HomeMy WebLinkAboutBLD06-088 (oversize plans in storage)PERMIT #
Qr rlDR nr Wrnl) v
CITY OF PORT TOWNSEND
PERMIT ACTIVITY LOG
DATE RECEIVED:......
. " _. _ ...... M.
DATE
�- .7 0
ACTION
Entered into TRIPS
ESA — to Planning -no evidence of ESA -
INITIALS
Vested Date
Checked for Completeness
LA I
y
12 2
Ent-
k -nn
i / IV Z-
\\Bcd_pen-nits\forms\BUILDfNG\Permit Activity Log.doc
V -ORT MECHANICAL PERMIT
x ^�
City of Port Townsend
Development Services Department
A 250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information
Permit Type Mechanical Permit
Site Address 1215 LAWRENCE ST
Project Description
Permit # MEC08-075
Project Name TWO FURNACES FOR THE
Parcel # COMMERICAL BUILDING AT 1215
LAWRENCE STREET
4847t3-3-03 96 9 Lev C
TWO FURNACES FOR THE COMMERCIAL BLD AT 1215 LAWRENCE STREET
Fee Information
Project Valuation
Record Retention Fee for Mechanical $ 3.00
Mechanical Permit $ 64.00
Technology Fee for Mechanical Perrr $ 5.00
Total Fees $ 72.00
Conditions
10. Manufacturers installation specifications must be on-site at the time of inspection.
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner.
Print Name J • �L- V Lr Sa J Date Issued: 12/16/2008
Issued By: FRONTDESK
:MECHANICAL PERMIT
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information Permit # MEC08-075
Permit Type Mechanical Permit Project Name TWO FURNACES FOR THE
Site Address 1215 LAWRENCE ST Parcel # COMMERICAL BUILDING AT 1215
LAWRENCE STREET
Project Description 989713303
TWO FURNACES FOR THE COMMERCIAL BLD AT 1215 LAWRENCE STREET
Names Associated with this Project License
Type Name Contact Phone # Type License #
Applicant Lippincott House Llc
Owner Lippincott House Lie
Construction Air Flo Heating
Contractor
Construction Air Flo Heating
Contractor
Fixtures
2 - Furnace < 100,000 Btu/h
(360) 385-5354 CITY 001208
Exp Date
12/31/2008
(360) 385-5354 STATE AIRFLOI206D, 04/25/2010
* * * SEE ATTACHED CONDITIONS * * *
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner,.
Print Name Date Issued: 12/16/2008
Issued By: FRONTDESK
rn
0
0
_N
CO Q
C) O
J
F -
z
LLI Q
IL
Z O
O
a
6
LL
LL
F
J
Z
CO
mO�
00
O
LU
Q
LU
=
O
J
LL
00
H
❑ W
wF
a
C)
z0
Q
co
Z
N
7-
O
~
O
Lu0 Ix
o
[If
0
a
55
O
U
N
U
❑ w
a:r
O
U
w z
U)
Q o
w
LL.Z
O
LU
W
LLI
U
ww m
J
O
a
J
❑
fn a
IL
a_
❑
00
o a
w
en
LU
D
�
w m
CO
N
3
F■+w�
�
W m
It Z
V1
w
w Lu
y
o
J
ca
O
�'
J
z Q
V
C
M ❑
a
•�
0.
w
M
O Q
z w
O
�a
PLOOwwk
w
7
UJ 0
It
0 O
LL
Z0
O
a
LU
❑
ct i
W O
a
C
a
a
"
v
y
In
N
a a
N
z 0
oz
Qo
J
OJ
m
0=) X:
U ❑
U Z
as
N
z
O �
O
LLY x
LL F-
LU w
F
Z a
tksr
va.
of
IL
xm
a
is
F_w
F x
F-
a m
t
rn
0
0
_N
CO Q
C) O
J
F -
z
LLI Q
IL
Z O
O
a
6
LO
r-
9
00
0
U
LU
2
O
z
F-
m
w
W
IL
F
J
Z
CO
mO�
00
U) LLI
Z
w
Q
LU
Q
LU
=
O
J
LL
00
H
U
a
C)
z0
Q
Z
N
7-
O
~
LLI
a
Lu0 Ix
o
[If
0
a
P:
P:
O
U
N
U
LL
U
U)
LL.Z
O
W
LLI
U
In
O
Q
J
❑
IL
a_
❑
w
D
U
U)
CO
N
F -
w
a
LO
r-
9
00
0
U
LU
2
O
z
F-
m
w
W
IL
F
z
w
O
U
Q
O
H
rn Z
N 0 Ln
M LL
to
C
J cl
QO
U �
Z
02
F" a
U
w
aW
zW
Z W
Q a.
~ W
c m
wD
Of
OF -
W
M
C�
w
a
z
O
F-
U
a
N
Z
F
J
Z
CO
mO�
00
U) LLI
Z
w
Q
vi
O
=
O
Q
LU
=
O
J
LL
J
U
a
Z_
Z
N
E
J
O
~
LLI
a
Lu0 Ix
o
W
Z
3
0
a
Q
O
U
F
z
w
O
U
Q
O
H
rn Z
N 0 Ln
M LL
to
C
J cl
QO
U �
Z
02
F" a
U
w
aW
zW
Z W
Q a.
~ W
c m
wD
Of
OF -
W
M
C�
w
a
z
O
F-
U
a
N
Z
RT
° CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
':tel w INSPECTION REPORT
AWA For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
9 �--...
DATE OF INSPECTION � ��� � �� �° �° ��E�I
M` NUMBER
°" ..
SITE ADDRESS: ,..o.;
._�.. ............
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION
j.
4rypp rc
❑ APPROVED '� ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
Inspector..- .. a,.. Date
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
Development Series
QgFii w
250 Madison Street, mite
Port Townsend WA 98368
Phone: 360-379-5095
`� mm Fax: 360-344-4619
+ n www.cityofpt.us
Mechanical Permit Application
Project Address: Legal Description (or Tax #): Office Use Only
t r Addition: Pe cwt
Block:
# � .
s
oPated Permits;
Parcel #9�� �, I Lot(s):
Property Owne :
Name: W0, 1 tc>�s+v+;�,1J
Address: I L 3 13,D N rAr, .. Su (� L
City/StIzi p: r�ra1
Phone:
Email:
Special Overlay District: ❑ Shorelines ❑ Historic
OF EQUIPMENT
Air handler up to 10,000 cfm
Boiler/Comdr, W< 100,000 btu or h o
Boiler/Comp, 100,000 to 500.000 btu or 3-15 h
Boiler/Comp, 500,001 to 1 M btu, or 16-30 hp
Boiler/Comp, 1M to 1.75M btu or 31-50 hp
Boiler/Comp, > 1.75 M btu or 50 ho
Domestic Incinerator
Evaporative Cooler
Furnace < 100,000 btu
Furnace >_ 100,000 btu
Gas hot water heater-
Gas or wood stove
Gas piping, 1-4 outlets
Gas piping, additional outlets
Hazardous process piping sy
Hazardous_ processi ip p ng sy
Hood/exhaust system
Industrial incinerator� -
_
I n sta I lation/relocation/replace
Other equipment
stem, 1-4 outlets
stem additional outlets
ment of each
Process piping„ 1-4 outlets
Pros§ i in §+stem ad'diti�nal outlets
Pro .._ m _.
ane tank.., mcludiniin
Pte_ 3r/alteration of e u�nt
Vent/exhaust Fan
TOTAL
Contractor:
Name: i r -(
Address:City/St/zip: 44
Phone: 3 F? S 3
Email:
State License #: Exp:
City Business License #: p O 174-0 18
QUANTITY COST PER
13.00
17.00
30.00
44.00
60.00
..___ 115.00._.._
_...
21.00......
13.00
17.00
21.00
�..........W, 15.00.__.'
17.00
9.00
3.00
7.00
2.00
�._.._._.............� . 13.00 ._..._.
�..................... 71.00................
10.00
13.00
1111111111111111M 11MAIM
CAG�.,w.��l I- �tl 11 dii" �i�[ f1
I hereby certify that the information provided is correct, that I am either the owner or authorized to act on behalf of the owner
and that all activities
� associated with this permit will be in accordance with State Laws and the Port Townsend Municipal Code.
PrintName: MCLL CU C' ,,,
Signature: Date:
International Fire Code 2006 — TABLE 3804.3
LOCATION OF LP -GAS CONTAINERS
MINIMUM SEPARATION BETWEEN CONTAINERS AND
BUILDINGS, PUBLIC WAYS OR LOT LINES OF
ADJOINING PROPERTY THAT CAN BE BUILT UPON
CONTAINER Mounded or Above ground Minimum Separation
CAPACITY Underground Containers Between Containers
(Water gallons) Containers (feet) (feet) (feet)
Less than 125
10
5
None
125 to 250
10
10
None
251 to 500
10
10
3
501 to 2,000
10
10
3
Selected text from the above Tab/e. The minimum distance for underground containers shall be measured from the pressure relief
device and the filling or liquid -gauge vent connection at the container, except that all parts of an underground container shall be 10
feet or more from a building or lot line of adjoining property which can be built upon.
In applying the distance between buildings and ASME containers with a water capacity of 125 gallons or more... distances to the
building wall shall not be less than those prescribed in this table.
The following shall apply to above -ground containers installed alongside buildings:
1. Containers of less than a 125 -gallon water capacity are allowed next to the building they serve when in compliance
with Items 2, 3, and 4.
2. Department of Transportation (DOTn) specification containers shall be located and installed so that the discharge
from the container pressure relief device is at least 3 feet horizontally from building openings below the level of such
discharge and shall not be beneath buildings unless the space is well ventilated to the outside and is not enclosed
for more than 50% of its perimeter. The discharge from container pressure relief devices shall be located no less
than 5 feet from exterior sources of ignition, openings into direct -vent (sealed combustion system) appliances or
mechanical ventilation air intakes.
3. ASME containers of less than 125 -gallon water capacity shall be located and installed such that the discharge from
pressure relief devices shall not terminate in or beneath buildings and shall be located at least 5 feet horizontally
from building openings below the level of such discharge and not less than 5 feet from exterior sources of ignition,
openings into direct vent (sealed combustion system) appliances, or mechanical ventilation air intakes.
4. The filling connection and the vent from liquid -level gauges on either DOT of ASME containers filled at the point in
installation shall not be less than 10 feet from exterior sources of ignition, openings into direct vent (sealed
combustion system) appliances or mechanical ventilation air intakes.
Please draw a simple plot plan below or on another piece of paper so we can easily locate the
LPG container. Indicate container size and type, gas piping and regulator location, and setbacks to
Duuainci. incluse the aaiacent street ana name.: ana anv otner newtul lanamarKS on-site.
PORT to
Receipt Number:
8-1141
Recei tbate,
1 11
Cashier* FF I' DESJ 'Pa p r/payee blame, LIPPINCt Thi "FUSEL C
Original Fee
Arnount
Frye
Permit
Parcel
Fee Description
Amount
Paid
Balance
MEC08-075
989713303
Record Retention Fee for Mechanic;
$3.00
$3.00
$0.00
MEC08-075
989713303
Mechanical Permit
$64.00
$64.00
$0.00
MEC08-075
989713303
Technology Fee for Mechanical Pen
$5.00
$5.00
$0.00
Total„
$72.00
I
Receipt Receipt !Gate- Fee Description Am ou:nt Paid Perm It #�
Paym a fat C he clm Paym er nt
Method Num,leer Am,ouint
CHECK 33552 $ 72.00
Total $72.00
genpmtrreceipts Page 1 of 1
To my knowlege, the only thing left outstanding is painting of the propane
stove vents that extend from their roof. These were to be painted a dark
color that would be presented to DSD staff first (for review and approval)
before painting. They may have other Design Review issues that need to
be completed, but I'll have to double check their file & probably do a site
visit.
I'm pretty sure they've satisfied the Public Works end of things EXCEPT
providing them with some final "As-Builts" for the work they've done in the
right-of-way. Check with Alex for any outstanding items.
Thanks,
John
z
Scottie Foster
From:
John McDonagh
Sent:
Monday, November 09, 2009 8:37 AM
To:
Scottie Foster
Subject:
FW: Nordland Bldg.
Charlie says one of the condo's is occupied on the 2nd floor.....
John McDonagh, Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Charles Paul [mailto:charlesapaul@msn.com]
Sent: Sunday, November 08, 2009 8:52 AM
To: John McDonagh
Subject: Nordland Bldg.
John:
Just as follow-up to our conversation
two occupants in their bldg. Uptown
condo (2nd flr left.)
CP
at the HPC mtg. Nordland does have
Therapy in the basement and one
1.
Scottie Foster
From:
John McDonagh
Sent:
Monday, November 09, 2009 8:16 AM
To:
Scottie Foster
Subject:
FW: Nordland Bldg.
2 TCO's at the Nordland site or just one?
John McDonagh, Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Charles Paul [mai Ito: charlesapauI@msn.com]
Sent: Sunday, November 08, 2009 8:52 AM
To: John McDonagh
Subject: Nordland Bldg.
John:
Just as follow-up to our conversation at the HPC mtg. Nordland does have
two occupants in their bldg. Uptown Therapy in the basement and one
condo (2nd flr left.)
M
CITY OF PORT TOWNSEND
REQUEST FOR PUBLIC RECORDS
Submit request to: City of Port Townsend City Clerk Phone: (360) 379-5045
250 Madison St. Suite 2 Fax: (360) 385-4290
Port Townsend, WA 98368
Date received : � Received by; . _,,,,,,,
.....
REQUESTOR'S NAME (PLEASE PRINT): __ ) 2,t �. ___._._ �..._....
ADDRESS:
STREET L CITY r� ZIP CODE
'3 TELEPHONE NUMBER: ? ' . `� / ` /9
HOME WORK CELLULAR
E-MAIL:
WISH TO (CHECK ONE) Review a Record Obtain photocopies of a record
Please describe the records you are requesting and any additional information that will help us locate them for you as quickly as possible:
I understand that there may be charges for duplication of these specific records. If the request exceeds 9 pages, a minimum of $0.15 per
page for standard photocopies will be charged to the requestor. I understand the Public Records Officer may require a deposit from me
in an amount not to exceed ten percent of the estimated cost of providing copies for a request. If a request is made available on a partial
or installment basis, the Officer may charge me for each part of the request as it is provided. If an installment of a records request is not
claimed or reviewed within 30 days, I understand that the City is not obligated to fulfill the balance of the request.
I certify that any lists of individuals obtained through this request for public records will not be used for commercial purposes. (RCW
42.56.070)
I understand that pursuant to RCW 42.56.520 the City will respond within five (5) business days, either by providing the information
requested, providing a reasonable estimate as to when the records will be available, or by denying the request. Five day response begins
one working day after receipt of request.
Signature:
(Staff to Complete the following)
Date Request fulfilled:-_..-_._,
_,_
Date Request denied:
Written explanation of denial attached, pursuant to RCW 42.56.520: _ ITIT
Other information and record of contacts with requestor:
G: (City Admin I Clerkl Records I rules (form. doc
JUN : 3 271
CITY OF PORT TOWN SEND
r
ell
����%�'-iia
J-2�2A ex
7q-tcl
lr City of Port Townsed DSD
^ 250 Madison Suite 3
Port Townsend, WA 98368
Phone: 360-379-5095 Fax360-344619
CITYL OF PORT TOWNSEND
CONSTRUCT ION PERMIT & INSPECTION RECORD
THIS CA,IW MUST- BE-P-OSTED AT CONSTRUCTION SITE
Cal 385-2294-pri,o ,,to 3:00 p m for next day Inspection
,W.
m° J
Permit Number: BD06-088,.,.. 08/22/06 la�cel Number: 989-713-303
Job Address: 121.5 Lawrence Street. Zoning: C -III Type: V A full ° s arinklered
Occupancy: B/R -2 Occupant Load: Varies by Space
Nature of Work: Construct Office Buildiniz with Residential Units above
o.e
Owner: Johanna Reinstra Contractor: Hammer W° r' Ine HAI IIS' EI 07333
GENERAL CONDITIONS APPLY: Scc Last Ila c
SEPARATE PERMITS REQUIRE])'-
Pedestrian Protection - review" and approval prior to installation d '
Electrical Permit - Contact WA State Dept. of Labor & Industries 360-417-2702
Sign Permits - contact Penny Westerfield @ 379-5082
p ,
my ,
Fire rinkler/Fire Alarm - as deferred submittals,
s = , n
Structural for l+ lt�vator 1 a, Idl+jevator/Hoistway Venting - as deferred submit6D
° Inti r�w"iriir I� fice Space- as "11 deterred submittal -
�� Mechanical - heating, NREC compliance and ventilation for offices as deferred submittal,,',,,",",/,",,,"/,
Lighting -- Interior retail as deferred submittal'and exterior, requires HPC review
Landscaping as deterred submittal
HPC-lari"or to schedidiLiga framing inslmelion, remaining exterior details to be reviewed and
approved by HPC subcommittee ,
lye
NOTE: Special Inspection is required f �r soil condition 1,�v geotechnical engineer, high-strength
concrete, placement of reinforcing steel, anchor bolts, holdowns, shear wall nailing, structural
ig,high
streg bolting,
building, enclosure details etc. per IBC Chapter 17 and Sheet Sl. I of
plans. SpecialInspector , l7 j
ICC certified and listed in the current edition of the WABO
Agency and Inspector &,�i s°ter or provide credentials and demonstrate competence in the specific
construction field. Required Special Inspection Reports shall indicate compliance with the plans
and specifications and shall be copied to the Building Department in a timely manner. Permit
Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies
...�.m .... ..�
noted by required special inspections,
****Outside construction activities shall be limited to 7:00 am to 6:00 pm Monday through
Friday and prohibited on weekends and national holidays****
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page I of
REQUIRED INSPECTIONS
PEDESTRIAN PROTECTION Prior to beginning
construction activities, a plan shall be submitted for review and
approval by the Development Services and Public Works
Departments; Inspection Required
CLEARING AND GRADING
Per engineered soils report, as construction will take place
during the wet weather season, de -watering measures may be
required
In accordance with the geo-technical engineering investigation
conducted by Krazan & Associates, a Krazan representative
shall be present at the site during all earthwork activities and
shall submit written reports to DSD that development proceeds
in accordance with the exploratory fieldwork and the results of
the geotechnical investigation
FOOTINGS . —per en ...........
— p engineered details; geotechnical engineer
shall observe excavation; special inspection required
Setbacks — 0 for zoning; per IBC only
Footing Drains — sheet 54.1
Footings — schedule per Sheet 53.1
Exterior Post Footings — detail 54.2
Grade Beam — detail Sheet S4.2
Forms
Reinforcement — grade 60; see sheet S 1
Interior Footings/Column Bases
UFER
FOUNDATION WALL/SLAB — hot -dipped galvanized
fasteners shall be used in all applications in contact with
pressure treated wood; special inspection required
***Basement must meet definition of "basement"; S stories not
allowed****
Stem Wall — foundation wall details Sheet 54.1; foundation plan
per Sheet 52.1
Forms
Reinforcement — grade 60 steel; see sheet S 1.1
Retaining Wall — sheet S4.2
Holdown Hardware — holdown schedule Sheet 53.1
Anchor Bolts and Washers — see shear wall and column
schedules, Sheet 53.1
Waterproofing
Expansion Anchors — sheet S 1.1
Adhesive Anchors — S 1.2
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 7
Building Permit#BLD06-088
ED/DATE
I tUWL r
FLOOR FRAMING - hot -dipped galvanized fasteners shall be
used in all applications that contact pressure treated wood;
holdowns required all floors
Beams — beam schedule Sheet S3.1
Columns — column schedule sheet S3.1
Pressure -treated plates
Treated Wood to Concrete
Anchor Bolts & washers — see shear wall and column schedules,
sheet S3.1
Joists — Joist schedule sheet S3.1 �.
Blocking - block under all shear wall locations
Ledger/Rim Joist
Positive Connections
I" floor framing — sheet S2.2
2ns floor framing — sheet S2.3
3"l floor framing —sheet S2.4
4'h floor framing — sheet ,52.,
Floor Sheathing — details S5.1
Floor to Floor Holdown Details — sheet S5.1
PLUMBING
llarrMier- gee? Legylired b commercial restrooms
Rough -In (drain, waste and vent)
Island Venting (as applicable)
Water Supply
Oval, split front seats
Hose Bibbs (backflow prevention required)
Pipe Insulation (R-3)
Pressure Reducing Valve
Water Hammer Arrestors @ clothes and dishwashers
Water Heaters
Pressure Relief Valve Drain to exterior
Seismic Straps @ 1/3 points
Drain Pans
Expansion tanks
Floor Drains — trap seal protection required
Air Gaps
Licensed Plumbing Contractor's Signature &
License Number:
Sign Here:
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 7
Building Permit#BLD06-088
M-9aralw
MECHANICAL — heating and ventilation as deferred
submittal for commercial spaces
LPG Fireplaces
Source Specific Exhaust Fans @ laundry (50 cfm) and
kitchens (100 cfm) & commercial baths (50 cfm)
Whole House Fans with timers in bathrooms (50-80 cfm)
Wall or window ports required @ each habitable room
Environmental Air Exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (located 3 feet
from openings)
Dryer Duct Exhaust —per manufacturer's instructions; no
screening @ duct termination
Make-up air for dryers in enclosed space —100 square inches
FRAMING - One-hour construction; two-hour stair enclosure
with 90 minute doors
HPC review and approval of remaining exterior details is
required prior to framing inspection
Engineered trusses and metal stairs as deferred submittals
Walls — one-hour demising walls required for condominium;
rated section details shown on sheet A5.2
_P,sitive Connections
Shear Walls- re@ares special inspection prior to cover;
maximum penetration 1/16"; typical shear wall details per
sheet 55.1
Shear Parml-Vocking
Typical framing details for drag strut connection, headers,
beams, wall intersections, built-up columns, etc. see sheets S5.1
and 5.2
Posts — DF#1
Roof/Truss framing details — sheet S5.3
Roof drainage
Roof Hatch —16 square feet
Beams and Headers
Blocking
Steel framing — structural welding requires special inspection;
see sheet S6.1 for details
Windows — requires revision for commercial spaces
.40 or better for residential; NFRC sticker must be on windows
Safety Glazing
Escape Windows @ residential units
Doors - 20 minute at corridor; 90 minute at stairs
Building Permit #BLD06-088
V°ED/DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 7
i
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 7
RE URED INSPECTIONS
FRAMING (continued)
Door Thresholds — t/2" maximum
Air Seal
Fresh Air Intake @ residential units
Fire Blocking
Fire Stops — submit for approval prior to installation
Fire Dampers — submit for review and approval prior to
installation
Draft Stops
Stairs — interior and exterior
Weather Resistive Barrier.— inspection required prior to cover
Smoke Detectors at residential units
Building Enclosure Reports
INSULATION
Slab—R-10
Walls (R-21),,"',
Ceiling (R-38)
Vapor Barrier Paint _ certification required at final
Mechanical Room Separation (if applicable)
DRYWALL NAILING — one-hour construction; rated floor
and wall section details on sheet A5.2
Walls
Ceiling
Draft Stops
Stair Enclosure — two hour
Dwelling Unit Separation
Occupancy Separation
Shaft
LIGHTING — exterior as deferred submittal; exterior lighting
requires HPC review and approval prior to installation; metal
halide prohibited
Inspection required; contact John McDonagh # 344-3070 for
inspection
PARKING/LANDSCAPING/BIKE
RACK/DUMPSTER/RECYCLING
Building Permit#BLD06-088
VED/DATE
i
prior to installation
Field Inspection required; contact John '44cl ona�h at 344-3070
_. --.. .......... w.. .....
Call 48 hours before you dig for utility line locates
1-800424-5555
Page 5 of 7
w
i
prior to installation
Field Inspection required; contact John '44cl ona�h at 344-3070
_. --.. .......... w.. .....
Call 48 hours before you dig for utility line locates
1-800424-5555
Page 5 of 7
Building Permit YBLD06-088
APPROVED/DATE
Public Works Department Sign -off
Fire Department Sign -off
FINAL
Building addresses posted — minimum S " numbers
Electrical Sign -off (L & I)
Barrier Free Access — ramps, handrails, thresholds, etc.
Door Maneuvering Clearances
Thresholds
Lever Hardware
Ramp, Stairs, Handrails
Braille/Pictogram Restroom & Office Signage
Van Accessible Parking Signage
Plumbing
Barrier free required
Restroom Wall and Floor covering per IBC Chapter 12
Mechanical: Pleating and Ventilation — as cltt t, ,rred ubmittal for
NREC; commissioning report required
Mechanical — residential and commercial restr cams, kitchens,
baths, laundries
Decks
Stairs and Stairway Lighting
Handrails including termination and extensions
Landings
Guardrails
Stair Signage
Smoke Detectors
Insulation Certificate
Vapor Barrier Paint Certificate
Exit Signage and Illumination
Lighting Power Allowance
Daylight Zones, Controls and Switches per NREC Chapter 15
Final — Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 6 of 7
Building Permit#BLD06-088
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
regi4tratiott number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing
and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free
of dirt debris. Soils exposed during construction shall be -temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re -inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twentv-four hours notice is required. Public Works aanroval must be received prior
to Scheduling (lie Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5095 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 7 of 7
CERTIFICATE OF REVIEW
and
FINDINGS OF THE HISTORIC PRESERVATION COMMITTEE
Design Review Application I:IPC06-001
The Port Townsend Historic Preservation Committee has completed its design review of the:
Construction of a new four story plus basement, mixed-use building designed for office use on the
basement and first floor. Five (5) residential units would be created on the second, third and fourth floors.
Total area within the new building would be 11,000+ square feet.
proposed by: Johanna R:ienstra
Representative: Johanna ltienstra & Richard Berg
for a new building to be located at: SW corner of Lawrence & Filmore
with significance classified as (circle one) N/A
Pivotal Primary Secondary Altered Historic/Recent Compatible Intrusion
Review of the project is: Mandatory
Compliance with review is: (circle one) Mandatory Voluntary (unless determined
otherwise through SEPA)
The review was conducted pursuant to Chapter 17.30 of the Port Townsend Municipal Code, and
was based on the application reviewed on 1/24/06
After review of relevant design guidelines, the Committee found that the proposed development:
(circle one)
CONTRIBUTES IS ACCEPTABLE DOES NOT CONTRIBUTE
to the Port Townsend Historic District with the following condition:
1. The proposal is approved in concept only (emphasis added) with regards to footprint,
orientation, massing and elevations. Additional Design Review is required for specifics on
materials, landscaping, building colors, door hardware, and other details not included with the
Design Review submittal.
Issued this 25th day of January, 2006
Vproved
Disapproved by
(circle one)
Bed Permits: MCD_ PERMITSUAHMCERTIFICMERGE. DOC
1)age 1 qf I — Revised 12198
'hair, Historic Preservation Committee
DSD Director (or esigne
§
%
z
r
Z
O
LD
Z
O�
Z�
Oo
�Z
WW
Lt_ O
O�-
d n
0
�
d o
0
z
O
H
C7
z
0
a<
O3t
Uz
� z
WW
U)
LL
lL O
O ►-
0
k
/
:5
�
z
�
«
§§
00
§
z
o\
9/
�6
oz
0U)
OK
%}(e
o
W
f
S
n
i
z
O
O
z_
O=
O�
Uz
�z
WW
UC/)
1
LL O
O F-
F-
ao
na�
L2
/
§
4444444'4 44 Nn
G1N VI fn f/1N !"
L
H
..
�
r
Q
CD �GppI [Nr�IVppIN
CDCDC%J N I7 ��
I�
N
r_
'� MYI It r��wry yla�'
i
w r
O
en
f>4 _
l
1m=3=D=D�WL.j
MIR
Z'ZZFJX fY ZZ Q'
O
1
ym C,
'F.yY„• ',,.
�
44444' 4 4444 4
VIVI VI VIh VI NVI VI VI fn
4144444
VINV)h VI
4
VJ VI VI
�. �
wP / ..
w
'
O O x0 •-� O !� O ['I O 1(I m
ti N N m m
m (7 m m f`
- N - - -
� N n
N
� 4� �"'�' y'h*'
y"f gyp" :fir o
C'I N N
"" ^
C -i
g. _j
x
1-
of
_Pcc
09 _
dp
�, Yp
7....
�p 5
G
DC \
u u
\h I Wd.a
(7p
O
7Ati
Q��W Q xZiYQ
Q
U Ab,^L'�' "4 4E
m
ZQWi W NUQW W
Q,Or JQ OWrJ
rr+Fixri xr.�>W
QWr W
Z222F-JX
Q
M
> Sw
p%IU VI WL) Q mm C4 Q
OJ�OVIWW
�.........�.
.... Z ..
n
t<
0 z
Q O
NI' VI +' N a
S
N L itl'
= C
in
1 N
^
z w i W D. z z
Cn w
E Cn
>
W
N
_ \ o
¢ o cc
o _ UI FF
E c C C
6 E -op ^� t4 U r
awdo
I m ''.N
¢4 dl, Mm^ O It Ir
C!' J – Q Q Z
as
w,
6'M u
Y r" O c
Q
a
01,E vv p
o v ww
V) 1ny F
id'Y Y�'�u�i
b W{�
Q
��n
Fw ==w 3_::: Y}
Q
In 1n u1
M+iL1
V)C)U
^mri 1f Wafly wcr4 zs4Q VzW
F
i i i s i p L
LR:t
Z =
N
gip},
. N i:} In (ll 01A
°S 'O'
Z
U U U U W O Y
m S d 4 U 7iA n O ^
R
N 1
^CCY O
Q F Z V- (] v^^ �}✓
m 6 f a. Z V W I f/l CSCy� p di •-
w
.:.:.-i 7 3 or.•. Uj 3
w ^ ca
\ N n.
F ry1 q pyo p mL ul 3 j
L
L4�
O�
oppo op,�p8p
N
� 1 1
� m �
¢ ��', � W'� z NSS 0?=
w
pop copp¢
!U N N .. (V (LL+lU 3 ..
I I'i1 N O
¢¢ –C9 Z_
�J W J }
m z J 3 U
N
1
N T
a7
cu
JVnF W N M U W
Z Z :4 I La
m
\W a OR 17W�KU� p0
----
N
Q
F O \
3 Fr F_ �a0 04 11 U z
0
�U
WH O Z WW ZO z Z�J4I0 OO O !11 z
F J 4✓70
w
QJ
°C.1 m w W-0 z
oz o
�,.
1ii
a
¢
�
w �F I Vw1 0 �1F F
F�@Io
3 o rw;. >WC z o�
O o�o
a
W
J
_
C�0 I
r�11��
U
0 K
U z
U
Z
U
Q=
'Mario
3W–d,�J�
.zx� 0EL WOW KOH�OI�w OJ
ffN Co ?"""IQIIC�QUO zap
0 O mv)dt=/11Ji0 �mm I�z
Z
U r
U
z
O W W D
y�o w L6V ZV111 O
¢UN J– di`.
