HomeMy WebLinkAbout004152
204
.0 � �
r 7 k 3
Minutes of March 19 1929 oontinudd.�
. . , Minutes of March 19, 1929,,aontinued.
The principal estimated quantities are, " .1. Mayor to Request Mr. Baar to be Present:
j 900 cubic yards Excavation. It was moved by Councilman Quenell and seconded by Coundilman Peach, that the
{ Mayor be instructed to get in touch with Mr. Baer and request him to be present at and
a+i bbO " " Baokfilling. I before meeting of the council Friday evening, March 22. Motion carried.
74 Reinforced concrete.,- ; REMARKS BY MR. HELANDER:
900 feet - 24 inch Creosoted Continuous Woodstave Pipe. Mr. Helander, State Examiner, who was present, now addressed the Council, First
?a in relation to the Ordinance creating the Water Extension Project. He stated that the
9 {
" 4H0 " - 24"-3/16" plate Are Welded Steel Pipe. 4 � ordinance provided that the pipe line should be built to and out of City Lake, and wanted
}w 1 to know upon what authority the pipe line was built past the, lake, instead as provided in
Plans, Specifications, and blank Form of Proposal can be seen in the office of the City i I the Ordinance. He was advised by City Attorney Scott that the change was made by the Engin-
r, Clerk or City Engineer,, City Ha11,.Port Townsend, Washington, or in the offioes of Baar and -�, I ear, and approved by the City Council. He then questioned the legality of spending addition -
or
Cunningham Consultin En ineers 414 Spalding Build Portland Oregon. Copies can be ob �'
g g p g fig, , g p, r j al money for the develmpment of City Lake, claiming that the City had fulfilled the terms of
twined upon receipt of a deposit of TEN ($10.00) DOLLARS, which will .be refunded, if a bona i the leasewhen water was furnished to the Paper Company.
fide bid is'submitted`and the Plans and Specifications are returned in good order. All pro
' posals must be upon the regular blank forms and must be accompanied by sash or certified check He also questioned the legality of further payments to Haar and Cunningham, in the
<-" made payable to the Treasurer of'the City of Port Townsend, Washington, in an amount FIVE I�. 1f�z.+,' belief that the engineers had already been paid for further work contemplated on the water line
Cc orate aurat bond will be required is tho.sum o£ SEVENTY FIVE and system. He further claimed that Mr. Haar should have furnished receipts for expenses and
HUNDRED ($5OO.00)DOLLARS. p y
7, (76$6CENT of the estimated cost to guarantee the faithful performance of the oontraot. The r� �xx*4,,��t money paid out by him as per bills presented and paid by the City.
right is reserved to reject any and all Proposals or to accept the Proposal for the pipe line
only. RECESS.
BY OILER OF THE CITY COUNCIL of the City`of Port Townsend, Washington r 'Ya. �I It was moved by Councilman Quenell and seconded by Councilman Robbins to recess to
Friday, March 22, 1929, at 7:30 P. M. Motion carried and recess declared.
3gned C. F. Christian
,;�� r
V City Clerks i°�:'� RECONVliNED AFTER RECESS,
Port To^;nsoud, d Cunningham, B
said
The aforeplans and specifications together with letter from aar an�Aw3;�;�=`
P P g y h p Ylua:;iadtom
and copy of Notice to Creditors, were all referred to the Water Committee.Fm�g I 7'srch 22, 1929
RECESS.�� :��"x� w�;t{ The City Council reconvened this 22nd day of March, 1929, at 7:30 P. M., in the Councilcp
Chamber of the City Hall, Councilman Quenell, Mayor pro tem, presiding.
It was moved by Councilman Quenell and seconded by Councilman Lammers that the Council
recess for fifteen minutes. Motion carried and recess declared. '1 Yya� ROLL CALL -
Fr
COUNCIL RECONVENED.`�' r s' ,�r> ` Upon roll call there were present City Attorney, Jae. W. B. Scott, City Clerk, C. F.
