From W. J. Sadler, City Engineer.
The communication from W. J. Sadler, City Engineer, was presented and read
as follows:
"To the Mayor h City Council.
Gentlemen;
Mr. Green had drained the small reservoir and reports several leaks.
I went up with him and made an examination and recommend that he clean these
spots off and patch them up with some cement mortar, let them dry and give them a coat of Asphalt
and cover with burlap and another coat of Asphalt.
This will be a temporary repair only. The south-west corner of the reservoir
be repaired and thw whole interior relined this could be done with wire mesh and guniting same.
This would be cheaper and not out down the capacity of the reservoir as much
as relining it with 4" of concrete.
Yours truly,
WRS/RV W. J. Sadler City Bngineer. "
Said communication was referred to the Water Committee.
From G. A. Hose.
Report of G. A. Rose, Superintendent of Pipe -line Patrol was presented,.read
and referred to the Water Committee.
Councilman Smith assigned to bommittees.
At this time Mayor Bangerter eadirised Councilman Smith that he would be assigr
to.the some Committees as the former Councilman from the 3rd ward.
BUILDING PERMITS
Applications for Building Permits were presented, read, and disposed of as
follows:
From Theo. R. Gonterman, to -wit:
Port Townsend, Wash., April 12,1929
To the Honorable Mayor and City Council,
Port Townsend, Wash.
Gentlemen:
Permission is requested to erect a frame garage, about 14 x 14 feet in size, on Lots 31
and 32, Block 50, Eisenbeis Addition, at an estimated cost of 450.06. Building will be set back
three feet from the street line.
Respectfully submitted,
Theo. it. Gontleman
From Miss Susie Hancock, to -wit:
To the.Honarable Mayor and City Council, Port Townsend, Wash.,April 11, 1
Port Townsend, Wash.
Gentlemen:
Permission is requested to make general repairs to the dwelling house at 342 Harrisbn
Street, at an estimated cost of $50.00
Respectfully submitted,
Miss Susie Hancock
By C. 17. �Irmantrout
From William H. Gallon, to -wit:
Port Townsend, '+yeah., April 3, 1929
To the Honorable Mayor and City Council,
Port Townsend, Wash.
Gentlemen:
Permission is requested to make repairs to my dwelling house, to erect a wood shed and
chicken house and also to erect a two -room bungalow, in Pettygrove Addition.
The cost, exclusive of my own labor, is estimated at ii100.00.
Respectfully submitted,
William H. Gallon
should
NE
t
fiy`'r ,Y From Manuel Enos, to -wit:
Port Townsend; Wash., April 3, 1929
To,the Honorable Mayor and City Council
Port Townsend, Wash.
Gentleman:
Permission is requested to rebuild our dwelling house in the Littlefield Addition,
the new building to be about 22 x 24 feet, and to cost approximately 4150.00. i
a Respectfully submitted,
MersManuel Enos +,
From J. C. BQlser, to -wit:
Port Townsend, Wash., April 8, 1929 {%
l To the Honorable Mayor and City uouncil
{r
Port Townsend, bash.
s ? Gentlemen:
j r�, Permission is requested to•ereot a building about 28 x 34 feet in size, to be used as 1
�'..` a barn and garage, on Lot 4, Block 54, Eisenbeis Addition, at an estimated cost of $200.00
h 4 ra H' Respectfully submitted,
µ NY. Yi. C. Bolser i
a rv9`� From Gahtano' Brogna, to -writ: Ili
Port 'Townsend, Wash., April 9, 1929
➢r''ju To the Honorable Major and uit Council
`i Port Townsend, Wash Y
Gentlemen: I
Permission is requested to make general repairs to dwells house situate at the
R A q g P Y 20'
x�r;,.�• � ,;,:ry# < corner of Rose and Streets, Webster Addition, at an estimated coat of $200.00 '#
Respectfully submitted, {
Gaetano Brog ns.
h •�, I
,4 From A. W. 4uist Go., to -wit:
� � £ 1v
°p Port Townsend, Wash., April 16, 1929
To the Honorable Mayor and City Counoil
��,� Port Townsend, Wash. �{
.XP,
Gentlemen:
r''f� Permission is requested to erect an addition to St. Johns Hospital situate on Bbcks
15. x, ,r M1 ,� ,r,,), 210 and 220 , Eisenbeis Addition. Addition will be approximately 42 x 92 feet in size, 3 stories
and basement, of Class A oonttruotion and the cost is estimated at $75,000.00.
_,: r w Respectfully submitted,
R
t�S 4RfltA. W. Guist Co.
Bgr F. E. Kitsman '
It was moved by Councilman Lammers and seconded by Councilman Peach that said
+T applications be granted. Motion declared carried. �
From Peter Sofie, to -writs i!
Port Townsend, Wash., April 11, 1929 i
61 z t To the Honorable yor and City Council,
Port Townsend, "ash.
„k
Gentlemen:
Permission is requested to remodel the front of the Klinger Building at 925 Water Strad "
by making certain changes in the door and window arrangement. °ost is estimated at $200.00
rr,
Respectfully submitted, S
r Peter Sofie
It was moved by Councilman Lammers and seconded by Councilman Peach that the permit ,
be granted. Upon roll clll, all six councilmen present, namely, Lammers, Miller, Robbins, Aldrich,
Peach and Smith, voted in favor thereof, and motion was declared carried.
From S. C. Starbuck, to -writ:
Port Townsend, Wash., April 9, 1929 �1
To the Honorable Mayor and City "ounoil
I Port Townsend, Wash.
Gentlemen:
Permission is requested to change a partition in the room at 815 'r;ater Street, to an -
large the kitchen, and to build a platform, about 15 x 18 feet in size, in the rear of said premise
Coat is estimated at $15.00
Respectfully submitted,
F. U. Starbuck
n