Ir
z N z
� F
J� _-1 Q F
W F= FQ m z w C
H
J
Z U d
d'
4�¢0y
L) K x EL M CC
w
W ul ul 7
41
WQ~J
Z ON W O .Z� Q
LLJ
O W U
O
QQ W
U Vl O
U Li
M 1L x s
x¢ .. if v
,..
..._._...
....,_._..
..........
4
LA
M (4/1 O W
V)
0 W
O
O O leo
Z
Lv, Z.
S3
O
Ir
I I M U> 00
N
0�
1L
\
O O. N 1[1 Kir
W \ \ JJJJ
3
_0Vi
ODp� ¢Q
7Z O
O
CW/1 Z N y (A
00 to II V_ OM
10
O
�'i�CPF W
OCYi
Z - O N
cc w��aial
A
u4w, Z
yL
Cf)OI
II
Z
K
00 to ugy
i
U
01 F
OI �g4. ,3 i!"r W
0.x. �Cg O
N i;Aa +=
W �
Z
Z µ U
C9i-�
6, Cy
19
c N
C 0
W O F
w 6 w W= a0 J
S
W
(e"
Z po &1"eg' Q
�-� 0'LC z
W Q
Wt 0
6P1 w II C/1
j
W(S/1
2.
S�q
•-• �1' O w 0 ^ g
Z
�3 y,.,J4lU'pii OC+IR
bin w a
',.
LT
�\\\ a3 o
0Z
z
Op',F Y zi.7 w
rarramm�Wa
/��(
�l QI�r.p
4WD w W a
W W
LL
N WO F »� ', 'C'. m
UZ d CS G"J�,CO Oz T.
Z ...W °
O u'1i '�„
W U
W W
fn Ck CY " F F fY 0
Y W w 0
a`rsusr o
U
ZW � M zoa
° w
�' v
Q a f C)
LL
Q
QQ 3o WO 1O tr W M
F .-arm,
0' ^ ���
m N .. a- - � N p
0
F4FYL:� a 0 r U
F_ F z
W 4a1 tl('.
O�^
V In p ul
o =
F
In F w w Z vj vi
¢ to = o O O
ro
Lu
U M F p p w Q m
W N 608" 9j O .. W d 01
F-- CL Wvl
J CG6 Wa.P�
Z p
— C9 W=
w CD =
Z C9 0 F Q C.7 [�
SS
a n
O c
Z
�No Qp
Ord OFMd r x'IG (, z. FCwP
zX._
Z I
ZOO U
ao z z z =
W J � � FF W � 4
Sao
W
a
d CL U Ib 1- F
J
5 J J Z Z M p(A K U
V�
O N
f n m m m J J M M d
,pOrAT Ir"C1ACY BUILDING PERMIT
City of Port Townsend
{ Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information Permit # BLD06-088
Permit Type Legacy Building Permit Project Name Mixed Use Commercial Building
Site Address 1215 LAWRENCE ST Parcel # 989713303
Project Description
New construction mixed use building with commerical and residential condos of four stories plus basement creating 12,577 sq,
ft. of improvement
Names Associated with this Project License
Type NameContact Phone # Type License # Exp Date
1 0 000"" COft C L1. °L
Applicant erkins Johanna t (360) 385-5849
General Dual Nordland Construction W/ / n �' O - CITY APPLIED 12/31/2007
License
Contracting
General Dual Nordland Construction Q - STATE NORDLCN953 08/30/2009
License
Contracting
. ,. ... i. lx 6
Call .385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. 1 certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner.
Print Name :To h �- �'4 79/ U L Date Issued: 08/16/2007
S Issued By: SYS
M ottrro LEGACY BUILDING : PEL'!LMIT
City of Port Townsend
Development Services Department
AWA 250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information
Permit Type Legacy Building Permit
Site Address 1215 LAWRENCE ST
Project Description
Permit # BLD06-088
Project Name Mixed Use Commercial Building
Parcel # 989713303
New construction mixed use building with commerical and residential condos of four stories plus basement creating 12,577 sq.
ft. of improvement
Fee Information
Project Valuation
Building Permit Fee
$
6,674.16
Fire Sprinkler Plan Review Fee
$
150.00
Site Address Fee
$
3.00
Plan Review Fee
$
500.00
Energy Code Fee - Commercial/Mult
$
220.00
Energy Code Fee - Commercial/Mult
$
220.00
Total Fees $ 7,767.16
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner.
llt"'fial: )I" iine Date Issued: 08/16/2007
Issued By: SYS
Cl
Permit Marcel Fee Descri tl+dia'
BLD06-088
BL D06-088
BL D06-088
BLD06-088
BLD06-088
BLD06-088
959713303
989713303
989713303
989713303
989713303
989713303
Fire Sprinkler Plan Review Fee
Plan Review Fee
Energy Code Fee - Commercial/Mull
Energy Code Fee - Commercial/Mull
Building Permit Fee
Site Address Fee
Re # receipt Date Fee Description
Paient Check i?�ayunealC
Method Number r Afrlrtoun
CHECK , 2077,20 $ 7,767.16
Total $7,767.16
$150.00
$150.00
$500.00
$500.00
$220.00
$220.00
$220.00
$220.00
$6,674.16
$6,674.16
$3.00
$3.00
Total:
$7,767.16
Amount Paid Permit
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
genpmtrreceipts Page 1 of 1
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360) 379-5095 FAX 060) 344-4619
May 17, 2007
Ms. Johanna Perkins
P.O. Box 296
Port Townsend, WA 98368
SUBJECT: Application extension — BLD06-088
Dear Johanna,
I have your request for an extension of the building permit application BLD06-088. The
application was extended once and is now due to expire on the 19th of this month. As I
understand it the initial sale of the project did not close and you are now seeking a new buyer.
Due to the circumstances it is appropriate to provide an extension of the time by which action
must be taken on the application. Under section 105.3.2 of the International Building Code, as
adopted by the City, this type of extension is limited to 90 days. This will place the new
expiration date as August 17th. The permit will need to be issued (physically picked up and paid
for) by that date. Due to the fact that the 2006 International Codes become effective on July 1 in
the state, I will not be able to provide an additional extension.
Please note that once the permit is "issued" the permittee has 180 days to commence work in
order to keep the permit valid. If you have any questions or if I can be of further assistance,
please let me know.
Sincerely,
Leonard Yarbe, y
Development Services Director
a ; ° , AXD MA"i'
f
oN���
r r 7
�i/„NiY,f
y
��f�/
! ire tri'
(a 'i � v^vi ..e ,�l/
i''cNlnV�i�l✓ff ✓��� l'
a y
/
Y A�
W
...... Ib II��. W P �
1, ;�,
e � 7
)r l�t14,102", llh to',:.
nHe j
�; 11
A NATIONAL MAIN STREET COMMUNITY WASHINGTON'S HISTORIC VICTORIAN SEAPORT
Uptown Land
L e Plus Development Package
..: p g
Land only Includes completed
development package to build 4 condos
plus penthouse & commercial office/
�l
x
... � reta�� c� r�ain `dor, PerreIi, redyat city
H
F
V bu Out eentra� tJpto � :,
„/�
V
I � w ✓ ��, +� l ; i///� ff//i f/i/ / / iii f fi /// /// / i% f / � f/ii f i� ;,
.'®R...... . . ...... . . . .. ........ . .
�I1T �� � G � , .,.„. , � � � . r�°°, � � � ".,.: r .._ �..� .,� ....µ - - � �� rl, � rf , f � ,iii ' � 111 l�l� � f r'� � ���r rl �/lll� l �lll� >✓%If l r,�
�r A.
INA
wig /fa _ 00\1 ,oc ✓"' "M
rill",
� ��
110
I� re
Commercial/Indri. Client Detail Report
of 05/30/07 at 4:
Dn lots 2&4
Status Active
Listing# 27087993
County Jefferson
Style
Community
Gen Zoning
Gr Schd Inc
Vacancy Rt
Gr Adj Inc.
Total Exp.
Net Opr Inc
Cap Rate
�S11tntti. �"�.tr
uetow w�
Area
Map
Grid:
Uptown
Commercial
Page 1 of 1
480 List Price
488,000
5 Sold Price
E-1 Year Built
9999
Acreage
0.080
Lot Size
3473
Bldg. SOFT
Off. SQFT
Whse SQFT
Tax Year
Annual Taxes
Features Site Frontage
Energy Source Lot Depth
Heating/Cooling # Pads
Floor Covering Pad Ready
Loading Envr. Survey
Terms Cash Out Bndry Survey
Foundation
Roof Type
Exterior
Sewer Sewer Available
Directions : Lawrence Street to Fillmore - corner lot next to Victorian Office building. Do not bother tenants in off bldg next door,.
Marketing Remarks : LAND ONLY — Includes completed development package to build 4 condos plus penthouse & commercial office/retail
on main fir. Permit ready at city for $7000. Fabulous central Uptown location surrounded by restaurants, theatre, library, Farmer's Market, &
Aldrich's Grocery & Deli. Very close to downtown waterfront. The extensive permitting process incorporates design & engineering by Taylor
Gregory Butterfield Architects, Edmonds. This is a one of a kind opportunity.
Presented By: Shirley Rudolph / John L. Scott/Pt. Townsend
Lot Sizes And Square Footage Are Estimates.
Information From Reliable Sources, But Not Guaranteed.
Copyright ©2007 Rapattoni Corporation. All rights reserved.
file://C:\DOCUME—I\Sandy\LOCALS—I\Temp\LASYNHJ5.htm 5/30/2007
ddKraza-ti& ASSOCIATES, INC.."�
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 27, 2008 KA Project No.: 106-08091
,. Permit No..
i , x
Mr. Tom Johnson
Nordland Construction NW, Inc. �hw;
123 Ponderosa Place
Nordland, WA 98358 uA
RE: Lawrence Building
Port Townsend, WA�
Dear Mr. Johnson:
In accordance with your request and authorization, the following test data are presented on the following reports,
which are enclosed:
May 15
May 20
Cylinder Report No. 33134
Cylinder Report No. 34280
Referenced concrete reports and compressive strength data will be mailed following 28 -day tests, if applicable.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office.
Respectfully submitted,
Penn Seely, Laboratory Manager
Peninsula Division
PS: mds
Enclosures
ccd City of Port Townsend/Leonard Yarberry (e-mail)
With Offices Serving The Western United States
20714 State Hwy. 305 NE, Suite 3C 9 Poulsbo, Washington 98370 • (360) 598-2126 9 Fax: (360) 598-2127
Krazan & Associates, Inc. 20-x" 4 Stag HWy. 305 N.E. Suite 3C, Pcv!lsbo, WA 98370 (360)-598-2126
Project No. 106-08091 CA. Code P14452 Pour Date 5-15-2008 Report No. 33134
Weather OVERCAST Jurisdiction CITY OF PORT TOWNSEND Permit No. BLDG 06-088
Project LAWRENCE BUILDING Engineer
Location PORT TOWNSEND Architect
Client NORDLAND CONSTRUCTION Contractor NORDLAND CONSTRUCTION
Field Data
Supplier COTTON
Concrete X Mortar Grout
Prisms Grouted Ungrouted
Site Mix
Plant No.
Flex Beams
Other
Conc. Air
Temp. Temp. Unit
Time Truck # Ticket # % Air Slump (F) (F) Wt.
13:00 43 311 4.7 5 72 60 -
Footings Walls Columns Grade Beams
Slab/Deck Slab Pilings Other
Grids ELEVATOR PIT SLAB/FOUNDATION
Reported Batch Data
Cement Type I
ASTM C39
Design
Actual X
Mix No.
P30AW
Cam. lbs.
469
F. Ash lbs.
-
C. agg. lbs.
1668
C. agg. lbs. 2
176
C. agg. lbs. 3
-
Sand lbs.
1380
Water
25
Admixture POLY 997
38.6 OZ
Other
-
Air Ent. (oz/cwt.)
211
Water Added on Job (gals.)
Field Test Methods
Remarks REINFORCEMENT INSPECTED W/C .47 NOTE AIR ASTM C143 ASTM C138 ❑,
ENTRAINMENT PRESENT IN MIX THOUGH NOT ASTM C1064 ASTM C173
IIS
REQUIRED IN THE APPLICATION ASTM C31 Other_ IT._.__ .....................
Inspector ERIC WORTH Reviewed By
Laboratory Data Design Strength 3000 Date Specimens Rec'd. 5-16-2008
CA. Test Cali
Dia
ASTM C39
Length
Max.
Comp.
Tested
Break
Code Date
Age
Dim.
Area
Load
Str. (psi)
Set # By
Type
P14452- 05/22/08
7
4X8
12.57
38145
3,030
AC
2
P14452- 06/12/08
28
4X8
12.53
53115
4,240
CJA
1
P14452- 06/12/08
28
4X8
12.53
50640
4,040
CJA
1
P14452- 06/12/08
28
4X8
12.53
53000
4,230
CJA
1
14452-
P14452-
P14452-
P14452 -
P1 4452-
P14452-
Lab Test Method
ASTM C39
ASTM C109
❑
ASTM C617
ASTM C1231
ASTM C1019
El
Other
2�compressive
Flexural
P14452- Test Results
Remarks FR 92573 X Conforming
s
Results Reviewed By Date Reviewed Non -Conforming
�.���-^
Codes for Break Types: 1. Cone11 2. Cone & Split0, 3. Cone & Shear4. Shear , 5. Columnar (Split)
0
Krazan & Associates, Inc. 2x-14 State Hwy. 305 N.E. Suite 3C, P�-'!�sbo, WA 98370 (360)-598-2126
Project No. 106-08091 Cyl. Code P14433 Pour Date 5/20/2008 Report No. 34280
weather OVERCAST Jurisdiction PORT TOWNSEND Permit No. 06-088
Project LAWERENCE STREET BUILDING Engineer
Location PORT TOWNSEND Architect
Client NORDLAND CONSTRUCTION Contractor NORDLAND CONSTRUCTION
................................
Field Data Site Mix
Supplier COTTON REDI MIX Plant No. HADLOCK
Concrete X Mortar Grout Flex Beams
Prisms Grouted Ungrouted Other
Time Truck # Ticket # % Air
9:02 47 341 ---
Conc. Air
Temp. Temp. Unit
Slump (17 (F) Wt.
5.5 64 53 ---
Footings Walls Columns Grade Beams
Slab/Deck Slab Pilings Other
Grids ELEVATOR PIT WALLS. 4.5 YARDS PLACED
Remarks REBAR CONFORMS TO PLANS PER DETAIL
S4.1(11). WC=0.37
Inspector JIM SHULTS Reviewed ByQ
Laboratory Data
Cyl. Test
Code Date
P14433- 05/27/08
P14433- 06/17/08
P14433- 06/17/08
P14433- 06/17/08
P1 4433-
P14433 -
P1 4433-
P14433 -
Dia
Remarks FR 92464
Results Reviewed By
Codes for Break Types:
Age
Dim.
Area
7
4X8
12.56
28
4X8
12.63
28
4X8
12.63
28
4X8
12.63
Design Strength 4000
Length Max.
Comp.
Load
Str. (psi) Set #
51920
4,140
70920
5,620
74090
5,870
82250
5,720
Reported Batch Data
Cement Type 1-11
By
Design
Actual X
Mix No.
50AW B
Cern. lbs.
608
F. Ash lbs.
---
C. agg. lbs.
818
C. agg. lbs. 2
796
C. agg. lbs. 3
---
sand lbs.
1489
Water
27GAL
Admixture POLY
37.33OZ
Other
---
Air Ent. (oz/cwt.)
---
Water Added on Job (gals.) 4
Field Test Methods
ASTM C143 ASTM C138 ❑,
ASTM C1064 ASTM C173 ❑
ASTM C31 Other E=
Date Specimens Rec'd. 5/21/2008
Tested
Break
By
Type
AC
2
CJA
2
CJA
1
CJA
1
Lab Test Method
ASTM C39
ASTM C109
ASTM C617 ❑
ASTM C1231 75
ASTM C1019
Other
/\ Compressive
Flexural
Test Results
Conforming
Date Reviewed
/�p,,,� Non -Conforming
� o`�J'^„'
1. ConeH E 2. Cone & Split3. Cone & Shear 4. Shear 5. Columnar (Split)
i
COMMF'ICIAL BUILDING C ECITTAST
l� rae
Applicant:Date:
BUILDING
BUILDING REVIEW
l , Completed Application
w Completed Checklist
Site Address
Architectural/Engineering Drawings
(3 sets plus 1 for PW if new const)
+St-_rs
/ Plot Plan
/Floor Plan
Foundation Plan 4&o-Tz�,r-14.w,�..
_ Typical Framing Details
Elevations ( /,,;= ���2-c•,
NREC Lighting Budget Compliance
F' Foe- a-kT ,
NREC Mechanical Compliance
l " ,
NREC Envelope Compliance
WSVIAQ Requirements
Contractor's License Verification
State 1-800-647-0982 (press 1 & 2)
City ext. 1115
To County Health Department
To Fire Dept
Occupancy Rating
Change of Use? Yes ❑ No
Bid or Total Floor Area Breakdown
I I, o /, 6/T. vz�
\\Bcd_permits\forms\BUILDINGCommercial Building Checklist.doc
Rev. 12/26/01
Building Permit # BLD d 6 - -4166
PUBLIC WORKS DEPARTMENT
Street and Utility Development Permit/
Minor Improvement Sb) -f D 6 - o 36
Routed to Public Works with plans
Technical Conference
Temp Erosion/Sediment Control
Grading/Drainage
PLANNING REVIEW
C � t'p/zoning District 51:�7 Tier
ESA Questionnaire —
Rout ed to Planning
Special Conditions:
ESA?
Floodplain Area?
SEPA?
Shorelines?
HPC? D
PUD? P ,�5e �, o Foe. FJm-- J
Subdivision?
Conditional Use/Variance/LLA?
Variance?
C -II Design Standards?
Restrictive Covenant
04- Sign Permit ev
Parking — Oc/1{rr pL t A /, 6
Landscaping
Page 1 of 1
CITY OF PORT TOWNSEND
COMMERCIAL BUILDING PERMIT APPLICATION
NEW CONSTRUCTION, REMODELS, ADDITIONS, & ALTERATIONS
Property Owner's Name(s) Johanna Rienstra
Conditioned Space Sg4t: 12,577 ,�
Mailing Address - 420 Hudson St, Port Townsend, WA 98368
Phone — 360- 774-1424 Permit No.
Addition/Expansion
Property Street Address 1215 Lawrence St, Port Townsend, WA
Parcel # 989713303
Zoning District C -III H.C.D, Construction Type: V-A
Occupancy Rating: B & R-2
Legal Description: Addition see legal des. Block
133 Lot(s) 2 & 4
General Contractor's Name- HammerWorks, Inc.
Grading/Excavation
Mailing Address: 654,5t' Ave S., STE 300 Edmonds, WA 98020
Phone: 425- 673-5008
State License Number:
City Sewer
Septic
Exp. Date: April '07
City Business License Number: BL006759
Exp. Date: 2007
Authorized Representative/Contact Person: Colin Winters
Phone: 425-673-5008
Estimated Value of construction $ 1,194,815.OQ
Financed By Ii G�pr,V,A6 4L-x�4,q LL ,
Date Work is to Begin: approx. July 2006 Date Work is to be Completed: approx. June 2007
Please check all that applies for the type of building permit you are requesting:
X New Commercial
Conditioned Space Sg4t: 12,577 ,�
Restrooms Sq. Ft: 662
Addition/Expansion
X New Multi -family - # of units: 5 units
Mezzanine Sq. Ft:
Entry/Lobby Sq. Ft: 351 I
Change of Use
Repair/Remodel/Ten ant Improvement
2,897 3`d —2,898 4th -2,169
Grading/Excavation
Other (please describe):
City Sewer
Septic
3/4" Water (rd¢.rv" 1 1/2 " Water Meter
1 "" Water Meter 2" Water Meter
Side Sewer Contractor:�.�(% /
Floor Area
The proposed structure is #o;be-ase f�or`Residential units, Office/Retail space
Conditioned Space Sg4t: 12,577 ,�
Restrooms Sq. Ft: 662
Basement Sq. Ft: 1,835,,_
Storage Sq. Ft:
Mezzanine Sq. Ft:
Entry/Lobby Sq. Ft: 351 I
Other (please describe): 15t — 2,790 2"d-
Decks Sq. Ft: 822
2,897 3`d —2,898 4th -2,169
PA05076 J & J Perkins Building\Applications\completed\05076Application-Commercial Building.doc
Property Site Area/Coverage Information Total area of the property in square feet: 8,249 SF
Total area covered by structures in square feet (existing & proposed; use fdn. bldg. line for dimension): 3,480 SF
Percentage of lot coverage: 42%
Impervious Surfaces.
Please provide the square footage of the roof area of the proposed and existing structures, and the square footage of the
total area covered by porches, walkways, patios and driveways, parking, etc.
Proposed Building Roofprint Sq. Ft: 3,132
Existing Building Roofprint Sq. Ft: 1,629
Proposed Garage Roofprint Sq. Ft:
Existing Garage Roofprint Sq. Ft:
Proposed Porch/Walkway Sq. Ft: 407
Existing Porch/Walkway Sq. Ft: 764
Proposed Parking/Driveways Sq. Ft: 1,879
Other (describe):deck -134 dumpster/propane - 126
Existing Parking/Driveways Sq. Ft:
Other (describe):
Total Proposed Impervious Sq. Ft: 4,397
Total Existing Impervious Sq. Ft: 2,393 % New: 53
Please check the plans that you are submitting with this application:
X
Site Plan
X
Framing/Roof Framing Plan
X
Parking Plan
X
Building & Wall Sections
X
Landscaping Plan
X
Elevations
X
Drainage/Erosion Control
X
Plumbing
X
Foundation Plan
(attach list).
Mechanical
X
Floor Plan
on-
NREC Compliance: Electric Non-
electric
elec tric
Special Conditions - Please check YES or NO as applicable
YES
NO
X
1. Is the property within 200 feet of a fresh or salt water shoreline?
2. Is the property within the Port Townsend Historical District?
X
3. Is the property located within or adjacent to an environmentally sensitive area?
X
4. Will this proposal involve any sewer, water or other utility extensions that will or could serve
X
vacant properties other than the project site? If yes, please identify the utility extensions and sites
(attach list).
5. Have any special conditions been placed on this property, or has the property been subject to
X
any conditions on any prior action of the City (If yes, attach copies of appropriate documents):
Subdivision/Short Plat/Boundary Line Adjustment?
X
SEPA (environmental review)?
Variance?
X
Conditional Use Permit?
X
Street Vacation?
X
PA05076 J & J Perkins Building\Applications\completed\05076Application-Commercial Building.doc
Planned Unit Development?
X
Restrictive Covenant?
X
Easement?
X
6. Are any properties within 800 feet of the site owned or controlled by the applicant, any relative or
X
business associate, or any partnership, corporation, or other entity affiliated with the applicant? (If
yes, attach list)
7. Have any of the properties listed in item #6 been developed within the last two years? (if yes,
X
attach list)
8. Have you previously discussed this project with a City staff member? If yes, who and
X
when?
Jan Hopfenbeck — past two months.
Applicant Certification
The applicant hereby certifies to have knowledge of those sections of the Uniform Building Code and the Port
Townsend Municipal Code pertinent to the above project and that the applicant is responsible for constructing in
conformance with these codes; the applicant understands that the permit, if issued, expires in six months unless work is
started; that the permit, after construction has started, will expire after one year if an inspection is not made to show
significant progress on the structure; the applicant agrees to abide by the ordinances, codes, regulations, restrictive
covenants, deed or plat restrictions, and water and sewer plans attached hereto; the applicant certifies that all information
given above and on accompanying plans is complete and accurate to the best of his/her knowledge; and the applicant
understands that this information will be relied upon in granting permits and that if such information is later found to be
inaccurate any permits may be withdrawn.
The undersigned hereby saves and holds the City of Port Townsend harmless from any and all causes of action,
judgments, claims, or demands, or from any liability of any nature arising from any non-compliance with any restrictive
covenants, plat restrictions, deed restrictions, or other restrictions which may have been established by parties other than
the City of Port Townsend.
Complete Application
Port Townsend Municipal Code, Section 16.04.140, Vested Rights - Substantially Complete Building Permit
Application: Application for all land use and development permits required under ordinances of the city shall be considered
under the zoning and other land use control ordinances in effect on the date a fully complete building permit application,
meeting the requirements identified in this section, is filed with the Building and Community Development Department.
Until a complete building permit application is filed, all applications for land use and development permits shall be reviewed
subject to any zoning or other land use control ordinances which become effective prior to the date of issuance of a final
decision by the city on the application.
An application for a building permit shall be considered complete when an application meeting all of the
requirements of Section 106.3 of the Uniform Building Code, 1997 Edition, is submitted which is consistent with all then
applicable ordinances and laws. In addition, to be considered complete, such an application must be accompanied by
complete applications for any subsidiary land use or development permits needed, such as a complete shoreline
management permit application and/or complete applications for other discretionary permits required under the ordinances
of Port Townsend. An application for a partial permit under Section 106.4.1 of the Uniform Building Code, 1997 Edition,
shall not be considered complete unless it meets all requirements stated above and contains plans for the complete
structural frame of the building and the architectural plans for the structure.
-..-
Signattke f Property Owner or Authorized Representative Date
PA05076 J & J Perkins Building\Applications\completed\05076Application-Commercial Building.doc
For Office Use Only
Permit No.
Building Otcapproval
D e * V
Plan Review Fee $
Water/Sewer SDC $
Date
Date
Receipt No.
Receipt No.
Balance Due $
Date
Receipt No.
Owner/Representative Signature
Date Received
PA05076 J & J Perkins Building\Applications\completed\05076Application-Commercial Building.doc
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360) 379-5095 FAX (360) 344-4619
May 17, 2007
Ms. Johanna Perkins
P.O. Box 296
Port Townsend, WA 98368
SUBJECT: Application extension — BLD06-088
Dear Johanna,
I have your request for an extension of the building permit application BLD06-088. The
application was extended once and is now dtie to expire, on the 19"" of this 111ond). As I
understand it the initial sale of the project did not close and you are now seeking a new buyer.
Due to the circumstances it is appropriate to provide an extension of the time by which action
must be taken on the application. Under section 105.3.2 of the International Building Code, as
adopted by the City, this type of extension is limited to 90 days. This will place the new
expiration date as August 17th. The permit will need to be issued (physically picked up and paid
for) by that date. Due to the fact that the 2006 International Codes become effective on July I in
the state, I will not be able to provide an additional extension.
Please note that once the permit is "issued" the permittee has 180 days to commence work in
order to keep the permit valid. If you have any questions or if I can be of further assistance,
please let me know.
Sincerely,
Leonard Y, -bet
Development Services Director
A NATIONAL MAIN STREET COMMUNITY WASHINGTON'S HISTORIC VICTORIAN SEAPORT
rRONkriffluntl 164110
(A)
May 14, 2007
Leonard Yarberry
Development Services Director
City of Port Townsend
250 Madison Street, Suite 3
Port Townsend, WA 98368
Dear Leonard,
Due to circumstances which have prevented sale of Unit B of the Lippincott House, LLC
property, I wish to formally request a 90 day extension of the building permit application
LD06-088 which was issued on August 22, 2006.
The extension is necessary to have time to locate another buyer and give them time to line
up financing, etc.
Sincerely,
Johanna Perkins
City of Port Townsend.
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360) 379-5095 FAX (360) 344-4619
January 26, 2007
Malcom S. Harris
Harris, Mercile & Wakayama
999 Third Ave., Suite 3210
Seattle, WA 98104
SUBJECT. Application extension — BLD06-088
Dear Mr. Harris:
I received your fax; send on behalf of Ms. Perkins, requesting an extension of the building permit
application BLD06-088. The application was approved for issuance on August 22, 2006. The
expiration date for this approval is Feb. 18th. Due to the time required by financing and the
impending sale it seems appropriate to provide an extension of the time by which action must be
taken on the application. Under section 105.3.2 of the International Building Code, as adopted
by the City, this type of extension is limit to 90 days, This will place the new expiration date as
May 19th. The permit will need to be issued ('physically picked up and paid for) by May It)" or
an additional extension of time will need to be requested prior to then.
Please note that once the permit is "issued" the permittee has 180 days to commence work in
order to keep the permit valid. If you have any questions or if I can be of further assistance,
please let me know.
a
Leonard
Development Servic Director
cc: Johanna Perkins
A NATIONAL MAIN STREET COMMUNITY WASHINGTON'S HISTORIC VICTORIAN SEAPORT
Jan 25 07 03:15p
MALCOLM S. HARRIS
&mail: rnharris@hmwlaw,com
Harris,Mericle&Wakayama
(206)624-8560
HARRis, MEFICLE & WAKAYAMA
A Ph Pei%�,wa,wal Limited Liability Conryany
ATTORNEYS AT LAW
"SIA Mfuill —14J-E�C)
494 THIRD AVENUE, SUITE 3210
SEATTLE, WASHINGTON 98104
FAX (206) 674-8560
(206) 621-1818
January 25, 2007
Mr. Leonard Yarberry
City of Port Townsend Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Re: File No BLD06-088
Dear Mr. Yarberry:
Port Townsend Office
213 TAYLOR STRU- —'
PORT T®WMEEN®,WASt§NC,"T '98
FAX (WD 379-9378
(36U) 3799377
On behalf of my clients, Ms. Johanna Perkins and Lippincott House, LLC, we
hereby formally request a 180 - day extension of building permit File No BLD06-088, which
is presently vested under the regulations in effect when it was granted on August 22,1006.
The extension is necessary to finalize financing for the project and to consider a
proposed purchase offer.
Yours very truly,
HARRIS, MERICLE & WAKAYAMA
/-1111��"alcolni S. Harris
cc; Johanna Perkins
p.2
I� TAYLOR- GREGORY- BUTURRELD
r�,rrcARCHITECTS
TRANSMITTAL
Date: July 30, 2006
Sent To: Jan Hopfenbeck Fax: Phone: 360-379-5086
City of Port Townsend
250 Madison St — Suite 3
Port Townsend, WA 98368
40 C/o
/ Alex Angud Fax: Phone:
From: Sam Evich
Project: JJP Building, 1215 Lawrence St
Project #: 05076
Sent by: ❑ Mail
❑ UPS
❑ Hand ❑ Courier ❑ Other
Copies Date
Pages
Description
3 7/18/06
2
24x36 Civil — C3.1 and C5.1 revised per city
comments
3 .....
1
Revise .............-..._.__....__....
d Structural sheet S4.2
..
2
__.... _ _ .................
1
�..
