Loading...
HomeMy WebLinkAbout0251427 Section 11.03 An adequate drainage system including necessary pipos, culverts, intorooctional drains, drop inlets, bridgas, etc., shall be provided for the proper drainage of all surface water. Cross drains shall be provided to accommodate all natural water flow and shall be of suFfi- cient length to permit full width roadway and required slopes. Cross drains shall be built on straight line and grade, and shall be laid on a firm base but not rock. Drain pipes shall be placed at a sufficient depth below the road bud to avoid dangerous pressure of impact and in no case shall the top of the pipe be less than twelve inches below the road bad. Section 11.04 All streets, roads and alloys shall be graded to their full width so that pavement and sidewalks can be constructed on the some plane. Before grading is started the entire right of way shall be cleared of all stumps, roots, brush and other objectionabl❑ material. Section 11.05 After grading is completed and before any base is applied, all of the underground utilities such as water mains, sewer mains, power, telephone and gas lines, etc., and all service connections shall be installed, completed and approved throughout the length of the road and across the flat section. Section 11.06 The subdivision shall be provided with a complete sanitary sewer systom at no cost to the City, providing a public sewer is located within 1500 rout of the proposed subdivision. The sanitary system shall be designed and installed in accordance with the Standard Specifications for municipal Public Works Construction. If a public sewer main or other adequate moans of common disposal is not located within fifteen hundred feet of the proposed subdivision, the sub- divider may provide for the installation of approved septic tank and 101