Christian and Councilmen Clark Aldrich, S. V. Peach, Edward Quenell, William Lammers, Jacob
Council reconvened at 10:00 P. M., with Mayor Bangerter presiding. J3, „asr ' `, t Miller and Harry W. Robbins. rr�*[R.0-�U[a•«CC� w y. 0�.�7r f �^� "'�,
�x
ROLL CALL. , ?1 0° !I Mr. Schoenwerk, who was present, was invited to occupy a seat by the Mayor.
Upon roll call, there were present Mayor Bangerter, City Attorney Scott, City Clerk w a° '- Nk REPORTS OF STANIII NG COMMITTEES.
Christian and Councilmen Aldrich Peach uenell Lammers Miller and Robbins.
,R - Building Committee:
C00AITTEE REPORTS.
„` Councilman Lammers, Chairman of the Building Committee, requested and was granted `
Water for Post Office Building: i11ZT =[k`r, xrz•,` additional time on the application of W. A. Myers, for Zee Tai Company.
z1�10
With reference to the proposal to furnish water to the poet-offioe building, it , �; ,;' ,rt``z!' Mayor Bangerter Arrives:
was moved by Councilman Quenell and seconded by Councilman Peach, that the water contract
with the post -office building be renewed, .in accordance with existing rates, and that the},rl`r'+,' f Mayor Bangerter arrived at this time, and took his chair and thereafter presided.
•t` Mayor and the City Clerk be authorized to sign said contract. Upon roll call, all six noun- fit; t} „sl y ,r {,r 1 x VL,IT
oilmen present voted in the affirmative, and motion wae'deolared carried. s��r i(S<< err HILLS AND CLAIMS.
Big Quileene WatbrrSupply Requisition; Nelson:
Bill of Charles J.
4 W
With reference to the requisition for the Big Quileene Water Supply Line, it was i,1tt, n By unanimous consent, the bill of Charles J. Nelson, for ton cords of wood,in the
moved by Counoil=n Quenell, and seconded by Councilman Peach, that the requisition be granted. t' t ��E.[. amount of $81.50, was now presented. It was moved by Councilman Aldrich and seconded by
Upon roll call, OB�lneilman?�dueilell,(Lammer.ap�MiTler,iRcbbi�tl:-andfYeacR votedainrthe':aPfirniative ;' tF ; ] Councilman Quenell that the claim be allowed, and that.the Mayor and City Clerk be authorized
anct-.Councilman Aldrich in the negative. Motion was declared carried. to draw a warrant upon the proper fund in payment thereof. Upon roll call, all six councilmen
aY
present voted in favor thereof, and motion was declared carried.
Plano and Specifications: �s c ,ttiyE3:
REQUISITIONS. `{
Consideration of plans and specifications submitted was now taken up, and it was
moved by Councilman Quenell and seconded by Councilman Lammers that the plans and specifications 'h• For Water Department: ftf
be referred to Mr. Schoenwalk, and the National Paper Products Company for their approval in
writing, to be presented to the Mayor and City Council by Friday, March 22, at 7:30 P. M., to f 1 Jar Paste
call Mr. Bnar's attention to size of connection of the pipe and to ask Mr. Baer for an estimate
of -the cost of the line and screening device in separate units; estimates to be presented by "` Upon motion of Councilmen Quenell, seconded by Councilmen Peach, requisition was granted.
j Friday, March 22, 1929, at 7:30 P. M. Upon roll call, all six councilmen present voted in
l
favor thereof, and motion was declared carried. ` {'-I For City Water Department:
I Water Pipe Extension; Typewriter 1
Councilman Peach brought up the matter of Plater Pipe Extension in the Eisenbeis This requisition was referred to the Water Committee.
addition, and moved, seconded by Councilman Quenell, that the extension near Peek's Camp be
' made as soon as ten consumers have signed up and made the necessary deposits of $25.90 each COMMUNICATIONS.
} for tap and meter. Upon roll call, Councilman Peach, Quenell, Lammers, Miller and Robbins pp'
voted in the affirmative and Councilman Aldrich asked to be excused from voting. Motion From National Paper Products Company:
declared carried.
�I