_ re geotech r
CG Englneerin ��letter � -
9 sport
These are transmitted as checked below:
® For your approval
❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use
❑ Approved as noted
❑ Submit Copies for distribution
❑ As you requested
❑ Return for corrections ❑ Return �� Corrected prints
❑ For review and comment
❑ For your records
❑ Other
NOTES
554 5th Ave South, Suite 300, Edmonds, WA 98020 r Phone 425.778.1530 • Fax 425.774,7803 • www.TGBArchitects.com
Incorporated in the State of Washington Page 1
05076Tr,a i milt d_...city7..1 -06, dc.y :r
C
ENGINEERING
To: City of Port Townsend
From: Melissa Doonan
cc:
Date: July 18, 2006
Re: J & J Perkins Building Geotechnical Report
Our office has read the geotechnical report by Krazan & Associates dated June 21, 2006. The
allowable bearing pressures are greater than the bearing pressures we assumed, therefore the isolated
footing design is acceptable as is. The seismic loading for retaining walls is greater than what our office
assumed, therefore the retaining wall schedule has been revised. See detail 1 on ,sheet S4.2
"Retaining Wall Revisions" dated July 18, 2006.
EXPIIIE �P'�
250 4h Avenue South, Suite 200, Edmonds, WA 98020
Office: 425/778-8500 — Fax: 425/778-5536
ENGINEERING
To: City of Port Townsend
From: Melissa Doonan
cc:
Date: July 18, 2006
Re: J & J Perkins Building Geotechnical Report
� J1 M- 1 -1 rel
Our office has read the geotechnical report by Krazan & Associates dated June 21, 2006. The
allowable bearing pressures are greater than the bearing pressures we assumed, therefore the isolated
footing design is acceptable as is. The seismic loading for retaining walls is greater than what our office
assumed, therefore the retaining wall schedule has been revised. See detail 1 on sheet S4.2
"Retaining Wall Revisions" dated July 18, 2006.
EXPIkES ?�� " u
2504 'h Avenue South, Suite 200, Edmonds, WA 98020
Office: 425/778-8500 — Fax: 425/778-5536
♦I TAYLOR• GREGORY•BUTTERFIELD
1 AFI C H I T E C T S
TRANSMITTAL
Date: June 30, 2006
Sent To: Jan Hopfenbeck Fax: Phone:
City of Port Townsend
250 Madison St — Suite 3
Port Townsend, WA 98368
cc: Fax: Phone:
From: Sam Evich
Project: JJP Building, 1215 Lawrence St
Sent by: ❑ Mail ❑ UPS ® Hand
360-379-5086
Project #: 05076
❑ Courier ❑ Other
These are transmitted as checked below:
® For your approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit Copies for distribution
❑ As you requested ❑ Return for corrections ❑ Return Corrected prints
❑ For review and comment ❑ For your records ❑ Other
NOTES
654 5th Ave Southr Suite 300, Edmonds, 'WA' 8020 a Phone 425.778.1530 a Fax 425.774.7803 a www.TGBArchitects.com
Incorporated 6n the State of Washington Page 1
Transrniffal.doc
ENGINEERING
June 15, 2006
Ann Hall/Jan Hopfenbeck
Plans Examiners
City of Port Townsend
250 Madison St — Ste 3
Port Townsend, Washington 98368
Project Name: J & J Perkins Building
Project Address: 1215 Lawrence St
Dear Ann Hall & Jan Hopfenbeck,
Itemized below are the responses to they structural review comments contained in the June 2, 2006
review for the above referenced project. Where additional calculations are required, they have
been included with this letter.
Structural
. Sheet S3.1 Holdown schedule note 1 and Joists Schedule note 1 Clarify use of
Simpson Strong Tie C-2004 catalog use.
Notes have been revised to indicate latest edition.
3. Clarify difference in shear wall indicated on line D of talcs page 2-002 and Sheet
S2.6 lines D1 and D2.
Structural drawings and calculations sheets have been revised to match.
o. Indicate type of shear wall required at line B 1 on sheet S2.3.
Shear wall callout has been added.
�5. Clarify shear wall line L in talcs, page 2-005 which is shown as 6', however
shown as 4' on line L5 & L6 on Sheet S2.3.
Shear wall markings on S2.3 and page 2-005 have been revised to match.
f. Clarify difference in shear wall design shown in talcs, page 2-006 and line L5 &
L6 on Sheet S2.2, line L5 & L6; talcs do not reflect doors.
Calculations have been revised to reflect doors.
J&J Perkins Buildingl , — ,, Lawrence St
CG Engineering Project #06068.10
June 15, 2006
Page 2
f,. Indicate type of shear wall required shown on calcs, page 2-006, line B. Construction Plans
reference shear wall on Sheet A2.01, but are not noted on the structural plans.
Sheet S2.3 has been revised.
If you have any questions or comments regarding the responses to this review please do not hesitate to call.
Sincerely,
CG Engineering
C. Chevy Chase, PE, E
Principal
TAYLOR- GREGORY•BUTTERFIEW
�our° ARCH I T E C T S
0101
June 30, 2006
Jan Hopfenbeck
City of Port Townsend
250 Madison Street — Suite 3
Port Townsend, WA 98368
Subject: Response to City Review Letter dated June 2, 2006 (received 6/8/06)
re: J& J Perkins Building, 1215 Lawrence St.
Dear Jan,
The following items are in response to your letter noted above. See the attached drawings dated June 30,
2006 for revisions:
x111. Sheet R0.O0 has been revised by deleting the term "Retail' from the description.
r
. Sheet IR0.O0 has been revised by changing R-3 to R-2 in the Basic Allowable Area notes.
3. See sheet R0.10 A barrier at 1$' floor landing within the stairway enclosure is not necessary due to
the fact that the lowest level of exit discharge is on the basement level. See sheet R0.10 for updates to the
exiting and occupancy concept on the first and basement floors.
\4. Sheet A1.10 — The "Van Accessible" sign has been revised to be 60" inches minimum above the floor of
the parking space measured to the bottom of the sign per Sec. 502.7, ICC -ANSI Al 17.1, 2003 ed.
�. Sheet A6.01: Windows 006, 221, 321, 301, 322, 405, 406, (305 & 306 on Sheet A2.41 have been clarified
with a note, as they are the same long windows from the floor below) and 410 will be safety glass due to
proximity to doors or location within tub enclosure.
N14. Sheets A2.02, A2.12, A2.22, A2.32, and A2.42 — have been revised to read "2003 International Building
Code."
"7.Sheets A2.02, A2.12, A2.22, A2.32, and A2.42 have been updated to show compliance with "Daylight Zone
Controls" as required per Section 1513.3 of the Washington State Energy Code.
. Sheet A6.01 — Windows 203, 208, 303, 308, 403, 404, 406, and 417 meet the dimension requirements for
egress windows.
". Sheet A6.01 — Note 13 has been changed to the current section in the IBC.
`1^. Sheet A7.0O — The fire extinguisher cabinet, paper towel dispenser/waste receptacle, paper towel
dispenser, soap dispenser and toilet seat cover dispenser have been revised to show the 40" maximum
height above the floor or ground to any rack, operating controls, receptacle or dispenser per Section 1101.2.5
WA State amendment to the 2003 IBC.
1. Sheet A8.0 — Compliance with the requirements that characters or braille shall not be located in the 6"
minimum pictogram field is shown with an added dimension.
654 5th Ave South, Suite 300, Edmonds, WA 98020 w Phone 425.778.1530 o Fax 425.774.7803 9 www.TGBArchitects.com
Incorporated in the State of Washington
12. Sheet S3.1 — See Structural attachment.
13. Line D of calcs page 2-002 and Sheet S2.6 lines D1 and D2 — See Structural attachment.
14. Line 131 on Sheet S2.3 — See Structural attachment.
15. Line L in calcs, page 2-005 / Line L5 & L6 on Sheet S2.3 — See Structural attachment.
16. Calcs, page 2-006 line L5 & L6 and Sheet S2.2, line L5 & L6 — See Structural attachment.
17. Calcs, page 2-006, line B / Sheet A2.01 — See Structural attachment.
S. Sheet A2.51- The skylights in the stairway have been eliminated and the attic access has been eliminated
y ear in height
` , The hoistwa ventingand elevator are a d °,.,,
as
it not required in spaces smaller than 30" clear
ii.ula�tt'I
Soils analysis per Krazan & Associates, Inc. is attached in the report dated June 21, 2006.
� 12r1. Location of drinking fountain is shown on Sheet A2.11
TM plit-front toilet seats in accordance with UPC Section 409.2 are indicated on Sheet A7A0
oof access in not required per IBC Section 1009.12, where the slope of the roof is more than 4:12,
ry Stair signage in accordance with IBC Section 1019.1.7 is shown on detail 2, Sheet A8.00
. Signage for interior rooms and spaces in accordance with IBC Section E107 is shown on detail 3,
Sheet A8.01.
Let me know if these items satisfy your request. Please contact me if you have any further questions.
Sincerely,
Sam Evich
Project Manager,
Taylor Gregory Butterfield Architects
VORT
City of Port Townsend
Development Services Department'
250 Madison Street — Suite 3
Port Townsend, WA 98368`
(360) 379-5095 FAX (360) 344-4619
June 2, 2006
Taylor -Gregory -Butterfield Architects
654 5"' Ave. S. Suite 300
Edmonds, WA 98020
ATTN: Sam Evich
Dear Sam:
The City
of Port Townsend Development Services Department is currently reviewing the
construction plans for the Johanna Rienstra project to be located on Lawrence and Fillmore
Streets in
Port Townsend, Washington. The following list reflects items that need to be
addressed
in order for us to complete the plan review portion of the building permit.
"Sheet R0.00 — Delete "Retail" from the Project Description.
Sheet R0.00 — Change "R-3" to "R-2" in Basic Allowable Area notes.
�3
Sheet R0.10 — Show barrier at stairway enclosure to prevent occupants on V floor
from exiting into the basement per IBC Section 1019.1.6.
......
Sheet A1.10 — Indicate the "Van Accessible" sign to be 60" inches minimum above
the floor of the parking space measured to the bottom of the sign per Sec. 502.7,
ICC -ANSI A117.1, 2003 ed.
Sheet A6.01: indicate windows 006, 221, 321, 301, 322, 405, 406, (change 305 &
306 on Sheet A2.41 to 405 & 406) and 410 will be safety glass due to proximity to
doors or location within tub enclosure.
.
Sheets A2.02, A2.12, A2.22, A2.32, and A2.42 — Change 1997 Uniform Building Code
from No. 4 of General Notes to read 2003 International Building Code.
"Deferred
NOTE: Although compliance with NREC lighting power allowance is a
Submittal", Sheets A2.02, A2.12, A2.22, A2.32, and A2.42 should show compliance
with "Daylight Zone Controls" as required per Section 1513.3 of the Washington
,State
"I)8.
Energy Code.
I)8
Sheet A6.01 — Indicate windows 203, 208, 303, 308, 403, 404, 406, and 417 will
meet the dimension requirements for egress windows.
�'°9.
Sheet A6.01— Change note 13 from "UBC" to IBC with current code section.
'1tD.
Sheet A7.00 — Show .fire extinguisher cabinet, paper towel dispenser/waste
receptacle, paper towel dispenser, soap dispenser and toilet seat cover dispenser to
comply with 40" maximum height above the floor or ground to any rack, operating
controls, receptacle or dispenser per Section 1101.2.5 WA State amendment to the
2003 IBC.
0
NOTE: Sheet A8.0 — Restroom Signage — Indicate clearly compliance with the
requirements that characters or braille shall not be located in the 6" minimum
pictogram field per Section 703.5.2 ICC A117.1, 2003 edition.
Sheet S3.1 — Holddown Schedule note No. 1 & Joists Schedule note No. 1 — Clarify
use of Simpson Strong -Tie C-2004 catalog -use.
Clarify difference in shear wall indicated on line D of calcs page 2-002 and Sheet
52.6 lines D1 and D2.
Indicate type of shear wall required at line B1 on Sheet S2.3.
Clarify shear wall line L in calcs, page 2-005, which is shown as 6', however shown
as 4' on line L5 & L6 on Sheet S2.3.
Clarify difference of shear wall design shown in calcs, page 2-006 line L5 & L6 and
Sheet S2.2, line L5 & L6; calcs do not reflect doors.
Indicate type of shear wall required shown on calcs, page 2-006, line B.
Construction plans reference shear wall on Sheet A2.01, but are not noted on the
structural plans.
Please clarify placement of the skylight and attic access openings located in the
stairway enclosure roof of the fourth floor. IBC Sections 1019 & 707 appear to
prohibit these openings.
wcompliance with IBC Section 3004 for hoistway venting or list as a deferred
Indicate
subrriu.�ti
Submit soils analysis per our previous discussions to allow use of the Fire Hall
geotech report for gfoundation design or alternatively, provide geotechnical report for
the subject site. V- 11'U,,dN ' ,,"!, 3� I
Indicate location of drinking fountain in accordance with Uniform Plumbing Code
(UPC) Section 2903.4 Washington State Amendment.
Indicate split -front toilet seats in accordance with UPC Section 409.2.
Indicate a roof hatch in accordance with IBC Section 1009.12._
Indicate stair signage in accordance with IBC Section 1019.1.7.
Indicate signage for interior rooms and spaces in accordance with IBC Section E107.
Once these items have been addressed, we can complete the plan review portion
building permit, notwithstanding, other items required concerning SEPA addendum,
'e Works Department, Historic Preservation Committee, etc.
of the
Public
{ If you have questions, please contact me at 360-379-5087 or Jan Hopfenbeckat 360-379-5086.
y� b
Sincerely,
Alin Hall/'Ja Hopfenbeck
Plans Examiners
C. Correspondence file, BLD06-088
Johanna Reinstra, Owner
,. City of Port Townsend
Fire Department
Office of the Consulting Fire Code Official
1256 Lawrence Street, Port Townsend, WA 98368
(360) 344-4607 Email: tattiFax: (360) 344-4604
PLAN REVIEW MEMORANDUM
TO: Jan Hopfenbeck, Plans Examiner, DSD
FR: Tom Aumock, Asst. Fire Chief
DT: 19 July 2006
RE: BLD06-088: J & J Perkins Bldg., Reinstra, 1215 Lawrence Street
This department is in receipt of the set of plans for the above -referenced proposal from your office.
The above -referenced proposal was reviewed with the International Fire Code [I.F.C.], 2003 Edition. The
following constitutes this department's findings and determinations based upon the plans of record
submitted.
It is understood that fire alarm system, automatic sprinkler system, and elevator detail plans and
specifications are deferred submittals.
F"indin s & Determinations:.
1. The proposal was reviewed as a 4 -story with basement, Group B basement and I" floor, Group R-2
floors 3 and 4, mixed occupancy with an approximate total of 12,577 square feet of fire area with Type
V-A construction classification; and,
2. Addressing for the proposal shall be consistent with the Municipal Code for size, and be in a position
as to be plainly visible and legible from the street or road fronting the property. Said numbers shall
contrast with their background [I.F.C. Section 505]; and,
a. Tennant identification shall be consistent with Section 408.11.2, which requires that each tenant
space that is provided with a secondary exit to the exterior or exit corridor shall be provided with
tenant identification by business name and/or address. Letters and numbers shall be posted on the
corridor side of the door, be plainly legible and shall contrast with the background.
3. Key box access to or within the subject structure for emergency services delivery is required to be
installed at the main entry and shall be an approved SUPRA Model (with tamper switch wired to building
security if installed), to contain key(s) to gain necessary access to the structure in its entirety, under
[I.F.C. 506]; and,
4. Road access provided via Lawrence and Fillmore Sts. for this proposal is found to be consistent with
Section 503 and Appendix D fire apparatus access road design standards; and,
5. Access to building openings is designed consistent with the I.F.C. Section 504 which requires an
approved access walkway leading from fire apparatus access road(s) to exterior openings that are required
by the Fire Code or Building Code; and,
6. The proposal is subject to I.F.0 Section 504.3 stairway access to the roof requirement, and may be
eligible for the access method exception of I.F.C. Section 1009.12.1 for roof hatch.
7. An NFPA 13 automatic fire suppression system (sprinklers) is required under I.F.C. Section 903,
a. The automatic fire sprinkler system shall be designed, installed, and certified by a licensed
technician (W.A.C. 212-80) or registered professional engineer using the design provisions of
NFPA 13 and related sections; and,
b. A complete set of as -built drawings of the system shall be filed for record with this office, and
on-site in a formal plans box adjacent to the F.A.C.P., submitted on a 24 x 36 inch maximum
format, and a system plans electronic file shall be submitted to this office if available; and,
c. Specific reference to the fire department connection [F.D.C.] location and specifications shall
submitted to this office in the sprinkler system permit deferred submittal, and prior to installation,
as the plan call at A1.00 is not approved at this time; and,
d. Elevator sprinkler protection and valves shall comply with W.A.C. 296-96; and,
e. Stairway intermediate landings will require sprinkler protection, as approved by the Fire Code
Official; and,
f. The backflow prevention device shall be approved for installation by the City of Port Townsend
Department of Public Works, Water Division, prior to installation; and,
g. The automatic sprinkler system shall be inter -tied with the automatic fire alarm system; and,
h. A sprinkler bell is required, or electronic equivalent, and may be combined with the exterior fire
alarm notification device.
8. The facility is subject to the standpipe systems requirements of I.F.C. Section 905, and installed to
NFPA 14 standards, and may be combined with the automatic fire sprinkler system; and,
9. An NFPA 72 automatic fire detection alarm system is required for this occupancy under IFC Section
907.3.1.7 of said Code, and;
a. The fire alarm system shall be designed, installed, and certified by a licensed alarm technician
under the provisions of National Fire Code 72 and related sections; and,
b. Detailed system design plans and equipment specifications shall include layout, zones, and
annunciation location review; and,
d. Elevator sprinkler protection and valves shall comply with W.A.C. 296-96; and,
e. Common areas [laundry, restroom, etc.] shall be provided audio-visual signaling devices
consistent with I.F.C. Section 907.10; and,
L The system shall be monitored by a remote agency; and,
g. A complete set of as -built drawings of the system shall be filed for record with this department,
and on-site in a formal plans box adjacent to the FACP, submitted on a 24 x 36 inch maximum
format, and system design cd shall be provided this office, if available; and,
h. The system shall be monitored by a separate remote agency; and,
10. Fire extinguisher sizing and placement shall meet or exceed IFC Section 906 and NFPA Standard 10;
and,
11. Fire flow and fire hydrant review for this proposal is derived from the requirements of the City of
Port Townsend Engineering Design Standards, Section 903.2 and Appendix B and C of the I. F. C., and
applying the maximum spacing rules for mixed use, multi -family, and commercial areas as defined by
this project [see attached concentric fire hydrant spacing map]. Fire Hydrant requirements include Code
stipulated proximity [distance from project], flow, duration, number, and emergency services routing:
a. The base fire flow requirement for this proposal is 2,000 gallons per minute sustainable for two
[2] hours, from a minimum of two fire hydrants based upon the total fire area square footage and
construction type noted in item 1. above; and,
b. The proposal is eligible for a reduction in the required fire flow of up to 50 percent, as approved,
when the building is provided with an approved automatic sprinkler system, but not less than
1,500 gallons per minute, as allowed by I.F.C. Section B105.2; and,
c. Existing eligible fire hydrants in the vicinity of the proposed project are:
1] H44 at Polk and Lawrence Streets [1156 gpm @ 20 psi — 1983 test report] is greater than 250
feet from the subject site; and,
2] H45 at Lawrence and Harrison Streets [2970 gpm @ 20 psi -1983 test report] is greater than
210 feet from the subject site; and,
31 H39 at Fillmore and Clay Streets [1336 gpm @ 20 psi -1983 test report] is greater than 150
feet from the subject site, but is deemed not to be the primary fire hydrant for this proposal as
the travel route increases the response time from the fire station; and,
Thus, the existing hydrants do not meet the proximity requirement of the City's Engineering
Design Standard [Chapter 2 "Water", Section 1, which requires an existing fire hydrant within
150 feet of a project site and must be on an efficient emergency services route]. This results in the
requirement of a new fire hydrant installation at Lawrence and Fillmore Streets to meet the Code
fire hydrant proximity requirement; and,
d. Based upon the existing flows and location of hydrants adjacent to this proposal, it is the
determination of this office that existing and required fire hydrants will provide the Code required
fire flow; and,
12. The proposed elevator is subject to WAC 296-96; and,
13. During demolition and/or construction, the proposal is subject to general precautions against fire
provisions of Chapter 3 of the I.F.C. and related sections.
Any other applicable or relevant sections of said Code not covered herein shall nonetheless apply to this
proposal.
3.0 hours time was logged in the review of this proposal.
It is the administrative determination of this department that the proposal be approved subject to the
aforesaid requirements of the Municipal Code, International Fire Code, and the N.F.P.A.
,
4;pRT 0
City of Port Townsend
Development Services Department . t
250 Madison Street Suite 3
Port Townsend WA 98368 WA
(360) 379-5095 FAX (360) 344-4619
:EP'EII ED SUBMITTAL
Request to defer portions of the design drawings per IBC Section 106.3.4.2.
Deferral of any submittal items shall have the prior approval of the building official. The registered design
professional in charge (responsible architect or engineer) shall list the deferred submittals on the cover page
of the construction documents.
Building Permit #__JZ, °"'
Applicant: J & J Perkins Building, LLC
Site Address: 1215 Lawrence St., Port Townsend, WA
The purpose of this form is to assist the applicant in meeting the requirements for a complete application.
One of the elements of a complete application is a complete set of design drawings for the project. When
portions of the plans are missing, arrangements must be made to coordinate the receipt of the late
drawings and related documents.
Documents and/or plans for the deferred elements shall first be submitted to the architect or engineer of
record who shall review them, and then forward them to the building official with a notation indicating
that the deferred documents and/or plans have been reviewed and have been found to be in general
conformance with the design of the building. The deferred items shall not lie installed until the
Architect, Engineer, or Designee of Record:
Name:
Signature:
Y
[ X] Fire Suppression Plans
[ X] Fire Alarm Plans'
[ ] Parking
[ ] Landscaping
[X] Final Historic Design Review approval
[ X] Tenant Improvement
. Please check the specific items:
[ X] Plumbing Plans'
[ X] Mechanical Plans
[ X] Lighting'
[ ] Final Commercial Design Review Approval
[ ] Public Works/Infrastructure2
[ X] Other (Signage, Elevator, Side Sewer, Water
Meter, R.O.W., Bldg. Envelope Engineer)
'Additional plan review required.
2Preliminary plan approval required prior to building permit issuance.
Using this process may require an additional plan review fee for each deferred item. All
deferred items shall be listed on this form before the building permit will be issued.
Department Approval: Date:
City of Port To uase�t cl Develops it Services Department, Waterman & Katz Building
181 Quincy Street, Suite 301A, Port Townsend WA 98368
Hours: M -F, 8:00 am to 5:00 pm. Phone 360-379-3208. Fax 360-385-7675
www.ci.port-townsend.wa.us
PA05076 J & J Perkins Building\Applications\completed\05076Defeired Submittal Form.doc 5/16/06
20041N 'hinaton State Nonresidential Fnerav Code Cc'lance Form
2004 Washington ate Nonrestdomfi tl Energy Code Compliance Forms Revised May 2005
Project Info Project Address PERKINS BUILDING Date 5/8/2006
1215 LAWRENCE ST For Building Department Use
PORT TOWNSEND, 4A1
Applicant Name: ANDY L,ONG=No
Applicant Address: 19015 36TH AVE. W. SUITE A
Applicant Phone: 425-774-3829
Project Description New Building ❑ Addition ❑ Alteration ❑ Change of Use
❑ Prescriptive E] Component Performance E] Systems Analysis
COlriphariCe Option (See Decision Flowchart (over) for qualifications)
Space Heat Type
Q Electric resistance * All other (see over for definitions)
If project qualifies for Concrete/Masonry Option, list walls
with HC >_ 9.0 Btu/ft2-1F below (other walls must meet
Opaque Wall requirements). Use descriptions and values
from Table 10-9 in the Code.
Total Glazing Area Electronic version: these values are automatically taken from ENV -UA -1„
Glazing Area Calculation
(rough opening) Gross Exterior
Note: Below grade walls may be included in the
(vertical & overhd) divided by Wall Area times 100 equals % Glazing
584.0 — 3607.0 X 100 = 16.2%
Gross Exterior Wall Area if they are insulated to
the level required for opaque walls.
19.0
Q yes Check here if using this option and if project meets all requirements for the Concrete/Masonry
Concrete/Masonry Option
no Option. See Decision Flowchart (over) for qualifications. Enter requirements for each qualifying
NA
assembly below.
Envelope Requirements (enter values as applicable)
Fully heated/cooled space
If project qualifies for Concrete/Masonry Option, list walls
with HC >_ 9.0 Btu/ft2-1F below (other walls must meet
Opaque Wall requirements). Use descriptions and values
from Table 10-9 in the Code.
Wall Description 1.11 -factor
(including insulation R -value & position)
Minimum Insulation R -values
Roofs Over Attic
NA
All Other Roofs
NA
Opaque Walls1
19.0
Below Grade Walls
11.0
Floors Over Unconditioned Space
NA
Slabs -on -Grade
0
Radiant Floors
NA
Maximum U -factors
Opaque Doors
NA
Vertical Glazing
0.400
Overhead Glazing
NA
Maximum SHGC (or SC)
Vertical/Overhead Glazing
NA
Semi -heated space;
Minimum Insulation R -values
Roofs Over Semi -Heated Spaces2 NA
1. Assemblies w4h metal framing must comply with overall U -factors
2. Refer to Section 1310 for qualifications and requirements
Notes:
Opaque ConcretalMasonry Wall Requirements
Wall Maximum U -factor is 0.15 (R5.7 continuous ins)
CMU block walls with insulated cores comply
If project qualifies for Concrete/Masonry Option, list walls
with HC >_ 9.0 Btu/ft2-1F below (other walls must meet
Opaque Wall requirements). Use descriptions and values
from Table 10-9 in the Code.
Wall Description 1.11 -factor
(including insulation R -value & position)
Washington State Energy Code: 2003 Edition, Prescriptive Worksheet
Zone 1
PERKINS BUILDING
1215 LAWRENCE ST
PORT TOWNSEND. WA
TAYLOR GREGORY BUTTERFIELD ARCHITECTS
654 5TH AVENUE SOUTH, SUITE 300
EDMONDS, WA 98020
Select
One
Option
Effective 7/1/04
Conditioned Floor Area 1 6659
Glazing Area
Area Weighted
Feet U -Factor
Vertical Glazing 1350.5 0.40
Overhead Glazing 28.0 0.58
Door'
602.7.2 Exception, Area X 3
Glazing Area Total 1378.5
Glazing To Floor Area Ratio 20.7'ra
Glazing Area Total/ Conditioned Floor Area
602.7.2 Exception Ratio
602.7.2 Glazing Area Total / Cond R one odr Area, not to exceed 1 %
TABLE 6-1
PRESCRIPTIVE REQUIREMENTS" FOR GROUP R OCCUPANCY
CLIMATE ZONE 1
See code text for footnote references
Copyright 2004 WSUEEP 02-143
Copied by permission from Washington State University Extension Energy Program.
(see copyright restrictions) 5/15/2006 1 of 3
Glazln U -Factor
------------------
Wall"
Waller
Wall*
Slab'
Option
7re
Dom a
Ceilin s
Vaulted
Above
into
ext;
�`��
on
Vertical
Overhead"
U -Factor
Ceilings
Grade
Below
Below
Grade
11
Grade
Grade
I.
1 12%
035
0.58
0.20
R-38
R-30
R15
R-15
R-10
R-30
R-10
H.°
15%
0.40
0.58
0.20
R-38
R-30
I R-21
1 R-21
R-10
R-30
R-10
III.
25%
0.40
0.58
0.20
R-381
R-30 i
R-21 /
R-15
R -I0
R-30 T
R-10
Group R-1
U=0-031
U-0.034
U=0.069
G'=0.029
and R-2
Occupancies
Only
�'.
Unlimited
0.40
0.58
0.20
R-33
R-30
R-21
R-21
R-10
R-30
R-10
Group R-3
and R-4
Occupancies
Only
'
Unlimited
0.35
1 058
0.20
11-38
R-30 i
R-21 ?
R-15
R-10
R-30 !
R-10
Group R-1
U-0.031
U=0.034
U=0.060
U=0_029
and R-2
Occupancies
Only
See code text for footnote references
Copyright 2004 WSUEEP 02-143
Copied by permission from Washington State University Extension Energy Program.
(see copyright restrictions) 5/15/2006 1 of 3
Washington State Energy Code: 2003 Edition, Prescriptive Worksheet
Zone 1
Effective 7/1/04
Exterior Doors
Plan Component Door Percent Width Height Glazing Door Door
Sum of Area and UA (do not include exempt door)
Area Weighted U = UA/Area
Vertical Glazing (Windows, Doors using Exception 602.6 #1)
Plan Component Glazing
ID Descri tion Ref. U
U
0.400
Area
Width Height
Gt. Peet Inc, Feet Inch
1 1 414
1 1 116 6
1 1 1470,
1 1 350
i
Sum of Area and UA
Weighted U = UA/Area
Glazing
Area UA
A =UXA
414.0
165.60
0.400
0.400
116.5
46.60
470.0
350.01
188.00
140.00
0.400
1350.5' 540.20
0.40
Copyright 2004 WSUEEP 02-143
Copied by permission from Washington State University Extension Energy Program,
(see copyright restrictions)
5/15/2006 2 of 3
Washington State Energy Code: 2003 Edition, Prescriptive Worksheet
Zone 1
Effective 7/1/04
Overhead Glazing
Plan Component Glazing
Width Height
Qt Feet Inch Feet Inch
Section 602.7.2 Exception
Plan Component
ID Description
Sum of Area and UA
Area Weighted U = UA/Area
Width Height
M Feet Inch Feet Inch
Sum of Area and Area X3
Copyright 2004 WSUEEP 02-143
Copied by permission from Washington State University Extension Energy Program.
(see copyright restrictions)
Area UA
A =UXA
12.0 7.0
16.0 9.3
28.0 16.2
0:58
Area
Area
5/15/2006 3 of 3
2004'UU ` hinoton State Nonresidential Enerov Code Co'lance Form
Washington State Nonresidential Energy Code Compliance Forms
Revised May 2005
Decision Flowchart Use this flowchart to determine if project qualifies for the optional Prescriptive Option.
for Prescriptive Option If not, either the Component Performance or Systems Analysis Options must be used.
1302 Space Heat Type: For the purpose of determining building envelope
requirements, the following two categories comprise all space heating types:
Other. All other space heating systems including gas, solid fuel, oil, and
propane space heating systems and those systems listed in the exception to
electric resistance. (continued at right)
All Insulation Installed?
Below Grd Wall (ext) R-10
Below Grd Wall (oth) R-19
Roof Over Attic
R-30
All Other Roof
R-21
Raised Floor
R-19
Slab -On -Grade
R-10
Radiant Floor
R-10
Opaque Door
U-0.60
Mass Wall
Criteria OK?
(below)
Yes
_-:
rMass Wall Insulation Req.
