HomeMy WebLinkAbout02161the private sewage disposal facilities in a sanitary manner at all
times at no expense to the City.
Section 2.08: Any building hereafter constructed or made
available for human occupation and use upon a lot or parcel or
real estate capable of being served as defined in Section 2.03,
shall, within ninety (90) days after an application for a side sewer
permit shall have been made, or prior to occupancy of said premises,
whichever event first occurs, be connected to the sewer system
of the City.
ARTICLE III
Side Sewer Permit Required
Section 3.01: It shall be unlawful for any person to make
any connection with any public or side sewer without complying
with all of the provisions of this ordinance in relation thereto
and,having first procured a permit to do so from the superintendent.
Section 3.02: Application for the permit required by the fore-
going Section shall be filed in the City Clerk's Office, stating
the name of the owner, the correct address and proper legal descrip-
tion of the property to be served, dimensions and locations of any
buildings on the property, and the whole course of the side sewer
from the public sewer to its connection with the building or property
to be served. The application shall be submitted to the superintend-
ent for approval, who may change or modify the same and designate
the manner and place in which such sewers shall be connected with
the public sewer, and shall endorse his approval upon the application
if the same is acceptable to him. The superintendent may requite
the permitee to furnish him plans pertaining to the application
and issuance of the permit.
Section 3.03: Upon approval of said application, the superin-
tendent shall issue for his own records a sewer plat showing the
size and location of the public sewer, the point of connection, the
location of any buildings on the lot, the course of the side sewer
to its connection with the house or other building, the grade of