HomeMy WebLinkAbout01657(4,000,000) gallons daily roserve:d to the City from the Big Quileene
'later Extension Project.
4. (a) The maintenance and repair of that part of the water-
works and system hereby leased which is known as the "Big Quilcene
Water Extension Project", as described in Ordinance Ido. 947, shall
devolve upon the Lessee, and the Lessee shall, at its own cost and
expense, maintain and keep said waterworks and system known as the
"Big Quilcene '+rater Extension Project", in good and reasonable
state of repair at all times, reasonable wear and tear, deteriora-
tion and obsolescence excepted.
(b) The maintenance and repair of that part of the water-
works and system known as the "Olympic Gravity ';later System", with
head -works on Snow Greek., shall devolve upon the City as Lessor,
and the City shall, at its own cost and expense, maintain and keep
that part of the leased property in such a state of repair as shall
be necessary and proper, so long as the same continues to be used
in connection with said system; but the City, at its option, may
discontinue the use of that part of the system in connection with
that part of the system leased to the Lessee.
(c) Immediately upon this lease becoming effective, the
City will proceed to replace the portions of the pipe line described
in Schedule A below with pipe of a character and construction equal
to or better than that, when new, of said pipe to be replaced. If
at any time or times hereafter, during the term of either the Exist-
ing Lease or this lease, it shall be determined, by joint agreement
of the Cityls engineer and any duly qualified engineer employed by
the Lessee for the purpose, that by reason of deterioration it is
necessary to replace all or any part of the portions of the pipe
line described in Schedule 8 below, the City shall immediately pro-
ceed with such replacement or replacements with pipe of a character
and construction equal to or better than that, when new, of the
pipe to be replaced.
Schedules A and B referred to in this lease are as follows,
all data as shown on the condensed Profile of Gravity Y2ater Supply
Line from the Big Quilcene hiver, prepared by Messrs. Bear &
Cunningham, Engineers, dated October 11, 1928:
SCHEDUL- A
Portions of pipe line originally constructed of plain wood
stave pipe as follows:
From approximately Station 1500 to Station 1580, and
From approximately Station 1680 to Station 1720.
SCHEDULE B
Portions of pipe line originally constructed of plain wood
stave pipe as follows:
From approximately Station 810 to Station 820, and
From approximately Station 1005 to Station 1050, and
From approximately Station 1085 to Station 1095, and
From approximately Station 1205 to Station 1215, and
From approximately Station 1360 to Station 1375.