Mass Wall
U0.15/R5.7ci
elements as the primary heating system including baseboard, radiant, and
CMU Block
Ins. Cores
R-10
Wood Frame
R19
terminal electric resistance heating in variable air volume distribution systems.
Metal Framed
R19
Nn
Wall R19
Yes
Electric Resistance: Space heating systems which use electric resistance
START
elements as the primary heating system including baseboard, radiant, and
Below Grd Wall (ext)
forced air units where the total electric resistance heat capacity exceeds 1,0
R-10
W/ft2 of the gross conditioned floor area. Exception: Heat pumps and
R-19
terminal electric resistance heating in variable air volume distribution systems.
Electric
R-38
Resistance
Yes- -+
Heat?
rr...._-....-...........
All Insulation Installed?
T U —No
Wall R <MassWallwood, or No--- OK? N
.062 mew)
Yes Yes
Mass Wall Insulation Req.
Mass Wall U0.15/R5.7ci
CMU Block Ins. Cores
Wood Frame R19
Metal Framed U0.062
Glazing Criteria Met?
Glazing
Wood
Metal
Below Grd Wall (ext)
R-10
R-10
Below Grd Wall (oth)
R-19
U-0.062
Roof Over Attic
R-38
U-0.031
All Other Roof
R-30
U-0.034
Raised Floor
R-30
U-0.029
Slab -On -Grade
R-10
R-10
Radiant Floor
R-10
R-10
Ooaaue Door
U-0.60
U-0 an
T U —No
Wall R <MassWallwood, or No--- OK? N
.062 mew)
Yes Yes
Mass Wall Insulation Req.
Mass Wall U0.15/R5.7ci
CMU Block Ins. Cores
Wood Frame R19
Metal Framed U0.062
Glazing Criteria Met?
Glazing
Vert
OH
Area %
UVal
UVal SHGC
0-30%
0.55
0.70 0.45
30-45%
0.45
0.60 0.40
>45%
Not Allowed
may be used.
"For framed
walls, assume
Glazing Criteria Met?
Glazing Vert OH
Area % UVal UVal SHGC
0-30% 0.40 0.60 0.40
>30 Not Allowed
No Yes Prescriptive Yes NPo
Path Allowed
Component Performance
or
Systems Analysis Required
Concrete/Mason Option* Wall Heat Capacity (HC)
'If the area
weighted heat
capacity (HC) of
the total above
Assembly Description Assy.Tag HC— Area (sf) HC x Area
grade wall is a
minimum of 9.0,
the Concrete
Masonry Option
may be used.
"For framed
walls, assume
HC=1.0 unless
calculations are
provided; for all
of horwnlla ilea
"Totals Section 1009.
Area weighted HC: divide total of (HC x area) by Total Area
Q+� ORT �
City of Port 'Townsend
Development Services Department ,u p
ENVIRONMENTALLY SENSITIVE AREAS QUESTIONNAIRE
Permit applications are reviewed by our staff to make a preliminary determination of the presence or
absence of an Environmentally Sensitive Area on the property, pursuant to Chapter 19.05 of the Port
Townsend Municipal Code. To help us make this determination, please supply the following
information.
General Information:
C/o Gi/�,`rC�� yyUc.�s�� GG.�
Applicant Name: J & J Perkins Building, �1 (/ Phone: 360-774-1424
Mailing Address: 420 Hudson St., Port Townsend, WA 98368
Property Address (if different): 1215 Lawrence St.
Description of Proposal (include site plan):
A new 4 story wood frame building with basement. Office/Retail in the basement and first floors.
Second, third, and fourth floors are condominiums totaling 5 units. There are 3 on-site parking stalls.
The proposed new construction creates _4,397_ sq. ft. of impervious surface. What best
management practices are proposed?
Appropriate drainage and catch basin design. Adequate landscaping is integrated into the project.
Sensitive Area uestions:
1. Is any portion of the property within or near a mapped Environmentally Sensitive Area?
(Maps are available at the Building and Community Development Department)
YES _X—NO
2. Is there any standing or running water on the surface of the site at any time during the year?
Yes X No If YES, please describe:
3. Has any portion of the site been identified as a wetland? YES _X NO
If YES, please describe:
4. Is the site characterized as:
Forest Meadow _X—Cleared Mixed
P:\05076 J & J Perkins Building\Applications\completed\05076Sensitive Areas Questionnaire. doc
5. Is the slope of the property: _X—flat gentle slope steep slope
(0%-5%) (5%-15%) (15%-40%)
Critical Slope — 40% or greater
Flat - 0 - 5%
>40%
40%
EM
0%
The applicant hereby certifies that all of the above statements and the information contained in any other
transmittals made herewith are true, and the applicant acknowledges that any action taken by the City of Port
Townsend based in whole or in part on this application may be reversed if it develops that any such statement
or other information contained herein is false.
The applicant understands that the determination of the Director may be appealed by the applicant or by any
other party by following the appeal procedure outlined in Chapter 1.14 of the Port Townsend Municipal Code.
Any appeal must be filed within seven calendar days from the Notice of a final decision.
Signature of Applicant Date
FOR DEPARTMENT USE ONLY:
Reviewed by:
Site visit Required? NO YES Site visit made on:
Exempt per PTMC 19.05.040 (B)? NO YES
Threshold Determination (presence/absence of ESA, type of ESA):
Shorelines Jurisdiction? NO YES
P:\05076 J & J Perkins Building\Applications\completed\05076Sensitive Areas Questionnaire.doc
"ITY OF PORT TOWNSEND
COMMERCIAL BUILDING PERMIT PLANS CHECKLIST
Name_J & J Perkins Building, MOM Permit # 8 LD o &
Please read the following information before preparing your building permit plans. Construction documents
must be of sufficient detail to show clearly the project in its entirety with emphasis on the following: structural
integrity, life safety, architectural barriers (accessibility requirements), compliance with all other codes having
jurisdiction and description of scope of work (e.g., tenant improvement, remodel, etc.).
New Commercial Construction:
Four sets of plans (minimum paper size 18" x 24") are required with one copy of the application form.
New construction requires a Public Works Street/Utility Development Permit application or Minor
Improvement Permit application be submitted with your Building Permit application.
Additions remodels Alterations:
Three sets of plans (minimum paper size 18" x 24") are required with the application form.
Plans Designed by an Architect or Engineer:
Construction of a residential building that exceeds four dwelling units and/or a building of any occupancy
that exceeds 4000 square feet: plans must be prepared by a Washington State registered architect. Plans
with architect and engineer information (name, etc.) must have that architect's or engineer's wet seal
[minimum one (1) set of originals] with an original signature in color other than black.
List the page number, in the spaces provided below, for each item that you have included on your plans
and include this checklist with your permit submittal. A separate Deferred Submittal Request form shall
be submitted with the construction drawings for all deferred items.
Page # COVER SHEET
R0.00
Project identification au
R0.00
Project address, legal description, location map, and tax parcel number
R0.00
All design professionals identified including addresses and phone numbers
R0.00
Name, address, and phone number of person responsible for project coordination; all communication
will be directed through this person
R0.00
Design criteria: occupancy group (e.g., F-1); construction type (e.g., V -B); seismic zone (132); floor
area (IBC allowed vs. proposed); fire sprinkler requirements (if any); height and number of stories;
total occupant load; land use zone; parking requirements (required vs. provided); allowed soil
bearing pressure; design loads (floor, roof, wind, etc.); material strengths, if applicable; soils report,
if applicable; landscaping, if required; flood hazard zone (if applicable) and deferred submittals per
IBC Section 106.3.4.2
R0.00
Indicate compliance with the following codes: 2003 International Building Code, 2003 International
-S6.1
Mechanical Code, 2003 International Fire Code, 2003 Uniform Plumbing Code and Uniform
Plumbing Code Standards, 2003 Washington State Energy Code, 2003 Washington State Ventilation
and Indoor Air Quality Code, WAC 51.40 Washington State Barrier Free Facilities & Design
(Chapter 11, 2003 IBC), 1993 Water Conservation Standards and all related Washington
Administrative Code Changes, with changes and exceptions set forth in Ordinance No. 2867.
PA05076 J & J Perkins Building\Npplications\completed\05076Commercial Permit Plans Checklist.DOC Page 1 of 5
Revised 8/31/04
A2.01-
plumbing fixtures
A2.41
Guardrail heights, handrails, stairways, elevator operation panels, etc.
A2.01-
Stairways: width, rise, run, handrails, guardrails, landings, barrier free requirements, etc.
A2.41,
A4.10
A2.01-
Area and occupancy separation, all fire rated assemblies, draft stops and fire blocking
A2.41,
A5.20
A6.00,
Door, window and hardware schedules
A6.01
PAGE # FLOOR FRAMING AND ROOF FRAMING PLAN
S2.1- Identify structural members, grade, material size and method of attachment; roof venting, roof
S6.1 drainage and location of roof mounted equipment
PAGE # EXTERIOR ELEVATIONS
A3.00 Exterior views on front, rear and sides
—3.03
A3.00 Decks, steps, handrails, guardrails, landings, balconies, marquees, porches
—3.03
A3.00 Final grade
—3.03
A3.00 Height of building per IBC Section 502.1
—3.03
PAGE # BUILDING SECTIONS AND WALL SECTIONS
A5.00, All materials of construction from footing through roof covering
A5.01,
A5.10,
A5.11,
A8.00,
A8.01
Same All fire -rated assemblies and fire -rated penetrations
as
above
Same All vertical dimensions
as
above
n/a Dry or wet floodproofing (if in a flood zone - see FEMA Flood Insurance Rate Maps for which zone)
PAGE # INTERIOR ELEVATIONS
A7.00
All Barrier -Free required designs with proper clearances shown (including signage) - see below
A4.10
Guardrail heights, handrails, stairways, elevator operation panels, etc.
PA05076 J & J Perkins Building\Applications\completed\05076Commercial Permit Plans Checklist.DOC Page 3 of 5
Revised 8/31/04
PAGE # MECHANICAL SYSTEM
B/D
Entire mechanical system
B/D
All units, their sizes, mounting details, all duct work and duct sizes
B/D
Fire dampers where required
B/D
Equipment schedules
*B/D — Bidder — Designed (deferred submittal)
PAGE # PLUMBING SYSTEM
B/D All fixtures, piping, slopes, materials and sizes (provide calculations)
B/D Connection points to utilities, septic tanks, pretreatment sewer systems and water wells
B/D Greasetraps and/or grease interceptors required for commercial kitchens
PAGE # BARRIER -FREE ACCESSIBILITY DESIGN
A7.00
Grab bar mounting heights, sink clearances, fixture locations, sizes, and placement
A2.11
Restrooms — show 5 foot diameter circle used for measuring unobstructed floor space
00,
Exterior Route of Travel — show all connections from the entrance
01-
L
All existing and new structures
41,
PAGE # ACCESSIBLE PARKING
A1.0o I Dimensions of all parking spaces, aisle striping, signage (including for van parking), surfacing..
PAGE # LANDSCAPING PLAN
civil
Existing and proposed grades
Civil,
Underground and above ground utilities
survey
ALOO,
All existing and new structures
A1.01
ALOO,
All streets, walkways and sidewalks
A1.01
A1.01
Plant materials with appropriate symbols and identifications keyed to planting schedule
A1.01
Planting schedule to include botanical and common names, sizes and conditions of plants
A1.01
Plant installation techniques and guidelines. (Example: bareroot vs.container)
PAGE # NREC
See Submit 2003 Non Residential Energy Code (NREC) compliance forms
attached
PAGE # WSVIAQ
PA05076 J & J Perkins Building\Applications\completed\05076Commercial Permit Plans Checklist.DOC Page 4 of 5
Revised 8/31/04
A6.00, I Show compliance with 2,j3 Washington State Ventilation and Irit., ,or Air Quality code
A6.01 requirements,
ELECTRICAL PERMIT - See WA State Department of Labor & Industries for electrical permit.
SPRINKLER, HOOD FIRE SUPPRESSION AND ALARM WORK - Separate permit required to be
submitted to the Building Department.
SEPARATE PLUMBING AND MECHANICAL PERMITS MAY BE REQUIRED
SENSITIVE AREA QUESTIONNAIRE — Must be submitted if creating a new footprint of a structure.
STRUCTURAL CALCULATIONS - Where required, provide for project's entire structural system.
SPECIFICATIONS - To be provided either on the drawings or in booklet form. The specifications shall
further define construction regarding construction components, materials and methods of construction, wall
finishes and pertinent equipment.
REVISIONS - It shall be the responsibility of the owner or owner's agent to obtain revisions approved by the
Development Services Department for all changes during the project prior to actual construction. Revision
submittals to include completed Revision Form, 2 sets of revised plans, calculations and other applicable
documentation. For clarity, all revisions should be identified with a W" symbol and clouded on the drawings or
resubmitted as a new plan set.
PA05076 J & J Perkins Building\Hpplications\completed\05076Commercial Permit Plans Checklist.DOC Page 5 of 5
Revised 8/31/04
GEOTECHNICAL ENGINEERING INVESTIGATION
PROPOSED MIXED-USE BUILDING
1223 LAWRENCE STREET
PORT TOWNSEND, WASHINGTON
PROJECT No. 092-06094
JUNE 21, 2006
Prepared for:
J AND J PERKiNS BUILDING, LLC
C/O Mrs. Johanna Rienstra
402 HUDSON STREET
PORT TOWNSEND, WASHINGTON 98371
Prepared by:
KRAZAN & ASSOCIATES, INC.
GEOTECHNICAL ENGINEERING DIVISION
19501144 TH AVENUE NE, #F-300
WOODINVILLE, WASHINGTON 98072
(425) 485-5519
4UKrazan& ASSOCIATES,INC.
GEOTECHNICAL ENGINEERING * ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 21, 2006
J AND J PERKINS BUILDING, LLC
C/O MRS. JOHANNA RIENSTRA
420 Hudson Street
Port Townsend, Washington 98371
RE: GEOTECHNICAL ENGINEERING INVESTIGATION
Proposed Office/Condominium Development
1223 Lawrence Street
Port Townsend, Washington
Dear Mrs. Rienstra:
KA Project No. 092-06094
In accordance with your request, we have completed a Geotechnical Engineering Investigation for the
referenced site. The results of our investigation are presented in the attached report.
If you have any questions or if we can be of further assistance, please do not hesitate to contact our
office.
Respectfully submitted,
KR ZAN ASSOCIATES, INC.
Chns Behrens, L.GqLG.
Senior Engineering Geologist
CB/slc
Eleven Offices Serving The Western United States
19501 144ih Ave. NE NF -300• Woodinville. Washington 98072 * (425) 485-5519 * Fax: (425) 485-6837
092-00)94.dut
dd-Krazan& ASSOC I ATE S, INC.
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
TABLE OF CONTENTS
INTRODUCTION............................................. .............................................................................. .................................... I
PURPOSEAND SCOPE....................................................................................................................................................1
PROPOSEDCONSTRUCTION.......................................................................................................................................2
SITELOCATION AND DESCRIPTION .............................................. ............. . ..... ......... ......... I ..................... 2
GEOLOGICSETTING................................................................................................................................,..,...................2
FIELDINVESTIGATION...................................................6............... 6.. ......... ......... ......... ...................................3
SOIL PROFILE AND SUBSURFACE CONDITIONS...................................................................................................3
GROUNDWATER..............................................................................................................................................................3
SEISMICCONDITIONS...................................................................................................................................................4
SoilLiquefaction...............................................................................................................................................................4
CONCLUSIONSAND RECOMMENDATIONS............................................................................................................5
SitePreparation.................................................................................................................................................................5
TemporaryExcavation............................................................................................................................................„........6
StructuralFill....................................................................................................................................................................7
Erosionand Sediment Control..........................................................................................................................................7
Groundwater Influence on Structures/Construction..........................................................................................................8
Drainage....-- --- .... . .... .................... . .„...,..........., ...,,..,........, .. ..........., ......, .... ..,................ .........8
UtilityTrench Backfill......................................................................................................................................................9
FloorSlabs and Exterior Flatwork....................................................................................................................................9
Foundations.....................................................................................................................................................................10
Lateral Earth Pressures and Retaining Walls .... . ....... ......... ................ ................ . Al
PavementDesign.............................................................................................................................................................12
Testingand Inspection....................................................................................................................................................13
LIMITATIONS.................................................................................................................................................................14
VICINITYMAP............................................................................................................................................Figure 1
SITEPLAN....................................................................................................................................................Figure 2
FIELD INVESTIGATION AND LABORATORY TESTING......................................................... Appendix A
EARTHWORKSPECIFICATIONS.................................................................................................... Appendix B
PAVEMENT SPECIFICATIONS....................................................................................................... Appendix C
Eleven Offices Serving The Western United States
19501 144" Ave. NE *Woodinville. Washington 98072 9 (425) 485-5519 9 Fax: (425) 485-6837
*QKrazan & ASSOCIATES>INC.
GEOTECHNICAL ENGINEERING 9 ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 21, 2006 KA Project No. 092-06094
GEOTECHNICAL ENGINEERING INVESTIGATION
PROPOSED MIXED USE DEVELOPMENT
1223 LAWRENCE STREET
PORT TOWNSEND, WASHINGTON
INTRODUCTION
This report presents the results of our Geotechnical Engineering Investigation for the proposed mixed
office/condominium development, located at 1223 Lawrence Street in Port Townsend, Washington.
Discussions regarding site conditions are presented herein, together with conclusions and
recommendations pertaining to site preparation, excavations, structural fill, utility trench backfill,
drainage and landscaping, erosion control, foundations, concrete floor slabs and exterior flatwork,
retaining/basement walls and pavement design.
A site plan showing the approximate exploratory test pit location is presented following the text of this
report (Figure 2). A description of the field investigation and the laboratory testing program, the
exploratory test pit log and the results of the laboratory testing are presented in Appendix A.
Appendices B and C contain guides to aid in the development of earthwork and pavement
specifications. When conflicts in the text of the report occur with the general specifications in the
appendices, the recommendations in the text of the report have precedence.
PURPOSE AND SCOPE
This investigation was conducted to evaluate the shallow soil and groundwater conditions at the site, to
develop geotechnical engineering recommendations for use in design of specific construction elements
and to provide criteria for site preparation and structural fill construction.
Our scope of services was performed in general accordance with our proposal for this project, dated
May 1, 2006 (Proposal Number G06-090WAW) and included the following:
• A site reconnaissance by a member of our engineering staff to evaluate the surface conditions at
the project site.
• A field investigation consisting of excavating and sampling one exploratory test pit that
provided general coverage of the property to be developed. The exploratory test pit extended to
a depth of approximately 6 feet below the existing site grade.
Eleven Offices Serving The Western United States
19501 144th Ave, NE #F-300 9 Woodinville, Washington 98072 9 (425) 485-5519 . Fax: (425) 485-6837
091-06U94.doc
KA No. 092-06094
June 21, 2006
Page No. 2
• Performing laboratory tests on representative soil samples obtained from the exploratory test pit
to evaluate the physical and index properties of the subsurface soils.
Evaluation of the data obtained from the investigation and completion of engineering analyses
to develop recommendations for use in the project design and preparation of construction
specifications.
Preparation of this report summarizing our findings, the results of our analyses and our
conclusions and recommendations for this investigation.
The preliminary plan that you forwarded to our office indicates that the proposed mixed-use building
will be constructed in the central area of the project site. Adjacent paved parking and driveway areas
for passenger vehicles will be included in the proposed construction. We anticipate that the foundation
loads will be light to moderate. We expect that grading will be limited to fills and/or cuts of 8 feet or
less with the deeper cuts and fills associated with the daylight basement level.
In the event that the structural or grading information detailed in this report is inconsistent with the final
design, the geotechnical engineer should be notified so that we may update this writing as applicable.
SITE LA'l'l N A. Dl? li*IPTI i
The property is currently developed with an existing building and associated landscaping. The site is
generally level within the southern section; however the northern and eastern section slope upward
toward Lawrence Street to the north and Fillmore Street to the east. The site is landscaped with grass
and shrubs. The general location of the site is shown on Figure 1 (Vicinity Map). The site is bordered
to the south by residential development, to the north by Lawrence Street, to the east by Fillmore Street
and to the west by an existing commercial and retail development.
'1< LO
. GIC. SETTING
The site lies within the central Puget Lowland. The lowland is part of a regional north -south trending
trough that extends from southwestern British Columbia to near Eugene, Oregon. North of Olympia,
Washington, this lowland is glacially carved, with a depositional and erosional history including at least
four separate glacial advances/retreats. The Puget Lowland is bounded to the west by the Olympic
Mountains, and to the east by the Cascade Range. The lowland is filled with glacial and nonglacial
sediments consisting of interbedded gravel, sand, silt, till, and peat lenses.
The Washington Division of Geology and Earth Resources Geologic Map GM -50, Geologic Map of
Washington Northwest Quadrant, indicates that the property is located in an area that is predominantly
underlain by Vashon Glacial Till. Vashon Glacial Till is typically characterized by an unsorted,
nonstratified mixture of clay, silt, sand, gravel, cobbles and boulders in variable quantities. The Vashon
Glacial Till is typically dense to very dense and relatively impermeable.
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
o9'-0(0)4 dov
KA No. 092-06094
June 21, 2006
Page No. 3
FIELD INVESTIGATION
A field investigation consisting of excavating and sampling one exploratory test pit, that provided
general coverage of the property to be developed, was completed to evaluate the subsurface soil and
groundwater conditions. The exploratory test pit reached a depth of approximately 6 feet below the
existing site grade. The excavation work was completed on June 13, 2006. The exploratory test pit was
excavated with a Kubota Trackhoe, which was supplied by the client. Representative samples of the
subsurface soils encountered in the test pit were collected and sealed in plastic bags. These samples
were transported to our laboratory for further examination and verification of the field classifications.
The soils encountered in the exploratory test pit were continuously examined and visually classified in
accordance with the Unified Soil Classification System (USCS). A more detailed description of the
field investigation is presented in Appendix A.
Laboratory tests were performed on selected soil samples to evaluate their physical characteristics and
engineering properties. The laboratory testing program was formulated with an emphasis on the
evaluation of natural moisture content and gradation of the materials encountered. Details of the
laboratory testing program and results of the laboratory tests are summarized in Appendix A. This
information, along with the field observations, was used to prepare the final exploratory test pit log,
which is presented in Appendix A.
SOIL PROFILE AND SUBSURFACE CONDITIONS
The soils encountered in the exploratory test pit were generally typical of those found in the described
geologic unit. Exploratory Test Pit TP -1 encountered approximately 2 inches of grass and topsoil
underlain by approximately 1.5 feet of loose to medium dense, silty, fine to medium grained sand with
variable amounts of gravel (Fill). The fill layer was underlain by dense to very dense, fine to coarse
grained sand with variable amounts of gravel (Vashon Glacial Till) down to the termination depth of
Exploratory Test Pit TP -1 (approximately 6 feet below the existing grade). For additional information
about the soils encountered, please refer to the log of the exploratory test pit in Appendix A.
gRqVNDWATF,R
The exploratory test pit was checked for the presence of groundwater during and immediately following
the excavation operations. Groundwater was not encountered in the exploratory test pit at the date and
time of our investigation.
It should be recognized that water table elevations may fluctuate with time. The groundwater level will
be dependent upon seasonal precipitation, irrigation, land use, and climatic conditions, as well as other
factors. Therefore, water levels at the time of the field investigation may be different from those
encountered during the construction phase of the project. The evaluation of such factors is beyond the
scope of this report.
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
0e2.06094.&c
KA No. 092-06094
June 21, 2006
Page No. 4
Groundwater flow may become heavier during construction, which typically takes place during the wet
weather season. This may cause difficulties with the grading and excavation work. Certain remedial
and/or de -watering measures may be required.
SEISMIC CONDITIONS
The native glacial till encountered in the exploratory test pit, primarily below a depth of about 1 to 2
feet, was generally dense. The overall soil profile generally corresponds to a site class soil profile of D
as defined by Table 1615. 1.1 of the 2003 International Building Code (IBC). A site class soil profile of
D applies to a profile consisting primarily of medium dense to dense or stiff soils within the upper 100
feet.
Soil Liotiefactign
Soil liquefaction is a state where soil particles lose contact with each other and become suspended in a
viscous fluid. This suspension of the soil grains results in a complete loss of strength as the effective
stress drops to zero. Liquefaction normally occurs under saturated conditions in soils such as sand in
which the strength is purely frictional. However, liquefaction has occurred in soils other than clean
sand. Liquefaction usually occurs under vibratory conditions such as those induced by seismic events.
To evaluate the liquefaction potential of the site, we analyzed the following factors:
1) Soil type
2) Groundwater depth
3) Relative soil density
4) Initial confining pressure
5) Maximum anticipated intensity and duration of ground shaking
Due to the composition and relatively dense nature of the majority of the on site native soils, it is our
opinion that the liquefaction potential at this site is low. It is our opinion that measures to mitigate
liquefaction potential will not be required.
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
692-0(A9JAw
KA No. 092-06094
June 21, 2006
Page No. 5
QNCL(.J61!Qn AND 11 A G M NDATI NS
General
Based on the findings of this investigation, and previous geotechnical experience in the project area, it
is our opinion that the proposed mixed-use structure may be supported on a shallow foundation system
bearing on the dense native soils, or on properly compacted structural fill, placed on the dense native
soils.
Site Preoration
General site clearing should include removal of vegetation; trees and associated root systems; wood;
existing utilities; structures including previously placed fill, foundations, basement walls and floors;
rubble; and rubbish. Site stripping should extend to a minimum depth of 1.5 feet (preliminarily; based
on the test pit and encountered fill depth, however site stripping depths will be variable), or until all
organics in excess of 3 percent by volume are removed. These materials will not be suitable for use as
structural fill. However, stripped topsoil may be stockpiled and reused in landscape or non-structural
areas.
After stripping operations and removal of any loose soils or undocumented fill that may impact the
development of the site, the building pad areas should be visually inspected to identify any loose areas.
Any remaining loose soils should be overexcavated to the level of the dense native soils. The resulting
excavations should be filled with approved on site material, or imported structural fill. Structural fill
material should be within :t 2 percent of the optimum moisture content, and the soils should be
compacted to a minimum of 95 percent of the maximum dry density based on ASTM Test Method
D1557.
During wet weather conditions, typically October through May, subgrade stability problems and grading
difficulties may develop due to excess moisture, disturbance of sensitive soils and/or the presence of
perched groundwater. Construction during the extended wet weather periods could create the need to
overexcavate exposed soils if they become disturbed and cannot be recompacted due to elevated
moisture contents. The on site native soils have variable silt contents that may result in moisture
sensitivity for these materials. If overexcavation is necessary, it should be confirmed through
continuous monitoring and testing by a qualified geotechnical engineer or senior geologist. Soils that
have become unstable may require drying and recompaction. Selective drying may be accomplished by
scarifying or windrowing surficial material during extended periods of dry, warm weather (typically
during the summer). If the soils cannot be dried back to a workable moisture condition, remedial
measures may be required. General project site winterization should consist of the placement of
aggregate base and the protection of exposed soils during the construction phase.
Any buried structures encountered during construction should be properly removed and backfilled.
Excavations, depressions, or soft and pliant areas extending below the planned finish subgrade levels
should be cleaned to firm undisturbed soil, and backfilled with structural fill. In general, any septic
tanks, underground storage tanks, debris pits, cesspools, or similar structures should be completely
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
692•0609J.duc
KA No. 092-06094
June 21, 2006
Page No. 6
removed. Concrete footings should be removed to an equivalent depth of at least 3 feet below proposed
footing elevations or as recommended by the geotechnical engineer. The resulting excavations should
be backfilled with structural fill.
A representative of our firm should be present during all site clearing and grading operations to test and
observe earthwork construction. This testing and observation is an integral part of our service, as
acceptance of earthwork construction is dependent upon compaction and stability of the material. The
geotechnical engineer may reject any material that does not meet compaction and stability requirements.
Further recommendations, contained in this report, are predicated upon the assumption that earthwork
construction will conform to the recommendations set forth in this section and in the Structural Fill
section.
Temporary y Excavations
The on site native soils have variable cohesion strengths, therefore the safe angles to which these
materials may be cut for temporary excavations is limited, as the soils may be prone to caving and slope
failures in temporary excavations deeper than 4 feet. Temporary excavations in the medium dense to
dense glacial soils should be sloped no steeper than 1H:1 V (horizontal to vertical) where room permits.
Temporary excavations in very dense glacial soils (if encountered at depth) should be sloped no steeper
than 3/4H:1 V (horizontal to vertical) where room permits. If the soil in the excavation is subject to
vibration from heavy traffic, the temporary excavation should be sloped no steeper than 11/2H: IV. All
temporary cuts should be in accordance with Washington Administrative Code (WAC) Part N,
Excavation, Trenching, and Shoring. The temporary slope cuts should be visually inspected daily by a
qualified person during construction work activities and the results of the inspections should be
included in daily reports. The contractor is responsible for maintaining the stability of the temporary
cut slopes and minimizing slope erosion during construction. The temporary cut slopes should be
covered with visqueen to help minimize erosion during wet weather and the slopes should be closely
monitored until the permanent retaining systems are complete. Materials should not be stored and
equipment operated within 10 feet of the top of any temporary cut slope.
A Krazan & Associates geologist or geotechnical engineer should observe, at least periodically, the
temporary cut slopes during the excavation work. The reasoning for this is that all soil conditions may
not be fully delineated during the previous geotechnical exploratory work. In the case of temporary
slope cuts, the existing soil conditions may not be fully revealed until the excavation work exposes the
soil. Typically, as excavation work progresses the maximum inclination of the temporary slope will
need to be reevaluated by the geotechnical engineer so that supplemental recommendations can be
made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be
adjustable, to deal with unanticipated conditions, so that the project can proceed smoothly and required
deadlines can be met.
If any variations or undesirable conditions are encountered during construction Krazan & Associates
should be notified so that supplemental recommendations can be made. In areas where it is not possible
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092-06094A,C
KA No. 092-06094
June 21, 2006
Page No. 7
to maintain the recommended slopes due to room constraints, temporary shoring may be required in
order to provide adequate stability for the cut faces, during construction.
Structural Fill
Best Management Practices (BMP's) should be followed when considering the suitability of material
for use as structural fill. The native glacial till soils can have elevated natural moisture contents, and
may need to be dried back during dry warm weather. The native glacial till soils are generally
considered suitable for reuse as structural fill, provided the soil is relatively free of organic material and
debris, and it is within t 2 percent of the optimum moisture content. If the native soils are stockpiled
for later use as structural fill, the stockpiles should be covered to protect the soil from wet weather
conditions. We recommend that a representative of Krazan & Associates be on site during the
excavation work to determine which soils are suitable for structural fill.
