend Chamber of Commerce was prasen
d
and read, as follows:
August 20 1929
�
TO THE MAYOR AND CITY COUNCIL
I. „
i Gentlemen:
The Chamber of Commerce Committee to whom was referred the matter of beautifying the
! ! i Taylor Street terrace asks your cooperation to the extent of making a change and an addition to the
1 i present sprinkling system.
' {+ The 3,74 inch tap near the Fountain we find too small to carry the extra burden of
: a sprinklers necessary to adequately wet the grads and we would suggest a li inch lead off at this
point.
i
0
0