HomeMy WebLinkAbout02496E
CHAPTER S. GENERAL PROCEDURE
Section 5.00 The procedure for rovinw and approval of a subdivision or plat
consists of throe separate stops. The initial stop shall be the
preparation and submission to the City Planning Commission of a
Proposed Plat of the arna to be subdivided. Thu second stop shall
be the preparation and submission to the City Planning Commission
of a Final Plat, together with the required certificates. The
final plat cannot be submitted to the City Planning Commission
until after the Pronosed Plat has been given tentative approval.
The third stop shall be the submission to the City Council of
the Final Plat, together with the required certificates, approved
by the Planning Commission.
Section 5.01 The subdivider, his landscape architect, architect, planner,
engineer, or land surveyor, while the proposed plat, subdivision,
or dedication is in sketch form, and before the proposed plat, sub-
division, or dedication is prepared, may consult with the City
Planning Commission, for the purposâť‘ of ascertaining the require-
monts of the Official Plan, or any portions thereof, and obtaining
any explanation of the rules and regulations herein contained as .
may be necessary and related to the proposed plat, subdivision or
dedication.
Section 5.02 The subdivider and his engineer or land surveyor shall examine
all of the available data on soils, water table, slope, land stabil-
ity, etc., shall consider all such information in the preparation
of the proposed and final plat, subdivision or dedication.