It should not be taken for granted that the onsite native soils may be used as the sole source for
structural fill (especially during winter construction activities). During wet weather conditions
the soils with higher silt and clay contents will be moisture sensitive, easily disturbed, and most
likely will not meet compaction requirements. Furthermore, during the winter the native soils
typically have elevated natural moisture contents, which will limit the use of these materials as
structural fill without proper mitigation measures. The contractor should use Best Management
Practices to protect the soils during construction activities. An allowance for importing
structural fill should be incorporated into the construction cost of the project.
Imported structural fill material should consist of well -graded gravel or a sand and gravel mixture with a
maximum grain size of 11/z inches and less than 5 percent fines (material passing the U.S. Standard No.
200 Sieve). All structural fill material should be submitted for approval to the geotechnical engineer at
least 48 hours prior to delivery to the site.
Fill soils should be placed in horizontal lifts not exceeding 8 inches loose thickness, moisture -
conditioned as necessary, (moisture content of soil shall not vary by more than t2 percent of optimum
moisture), and the material should be compacted to at least 95 percent of the maximum dry density
based on ASTM Test Method D1557. In place density tests should be performed on all structural fill to
verify proper moisture content and adequate compaction. Additional lifts should not be placed if the
previous lift did not meet the compaction requirements or if soil conditions are not considered stable.
Erosion and Sediment Control
Erosion and sediment control (ESC) is used to minimize the transportation of sediment to wetlands,
streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures
should be taken and these measures should be in general accordance with local regulations. At a
minimum, the following basic recommendations should be incorporated into the design of the erosion
and sediment control features of the site:
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092-MOVJ.doc
KA No. 092-06094
June 21, 2006
Page No. 8
1) Phase the soil, foundation, utility, and other work, requiring excavation or the disturbance of the
site soils, to take place during the dry season (generally May through September). However,
provided precautions are taken using Best Management Practices (BMP's), grading activities
can be undertaken during the wet season (generally October through April). It should be noted
that this typically increases the overall project cost.
2) All site work should be completed and stabilized as quickly as possible.
3) Additional perimeter erosion and sediment control features may be required to reduce the
possibility of sediment entering the surface water. This may include additional silt fences, silt
fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration
systems.
4) Any runoff generated by dewatering discharge should be treated through construction of a
sediment trap if there is sufficient space. If space is limited other filtration methods will need to
be incorporated.
Groundwater Influeric+e on truetures/Construction
Groundwater was not encountered in the exploratory test pit at the date and time of our investigation. If
groundwater is encountered during construction, it would most likely be perched.
Perched groundwater develops where vertical infiltration of surface precipitation is impeded by a
relatively impermeable soil layer, resulting in horizontal migration of the groundwater within overlying
more permeable soils.
If groundwater is encountered during construction, we should observe the conditions to determine if
dewatering will be needed. Design of temporary dewatering systems to remove groundwater should be
the responsibility of the contractor.
If earthwork is performed during or soon after periods of precipitation, the subgrade soils may become
saturated. These soils may "pump," and the materials may not respond to densification techniques.
Typical remedial measures include: discing and aerating the soil during dry, warm weather; mixing the
soil with drier materials; removing and replacing the soil with an approved fill material. A qualified
geotechnical engineering firm should be consulted prior to implementing remedial measures to observe
the unstable subgrade conditions and provide appropriate recommendations.
Drainap-e
The ground surface should slope away from building pads and pavement areas, toward appropriate drop
inlets or other surface drainage devices. It is recommended that adjacent exterior grades be sloped a
minimum of 2 percent for a minimum distance of S feet away from structures. Roof drains should be
tightlined away from foundations. Subgrade soils in pavement areas should be sloped a minimum of 1
percent and drainage gradients maintained to carry all surface water to collection facilities and off-site.
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092.0609d.doc
KA No. 092-06094
June 21, 2006
Page No. 9
These grades should be maintained for the life of the project. The collection facilities should be
tightlined away from slopes that exceed 30 percent.
LAIlity Trgnch Backfill
Utility trenches should be excavated according to accepted engineering practices following OSHA
(Occupational Safety and Health Administration) standards, by a contractor experienced in such work.
The responsibility for the safety of open trenches should be borne by the contractor. Traffic and
vibration adjacent to trench walls should be minimized; cyclic wetting and drying of excavation side
slopes should be avoided. Depending upon the location and depth of some utility trenches, groundwater
flow into open excavations could be experienced, especially during or shortly following periods of
precipitation.
Although dense glacial till soils, which generally have cohesive strength, were encountered at relatively
shallow depths below the existing site grades, bedding and joint (fracture) planes in these soils may still
cause caving in trench wall excavations. Shoring or sloping back trench sidewalls may be required
within these soils.
All utility trench backfill should consist of imported structural fill or suitable on-site material. Utility
trench backfill placed in or adjacent to buildings and exterior slabs should be compacted to at least 95
percent of the maximum dry density based on ASTM Test Method D1557. The upper 5 feet of utility
trench backfill placed in pavement areas should be compacted to at least 95 percent of the maximum dry
density based on ASTM Test Method D1557. Below 5 feet, utility trench backfill in pavement areas
should be compacted to at least 90 percent of the maximum dry density based on ASTM Test Method
D1557. Pipe bedding should be in accordance with the pipe manufacturer's recommendations.
The contractor is responsible for removing all water -sensitive soils from the trenches regardless of the
backfill location and compaction requirements. The contractor should use appropriate equipment and
methods to avoid damage to the utilities and/or structures during fill placement and compaction.
Floor Slabs and Exterigr Iatworl
In structure areas where it is desired to reduce floor dampness, such as areas covered with moisture
sensitive floor coverings, we recommend that concrete slab -on -grade floors be underlain by a water
vapor retarder system. The water vapor retarder system should be installed in accordance with ASTM
Specification E164-94 and Standard Specifications E1745-97. According to ASTM Guidelines, the
water vapor retarder should consist of a vapor retarder sheeting underlain by a minimum of 4 -inches of
compacted clean (less than 5 percent passing the U.S. Standard No. 200 Sieve), open -graded coarse rock
of 3/a -inch maximum size. The vapor retarder sheeting should be protected from puncture damage.
The exterior floor concrete should be placed separately in order to act 'independently of the walls and
foundation system. All fills required to bring the building pads to grade should be structural fill.
Krazan & Associates, Iite.
Eleven Offices Serving The Western United States
0e2-06094Ax:
KA No. 092-06094
June 21, 2006
Page No. 10
Moisture within the structure may be derived from water vapors, which were transformed from the
moisture within the soils. This moisture vapor can travel through the vapor membrane and penetrate the
slab -on -grade. This moisture vapor penetration can affect floor coverings and produce mold and
mildew in the structure. To minimize moisture vapor intrusion, it is recommended that a vapor retarder
be installed in accordance with ASTM guidelines. It is recommended that the utility trenches within the
structure be compacted, as specified in our report, to minimize the transmission of moisture through the
utility trench backfill. Special attention to the immediate drainage and irrigation around the building is
recommended. Positive drainage should be established away from the structure and should be
maintained throughout the life of the structure. Ponding of water should not be allowed adjacent to the
structure. Over -irrigation within landscaped areas adjacent to the structure should not be performed. In
addition, ventilation of the structure (i.e. ventilation fans) is recommended to reduce the accumulation
of interior moisture.
Foundations
The proposed mixed use building may be supported on a shallow foundation system bearing on the
medium dense to dense native soils or on structural fill, placed on the medium dense to dense native
soils. Continuous wall or column footings may be designed for a net allowable bearing pressure of
3,000 pounds per square foot (psf) dead plus live load, if the footings bear directly on dense native
glacial soils. For footings bearing on structural fill, placed on the medium dense to dense native soils,
we recommend an allowable bearing pressure of 2,500 psf.
Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or
adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth of 12
inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Footings should
have a minimum width of 12 inches regardless of load.
If constructed as recommended, the total settlement is not expected to exceed 1 inch. Differential
settlement, along a 20 -foot exterior wall footing, or between adjoining column footings, should be less
than 1/z inch, producing an angular distortion of 0.002. Most settlement is expected to occur during
construction, as the loads are applied. However, additional post -construction settlement may occur if
the foundation soils are flooded or saturated or if a strong seismic event results in liquefaction of the
underlying soils. It should be noted that the risk of liquefaction is considered low, given the
composition and density of the native, on site soils.
Seasonal rainfall, water run-off, and the normal practice of watering trees and landscaping areas around
the proposed structures, should not be permitted to flood and/or saturate footings. To prevent the
buildup of water within the footing areas, continuous footing drains (with cleanouts) should be provided
at the bases of the footings. The footing drains should consist of a minimum 4 -inch diameter perforated
pipe, sloped to drain, with perforations placed down and enveloped by 1 -inch sized washed rock in all
directions and filter fabric to prevent the migration of fines.
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092-0(0)4.doc
KA No. 092-06094
June 21, 2006
Page No. 11
Resistance to lateral footing displacement can be computed using an allowable friction factor of 0.34
acting between the bases of foundations and the supporting subgrade. Lateral resistance for footings
can alternatively be developed using an allowable equivalent fluid passive pressure of 295 pounds per
cubic foot (pcf) acting against the appropriate vertical footing faces. The frictional and passive
resistance of the soil may be combined without reduction in determining the total lateral resistance. A
1/3 increase in the above values may be used for short duration, wind and seismic loads. A factor of
safety of 1.5 has already been included in the allowable friction factor and the allowable equivalent
fluid passive pressure values.
Lateral Car h Er&ssures and Retainigg Wall§
We have developed criteria for the design of retaining or below grade walls. Our design parameters are
based on retention of the in place soils. The parameters are also based on a level backfill condition.
Walls may be designed as "restrained" retaining walls based on "at -rest" earth pressures, plus any
surcharge on top of the walls as described below, if the walls are attached to the buildings and/or
movement is not acceptable. Unrestrained walls may be designed based on "active" earth pressure, if
the walls are not part of the buildings and some movement of the retaining walls is acceptable.
Acceptable lateral movement equal to at least 0.2 percent of the wall height would warrant the use of
"active" earth pressure values for design.
The following table, titled Wall Design Criteria, presents the recommended soil related design
parameters for retaining walls with level backfill. Contact Krazan & Associates, Inc. if an alternate
retaining wall system is used.
Wall Design Criteria
"At -rest" Conditions
52 psf/foot of depth
"Active" Conditions
32 psf/ oot of depth
6H*
Seismic Increase for "At -rest" Conditions
14H*
Seismic Increase for "Active" Conditions
Passive Earth Pressure on Low Side of Wall
Neglect upper 2 eet, then 295 psf linear
(Allowable, includes F.S. = 1.5)
foot of depth
Soil -Footing Coefficient of Sliding Friction
0.34
(Allowable; includes F.S. = 1.5)
..fl is the height of the wall; Increase based on one in z')uo year seismic event (L percent prooaomiy or oeing
exceeded in 50 years) (Per 2003 IBC)
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092-MM4.doe
KA No. 092-06094
June 21, 2006
Page No. 12
The stated lateral earth pressures do not include the effects of hydrostatic pressure generated by water
accumulation behind the retaining walls or loads imposed by construction equipment, foundations or
roadways (surcharge loads). To minimize the lateral earth pressure and prevent the buildup of water
pressure against the walls, continuous footing drains (with cleanouts) should be provided at the bases of
the walls. The footing drains should consist of a minimum 4 -inch diameter perforated pipe, sloped to
drain, with perforations placed down and enveloped by 6 inches of washed gravel in all directions and
filter fabric to prevent the migration of fines. The backfill adjacent to and extending a lateral distance,
behind the walls, of at least 2 feet should consist of free -draining granular material. All free draining
backfill should contain less than 3 percent fines (passing the U.S. Standard No. 200 Sieve) based upon
the fraction passing the U.S. Standard No. 4 Sieve with at least 30 percent of the material being retained
on the U.S. Standard No. 4 Sieve. It should be realized that the primary purpose of the free -draining
material is the reduction of hydrostatic pressure. Some potential for the moisture to contact the back
face of the wall may exist, even with treatment, which may require that more extensive waterproofing
be specified for walls, which require interior moisture sensitive finishes.
We recommend that the backfill be compacted to at least 90 percent of the maximum dry density based
on ASTM Test Method D1557. In place density tests should be performed to verify adequate
compaction. Soil compactors place transient surcharges on the backfill. Consequently, only light hand
operated equipment is recommended within 3 feet of walls so that excessive stress is not imposed on the
walls.
Pavement fleshm
The near surface subgrade soils generally consist of sand with variable amounts of silt and gravel.
These soils are rated as good for pavement subgrade material. We estimate that the subgrade will have
a California Bearing Ratio (CBR) value of 12 and a modulus of subgrade reaction value of k = 210 pci,
provided the subgrade is prepared in general accordance with our recommendations.
We recommend that, at a minimum, 12 inches of the existing subgrade material be moisture conditioned
(as necessary) and re -compacted to prepare for the construction of pavement sections. The subgrade
should be compacted to at least 95 percent of the maximum dry density as determined by ASTM Test
Method D1557. In place density tests should be performed to verify proper moisture content and
adequate compaction. However, if the subgrade soil consists of firm and unyielding native glacial soils
a proof roll of the pavement subgrade soil may be performed in lieu of re -compacting the subgrade and
compaction tests. The recommended flexible and rigid pavement sections are based on design CBR and
modulus of subgrade reaction (k) values that are achieved, only following proper subgrade preparation.
It should be noted that subgrade soils that have relatively high silt contents may be highly sensitive to
moisture conditions. The subgrade strength and performance characteristics of a silty subgrade material
may be dramatically reduced if this material becomes wet.
Traffic loads were not provided, however, based on our knowledge of the proposed project, we expect
the traffic to be relatively light consisting mostly of passenger automobiles and delivery trucks. The
following tables show the recommended pavement sections for light duty and heavy duty use.
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092-IX094bw
KA No. 092-06094
June 21, 2006
Page No. 13
ASPHALTIC CONCRETE (FLEXIBLE) PAVEMENT
LIGHT DUTY
ESAL As haltic Concrete Aggregate Base* Compacted Sub rade* **
80,000 3.0 in. 4.0 in. 12.0 in.
1,95% compaction based on ASTM Test Method D1557
**A proof roll may be performed in lieu of in place density tests
ESAL Asphaltic Concrete Aggregate Base* Compacted Sub rade* **
300,000 3.5 in. 5.0 in. 12.0 in.
* 95% compaction based on ASTM Test Method D1557
* A proof roll may be performed in lieu of in place density tests
PORTLAND CEMENT CONCRETE (RIGID) PAVEMENT
I i['_UT nTiTV
ESAL
Min. PCC Depth
Compacted Sub rade* **
80,000
5.0 in.
12.0 in,
ESAL
300,000
*95% compaction based on ASTM Test Method DUX /
* A proof roll may be performed in lieu of in place density tests
HEAVY DUTY
6.0 in.
12.0 in.
*95% compaction based on ASTM Test Method D1557
* * A proof roll may be performed in lieu of in place density tests
**
The asphaltic concrete depth in the flexible pavement tables should be a surface course type asphalt,
such as Washington Department of Transportation (WsDOT) "Class B". The rigid pavement design is
based on a Portland Cement Concrete (PCC) mix that has a 28 day compressive strength of 4,000
pounds per square inch (psi). The design is also based on a concrete flexural strength or modulus of
rupture of 550 psi.
Ticsting—lin-4 111slLection
A representative of Krazan & Associates, Inc. should be present at the site during the earthwork
activities to confirm that actual subsurface conditions are consistent with the exploratory fieldwork.
This activity is an integral part of our services as acceptance of earthwork construction is dependent
upon compaction testing and stability of the material. This representative can also verify that the intent
of these recommendations is incorporated into the project design and construction. Krazan &
Associates, Inc. will not be responsible for grades or staking, since this is the responsibility of the Prime
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092•O(d)9+.Jut
KA No. 092-06094
June 21, 2006
Page No. 15
assessment for the presence or absence of hazardous and/or toxic materials in the soil, groundwater or
atmosphere, or the presence of wetlands. Any statements, or absence of statements, in this report or on
any test pit log regarding odors, unusual or suspicious items, or conditions observed are strictly for
descriptive purposes and are not intended to convey engineering judgment regarding potential hazardous
and/or toxic assessments.
The geotechnical information presented herein is based upon professional interpretation utilizing
standard engineering practices and a degree of conservatism deemed proper for this project. It is not
warranted that such information and interpretation cannot be superseded by future geotechnical
developments. We emphasize that this report is valid for this project as outlined above, and should not
be used for any other site. Our report is prepared for the exclusive use of our client. No other party
may rely on the product of our services unless we agree in advance to such reliance in writing.
If you have any questions, or if we may be of further assistance, please do not hesitate to contact our
office at (425) 485-5519.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC.
Lh1/ /�-
Chris Behrens, L.G., L.E.G. V kanCaraway, P.E.
Senior Engineering Geologist Geotechnical Division Manager
CB/slc:
Krazan & Associates, Inc.
Eleven Offices Serving The Western United States
092-110094.dok
ote: Figure generated from TOPO USA&
KRAZAN & ASSOCIATES
19501144 1h Avenue Northeast
#F-300
Woodinville, WA 98072
425-485-5519
FIGURE i -VICINITY MAP
Location: Fort Townsend, WA
Job No. :092-06094
Client: JJP Building, LLC
Date: 6-19-06
APPENDIX A
li"IE1GD I l 'l'I "ATIfJhN L 80 AjQRY TI TIINq
Field Invesdeation
Appendix A
Page A.1
The field investigation consisted of a surface reconnaissance and a shallow subsurface exploration
program. One exploratory test pit was excavated and sampled for subsurface exploration at this site.
The test pit reached a depth of approximately 6 feet below the existing grade. The approximate
exploratory test pit location is shown on the site plan (Figure 2). The depth shown on the attached test
pit log is from the existing ground surface at the time the test pit was excavated.
The soils encountered were logged in the field during the exploration and, with supplementary
laboratory test data, are described in accordance with the Unified Soil Classification System (USCS).
All samples were returned to our Woodinville laboratory for evaluation. The log of the exploratory test
pit along with the laboratory test results are presented in this appendix.
Laboratea Testing
The laboratory testing program was developed primarily to determine the in situ moisture condition of
the soils and the grain size distribution. The sieve analysis tests were performed for the purpose of soil
classification. Test results were used as criteria for determining the engineering suitability of the
surface and subsurface materials encountered.
The results of the moisture content tests are presented on the Log of Test Pit (presented in this
appendix). The sieve analysis test results are presented in this appendix.
Krazan & Associates, Inc.
Eleven Offices Serving The Wcstcrtt United States
IbJ_-OM94.due
Project: JJP Mixed Use Building
Client: JJP, LLC
Location: Port Townsend, WA
Depth to Water N/A
Log of Test Pit TP -9
Surface Elevation:
Datum:
Initial: Not Encountered
Project No: 092-06094
Figure No: A-1
Logged By: BBC
At Completion:
SUBSURFACE PROFILE
_ Description
CL cn
SAMPLE
u,
'
Z
C1 m -- m m
E CL o a
a.0
Dynamic Cone
Penetration
Test
(Blows/1-3/4 in)
20 40 60 80
Water Content
N
Wp 1-0..,-f WI
20406080
Gr
_..
,_........_..
GRASS?OPSOIL
--------------------------------
�...
SILTY SAND (SM) e
Loose to medium dense, fine to coarse grained with
varying amounts of gravel, dark brown, moist.
Masonry/Concrete debris found at 1 foot.
re
Fill
2
c: r
�,�� ��,
OORL� GRADED SAND W/SILT AND GRAVEL
�.......
x.,
SP -SM
dense, fine
S1
Grab
wl`
Very to coarse grained sand, gray, moist.
Blocky fracturing present. Trace amount of cobbles
below 3 feet.
�I
R,
(Glacial Till)
S2
Grab
441
S3
Grab
Wo t
'
S4
Grab
S5
Grab
End of Test Pit
a
k
�p
10
Excavation Method: Trackhoe
Contractor: Client
Krazan and Associates
19501 144th Ave. NE #F-300
Woodinville, WA 96072
Test Pit Date: June 12, 2006
Sample Method: Grab
Sheet: 1 of 1
0
F
Particle Size Distribution aport
GRAIN SIZE - mm
SIEVE
SIZE
% GRAVEL
% SAND % FINES
% COBBLES
CRS. FINE
_
CR S. MEDIUM FINE SILT CLAY
0.0
12.0 8.7
5.5
- 18.2 41.2 1 24.4
SIEVE
SIZE
PERCENT
FINER
SPEC."
PERCENT
PASS?
(X=NO)
1 in.
100.0
3/4 in.
98.0
1/2 in.
94.9
1
3/8 in.
93.6
#4
89.3
#10
83.8
#20
77.5
#40
65.6
#60
47.6
#100
34.7
#200
24.4
- (no specification provided)
Sample No.: 22935-A Source of Sample:
Location: TP -1 S-1
I_aterlal Description
Gray Gravelly Sand with Silt
Atterber Limits
PL= LL= P1=
Coefficients
D85= 2.43 DB0= 0.357 050= 0.269
D30= 0.114 D15= D10=
Cu= Cc=
Classification
USCS= AASHTO=
Remarks
Sample ID: 22935-A
Received Moisture Content:6.8%
. ...........
..
Client: J & J Perkins, LLC
KRAZAN & ASSOCIATES, INC. project: JJP Partnership Office and Condos
No: 09206094
Date: 6/12/06
Elev./Depth:
Particle Size Distribution keport
s .s
/o ° GRAVEL %° SAND % FINES
100
CHS. _ -FINE CRS. MEDIUM FINE SILT CLAY
0.0
16.3 1 4.4 15.5 36.1 21.5
Cu=
Cc=
1 in.
86.5
USCS=
AASHTO=
3/4 in.
83.7
Sample ID: 22935-D
Received Moisture Content: 5.9%
1/2 in.
82.5
3/8 in.
80.7
#4
77.5
#10
73.1
#20
67.7
#40
57.6
#60
41.4
#100
30.1
#200
21.5
t
d
d
1
8
@
N
u
0
Y W
tt
18
u
X
X
4
I
f
Y
Y
&
II
A
R tl
p
90
W
i
4
III I
b
p
p
8
P
Y Y
X
80
.......
I
X
t
f I
d
q
N
I
6 X{
70
._.�...
..
_
_.
L_.
..
..
—
.I
.._«
. _
....
m
._
j..
I_..
7
N
I
N
N
R
P I
d
I
V
X
d
o I
I
11.1 60
..._.
.......
Z
X
U
0
B
d #
tl
d
X
I
d
X I
P
R
d
11
0
R
A Y
X
I—
50
u
1
N
X
u
X
d
X d
N
P
IX I
Y
1
1 I
q
M
LL
iL
a
d
b
d 1
1
Y
V
q
tl
N
R.
r
R
- —
Cy
n
I
P I�
V
tl
U
I I
0
p
1
tl
4
R 4
9
Y
I
R
I
p
tl
!
i
o p
@
a
N
R
d 9
20
, ....
...
........
.. . .
..
.............
,..........
Y
9
tl
Y 9
u
q
X
Q I
Y
p d
8
d
a
u
a
10—
ol
LIr
500
100
10
1
01.1
010`11
0.001
GRAIN
SIZE
- mm
SIEVE
SIZE
/o ° GRAVEL %° SAND % FINES
% COBBLES
CHS. _ -FINE CRS. MEDIUM FINE SILT CLAY
0.0
16.3 1 4.4 15.5 36.1 21.5
SIEVE
SIZE
PERCENT
FINER
SPEC.'
PERCENT
PASS?
(X=NO)
1.25 in.
100.0
Cu=
Cc=
1 in.
86.5
USCS=
AASHTO=
3/4 in.
83.7
Sample ID: 22935-D
Received Moisture Content: 5.9%
1/2 in.
82.5
3/8 in.
80.7
#4
77.5
#10
73.1
#20
67.7
#40
57.6
#60
41.4
#100
30.1
#200
21.5
., (no specification provided)
Sample No.: 22935-D Source of Sample:
Location: TP -1 S-4
Material Description
Gray Gravelly Sand with Silt
AtterbeLq Limitst
PL= L
PI=
11 Client: J & J Perkins, LLC
KRAZAN & ASSOCIATES, INC. Project: JJP Partnership Office and Condos
Date: 6/12/06
Elev./Depth:
No: 09206094 Ficiure
Coefficients
D85= 22.2
1360= 0.471 D,50= 0.329
D30= 0.149
D1 5= D10=
Cu=
Cc=
Classification
USCS=
AASHTO=
Remarks
Sample ID: 22935-D
Received Moisture Content: 5.9%
11 Client: J & J Perkins, LLC
KRAZAN & ASSOCIATES, INC. Project: JJP Partnership Office and Condos
Date: 6/12/06
Elev./Depth:
No: 09206094 Ficiure
APPENDIX B
EARTHWORK RK SPECIFICATIONS
GENERAL
Appendix B
Page B.I
When the text of the report conflicts with the general specifications in this appendix, the
recommendations in the report have precedence.
SCOPE OF WORK: These specifications and applicable plans pertain to and include all earthwork
associated with the site rough grading, including but not limited to the furnishing of all labor, tools, and
equipment necessary for site clearing and grubbing, stripping, preparation of foundation materials for
receiving fill, excavation, processing, placement and compaction of fill and backfill materials to the
lines and grades shown on the project grading plans, and disposal of excess materials.
PERFORMANCE: The Contractor shall be responsible for the satisfactory completion of all
earthwork in accordance with the project plans and specifications. This work shall be inspected and
tested by a representative of Krazan and Associates, Inc., hereinafter known as the Geotechnical
Engineer and/or Testing Agency. Attainment of design grades when achieved shall be certified to by
the project Civil Engineer. Both the Geotechnical Engineer and Civil Engineer are the Owner's
representatives. If the contractor should fail to meet the technical or design requirements embodied in
this document and on the applicable plans, he shall make the necessary readjustments until all work is
deemed satisfactory as determined by both the Geotechnical Engineer and Civil Engineer. No deviation
from these specifications shall be made except upon written approval of the Geotechnical Engineer,
Civil Engineer or project Architect.
No earthwork shall be performed without the physical presence or approval of the Geotechnical
Engineer. The Contractor shall notify the Geotechnical Engineer at least 2 working days prior to the
commencement of any aspect of the site earthwork.
The Contractor agrees that he shall assume sole and complete responsibility for job site conditions
during the course of construction of this project, including safety of all persons and property; that this
requirement shall apply continuously and not be limited to normal working hours; and that the
Contractor shall defend, indemnify and hold the Owner and the Engineers harmless from any and all
liability, real or alleged, in connection with the performance of work on this project, except for liability
arising from the sole negligence of the Owner of the Engineers.
TECHNICAL REQUIREMENTS: All compacted materials shall be densified to a density not less
than 95 percent of maximum dry density as determined by ASTM Test Method D1557 as specified in
the technical portion of the Geotechnical Engineering Report. The results of these tests and compliance
with these specifications shall be the basis upon which satisfactory completion of work will be judged
by the Geotechnical Engineer.
SOIL AND FOUNDATION CONDITIONS: The Contractor is presumed to have visited the site and
to have familiarized himself with existing site conditions and the contents of the data presented in the
soil report.
Krazan and Associates, Inc.
Eleven Offices Serving The Western United States
092•cu o 9e.doC
Appendix B
Page B.2
The Contractor shall make his own interpretation of the data contained in said report, and the Contractor
shall not be relieved of liability under the contractor for any loss sustained as a result of any variance
between conditions indicated by or deduced from said report and the actual conditions encountered
during the progress of the work.
DUST CONTROL: The work includes dust control as required for the alleviation or prevention of any
dust nuisance on or about the site or the borrow area, or off-site if caused by the Contractor's operation
either during the performance of the earthwork or resulting from the conditions in which the Contractor
leaves the site. The Contractor shall assume all liability, including Court costs of codefendants, for all
claims related to dust or windblown materials attributable to his work.
SITE PREPARATION
Site preparation shall consist of site clearing and grabbing and preparations of foundation materials for
receiving fill.
CLEARING AND GRUBBING: The Contractor shall accept the site in this present condition and
shall demolish and/or remove from the area of designated project, earthwork all structures, both surface
and subsurface, trees, brush, roots, debris, organic matter, and all other matter determined by the
Geotechnical Engineer to be deleterious. Such materials shall become the property of the Contractor
and shall be removed from the site.
Tree root systems in proposed building areas should be removed to a minimum depth of 3 feet and to
such an extent which would permit removal of all roots larger than 1 inch. Tree root removed in
parking areas may be limited to the upper 11/2 feet of the ground surface. Backfill or tree root
excavation should not be permitted until all exposed surfaces have been inspected and the Geotechnical
Engineer is present for the proper control of backfill placement and compaction. Burning in areas,
which are to receive fill materials, shall not be permitted.
SUBGRADE PREPARATION: Surfaces to receive Structural fill shall be prepared as outlined above,
excavated/scarified to a depth of 12 inches, moisture -conditioned as necessary, and compacted to 95
percent compaction.
Loose and/or areas of disturbed soils shall be moisture conditioned and compacted to 95 percent
compaction. All ruts, hummocks, or other uneven surface features shall be removed by surface grading
prior to placement of any fill material. All areas which are to receive fill materials, shall be approved
by the Geotechnical Engineer prior to the placement of any of the fill material.
EXCAVATION: All excavation shall be accomplished to the tolerance normally defined by the Civil
Engineer as shown on the project grading plans. All over excavation below the grades specified shall be
backfilled at the Contractor's expense and shall be compacted in accordance with the applicable
technical requirements.
FILL AND BACKFILL MATERIAL: No material shall be moved or compacted without the
presence of the Geotechnical Engineer. Material from the required site excavation may be utilized for
construction site fills provided prior approval is given by the Geotechnical Engineer. All materials
utilized for constructing site fills shall be free from vegetable or other deleterious matter as determined
by the Geotechnical Engineer.
Krazan and Associates, Inc.
Eleven Offices Serving The Western United States
09'_-06094.doc
Appendix B
Page B.3
PLACEMENT, SPREADING AND COMPACTION: The placement and spreading of approved fill
materials and the processing and compaction of approved fill and native materials shall be the
responsibility of the Contractor. However, compaction of fill materials by flooding, ponding, or jetting
shall not be permitted unless specifically approved by local code, as well as the Geotechnical Engineer.
Both cut and fill shall be surface compacted to the satisfaction of the Geotechnical Engineer prior to
final acceptance.
SEASONAL LIMITS: No fill material shall be placed, spread, or rolled while it is frozen or thawing
or during unfavorable wet weather conditions. When the work is interrupted by heavy rains, fill
operations shall not be resumed until the Geotechnical Engineer indicates that the moisture content and
desity of previously placed fill are as specified.
Krazan and Associates, Inc.
Eleven Offices Serving The Western United States
b9'_ -G00 4A,a
Appendix C
Page C.
APPENDIX C
PAVEMENT SPECIFICATIONS
1. DEFINITIONS — The term "pavement" shall include asphalt concrete surfacing, untreated
aggregate base, and aggregate subbase. The term "subgrade" is that portion of the area on which
surfacing, base, or subbase is to be placed.
2. SCOPE OF WORK — This portion of the work shall include all labor, materials, tools and
equipment necessary for and reasonable incidental to the completion of the pavement shown on the
plans and as herein specified, except work specifically notes as "Work Not Included."
3. PREPARATION OF THE SUBGRADE — The Contractor shall prepare the surface of the various
subgrades receiving subsequent pavement courses to the lines, grades, and dimensions given on the
plans. The upper 12 inches of the soil subgrade beneath the pavement section shall be compacted to a
minimum compaction of 95% of maximum dry density as determined by test method ASTM D1557.
The finished subgrades shall be tested and approved by the Geotechnical Engineer prior to the
placement of additional pavement of additional pavement courses.
4. AGGREGATE BASE — The aggregate base shall be spread and compacted on the prepared
subgrade in conformity with the lines, grades, and dimensions shown on the plans. The aggregate base
should conform to WSDOT Standard Specification for Crushed Surfacing Base Course or Top Course
(Item 9-03.9(3)). The base material shall be compacted to a minimum compaction of 95% as
determined by ASTM D1557. Each layer of subbase shall be tested and approved by the Geotechnical
Engineer prior to the placement of successive layers.
5. ASPHALTIC CONCRETE SURFACING — Asphaltic concrete surfacing shall consist of a
mixture of mineral aggregate and paving grade asphalt, mixed at central mixing plant and spread and
compacted on a prepared base in conformity with the lines, grades, and dimensions shown on the plans.
The viscosity grade of the asphalt shall be AR -4000. The mineral aggregate shall be WSDOT Class B.
The drying, proportioning, and mixing of the materials shall conform to WSDOT Specifications.
The prime coat, spreading and compacting equipment, and spreading and compacting the mixture shall
conform to WSDOT Specifications, with the exception that no surface course shall be placed when the
atmospheric temperature is below 50 degrees F. The surfacing shall be rolled with combination steel -
wheel and pneumatic rollers, as described in WSDOT Specifications. The surface course shall be
placed with an approved self-propelled mechanical spreading and finishing machine.
6. TACK COAT — The tack (mixing type asphaltic emulsion) shall conform to and be applied in
accordance with the requirements of WSDOT Specifications.
Krazan and Associates, Inc.
Eleven Offices Servin; The Western Unitcd States
092-00094.duc
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360) 379-5095 FAX (360) 344-4619
July 7, 2006
Johanna Rienstra
420 Hudson Street
Port Townsend, WA 98368
RE: LUP06-070, SEPA Addendum for new 4+ story mixed-use
building - Request for Additional Information
Johanna,
Thank you and Sam Evich for meeting today with DSD Director Yarberry and myself to discuss
public comments generated by your proposed mixed-use building in Uptown. As you know, a
majority of the comments received focus on the potential for adverse environmental impacts
related to insufficient parking in Uptown. To better gauge the potential for parking impacts,
additional information from you will be necessary prior to finalizing the SEPA process.
Towards that end, please provide a parking demand & management assessment prepared by a
qualified parking/transportation consultant. In sum the study should:
Briefly (but thoroughly) document and describe existing parking conditions in the
Uptown area near your property;
Analyze anticipated parking patterns & demands generated by your project;
Summarize the potential impacts, if any, your project would have on Uptown area
parking;
Identify any appropriate measures that, when employed, would lower identified impacts
to a level below significant for purposes of SEPA.
Once we receive the above information and deem it complete, our office will move forward &
finalize the SEPA review. Both you and those who have commented will be provided with the
results of that review. At this time we do not anticipate offering another comment period or
administrative appeal opportunity; however, please be advised that appeals through judicial
means may still be sought.
If you have any questions about the above, please don't hesitate to contact me. I can be reached
at 379-5085 or via e-mail at jmcdonagh@citYoQ?t.us. I will be out of the office beginning July 10
and returning July 18. In my absence, please feel free to contact DSD Director Leonard
Yarberry with questions at 344-3041 or via e-mail at l aaa12, day iyityoffit u .
Congratulations on your upcoming marriage and I look forward to working with you on your
proj ect.
Regards,
John McDonagh
DSD Planner
Cc Leonard Yarberry
IRT
City of Fort Townsend
Development Services Department �' M
250 Madison Street — Suite 3
Port Townsend, WA 98368
(360) 379-5095 FAX (360) 344-4619
June 2, 2006
Taylor -Gregory -Butterfield Architects
6545 th Ave. S. Suite 300
Edmonds, WA 98020
ATTN: DeAnna Connors
Dear DeAnna:
The City of Port Townsend Development Services Department is currently reviewing the
construction plans for the Johanna Rienstra project to be located on Lawrence and Fillmore
Streets in Port Townsend, Washington. The following list reflects items that need to be
addressed in order for us to complete the plan review portion of the building permit.
1..
Sheet RO.00 — Delete "Retail" from the Project Description.
2.
Sheet RO.00 — Change "R-3" to "R-2" in Basic Allowable Area.
3.
Sheet RO.10 — Show gate at stairway to prevent occupants on 1St floor from exiting
into stair ray',to basernent.ala , 1- ��
4.
Sheet"he —Indicate the Van Accessible" sign to be 60" inches minimum above
the floor of the parking space measured to the bottom of the sign per Sec. 502.7,
ICC -ANSI A117.1, 2003 ed.
Sheet A6.01 —Indicate window 90'will be safety glass due to proximity to door
000.09 shown on Sheet A2.01.
6.
Sheets A2.02, A2.12, A2.22, A2.32, and A2.42 — Change 1997 Uniform Building Code
from No. 4 of General Notes to read 2003 International Building Code.
7.
NOTE: Although the NREC will be a "Deferred Submittal", Sheets A2.02, A2.12,
A2.22, A2.32, and A2.42 will need to show compliance of "Daylight Zone Controls"
as required per Sec. 1513.3 of the Washington State Energy Code.
Sheet A6.01 — Indicate window 2Pwill be safety glass due to proximity to door
201.08 shown on Sheet A2.21.
9.
Sheet A6.01 Indicate windows 203, 208, 303, 308, 403, 404, 406, and 417 will
egress windows. 'V�
y W
Sheet A6.01 — Indicate window �A will be safety glass due to proximity to door
301.08 shown on Sheet A2.31.
I
Sheet A6.01 - Indicate windows Pf and P2 well be safety glass due to location
within tub enclosure.
Sheet A2.41 — Change window numbers 305 and 306 to 405 and 406. And, on sheet
A6.01 — indicate windows (new) 405 and 406 will be safety glass due to proximity to
door 400.02 shown on Sheet A2.41.
Indicate on Sheet A6.01 that window 410 on Sheet A2.41 will be safety glass.
a. � d° ;a�° ,, ,, d" '"�s'� � � - d � , "d '` �" � `"' P Y ..,; d ",,,,n✓';r ,f..`
o r
d
J r
14. Sheet A6.01 — Change note 13 from 'UBC" to IBC with current code section."
15. Sheet A7.00 — Show fire extinguisher cabinet, paper towel dispenser/waste
receptacle, paper towel dispenser, soap dispenser and toilet seat cover dispenser to
comply with 40" maximum height above the floor or ground to any rack, operating j
controls, receptacle or dispenser. Sec. 11.01,2,5 amendment to 2003 IBC.
16. NOTE: Sheet A8.0 — Restroom Signage — Characters or Braille shall not be located in
the 6" minimum pictogram field per Sec. 703.5.2 ICC A117.1, 2003 ed. 40 dU41010
17. Sheet SM — Holddown Schedule note No. 1 & Joists Schedule note No. 1 — Clarify
use of Simpson Strong-Tie C-2004 catalog use.
18. Clarify difference in shear wall indicated on line D of talcs page 2-002 and Sheet
S2.6 lines D1 and D2.
19. Indicate type of shear wall required at line B1 on Sheet 52.3,
20. ClarifyA, shear wall lune L in talcs, page 2-005 hown as 6`, however only 4' on lane
L5 & L on Sheet S2.3.
21. Clarify difference of shear wall design shown in talcs, page 2-006 line L5 & L6 and
Sheet S2.2, line L5 & L6. Calcs do not reflect doors.
22. Indicate type of shear wall required shown on talcs, page 2-006, line B.
Construction plans these---reflect shear wall on Sheet A2.01, otherwise they are not
noted on the structural plans.
//��,, t� j,UO
Once these items have been addressed, we can cor lrl the plan review portion of the
building permit, notwithstanding, other items required concerning SEPA addendum, Public
Works Department, Historic Preservation Committee, etc.
If you have questions, please contact me at 360-379-5087 or Jan at 360-379-5086.'F
Sincerely,��°'` s
J ff p M o
Ann Hall
° r
Plans Examiner i. „y
If
CM Correspondence. file
m v =
BLD06'-088 F x k"e
r,
w
gg ,J
i r
F
d` ,d
`ro. r
a..
/ r
' _
rm 7
' bO
c (� Gk'
Jan Ho fenbeck
From: Jan Hopfenbeck
Sent: Thursday, July 20, 2006 8:31 AM
To: 'Sam Evich'
Subject: FW: BLDO6-088 J & J Perkins Bldg. Reinstra
Attachments: BLD06-088 - Reinstra.doc
BLD06-088 -
:instra.doc (91 k
Sam,
A copy of the Fire Department review will be attached with your approved plans but FYI so
you have a chance to read through it now. No surprises as we'd already addressed the need
for a standpipe and roof access.
Jan
-----Original Message -----
From: Tom Aumock[mailto:taumock@co.jefferson.wa.usl
Sent: Wednesday, July 19, 2006 11:53 AM
To: Jan Hopfenbeck
Subject: BLD06-088 J & J Perkins Bldg. Reinstra
Hi Jan.
Here's the Reinstra Plan Review report. Please note the standpipe and roof access
requirements.
Tom.
<<BLD06-088 - Reinstra.doc>>
1
Page 1 of 1
Ann Hall
From: Tom Aumock [tau mock@co.jefferson.wa.us]
Sent: Wednesday, May 24, 2006 9:03 AM
To: Ann Hall
Subject: RE: Rienstra building
Hi Anne!
All IBC or IEBC code dictated "accessible" space/area/room[s] that require a fire extinguisher[s], is required by
Code to have "accessible" fire extinguisher[s], where the maximum height measured to the top of the
extinguisher, whether in a cabinet or not, is 40 inches.
The Code allows less than 40 inches, but not less than 30 inches by City Fire Code Official policy, for ease of use
by wheelchair-bound citizens, and the "reach" to such extinguisher must not be compromised.
Where such extinguisher heights are not visible from all points in the room, say, vision of the extinguisher is
obscured from plants, chairs, partitions, etc., then a "fire extinquisher" sign is required as well.
Regards, Tom.
-----Original Message -----
From: Ann Hall [mailto:ahall@cityofpt.us]
Sent: Tuesday, May 23, 2006 4:06 PM
To: Tom Aumock
Subject: Rienstra building
Hi Tom,
I am reviewing the plans for the 4 -story w/ basement, B & R2 occupancy structure and am wondering
about "accessible" fire extinguisher cabinets. Jan seems to think that this has been discussed previously
but cannot remember what the outcome was. So... do you remember???
Thanks,
Ann
5/24/2006
Jan HoVenbeck
From: John McDonagh
Sent: Tuesday, June 13, 2006 2:37 PM
To: Sam Evich (E-mail 2)
Cc: Jan Hopfenbeck; Ann Hall
Subject: JJP Building
Hi Sam,
I just wanted to touch base with you about Johanna's building. I've done some review of the BP set from a Design Review
standpoint & just wanted to remind everyone that there's a lot of detail on the BP set that hasn't been reviewed by the HPC
yet.
HPC did look at & recommend approval "In concept" for a "dressed down" version of the building in late January.
However, no follow up design review has occurred since then. Do you have a schedule planned for doing the follow up
meetings that'll be needed to iron out the details shown on the BP set?
My main purpose for e -mailing is I don't want to confuse Johanna (or T,G,B) by getting through the SEPA Addendum
period (which is over next week) and also have all the BP plan review done, and then have folks think the full BP can be
issued & work can start. I really think a minimum of 1 or 2 more HPC meetings is needed to get most of the major details
worked out before the BP can be issued. If we get these big items taken care of (window/door specs, siding/roofing
materials & profiles, exterior lighting, support equipment screening, landscaping, etc.), I think we could go to sub-
committee review for any remaining minor details (door hardware, paint colors, etc.). I know you're experienced with HPC
review with your work on the Cannery & it's great to have you working on this project for her; I just want to be sure we're all
on the same page as far as what the remaining steps are.
Remember the HPC meets on the first & third Tuesdays of each month. Submittals for those meetings is due a week
ahead of time.
Take care - e-mail with questions.
John McDonagh, Planner
Development Services Department
City of Port Townsend
181 Quincy Street, Ste. 301-A
Port Townsend, WA 98368
360-379-5085
Page 1 of 1
Jan Hopfenbeck
From: Sam Evich [sevich@tgbarchitects.com]
Sent: Monday, June 12, 2006 11:38 AM
To: Francesca Franklin
Cc: Colin Winters; Brad Butterfield; Mike Adams; Jan Hopfenbeck
Subject: J & J Perkins Building Public Works Comments
Importance: High
Francesca,
Thank you for the update per our phone conversation. My understanding is that Alex in your office needs to
perform a final review prior to
sending us your comments. You acknowledged that returning our plans to the City of Port Townsend with
revisions for both building and public works comments simultaneously would be beneficial.
You estimated that comments from Alex may come before the end of this week.
Please be advised that emailing comments to me as soon as possible will help us coordinate all department
revisions.
Thank you very much,
Sam
Sam Evich
Taylor Gregory Butterfield Architects
654 5th Avenue South, Suite 300
Edmonds, WA. 98020
Phone: 425-778-1530 ext. 1218 Fax: 425-774-7803
Email: s N?ich@tgt), r l'iite is c tili
6/12/2006
Page 1 of 2
Jan Hopfenbeck
From: Jan Hopfenbeck
Sent: Tuesday, June 13, 2006 2:16 PM
To: John McDonagh
Subject: FW: June 2nd letter for JJP
John,
I copied this to Francesca and Ann yesterday. Would you please update me on the Addendum process and also
any HPC requirements that must be met prior to our issuance of the building permit? Sam spoke with Francesca
yesterday so he's updated on the infrastructure. Thanks,
From: Jan Hopfenbeck
Sent: Monday, June 12, 2006 4:36 PM
To: 'Sam Evich'
Cc: Ann Hall; Francesca Franklin
Subject: RE: June 2nd letter for JJP
From: Sam Evich [mailto:sevich@tgbarchitects.com]
Sent: Monday, June 12, 2006 4:22 PM
To: Jan Hopfenbeck
Subject: RE: June 2nd letter for JJP
Thanks Jan!
1. We also were wondering why windows 405 and 406 needed to be safety? Unless... you mean the 305 and 306
— that are on the 4th floor, that you want re -numbered.
We will re -number the "current" 405 and 406
Hi Sam, yes, 305 and 306 (assuming renumbering to 405 and 406, yes?) are also shown on the fourth floor plan;
one of which is within the rated stairway enclosure and both of which are within the stairway landing.
2. What is your estimate on the turn -around for your review of our response, once we submit it??
We're busy right now and have people rotating out of the office on vacations so if you give us a week we should
be okay. The land use portion will have to be complete prior to issuance of the building permit. Additionally, the
red -lined infrastructure plans will need to be resubmitted and, at a minimum, preliminarily reviewed before we can
issue the building permit.
Thanks,
Sam
Take care,
Jan
-----Original Message -----
From: Jan Hopfenbeck [mailto:jhopfenbeck@cityofpt.us]
Sent: Friday, June 09, 2006 1:42 PM
To: Sam Evich
6/13/2006
Page 2 of 2
Cc: Ann Hall; Francesca Franklin
Subject: RE: June 2nd letter for JJP
From: Sam Evich [mailto:sevich@tgbarchitects.com]
Sent: Friday, June 09, 2006 11:35 AM
To: Jan Hopfenbeck
Subject: re: June 2nd letter for JJP
Hi Jan,
1. In what form do we submit items #11, 19, 22, 23, 24, 25 to satisfy your request to comply?
As 1 recall, that was a visual detail that Ann showed me and so just show dimensions on the
detail. She seemed to think it wasn't clear enough that the characters/Braille would not intrude into the
pictogram area.
Do you have calculations and details for hoistway venting or is it a deferred submittal? Don't want
smoke accumulation in the shaft.
The split -front seats can be shown on the plan either by a visual of the toilets or a note to that
effect.
The roof hatch should be shown on the roof or 4th floor plan. Oops, 1009.12.
Stair signage can be shown on the stair section page(s). Please remember that these signs must
also be raised characters with Braille so a note indicating that next to the signage will be adequate.
Again, as with the stair signage a visual example of the signage placed at the correct height on
the wall to the latch side of the door of a typical office space where the public might come e.g.,
conference rooms, offices, etc. with a note indicating the tactile characters and Braille, will satisfy review
of that requirement. (the guidelines for the signs and letters are in ANSI 17.1-2003)
2. Also, re: #23 - IBC section 1019.12 does not exist. Also, did you mean attic access, not roof hatch?
Please clarify.
Sorry, IBC Section 1009.12.
3. When / in what form do we receive comments from Public Works??
That I do not know and Francesca and Alex are both out in the field. Alex is out of the office on
Monday but Francesca will be in so if you want to reach her at (360) 379-5093 or ffr nkliP@cotyof t,u ,
she'd be your contact on infrastructure.
Thank you, Have a good weekend, Jan
Sam
Sam Enich
Taylor Gregory Butterfield Architects
654 5th Avenue South, Suite 300
Edmonds, WA. 98020
Phone: 425-778-1530 ext. 1218 Fax: 425-774-7803
Email: SeviCti(),tgl)at'chitects,eotii
6/13/2006
Page 1 of 1
Jan Hopfenbeck
From: John McDonagh
Sent: Thursday, July 06,.2006:2:03 PM
To: 'Sam Evich'; Jan Hopfenbeck
Cc: Colin Winters; Alex Angud; Brad Butterfield
Subject: RE: JJP Building - SEPA / Permit Status
Hi Sam,
Johanna & I are meeting tomorrow at 10 a.m. with our Director, Leonard Yarberry, to discuss the SEPA
comments we received and where we go from here. We'll know a bit more tomorrow. Thanks, John
-----Original Message -----
From: Sam Evich [mailto:sevich@tgbarchitects.com]
Sent: Thursday, July 06, 2006 11:03 AM
To: Jan Hopfenbeck; John McDonagh
Cc: Colin Winters; Alex Angud; Brad Butterfield
Subject: JJP Building - SEPA / Permit Status
Hi Jan, John -
How are you? Hope you had a good Holiday.
I heard from Johanna that the HPC process the other night ended in an overall
approval, with a few comments to be handled later in sub -committee.
That being said, could you give us an updated estimate on SEPA and building review comments towards
building permit approval?
Thank you,
Sam
Sam Evich
Taylor Gregory Butterfield Architects
654 5th Avenue South, Suite 300
Edmonds, WA. 98020
Phone: 425-778-1530 ext. 1218 Fax: 425-774-7803
Email. sevicll t(,xg�4id cl'titlects.coni
7/6/2006
Page 1 of 1
Ann Hall
From: Jan Hopfenbeck
Sent: Thursday, May 18, 2006 11:11 AM
To: Francesca Franklin; Ann Hall; John McDonagh
Subject: FW: Thank you
FYI re: the Reinstra project. For land use, infrastructure (SDP and engineered civil drawings submitted
yesterday), and building questions and clarifications, Deanna is our point of contact.
Thanks John and Ann for your help.
From: Sam Evich [mailto:sevich@tgbarchitects.com]
Sent: Thursday, May 18, 2006 9:17 AM
To: Jan Hopfenbeck
Subject: Thank you
Hi Jan,
It was great to see you again yesterday!
I wanted to thank you for all your help on our submittal process.
I think Colin will email you a few more clarification questions for you re: plumbing dwgs, etc.
DeAnna will probably be your main contact, so CC her on all items.
I am merely assisting them at this time. But, I am sure we will talk more in the near future!
Regards,
Sam
Srarrr E'vic h
Taylor Gregory Butterfield Architects
654 5th Avenue South, Suite 300
Edmonds, WA. 98020
Phone: 425-778-1530 ext. 1218 Fax: 425-774-7803
Email: sevich atrchitects.com
5/18/2006
CITY OF PORT TOWNSEND
ADDENDUM TO
DETERMINATION OF NON -SIGNIFICANCE NS
Description of Proposal: Construction of an approximately 5,500 square foot mixed use office building and
relocation of an existing historic home (Lippencott house). The proposed development would be phased with
the first phase including demolition of an existing garage, grading the entire site, construction of a daylight
basement, moving the historic home onto the daylight basement, and adding an approximate 700 square foot
addition to the upper two floors of the historic home. No off-street parking is proposed. On -street parking
would be enhanced along Lawrence and Fillmore Streets.
File Reference: LUP99-59
Proponent: Douwe & Johanna Rienstra
Representative: Richard Berg
727 Taylor St.
Port Townsend, WA 98368
Location: The property is located at 641 Fillmore Street at the southwest comer of the intersection of Fillmore
and Lawrence Streets. Legal Description: The north 75 ft. of Lots 2 & 4, Block 133 of the Plat of Port
Townsend Original Townsite, all located in Port Townsend, WA. Tax Parcel #989713303.
Threshold Determination: Environmental review indicated a probability of significant adverse
environmental impacts from the proposal. The proponent has agreed to mitigation measures and
therefore a Mitigated Determination of Non -Significance was issued on August 18, 1999 which is hereby
incorporated by reference.
Public Comment: () No comments were received during the public review period.
() The responsible official has considered the comments received. Concerns
raised have been addressed in the original document, no further response is
necessary.
(x) The responsible official has considered the comments received. Minor
revisions to the document have been prepared in response to the comments.
This final MDNS is not a substantial modification to the MDNS issued
August 18, 1999, in that this document provides minor modifications to
mitigation measures for previously identified probable significant adverse
environmental impacts. There is no additional comment period for this final
MDNS pursuant to PTMC 19.04.220(B)(2).
Responsible Official; Bob Leedy, Interim Director
Staff Contact: Jeff Randall, Planner, (360) 379-3208 ext. 1124
Building and Community Development
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Signature- Date: September 14, 1999
Bob Leedy, Interim irector
Building & Community Development
I. Public Comment
Two comment letters were received during the 15 -day SEPA comment/ appeal period which ended
September 2, 1999.
The first letter was from Curtis Stacy of Jefferson Transit. Mr. Stacey indicated that projects such
as the Rienstra's should be expected to increase all modes of traffic into and away from the
Lawrence Street commercial district. As such Jefferson Transit must have the ability to serve the
increasing number of passenger trips to the area. Mr. Stacy indicated that a bus loading zone site at
Lawrence and Fillmore would address the need to provide safe bus stops at this key traffic
generator location. Jefferson Transit currently provides both regular bus service as well as
paratransit (dial -a -ride) service along Lawrence Street, but the nearest dedicated bus stop is located
approximately 750 feet to the east along Lawrence Street.
The second letter was from Stephen Mathison of the State Department of Community, Trade, and
Economic Development's Office of Archaeology and Historic Preservation. The letter indicates
that the Lippencott House is listed as a contributing property in the Port Townsend National
Historic Landmark District. Mr. Mathison stated the relocation of a contributing structure is not
recommended unless there is an imminent threat of demolition. The letter states that the proposed
relocation of the home will considerably alter the orientation, elevation and bulk of the historic
home and the additions to not appear to meet the Secretary of the Interior's Standards for
rehabilitation. Mr. Mathison supported the Port Townsend Historic Preservation Committee's
determination that the home should not be relocated. While understanding that the Port Townsend
Historic Preservation Committee's recommendations were advisory only, Mr. Mathison
recommended that Port Townsend should strive to negotiate with developers to create solutions
that more closely follow accepted preservation standards in the future.
The issues raised by these comment letters are addressed below.
Transit
Response: The Mitigated Determination of Nonsignificance (MDNS) issued August 18, 1999
noted that the nearest dedicated bus pull-out area was several blocks away and that the need for a
bus pull-out would be examined through the Street and Utility Development Permit process. After
review of the letter from Jefferson Transit, it is apparent that the proposed project will increase
the need for public transit to serve this site. A bus pull-out at the intersection of Fillmore and
Lawrence Streets would mitigate these transportation impacts. The requirement of a bus pull-out
at this location is roughly proportional to the traffic impacts generated by this project as
approximately 6, 000 square feet of commercial space will be added including medical offices.
The design of the bus pull-out will be determined through the Street and Utility Development
Permit process and the timing of installation will coincide with Phase H of the project
(construction of the new office building).
lfigariuLnd-(-11�r
The findings of the Port Townsend Historic Preservation Committee were discussed at length in the
Rienstra Addendum
9 /1 V /99 page 2
1l1DNS issued August 18, 1999. The AMNS required the applicants to take detailed black and white
photos of the interior and exterior of the Lippencott house prior to beginning work on the building and
to submit one set of negatives or photos to the Jefferson County Historical Society to document, the
condition of the historic residence prior to its alteration. Once existing asbestos siding is removed and
a method of repairing or replacing the underlying siding is determined, the applicants will submit the
plan for siding repair and replacement, trim detail, and color scheme to the HPC to complete the design
review process for this building. While design review by the HPC is mandatory, their recommendations
are advisory only. Prior to beginning work on phase II of the project the applicants will submit
materials for HPC design review of this building.. This addendum does not alter these conditions.
H. MODIFIED MITIGATION MEASURES (underlined language has been added,
strikeout language deleted):
PRIOR TO CERTIFICATE OF OCCUPANCY (APPLICABLE PHASING IS NOTED)
15. BOTH PHASES: All improvements as specified by the Street and Utility Development
Permit and the approved shall be installed, inspected and approved by the Public Works
Department prior to the final certificate of occupancy. The street improvements may be
phased in the Street and Utility Development Permit according to those improvements
associated with the frontage of each project. These improvements shall include but are not
limited to water and sewer connections, on -street parking, curb, gutter, sidewalks, bus -
pullout area r e r th tin p. In " r , street trees,
and stormwater facilities. Thg hua pull-outtill r 11 ('new office,
i 'n this proiect and the desim of the mill-out
wil r in h r
ns i' li I n on i installing llin : i w li: r
We Douwe & Johanna Rienstra have read, understand, and accept the conditions associated with the
above referenced addendum to the mitigated determination of Non -Significance (MDNS). We agree
to follow the above referenced modified mitigation measures. We agree to follow and carry out the
conditions, exhibits, and site plans associated with the MDNS and comply with any other local,
state, or federal permits required for the project.
Dhoti)eVestra Date
Rienstra Addendum
9/1'(/99 Page 3
62h nanna Rienstra Date
CITY OF PORT TOWNSEND
RESPONSIBLE OFFICIA;L'S AMENDMENTS TO TIRE EN I O N 'AL, CHECKLIST
AND THRESHOLD DETERl4IINATIO
Description of Proposal: Construction of an approimatel 5,50 -quare foot mixed use office building
and relocation of an existing historic home (Lippencott house . e proposed development would be
phased with the first phase including demolition of an existing garage, grading the entire site, construction
of a daylight basement, moving the historic home onto the daylight basement, and adding an approximate
700 square foot addition to the upper two floors of the historic home. No off-street parking is proposed.
On -street parking would be enhanced along Lawrence and Fillmore Streets.
File Reference: LUP99-59
Proponent: Douwe & Johanna Rienstra
Representative: Richard Berg
727 Taylor St.
Port Townsend, WA 98368
Locat onlll,egal Description, The property is located at 641 Fillmore Street at the southwest comer of the
intersection of Fillmore and Lawrence Streets, Legal Description: The north 75 ft. of Lots 2 & 4, Block
133 of the Plat of Port Townsend Original Townsite, all located in Port Townsend, WA. Tax Parcel
#989713303,
Lead Agency: City of Port Townsend, Building & Community Development Department
The lead agency for this proposal has determined that it does not have a probable significant adverse impact
on the environment. An environmental impact statement (21S) is not required under RCW
43.21C,030(2)(c). This'decision was made after review of acompleted environmental checklist and other
information in file with the lead agency. This information is available to the public on request.
This M)NS is issued tender 197-1.1-340(2), the lead agency will not act on this proposal for 15 days from
the date below. Comments or a written statement appealing the threshold determination must be filed with
the Building & Community Development Department by 4:00 p. m., September 2, 1999.
Responsible Official: Bob Leedy, .Interim Director, Building & Community Development
Contact: Jeff Randall, Planner
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Signature:
Bob Lee y, Interi Director
Building & Community Development
Date: August 18, 1999.
AppealDeadline: September 2, 1999.
ENVI&MMENTAL RECORD
The environmental review consisted of analysis based on the following documents included in the
environmental record.
DOCUMENTS/ REFERENCES:
Exhibit A: Environmental Checklist dated July 12, 1999.
Exhibit B: Site Plan
Exhibit C Q - 3): Conceptual Elevations
Exhibit D: Letter from Richard Berg (applicant's architect) to Historic Preservation Committee
(HPC), dated April 30, 1999
Exhibit E: Minutes from HPC Meeting, dated May 10, 1999
Exhibit F: Minutes from HPC Meeting, dated June 28, 1999 -
Exhibit G: HPC Certificate of Review, dated June 28, 1999
D Exhibit H: Parking Calculations for Phase I
D Exhibit I: Public Works Technical Conference Letter, dated July 9, 1999
D City of Port Townsend Zoning Ordinance - Title 17 (amended April, 1997)
D City of Port Townsend Comprehensive Plan (1996)
Unless otherwise noted, the above information is available for review at the Building and Community
Development Department, Waterman & Katz Building, 181 Quincy Street, Suite 301, between the hours of
9:00 AM to 4:00 PM Monday through Friday.
P LI
No comment letters have been received in response to the notice of pending threshold determination.
Environmental concerns raised in these letters have been addressed in the environmental checklist and the
Responsible Official's Amendments which follow.
RE,SM SIBLE OFFICIALS T0_! *, E "r'AL CH�CXLIST
The following sections correspond with related categories of the environmental checklist submitted for the
proposal (Exhibit A), and clarify, amend, or add to that document.
I. PROPOSAL DESCRIPTION
The proposal involves the relocation and alteration of a historic home (Lippencott House), the demolition of
a non -historic garage structure, the construction of an approximately 5,500 square foot building containing
a mix of medical and non-medical offices, and site grading. No off-street parking is proposed at this time.
On -street parking along Fillmore and Lawrence Streets would be improved.
II. PERMITS/APPROVALS REQUIRED:
D Building Permit
D Street Development/Utility Development Permit
D Clearing & Grading Permit
Landscape Plan Approval
Exterior Lighting Plan Approval
N
III. CHECKLIST ITEMS
A. EARTH
The underlying soils are listed as Townsend Gravelly Loam by the U.S. Dept. of Agriculture, Soil
Conservation Service soil survey. The land is fairly level with 0% - 5% slopes. There is no evidence
of unstable soils on the site.
To mitigate for potential impacts from soil erosion or sedimentation, temporary erosion and sedimentation
controls will be required to be in place prior to construction. Such practices should be maintained until
such time as the City of Port Townsend deems them no longer necessary. Mitigation for additional
impervious surfaces is addressed in section "C" under "Water" below.
B. AIR
During project construction air emissions will be present from construction equipment (dust and vehicle
exhaust emissions). Should dust become a problem during construction, water shall be applied as a
suppressant.
When the project is completed, automotive traffic to and from the facility will generate exhaust emissions.
Practices to control emissions from gasoline and diesel fuel vapors will comply with state, federal, and
industry standards. The applicants propose to use electricity and/or propane as the primary heating source.
Long-term air emission impacts are not considered significant.
C. WATER
The applicants propose to detain roof runoff on-site with controlled release to the City's stormwater system.
As no off-street parking is proposed, all runoff would be "clean" requiring no stormwater quality treatment.
According to the site plan (Exhibit B) approximately 6,000 square feet of the site will be covered with
impervious surfaces. Because the total project (phases I & 111) will result in more than 5,000 square feet
of impervious surface area the applicants will be required to prepare an engineered stormwater plan per
Department of Ecology Stormwater Management Manual standards. However, phase I of the project,
relocating the Lippencott house on a newly constructed daylight basement, can be accomplished prior
to the submittal and approval of this plan as this portion of the project will create less than 5,000
square feet of new impervious surface area and will cover less than 40% of the lot with impervious
surfaces.
Prior to issuance of the building permit for phase II of the project (medical office building) an
. Engineered Stormwater Plan and design drawings meeting the requirements of the Department of
Ecology's Stormwater Management Manual and the Port Townsend Engineering Design Standards
must be submitted and approved by the Public Works Department. The engineered stormwater plan
will show the necessary stormwater improvements and how stormwater treatment requirements will
be met on-site for the entire project.
The site is not located within a 100 -year floodplain as designated by the Federal Emergency Management
Agency (FEMA).
Discussion of the need for additional fire hydrants and public water service to the site is addressed under
3
"Utilities" below.
D. PLANTS
The site currently contains landscaping typical of a residential lot or a small commercial building (lawn,
flowers, bushes, and small trees), Existing landscaping may be altered through clearing and grading in
preparation of moving the historic home and constructing the new office building. New landscaping will be
installed per an approved landscape plan. Street trees will be provided along Lawrence and Fillmore
Streets by the applicant.
E. ANIMALS
The environmental checklist description is adequate. No mitigation is required.
F. ENERGY AND NATURAL RESOURCES
The checklist adequately addresses the issues of this section. No mitigation is required.
G. ENVIRONMENTAL HEALTH
The exterior of the Lippencott house is sided with asbestos shingles. These shingles will be professionally
removed prior to the relocation of the house in compliance with all federal, state, and local regulations. The
asbestos siding was added long after the original construction and its removal is not considered historically
significant. The owners plan to restore the original siding if possible, or replace with like siding once the
asbestos shingles are removed.
Standard construction practices shall be employed to minimize the risk of environmental health
hazards including explosion and the release of hazardous materials. Standard construction and traffic
control measures should be employed to minimize the risk of accident.
H. NOISE
On-site construction noise from the project is expected. While this site is located in a commercial area, it is
also adjacent to residential neighborhoods. To ensure that construction activities do not generate nuisance
conditions such as noise, dust glare, vibration, etc., the hours of construction should be limited per the Port
,l f 4 l Townsend Engineering Design. Standards to between 7:00 am. and 6:00 p.m. Monday through Friday, and
prohibited on Saturdays, Sundays, and national holidays, unless approved in advance by the Director of
Building and Community Development for special circumstances. All construction equipment will be
required to have mufflers.
I. LAND AND SHORELINE USE
The property is identified in the Port Townsend Comprehensive Land Use Plan (1996) and the Official
Zoning Map (1997) as being in the uptown C -III Historic Commercial District. Restaurants, professional
offices, commercial retail, and medical offices are all listed as permitted uses in this zoning district.
The site does not lie within 200 feet of a regulated shoreline, water body, or jurisdictional wetland.
J. HOUSING
While the Lippencott home was historically a. residesice, it has recently been used for commercial purposes.
The proposed relocation and alterations to the home will not displace any existing residential units.
K AESTHETICS
The proposal would relocate the existing historic Lippencott house and would also raise the height of the
4
building by placing it on a daylight basement. The exterior appearance of the Lippencott house would be
modified through the removal of existing nonhistoric, asbestos siding, the restoration of the historic wood
siding or replacement with similar siding if necessary, replacement of nonhistoric windows with new
wooden double glazed units, and adding approximately 700 square feet to the upper floors of the
Lippencott house. The applicants propose to keep the existing roof material and add like roolin ��-
proposed additions to the Lippencott house. At the corner of Fillmore and Lawrence Str , a t
story office building with a daylight basement would be built. An approximate footprint and square footage o
mp
for this new building is proposed, but the building has not yet been designed. The final siding and trim
details on the Lippencott house and the design of the new office building are subject to design review by the
Port Townsend Historic Preservation Committee. See below under "Section N - Historical and Cultural
Preservation" for a discussion of this review.
The size, bulk, and height of the proposed structures is compatible with other structures along
Lawrence Street. The applicants estimate the buildings will be 25 feet high at their highest points. The
new office building will be separated from the adjacent residence to the south by a 30 - 40 foot wide
landscaped courtyard which will soften the transition from residential to commercial buildings.
Subject to these design features and advisory design review by the Historic Preservation Committee,
the proposed development should be aesthetically compatible with the surrounding development
pattern.
L. LIGHT AND GLARE
Minimal exterior lighting will be provided around the buildings to provide for safe walking at night and for
security. To comply with PTMC 17.20.020(C) and to mitigate potential lighting impacts to adjacent
non-commercial properties, lighting will be kept to a minimum, shielded, and pointed downward.
Proposed lighting will be reviewed and approved by the BCD Director prior to issuance of the building
permits for each phase.
M. RECREATION
The checklist description is adequate. The proposal eliminates no recreational opportunities and provides
none.
N. HISTORICAL AND CULTURAL PRESERVATION
The applicants indicate they believe the Lippencott home was originally built in 1860. If this date is correct,
it would make the Lippencott home one of the oldest surviving structures in Port Townsend. Over the
years, the home has been expanded, modified, and the home now appears quite differently than it did when
it was originally built. Bay windows have been added, the front porch modified, the roofline appears
altered, and modern materials such as asbestos siding and asphalt composition roofing have been added to
the structure. Originally built as a residence, the building has been used for commercial purposes for a
number of years. See Exhibit D, architect's letter for additional background.
The applicants indicate they wish to retain as much of the historical significance of the building as possible
while altering the site for more intensive commercial use. The Rienstra's intend to remove the non -historic
asbestos shingles currently on the home. They hope that underneath these shingles the original siding is still
in place. If possible, the original siding will be repaired and matched as closely as possible on the expanded
portions of the home. Before beginning alterations to the home, the Rienstra's will take detailed black and
white photographs of exterior and interior of the home and provide a copy of the photos or negatives to the
Jefferson County Historical Society. The home is proposed to be moved the west side of the site where it
will be oriented to face Lawrence Street and raised so that the current ground floor matches the grade of the
t
y {
sidewalk along Lawrence Street. Because the building site slopes away from Lawrence Street, it will be
possible to build a daylight basement underneath the Lippencott house while maintaining the current ground
floor level at the height of Lawrence Street.
The Port Townsend Municipal Code requires that all developments within the C -III Historic Commercial
District be reviewed by the Port Townsend Historic Preservation Committee (HPC), PTMC Chapter 17.80.
However, in the uptown historic commercial district the recommendations of the HPC are advisory only and
are not binding upon the applicant, PTMC 17.80.050. Douwe & Johanna Rienstra applied for HPC review
on June 17, 1999 for relocating the Lippencott home (phase I). The proposal was presented at the June
28th regular meeting of the HPC. At the conclusion of the meeting the HPC approved demolition of an
existing non -historic garage, but recommended denial of the proposed relocation and addition to the
Lippencott home (see Exhibit G, HPC certificate of review). The HPC reasoned that the historic character
of the home would be destroyed through the relocation, reorientation, building additions, and placement
upon a daylight basement. The HPC recommended the Lippencott home be restored in its current location
(without the additions and the daylight basement) and that the new office building be constructed on the
west side of the property (see Exhibits E & F, HPC minutes).
The applicants indicated they appreciated the concerns of the Historic Preservation Committee, but that they
would proceed with the project as planned. They felt the siting of the new office building at the intersection
of Fillmore and Lawrence Streets was important to the success of the project and that the Lippencott home
should be expanded to make it a more commercially viable building. The applicants feel the proposed site
plan accomplishes both of these goals while retaining asmuch of the Lippencott home's appearance and
relation to the street front as possible.
To mitigate impacts to historic resources on the site, the applicants will take detailed black and white photos
of the interior and exterior of the Lippencott house prior to beginning work on the building. One complete
set of negatives or photos will be submitted to the Jefferson County Historical Society to document the
condition of the historic residence prior to its alteration. Once the asbestos siding has been removed and the
applicants have determined the method of repairing or replacing the underlying siding, the applicants will
submit the plan for siding repair and replacement, trim detail, and color scheme to the HPC to complete the
design review process on this building. While design review by the HPC is mandatory, their
recommendations are advisory only. Prior to be Dinning work on phase II of thero'ec w_o,
building) the applicants will submit nnatdriLal s for 1m1PC esu i of this building. As with the
Lippencott home, theC's esign review recommendations are advisory only,
To mitigate potential impacts to archeological resources which may be discovered during excavation, work
should be stopped immediately if such materials are discovered and the State Historic Preservation Officer
contacted immediately. Work should not resume until approval is obtained from the Director of Building
and Community Development.
O. TRANSPORTATION
The project lies at the corner of Lawrence and Fillmore Streets. The Public Works Department has
reviewed this proposal and indicates that curb, gutter, and sidewalk improvements are necessary along both
streets. On Lawrence Street these improvements will include: repair and widening or replacement of the
existing sidewalk, installation of curb and gutter, installation of a planting strip or tree wells with street
trees, and the construction of a sidewalk bulb -out with ADA ramps at the intersection. Along Fillmore
Street curb and gutter will be provided, with parallel or head -in on -street parking spaces, street trees, and
possible relocation and widening of the existing sidewalk. The applicants plan to phase the construction of
these improvements on Lawrence Street so that phase I will include those improvements fronting on the
on
relocated Lippencott home while Phase R will involve the remaining street improvements along Lawrence
and Fillmore Streets abutting the new mixed use office building.
The sidewalk improvements including the proposed bulb -out will be reviewed by the HPC at the time the
design of the new office building is reviewed,.
Parking
The Rienstra's wish to make efficient use of the on -street parking available adjacent to this project.
Currently parallel parking occurs along. Lawrence Street and informal head in parking or parallel parking
occurs along Filinre Street. The Rienstra's indicate they would be willing to increase the setback of the
office new buildingfrom Fillmore Street a few feet in order to create more room for head in on street
parking. This would involve reserving an easement for access purposes adjacent to Fillmore Street to
provide additional right-of-way width and relocating the sidewalk a few feet to the west to allow deeper
parking spaces.
The City of Port Townsend regulates the design of on -street parking by ordinance and the ordinance
specifies that only parallel parking is allowed on Lawrence and Fillmore Streets adjacent to this project.
Modifying the Fillmore Street parking to head -in parking will require an amendment to this ordinance,. The
Public "Works Department is reviewing guidelines and safety issues relative to the head -in on -street parking
proposed and will provide their recommendations as part of the proposed amendments to the parking, code
and through the Street and Utility Development. Permit process.
The Port Townsend Municipal Code Chapter 17.72 provides off-street parking requirements for new
development and redevelopment in Port Townsend'. Any uses established within the historic portion of
the Lippencott home are exempt from all off-street parking requirements [ l 7.72.020(13)]. Additions
to historic buildings may be subject to providing off-street parking depending on the intended use and
the size of the addition, However, uses established in new additions which require 10 or fewer
parking spaces are exempt from all parking requirements [17.72.020(0)]. And, in the case of multiple
uses in a single building, the total off-street parking requirements shall be the sum for the principal
uses computed separately, but any reductions which may apply to such requirements shall also be
computed separately for each use [17.72.070(B)].
The applicants' building plans provided parking calculations based upon mixed use occupancy of the
expanded Lippencott home and included both the existing structure and the new additions in the
calculations (Exhibit 1T). Those existing portions of the historic home that will be reused could have
been excluded from these calculations, however, even with the entire building counted towards off-
street parking requirements, the result of these calculations is that no off-street parking spaces are
required for Phase I of the project.
Because the new office building will also contain mixed uses, the same parking credits are applicable.
The off-street parking requirements are determined according to each proposed use, then the 10 off-
street parking space deduction is taken from each use individually. Other potential parking credits
include where a parking plan would restore one or more existing on -street parking spaces within the
C-II1 Flistoric District by reducing existing curb cuts or other conflicts, the off-street parking
requirements are reduced by two off-street parking spaces for each on -street parking space restored
by the plan (PTMC 17.72.120). in the present case the Rienstras propose to eliminate two separate
driveway curb cuts which would create 4 off-street parking space credits. Based on the preliminary
7
square footage calculations provided by the Rienstra's through the HPC review process it appears that
phase H of the project will also require no off-street parking spaces. However, the final determination
of off-street parking for phase II will be determined through the building permit process.
On -street parking will be determined through an amendment to the parking code for head -in parking and
through the street and utility development permit process. The applicant shall submit off" -street parking
calculations with applicable deductions as part of submitting the building permit for phase 11 of the project.
Vehicle Tri
The Public Works Department has reviewed the proposal for traffic impacts and indicates there are no
known level of service issues at the intersection of Lawrence and Fillmore Streets that would dictate
mitigation. The Fillmore Street intersection is currently controlled with a stop sign.
d lri F �-�s
Walkwaysshall be provided, for the frontage ofall commercial developments and the walkways in
commercial zones shall be concrete. El,igin -rring DesiLwo StandardL Cbapter. Item 23
23 d
Concrete sidewalk improvements will be provided along Fillmore and Lawrence Streets adjacent to the
project site. Phase I of the project will involve the construction of the Lawrence Street sidewalk abutting
the new location of the Lippencott home while the remainder of the sidewalks will be installed as part of
phase 11 of the project. Each building will be designed so that direct pedestrian connections are provided
from the sidewalks to the daylight basements of each building as well as the main floors (middle floors) of
each building. Buildings should be accessible from both Lawrence and Fillmore Streets. The pedestrian
access pathways shown on the preliminary site plan (Exhibit B) meet these criteria and are acceptable.
��ili
Require development in commercial, institutional, and multi family zones to provide bicycle
parking. Nm-1notorized Transp tationPlan. P li 4
The final plans must show bicycle parking. Individual bicycle racks for each building or a combined facility
will be provided for customer and employee use for each building or phase. Covered bicycle parking is
preferred. Bicycle parking should be located as close as possible to customer and employee entrances.
Transit
Jefferson Transit provides regular bus service and dial -a -ride paratransit service along Lawrence Street.
This site lies approximately 750 feet from the nearest Jefferson Transit bus stop in front of the Community
Center. Jefferson Transit indicates a dedicated bus ptdl-out area may be desirable at this location. The
inclusion of a dedicated bus pull-out along Lawrence Street will be examined through the Street and Utility
Development Permit process.
P. PUBLIC SERVICES
Provisions for emergency access will be determined as part the review and approval of the site plan
and parking plan for the project. All construction must comply with the Uniform Fire Code. For
discussion of fire hydrants, see "Utilities" below.
No additional impacts to public services are anticipated by this proposal in the area of emergency services
8
Q. UTILITIES
P: The applicants propose to use city water for domestic use, fire suppression, and landscape
irrigation. The City of Port Townsend Public Works Department indicates that water service to the site is
generally acceptable.
EktlbAmIL The Port Townsend Fire Department has determined that, based upon the proposed building
sizes, that existing fire hydrants in the area should provide sufficient fire service to the buildings. This
determination must be confirmed through detailed ,analysis of the building plans, once they are ,available for
phase H.
Sewer: Existing city sewer facilities are adequate to serve the proposed development.
ervi : New power, and telephone lines shall be placed underground where
feasible, as determined by the Public Works Director.
_Garhagg Di Pi -u The applicant's architect indicates that there will be no garbage dumpsters
associated with either phases I or H of this project. Garbage will be kept in cans in a screened area and the
cans will be wheeled to the curb -side on garbage pick up day. The applicants are encouraged to coordinate
the design of the garbage facility with local solid waste and recycling handlers.
REQUIRED MITIGATION MEASURES FOR
Douwe & Johanna Rienstra
FILE NO. 99-59
August 18, 1999
The environmental review indicates a probability of significant adverse environmental impacts from the
proposal, which could be mitigated.
The following mitigation measures are intended to mitigate adverse environmental impacts disclosed during
SEPA review.
If these recommendations are agreed upon by the proponent, issuance of a mitigated determination of Non -
Si iificance is a ro riate,
PRIOR ISSUANCE OF THE BUILDING PERMIT FOR THE LIPPENCOTT HOME (PHASE I)
1. To mitigate the alterations to the historic Lippencott home, the property owners will take detailed
black and white photographs of exterior and interior of the home prior to beginning work on the
building and provide a set of the photos or negatives to the Jefferson County Historical Society.
Particular care should be taken capture images of original built in features within the home
including'shelves, cabinets, etc. Photos should show joints where interior walls meet floors, where
walls meet ceilings, and window and door treatments. Finally, during the demolition and
construction process, if original features of the home are revealed during construction, these
features should be photographed.
2. A copy of these mitigation measures shall be given to and read by the project contractor and all
sub -contractors prior to beginning construction, and a list of these mitigation measures shall be
E
1
prominently posted at the site in a waterproof container or bag.
To mitigate impacts to bicycle parking, the final site plan must show a bicycle parking area
associated with the Lippencott house. This facility may be sized for both buildings (equivalent of
two racks, 10-12 bicycles) or a separate bicycle parking facility may a provided for the new mixed
use office building. Bicycle parking should be located as close as possible to customer and
employee entrances and covered parking is recommended.
PRIOR TO CLEARING AND GRADING THE PROJECT SITE
4. If removal of soils from the site is required, the applicant shall first notify the Director of
Building and Community Development (BCD) of the destination of the soil. If the destination
site is within the City of Port Townsend, the BCD Director must approve the location of the
site and the necessary erosion control measures associated with the soil relocation.
5. A clearing and grading permit has been submitted for phase I of the project. This permit must
be approved prior to beginning clearing and grading activities. Temporary erosion and
sediment control measures shall be installed as specified by the clearing and grading permit and
shall be in place prior to construction. These measures shall be maintained until the city Public
Works Department deems them unnecessary.
6. If earth disturbance occurs in drier months, water shall be applied as a dust suppressant.
DURING CONSTRUCTION OF PHASE I
7. PHASE I: Details regarding siding, trim, colors, and roof materials will be submitted to the Port
Townsend Historic Preservation Committee (HPC) for,reviewprior to installing or replacing siding
and trim on the Lippencott home (phase 1). Normal repair and maintenance of existing siding is
exempt from HPC review. While participation in the HPC design review process is mandatory, the
recommendations of the HPC are advisory only.
PRIOR TO APPLYING FOR BUILDING PERMIT FOR NEW MIXED USE OFFICE BUILDING
(PHASE II)
8. BRAML Prior to applying for a building permit for the new office building the applicants will,
subnn t an application for design review to the HPC for the new building. This review will include
sidewalk and street furniture designs, including sidewalk bulb -outs. Pursuant to PTMC 17, 80.050,
the recommendations of the HPC are advisory only and are not binding upon the applicant. This
reference does not vest the applicant to advisory HPC review if this section of the PTMC is
subsequently amended to require mandatory HPC review.
PRIOR TO ISSUANCE OF THE BUILDING PERMIT FOR PHASE H
9. PHASE II: The application for a building permit for phase II will contain off-street parking
calculations and the applicable deductions for phase H.
10. PHASE II: The applicants shall work with the Public Works Department to provide efficient
10
parking along Fillmore Street and Lawrence Streets. If it is necessary to widen the Fillmore
Street right-of-way in order to accommodate head -in parking, an easement widening the right-
of-way in perpetuity shall be recorded by the property owners with the Jefferson County
Auditor's Office.
11. PHASE II: Prior to issuance of the building permit for phase II of the project (mixed use
office building) an Engineered Stormwater Plan and design drawings meeting the requirements
of the Department of Ecology's Stormwater Management Manual and the Port Townsend
Engineering Design Standards must be submitted and approved by the Public Works
Department. The engineered stormwater plan will show the necessary stormwater
improvements and how stormwater treatment requirements will be met on-site for the entire
project.
PRIOR TO CERTIFICATE OF OCCUPANCY (APPLICABLE PHASING IS NOTED)
12. PHASE I: Prior to certificate of occupancy of phase I, a proposed landscaping plan must be
submitted by the developer for review and approval by the Building and Community Development
Director. The landscaping plan for each phase shall be approved prior to the issuance of a
certificate of occupancy for that phase. The landscaping plan shall include the following details:
a. Landscaping for the entire site (phases I & II) noting any phasing of the planting schedule.
b. Street trees on 20 - 30 foot centers along Lawrence and Fillmore Streets.
Revisions to the approved landscaping plan may also be required if the Director determines
that the installed landscaping has failed to perform as designed.
13. BOTH PHASES: Landscaping as per the approved landscape plan shall be installed prior to
issuance of the certificate of occupancy or a performance security shall be obtained by the
Director. The installation of the landscaping may be phased according to the construction
of each building (landscaping associated with phase I installed prior to certificate of
occupancy on that building). The amount of the performance security shall be based upon the
current cost estimate of all plant materials and landscape construction costs. The performance
security shall consist of a performance bond in a form acceptable to the City Attorney and in an
amount acceptable to the Director. Cash deposited in an escrow account may also be accepted
by the city. All required plantings shall be installed within six months of approving the
performance security.
14. BOTH PHASES: To mitigate possible light and glare impacts to adjacent properties and street
rights-of-way, the applicant will submit a lighting plan for review and approval by the BCD
Director. The lighting plan for each phase shall be approved prior to the issuance of a
certificate of occupancy for that phase. All exterior lighting, including those used to
illuminate signs, shall be pointed downward and shielded from direct observation from the air,
adjacent properties, and public rights-of-way. The lighting shall be designed so as not to cause
glare or light spillage to adjacent streets or other off-site properties. Revisions to the lighting
may be required if the Director of BCD determines that installed lighting fails to meet the
above performance standards.
11
15. BOT
H-PHAM: All improvements as specified by the'9&6t and Utility Developiti nt'Prmmit
and the approved shall be installed, inspected and approved by the Public Works Department
prior to the final certificate of occupancy. The street improvements may be phased in the
Street 'and Utility Development Permit according to those improvements associated with the
frontage of each project. These improvements shall include but are not limited to water and
sewer connections, on -street parking, curb, gutter, sidewalks, bus -pullout area, street trees, and
stormwater facilities.
GENERAL CONDITIONS APPLICABLE TO BOTH PHASES
16. To avoid environmental health hazards during construction, emergency spill and cleanup
procedures shall be explained to all workers on the site and a point of contact will be
designated.
17. To mitigate the impact of construction noise on adjacent residents, outside construction
activities shall be limited to 7:00 a.m. to 6:00 p.m. Monday through Friday, excepting national
holidays per the Port Townsend Engineering Design Standards. Any necessary exceptions
must be approved in advance by the Building and Community Development Director.
18. All construction contracts shall specify that all diesel, gasoline and air -powered equipment
must be properly muffled or silenced.
19. To mitigate potential impacts to archeological resources which may be discovered during
excavation, work should be stopped immediately if such materials are discovered and the State
Historic Preservation Officer contacted immediately. Work should not resume until approval is
obtained from the Director of Building and Community Development.
20. New power and telephone lines must be placed underground where feasible, as determined by
the Public Works Director.
21. If the proponent proposes to add new signage, it will be necessary to obtain a sign permit.
Please contact Carol Wilson of the BCD Department at 379-3208 ext. 1126 for signage
requirements.
22. All landscaping shall be continually maintained in a healthy growing condition by the property
owner. Dead or dying trees, shrubs or groundcover shall be replaced immediately, and, the
planting areas shall be routinely maintained.
We Douwe & Johanna Rienstra, have read, understand, and accept the conditions associated with the
above referenced mitigated determination of Non -Significance (MDNS). We agree to follow the above
referenced Mitigated Determination of Non -Significance (NMNS). We agree to follow and carry out
the conditions, exhibits, and site plans associated with the MDNS and comply with any other local,
state, or federal permits required for the project.
A�l
Date
4 14"
6 ' V�_ �, / F 1�7
12
CITY OF PORT TOWNSEND
HOUSE NUMBER APPLICATION
PROPERTY OWNER U a U Ck' -4- �TD
g,i F
-B L3:�' O�p o So
l
MAILING ADDRESS t4 I' o 1';1 4AS o q pT Lu
TELEPHONE NUMBER 3 Ste- S q
Property to be assigned street address is located in:
¢ ow/IS I 'k, v Addition, Block
�{ iv
7S' 'Pe f o r'
Lot(s) 2 and faces/access is from re n- c Street
Directions to the subject property: &v'd .
(see attached vicinity map)
HOUSE NUMBER ASSIGNED 12-33 1_g,t,j r- e h c e
Date of Approval
c:\forms.ss\house#
qM
AP
�I. 4
'I� �r nw � •4 � „ �R'—M
� L
�11I►'
�
40
rc,
yORT r
M CITE' OF PORT TOWNSEND
W DEVELOPMENT SERVICES DEPARTMENT
w INSPECTION REPORT
CALL THE INSPECTION LINE AT 360-385-2294 BY 3:00pm THE DAY BEFORE YOU
WANT THE INSPECTION. FOR MONDAY INSPECTION, CALL �BY 3:OOPM FRIDAY.
DATE OF INSPECTION: �.no
� PERMIT NUMBER: (d�
SITE ADDRESS:
CONTACT PERSON:
TYPE OF INSPECTION:
❑ APPROVED
❑ APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
._
Inspector... i Date
Acknowledgement
Date
PHONE:
❑ NOT APPROVED
Call for re -inspection before
proceeding.
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
VORT
CITY OF PORT TOWNSEND
Z DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
�CALL THE INSPECTION LINE AT 360-385-2294 BY 3:OOpm THE DAY BEFORE YOU
WANT THE INSPECTION. FOR MONDAY INSPECTION, CALL BY 3:OOPM FRIDAY„
DATE OF INSPECTION:
w PERMIT NUMBER:_Zli —
�--�
SITE ADDRESS: '.
CONTACT PERSON:
TYPE OF INSPECTION: l
PHONE:
N
„❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
Date
Inspector �� "
�._...
Acknowled en ent
Date
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
VORT
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
WA CALL THE INSPECTION LINE AT 360-385-2294 BY 3:00pm THE DAY BEFORE YOU
WANT THE INSPECTION. FOR MONDAY INSPECTION, CALL BY 3:OOPM FRIDAY.
DATE OF INSPECTION:* 121 PERMIT NUMBER:,
j/P� e �� I � I - -
SITE ADDRESS: 2.,.JAJ k.rAc
CONTACT PERSON: PHONE:
TYPE OFbNSPECTION:
r c
A L,L--,
N
L_1'1j
- ----------
0 APPROVED El APPROVED WITH El NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
1-1747-V 1/_ ?�
Inspector --- .. .... cez—, Date t L
Acknowledgement
Date
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if'work is not ready for inspection.
VORT
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: "';.� PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME:
CONTACT PERSON:
TYPE OF INSPECTION:
CONTRACTOR:
PHONE:
�.
❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
°aw. •-"° Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
.... .. . . . .. .. .
i 5 _ ��427
Inspector ' Date
Approved plans and permit card must be on-site and available at time rf'hsPeci'i�o n, A. re -inspection fee may
be assessed if'work is not ready for inspection.
VORT
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
WA CALL THE INSPECTION LINE AT 360-385-2294 BY 3:00pm THE DAY BEFORE YOU
WANT THE INSPECTION. FOR MONDAY INSPECTION, CALL BY 3:OOPM FRIDAY.
DATE OF INSPECTION: PERMIT NUMBER:
Z_
SITE ADDRESS: 2_ ze'�
CONTACT PERSON:
TYPE OF INSPECTION:
/4j
A.) IS dt-b-177"d
PHONE:
0 APPROVED [I APPROVED WITH 0 NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
Inspector .1 I/C Date
Acknowledgement
Date
Approved plans and permit card must be on-site and available at time of inspection. A re- inspection fee may
be assessed if work is not ready for inspection.
poor rod CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
�a For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION:, " 'f PERMIT NUMBER:
SITE ADDRESS:
_.-T _4-LjajHmo&,, !�a-_, cr—
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
P
TYPE of INSPECTION: ., L`� may;
:::4 914j) ........................... ... . . . ......
❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
Inspector
p Date. . . . . . . . . . ........................... . . ....................
�a
Approvedplans andpermit card must be on-site and available at time of inslwelion. A re -inspection fee may
be assessed if work is not ready for inspection.
AT CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
P P
the inspection. For Monday inspections, call by 3.00 PM la r wda
1 06
DATE OF INSPECTION: PERMIT NUMBER:&J "
SITE ADDRESS•�
PROJECT NAME:CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION: , "` V1 /,/, a 1r
� f:G APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
Inspectora *� Date ' ��
_�.
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
Grace Residential Building Materials
GRACE ' "YCGR® PLUS
Self -adhered flashing
Moisture Control is the First
Step to Mold Control
Water from both exterior and interior sources
is among the worst enemies of building struc-
tures. When water enters the wall system and
remains there for a long time, it creates a
favorable environment for the development of
rot, mold and mildew. Proper waterproofing
and flashing practices are necessary to ensure
high quality, long-lasting construction.
Repairs of rot and mold are major concerns
for homebuilders, contractors, architects, and
homeowners. Not only are such repairs diffi-
cult, but they are also extremely costly.
Window and door openings, deck -to -wall
intersections, foundation sill plates, corners,
and other penetration areas are the most
common water entry points. A self -adhered
flashing membrane, properly integrated with
the other elements of the building structure,
creates a barrier to water entry and a drainage
plane for water to drain out of the wall.
Product Advantages
• Available with Ripcord® split release
on demand
• Easier and faster to install correctly
• Improved product performance
• Proper integration with housewrap/
other weather -resistive barriers
• Reduces the risk of rot and mold
development
Grace Vycor® Plus, a high performance self -
adhered flashing membrane, provides
premium protection against water infiltration
in all critical non -roof detail areas, that tradi-
tional building papers, felts and housewraps
cannot match. When properly installed, it can
reduce the risk of rot and mold development,
often associated with costly call-backs.
ICBO APPROVED!
Product Description
Grace Vycor Plus self -adhered flashing is
composed of durable, cross -laminated, high-
density polyethylene sheet, backed by an
aggressive, pressure -sensitive rubberized
asphalt adhesive.
Grace Vycor Plus is available in a range of
widths: 4 in. (100 mm), 6 in. (150 mm),
9 in. (225 mm), 12 in. (300 mm) and 18 in.
(450 mm) to accommodate a variety of job
requirements.
Ripcord is available in 6 in. (150 mm),
9 in. (225 mm) and 12 in. (300 mm) wide
membranes.
Features & Benefits
Ripcord—With the sophistication of
construction practices it becomes a must to
follow the proper sequencing principles.
Ripcord offers the flexibility to install half the
membrane before and the other half after the
other building envelope components are
installed, i.e. housewrap or felt. Only in this
way are the proper installation principles
followed.
Easy to work with—Membrane installation
is fast and easy—simply remove the release
paper and press onto the substrate. With
Grace Vycor Plus contractors can flash more
windows with better quality.
Superior adhesion capabilities—
The membrane creates a strong bond to the
substrate for long-lasting waterproofing
protection.
Seals around fasteners—The specially
formulated rubberized asphalt adhesive seals
around fasteners, allowing no water to pene-
trate and get to the substrate.
Forms water -tight laps—Grace Vycor Plus'
superior adhesion properties ensure strong
laps, even in seams in the flashing.
Measurement markings—The membrane
surface is clearly marked at every 6 in.
(150 mm) and 12 in. (3 00 mm) intervals to
facilitate the installation procedure.
Highly conformable and flexible—
Can accommodate settlement and shrinkage
movement.
Proven track record—Grace Vycor Plus
employs the same proven technology as our
Grace Ice & Water Shield® the market
leader in self -adhered underlayments for over
30 years.
Long-lasting waterproofing protection—
Both the polyethylene film and the
specially -formulated rubberized asphalt
components create a water and moisture
barrier that does not degrade from the effects
of the environment.
Usage
Grace Vycor Plus is a unique solution, appro-
priate for working around a number of detail
areas, including, but not limited to:
• Window and door openings (headers, sills,
jambs, thresholds, nailing flanges)
• Deck -to -wall intersections
• Corner boards
• Wall-to-wall tie-ins
• Foundation sill plates
• Sheathing panel seams
• Under stucco finishes
• Masonry walls
• Other non -roof detail areas
Application Instructions
Surface Preparation
Apply Grace Vycor Plus in fair weather
when the air, surface and membrane are at
temperatures of 25°F (-4°C) or higher. After
precipitation, allow a minimum of 24 hours
for drying before installing the flashing.
Install directly onto a clean and dry surface.
Some compatible substrates include wood,
plywood, oriented strand board, metal,
concrete and masonry. Remove dust, dirt, and
loose nails. Protrusions must be removed.
Surfaces shall have no voids, damaged, or
unsupported areas. Repair surfaces before
installing the membrane.
Product Data
Property
Grace Vycor Plus
Product thickness
25 mil (0.64 mm)
Carrier film
Cross -laminated HDPE
Adhesive
Rubberized asphalt
Release liner
Paper
Color
Black -Gray
Recommended
30 Days
exposure limit
Roll width(s)
4 in. (100 mm)
6 in. (150 mm)
9 in. (225 mm)
12 in. (300 mm)
18 in. (450 mm)
Roll length(s)
75 ft (22.9 m)
75 ft (22.9 m)
75 ft (22.9 m)
75 ft (22.9 m)
75 ft (22.9 m)
Rolls per carton
18
12
6
6
2
Shipping weight
74 lbs (33 kg)
74 lbs (33 kg)
56 lbs (25 kg)
74 lbs (33 kg)
36 lbs (16 kg)
Cartons per pallet
30
30
30
30
35
Priming is generally not required for most
substrates provided they are clean and dry.
However, on concrete, masonry and
DensGlass Gold®, apply Perm-A-Barrier®WB
Primer. If adhesion is found to be marginal,
prime wood composition and gypsum sheath-
ing also with Perm -A -Barrier WB Primer. The
coverage rate for Perm -A -Barrier WB Primer
is 250-350 ft2/gal (6-8 m2/L). Allow primer
to dry completely, approximately 1 hour
depending on weather conditions, before
application of flashing.
Membrane Installation
Using the 6 in. (150 mm) and 12 in. (300 mm)
measurement markings, cut the membrane to
the desired length. Peel back the release paper
to expose the adhesive. Align the membrane
and press into place with heavy hand pressure.
Laps must be a minimum of 3 in. (75 mm).
Mechanically fasten the membrane at all
vertical terminations. Use only smooth shank
fasteners.
Consistent with good construction practice,
install the membrane such that all laps shed
water (following the shingle principle).
The top membrane layer should go over the
bottom layer. Always work from the low
point to the high point. When needed, use
Ripcord to split the release paper and adhere
half of the membrane, while leaving the other
half with the paper on. This is required when
flashing a window sill before the house-
wrap/weather resistive barrier is installed.
Precautions & Limitations
Grace Vycor Plus is designed for critical
NON -ROOF flashing details. The membrane
is slippery—DO NOT install on the roof, DO
NOT walk on the membrane.
Do not leave the product permanently
exposed to sunlight. Maximum recommended
exposure time is 30 days. Due to its slight
asphaltic odor, apply this product where the
membrane is not exposed to interior living
space. Grace Vycor Plus should not be used in
hot desert areas in the southwestern
United States.
Grace Vycor Plus is not compatible with flex-
ible PVC. Contact window manufacturer for
specific application instructions required
when using a bituminous -based flashing.
Certain metal window applications with inte-
gral nail fm may have specific limitations.
Some solvents in certain caulking may be
incompatible with the adhesive in Grace
Vycor Plus.
For more information, check with your local
Grace representative.
Approvals
ICBO approved as a Flashing Material
(Report ER -6141).
Key Details for Grace Vycor Plus
For most recent and additional details, consult our web site at www.graceconstruction.com
Flanged Window
Flashing Installation AFTER
Weather -Resistive Barrier
Half Round Window
Option 1 — Low to Moderate
Exposure
Flanged Window
Flashing Installation BEFORE
Weather -Resistive Barrier
Option 1 — Low Exposure
Half Round Window
Option 2 — Severe Exposure
Flanged Window
Flashing Installation BEFORE
Weather -Resistive Barrier
Option 3 — Severe Exposure
�
Exterior Sliding Door
with Deck
6_
Foundation Sill Plate Outside Corner Inside Corner
Option 1
www.graceathome.com
www.graceconstruction.com
For technical assistance call toll free at 866-333-3SBM (3726)
Vycor, Grace Ice & Water Shield, Perm -A -Barrier and Ripcord are registered trademarks of W. R. Grace & Co.—Conn.
DensGlass Gold is a registered trademark of Georgia-Pacific Corporation.
We hope the information here will be helpful. It is based on data and knowledge considered to be true and accurate and is offered for the users'
consideration, investigation and verification, but we do not warrant the results to be obtained. Please read all statements, recommendations or
suggestions in conjunction with our conditions of sale, which apply to all goods supplied by us. No statement, recommendation or suggestion is
intended for any use which would infringe any patent or copyright. W. R. Grace & Co.—Conn., 62 Whittemore Avenue, Cambridge, MA 02140.
In Canada, Grace Canada, Inc., 294 Clements Road, West, Ajax, Ontario, Canada L1S 3C6.
This product may be covered by patents or patents pending. Copyright 2007. W. R. Grace & Co.—Conn.
TP -083L Printed in U.S.A. 3/07 FA/LI/1M
�.... `
^` I ^
,
^ �
.®\ .
....... ...........
�
The miracle of Bien e
VE\3!0 2
Table of Contents
ApplicableProducts ............................................ ......... ............. ..... ...................
...,,....... ..... . ,.,......,...,, ,. ............. --2
RecommendedMaterials ............................... .. ......... ...... ,........ .... ,
...,............. , .................. ...........2
CodeRequirements ............................... ................. ..,...... ....,,... ,.......,
.,..,.... ,......., ......... ....,...,,.... .........3
GeneralInstructions .................................... --- ....... ........ ... ....... .........
...... ................... ...........,,..,3
SpecialConsiderations . .......... --- .... ...................... ........ ....... ..........
.......... .......... ........, ....., ...,....,............3
InstallationInstructions ................................ ...„ ..................... ......... ..
,,,.,..,. .... ..... ......._.. ......... ......,.........4
Continuity
9ftx100ft
Terminations................. .......... ... .................. ......
......,.. ......... ...........,.... , . 6
GableEnds............................................................... ......... ............
..,... ...., .... ......... .....,.,. 6
CantileverFloors .................................................... ........ ........ .............. ....
......,.. ................. , ........ ..............6
Penetrations....................................................................... ....... ..............
......... ............. .... ........ 7
Handling Tears and Holes .... ........
....... ..... . ...,. .....,... , ..,..... .............,.7
TiltWalls .......................................... ........... ................... .........
............. ......... ............................8
DuPont' Flashing Systems Integration .......................... ......... ........ . ..........
........ ....... ........ ..... ...........................9
FagadeConsiderations ...................................... ......... .........
....... ...,.... ,..,. ,..,.................10
Addendum: Use of Temporary Fastening Methods— ............. .......
,a................. ...... ................. 11
Applicable Products
W t r- wm tiiiv I13airri wir W-11 )
PRODUCT
DIMENSIONS
AREA
DuPont"" Tyvek® HomeWrap®
3 ft x 100 ft
300 sq ft
3ftx165ft
495sgft
DuPontf'Tyvek® Metallized Tape
5ftx200ft
1,000sgft
DuPontf'Tyvek® Wrap Caps for
9ftx100ft
900sgft
Crossfire® Cap Stapler
9 ft x 150 ft
1,350 sq ft
DuPont'" Tyvek® Wrap Caps for
10 ftx 100 ft
1,000 sq ft
Stinger'" Cap Hammer
10 ft x 150 ft
1,500 sq ft
DuPont" Tyvek® StuccoWrap•
5 ft x 200 ft
1,000 sq ft
DuPont'" Tyvek' DrainWrap'"
9 ft x 125 ft
1,125 sq ft
10 ft x 125 ft
1,250 sq ft
DuPont" Tyvek® ThermaWrap'"
5 ft x 150 ft
750 sq ft
9ftx100ft
900sgft
DuPont" Tyvek® CommercialWrap•
5 ft x 200 ft
1000 sq ft
10 ft x 125 ft
1250 sq ft
fin tailll tmDmm Accessorlies
PRODUCT
TYPE
QUANTITY
DuPont" Tyvek' Tape
2" Bulk Pack
36 rolls/case
3" Bulk Pack Dispenser
24 rolls /case
DuPontf'Tyvek® Metallized Tape
2" x 100' Rolls
12 rolls/case
DuPontf'Tyvek® Wrap Caps for
16 gauge; available in
2000 per box
Crossfire® Cap Stapler
7/8", 1-1/4", and 1-1/2" lengths
DuPont'" Tyvek® Wrap Caps for
16 gauge; 3/8" length
2016 per box
Stinger'" Cap Hammer
Recommended Materials
• DuPont" Tyvek® Water -Resistive Barrier
• DuPont'' Tyvek® Tape
• DuPont'" Tyvek® Wrap Caps or Recommended Fasteners (see step 3)
• DuPont"" Weatherization Sealant or compatible Caulks and Sealants — See the DuPont Building Science Bulletin
"Compatibility Guidelines for Building Sealants" for additional guidance
Copyright 02008 E. I. du Pont de Nemours and Company. All Rights Reserved. 2 V.2
Water -Resistive Barrier (WRB) Code Requirements
The 2006 International Building Code (Section 1403.2) and the 2006 International Residential Code (Section R703.1) require
a water -resistive barrier behind the exterior veneer. This water -resistive barrier must be equivalent to ASTM D226 Type 1
#15 Felt. DuPont" Tyvek® water -resistive barriers exceed the performance of ASTM D226 felt and are recognized as water -
resistive barriers by the following code evaluation reports:
• ICC -ES Legacy Report ER -4000: DuPont" Tyvek® HomeWrap®, DuPont" Tyvek® StuccoWrap®, DuPont"
Tyvek® DrainWrapT"
• ICC -ES Legacy Report 98-46: DuPont" Tyvek® HomeWrap®, DuPont- Tyvek® StuccoWrap®, DuPont" Tyvek® DrainWrapT"
• ICC -ES Legacy Report NER-642: DuPont' Tyvek® HomeWrap®, DuPont`" Tyvek® StuccoWrap®, DuPont"
Tyvek® DrainWrap'"
• ICC -ES Legacy Report 95105D: DuPont- Tyvek® HomeWrap®, DuPont- Tyvek® StuccoWrap®, DuPont- Tyvek®
CommercialWrap®
• ICC -ES ESR -1993: DuPontT" Tyvek®ThermaWrapT"
General Instructions
The most effective time to install DuPont'" Tyvek® water -resistive barriers is when:
• walls are constructed
• roof sheathing is installed
• step flashings and kickout flashings are installed
• BEFORE the windows and doors are set
If you want to install windows and doors prior to the water -resistive barrier, please refer to the DuPontT" Flashing Systems
Installation Guidelines, Flashing BEFORE water -resistive barrier section which will direct you back to this guide at the
appropriate step.
If the house has windows and doors already installed and they are flashed be sure to integrate the WRB by following
the DuPont- Flashing Systems Integration section in this guide.
Note: If DuPontT"' FlexWrapTm and apron are used, install the WRB under the apron with DuPont' Tyvek® and ensure
proper shingling. If a non -self adhering sill flashing product is used, please maintain proper shingling.
Special Considerations
1. DuPontT" Tyvek® StuccoWrap- and DuPontT" Tyvek® DrainWrap- shall be installed with drainage grooves vertical, going
up and down.
2. To help optimize the installed R -Value benefits of DuPont" Tyvek® ThermaWrap- it should be installed with shiny,
metallic side facing towards a clear 3/ inch minimum airspace. Without an airspace, DuPont- Tyvek® ThermaWrap- will
still act as a water -resistive barrier.
3. DuPont requires that DuPont' Tyvek® HomeWrap®, DuPont' Tyvek® StuccoWrap®, DuPont- Tyvek® DrainWrap- and
DuPont- Tyvek® ThermaWrap-be covered within 4 months (120 days) of its installation. DuPont' Tyvek®
CommercialWrap® must be covered within 9 months (270 days) of its installation.
Copyright 02008 E. I. du Pont de Nemours and Company. Ali Rights Reserved. 3 v.2
Installation Instructions
Start at the bottom of the structure to ensure proper shingling occurs throughout the installation. Proper shingling is required
to provide for water shedding and to prevent water entering the wall system.
STEP 7
UNWRAP roll at corner, leaving 6" to 12" inches vertical
overlap.
Printed stud marks are available on some DuPont'' Tyvek®
products to aid in aligning with the studs. (e.g. studmarks
are 8" apart for DuPont" Tyvek® HomeWrap®)
STEP 2
Roll should be plumb. Bottom edge of roll should extend
over sill plate interface at least 2". For maximum air
leakage reduction (when installing as an air barrier), seal
wrap at the bottom of the wall with sealant (i.e. DuPont-
Weatherization Sealant), DuPont- Tyvek® Tape, or DuPont'"
StraightFlash'". Extend to bottom of sill plate for slab on
grade foundations. For stucco exteriors integrate with
weep screed.
STEP 3
Secure DuPont" Tyvek® water -resistive barrier to the stud.
Fasteners should be spaced no closer than 6" and no
further than 18" on vertical and horizontal stud lines. Use
one or more of the recommended fasteners below for use
with DuPont'" Tyvek® water -resistive barriers:
• DuPont" Tyvek® Wrap Cap nails
• DuPont" Tyvek® Wrap Cap screws
• DuPont" Tyvek® Wrap Cap Staples for Stinger'
• 1.0 inch minimum crown staples (except when installing
DuPont'" Tyvek® over foam sheathing)
Please see the Addendum: Use of Temporary Fastening
Methods in this guide for more information on alternative
fastening schedules and requirements.
Note: Do not fasten within 9" of rough opening head.
STEP 4
Unroll directly over windows and doors. Upper layer of
water -resistive barrier should overlap bottom layer of WRB
by a minimum of 6".
Refer to the DuPont' Flashing Systems Installation
Guidelines to prepare and flash window and door opening.
Note: If windows are already installed, the DuPont'" Tyvek®
water -resistive barrier shall be integrated with proper
shingling with window flashings. If DuPont'" FlexWrap'" and
apron are used, install the water -resistive barrier under the
apron to ensure proper shingling. If non -self adhering sill
flashing is used, install the water -resistive barrier under the
bottom of the sill flashing to maintain proper shingling.
STEP 5
All vertical seams shall be taped with DuPont- Tyvek® Tape.
• For maximum air penetration resistance, when installing
as an air barrier, all horizontal seams shall also be taped.
Taping all vertical and horizontal seams, and taping or
sealing all terminations (including, but not limited to,
roof -wall interfaces and sill plates) is part of the
requirement to obtain the DuPont"" Tyvek® Products
Material and Labor Residential 10 -year Limited Warranty.
Recommend three inch (3") DuPont'" Tyvek® Tape when
taping horizontal laps for DuPont' Tyvek® StuccoWrap- and
DuPontt' Tyvek® DrainWrap-. DuPont' Tyvek® Metallized
Tape is required for taping DuPont'' Tyvek® ThermaWrap".
STEP 6
After water -resistive barrier is installed refer to the
DuPontTm Flashing Systems Installation Guidelines to
prepare and flash windows and doors.
Copyright 02008 E. I. du Pont de Nemours and Company. All Rights Reserved. Q v.2
Copyright 02008 E. I. du Pont de Nemours and Company. All Rights Reserved. 5 v.,2
Continuity
"fe-rirnfin ations
It is important to maintain the continuity of the water -
resistive barrier from top to bottom with proper shingling.
Continue wrapping all the way up the structure. The
entire wall surface shall be wrapped, including
unconditioned spaces.
Lap DuPont" Tyvek® over all flashing (e.g. wall to roof
intersections and thru-wall flashings).
Weep screeds and expansion joints need to be integrated
with flashings and the water -resistive barrier.
Minir
allbie Ends
Continue to wrap and cut away the excess WRB to
completely cover the Gable End.
V-12"
Overlap
Lap DuPont- Tyvek® over all flashing (e.g. wall to
roof intersections and thru-wall flashings).
Cantilever Floors
Wrap the DuPont' Tyvek® under and up the Cantilever floor
and fold the DuPont- Tyvek® up the sides of the Cantilever
wall a minimum of 6". Tape all corners. Top layer of WRB
should go over bottom layer a minimum of 6".
Note: Get the inside corner as tight as possible using a 1x4
or similar.
Copyright 02008 E. I. du Pont de Nemours and Company. All Rights Reserved. 6 v.2
Penetrations
There are many types of penetrations including dryer vents,
bathroom exhaust fans, exterior electrical outlets, exterior
lights, gas lines, etc.
Seal the DuPont" Tyvek® around all electrical, HVAC and
plumbing penetrations with DuPont- Weatherization
Sealant, DuPont- Tyvek® Tape, or DuPont" Flashing
Systems products.
Start taping or flashing at bottom of penetrations, shingling
upper tape over bottom tape.
Products that have flanges should be integrated into the
water -resistive barrier using DuPont" Tyvek® Tape or
DuPontT" Flashing Systems products.
Y
j"O
;i
f'p
CopyOgW W008 C, d. dim Pow aim Cerrtrpanyn All
num
"Tyvek°
rlap
7
Handling Tears and Holes
During the course of installing the WRB, minor tears may
occur. Be sure to tape all tears. Tears can easily be covered
with DuPontT" Tyvek® Tape (2" or 3") or DuPont' Flashing
Systems products.
Larger holes (greater than 1 ") may require you to cut a piece
of DuPont'" Tyvek® WRB to cover the hole. Keep in mind
shingling.
Make a cut 2" above the hole and extending a minimum of
2" on each side of the hole. Measure and cut a piece of
DuPont" Tyvek®. Tuck the cut piece of DuPont- Tyvek®
underneath the tear. Tape along the perimeter by starting at
bottom of tear, shingling Upper tape over bottom tape.
Tears
Holes
I
in
num
v.2
Tilt Wall Instructions
STEP 7 Unroll and secure DuPontT'Tyvek® WRB over the
wall section. Leave enough lap to ensure a minimum 6"
overlap of the WRB on all sides except top of the wall.
These flaps allow for a DuPont'" Tyvek®-to-DuPontT" Tyvek®
seal with adjacent sides. Make sure the stud marks printed
on the DuPont- Tyvek® line up with the first stud and that
the roll is plumb.
STEP 2 When starting a wall section, fold the beginning
side flap over the vertical side of the stud and secure.
Trim off excess. Ensure that the bottom flap overhangs
enough so that, when the wall is tilted upright, it overlaps
the sill plate.
STEP 3 As each wall section is raised, ensure that the
bottom flaps overlap the sill plate and that the side flaps are
on the exterior of the house.
, L
?� s
Ai+
STEP 4 Fasten the side flaps and secure the bottom flap to
the foundation. For maximum air leakage reduction (when
installing as an air barrier), seal wrap at the bottom of the wall
with DuPont'" Weatherization Sealant, DuPont"" Tyvek® Tape
or DuPontT" StraightFlashT'".
STEP 5 All vertical seams shall be taped with DuPontT"
Tyvek® Tape. For maximum air penetration resistance,
when installing as an air barrier, all horizontal seams shall
also be taped.
Taping all vertical and horizontal seams is part of the
requirement to obtain the DuPont- Tyvek® Products
Material and Labor Residential 10 -year Limited Warranty.
Recommend three inch (3") DuPont' Tyvek® Tape when
taping horizontal laps with DuPontT" Tyvek® StuccoWrap® and
DuPont- Tyvek® DrainWrapT". DuPontT" Tyvek® Metallized
Tape is required for taping DuPontT"" Tyvek® ThermaWrapT".
STEP 6 After water -resistive barrier is installed refer to the
DuPontTm Flashing Systems Installation Guidelines to
prepare and flash windows and doors.
Copyright 02008 E. I. du Pont de Nemours and Company., All Rights Reserved. 8 v.2
DuPont"' Flashing Systems Integration
If windows and doors have not been installed reference the
DuPontTm Flashing Systems Installation Guidelines to
prepare the rough opening.
If windows and doors are already flashed, then follow
these last 2 integration steps to tie the water -resistive
barrier into the flashing.
STEP 1
A. Verify that the water -resistive barrier is properly shingled
with the bottom of the apron.
B. Cut as shown to expose window and apron. DO NOT
CUT THROUGH DUPONT" FLEXWRAP- OR APRON.
Copyright ©2008 E. I. du Pont de Nemours and Company. All Rights Reserved. 9
STEP 2
A. Tape all seams as shown. DO NOT TAPE at bottom of
window.
B. At the head, continuous tape seams as shown with
DuPont'" Tyvek® Tape; if an air barrier is not required or if
additional drainage is desired, then skip -tape at the head,
v.2
1
DO NOT CUT!
I
through
DuPont- FlexWrap—
orapron.
Copyright ©2008 E. I. du Pont de Nemours and Company. All Rights Reserved. 9
STEP 2
A. Tape all seams as shown. DO NOT TAPE at bottom of
window.
B. At the head, continuous tape seams as shown with
DuPont'" Tyvek® Tape; if an air barrier is not required or if
additional drainage is desired, then skip -tape at the head,
v.2
Facade Considerations
Water -resistive barrier performance is dependent upon the ability of the facade to drain. You must consider the
following for specific fagades.
Stucco
When stucco is installed over wood -based sheathing the 2006 International Building Code (Section 2510.6) and the
2006 International Residential Code (Section R703.6.3) require "a water -resistive vapor -permeable barrier with a
performance at least equivalent to two layers of Grade D paper" or a layer of water -resistive barrier which is
separated from the stucco by an "intervening layer". When two layers are required by code and DuPont'" Tyvek®
water -resistive barriers are used behind stucco they should be separated from the stucco by a second layer of
DuPont" Tyvek® water -resistive barrier, a layer of Grade D building paper, felt, rigid foam board or the paper backing
of paper -backed lath. The first layer (directly over sheathing or studs) serves as the wall system's water -resistive
barrier and is integrated with window and door flashings, the weep screed at the bottom of the wall and any
through -wall flashings or expansion joints, Lath shall be installed over the intervening layer in accordance with
ASTM C1063-03 Standard Specification for Installation of Lathing and Furring to Receive Interior and Exterior
Portland Cement -Based Plaster and applicable codes. Rigid foam board, when installed over DuPont" Tyvek®
water -resistive barrier as an intervening layer, will provide enhanced structural support to the DuPont'" Tyvek® layer
and if installed within 24 hours of the DuPont- Tyvek® layer may reduce the required number of fasteners used for
the attachment of the DuPont'" Tyvek® water -resistive barrier.
Brick
The 2006 International Residential Code (Section R703.7.4.2) requires a nominal 1 inch airspace separating the
brick from the water -resistive barrier. The Brick Industry Association recommends a 1 inch air -space in front of
wood stud construction and a 2 inch air -space in front of steel stud construction. Consistent with these
requirements and recommendations, DuPont'" Tyvek® water -resistive barriers shall be separated from the brick
veneer by a nominal 1 inch air -space. Window and door flashing, and through -wall flashing shall be integrated with
the DuPont'' Tyvek® layer ensuring proper shingling. For maximum moisture management and drying of the wall
system the airspace in front of the DuPont'" Tyvek® shall be vented to the exterior at the top and bottom of the
wall. Some types of brick ties will act as additional fasteners for water -resistive barriers, and, if installed within 24
hours of the DuPont" Tyvek® layer may reduce the required number of fasteners used for the initial attachment of
the DuPont' Tyvek® water -resistive barrier.
Stone Veneer
The 2006 International Building Code (Section 1405.6) requires two layers of water -resistive barrier behind stone
(natural, manufactured, synthetic) veneers over wood frame construction. When two layers are required by code
and DuPont" Tyvek® water -resistive barriers are used behind stucco, they should be separated from the stone and
mortar by a second layer of DuPont'" Tyvek® water -resistive barrier, a layer of grade D building paper, felt, rigid
foam board or the paper backing of paper -backed lath. The first layer (directly over sheathing or studs) serves as
the wall system's water -resistive barrier and shall be integrated with window and door flashings, the weep screed
at the bottom of the wall and any through -wall flashings or expansion joints.
Wood Siding
DuPont" Tyvek® water -resistive barriers and wood siding shall be installed according to manufacturer's instructions,
industry standards and applicable codes, As recommended by the Western Red Cedar Lumber Association and
U. S. Forest Product Laboratory, wood siding should be primed on all six sides before installation„ In high exposure
installations, enhanced drainage and water management may be provided by using DuPont' Tyvek® DrainWrap-,
by installing a drainage mesh over the water -resistive barrier or by creating rainscreen cladding with a larger
airspace behind the siding using furring strips. If furring is installed over DuPont'" Tyvek® water -resistive barrier to
create a rainscreen, the primary fastener spacing can exceed 18".
IFilbeir Cement Sidling
DuPont'" Tyvek® water -resistive barriers and fiber cement siding shall be installed according to manufacturer's
instructions, industry standards and applicable codes. In high exposure installations, enhanced drainage and water
management may be provided by using DuPont- Tyvek® DrainWrap'" by installing a drainage mesh over the
water -resistive barrier or by creating rainscreen cladding with a larger airspace behind the siding using furring
strips. If furring is installed over DuPont- Tyvek® water -resistive barrier to create a rainscreen, the primary fastener
spacing can exceed 18".
Vinyl Siding
Vinyl Siding is installed directly over DuPont- Tyvek® water -resistive barriers. Vinyl siding shall be installed in
accordance with manufacturer's instructions, industry standards and applicable codes, including ASTM D4756-06
Standard Practice for Installation of Rigid Poly(Vinyl Chloride) (PVC) Siding and Soffit..
Copyright ©2006 E. I. du Pont de Nemours and Company. All Rights Reserved, 10 v.2
DuPontTm Tyvek® Water -Resistive Barrier Residential Installation Guide Addendum:
Use of Temporary Fastening Methods
Fastener selection and fastening schedule is a function of
holding power during exposure and durability while in
service. DuPont installation guidelines require the use of
cap fasteners (nail, staple and screw) and 1 " crown staples
as the means for permanently attaching DuPont— Tyvek®
water -resistive barriers. In addition to fastener selection,
DuPont requires a permanent fastener schedule between
6 to 18 inches, anchored to the studs.* These fasteners
and schedule are considered a permanent means of
attachment and provide substantial holding power during
exposure and in the case of cap fasteners, provide
additional protection against moisture and air infiltration at
the fastener locations particularly for cladding applications
that are in intimate contact with the water -resistive barrier
or provide minimal drainage. These fastening guidelines
minimize the number of penetrations while maintaining a
balance of product durability during exposure. Sheathing,
except for structural OSB and structural plywood, is not a
fastening base and should not be relied on as the fastening
base. This includes but is not limited to foam, fiberboard
and plaster sheathing materials.
Use of recommended permanent fasteners at reduced
schedules, other mechanical fasteners such as smaller
staples (slap staples) and adhesives are considered
temporary fastening methods because they do not have
substantial holding power and may not provide adequate
durability while in service. Temporary fasteners should not
be relied upon to permanently attach a water -resistive
barrier. Because these fasteners have limited holding
power, they are not supported by DuPont as the primary
means of attachment.
Temporary fastening methods can be used if the following
guidelines are followed:
• Temporary fastening methods shall only be used to tack
the DuPont'' Tyvek® in place when a permanent
fastener is installed immediately after the temporary
fasteners are installed. In this case, permanent
fasteners include cladding fasteners such as brick ties,
lath fasteners for traditional stucco, external foam board
fasteners, or siding installed with nails. Cladding shall
be installed according to applicable building codes and
industry standards.
Copyright 02008 E. I. du Pont de Nemours and Company. All Rights Reserved.
• When using adhesives, vertical strips are acceptable
spaced approximately every 24 to 36 inches or along
every other stud line. Vertical strips may be applied at
the sheathing outer face or directly to the studs for open
stud construction. When using adhesives, care must be
taken to not cover the surface excessively since this
may impact the vapor permeability of the wall system in
that region. Adhesives should be evaluated for
compatibility to DuPont- Tyvek® water -resistive barriers.
• When using temporary mechanical fasteners, they
should be used minimally to tack the water resistive
barrier in place. Small staple fasteners are acceptable
with OSB, plywood and exterior gypsum sheathing only.
Small staple fasteners should not be used with
fiberboard or foam sheathing. Temporary fastener
schedule should not exceed 4 fasteners per square yard.
Tape all tears and localized damage. For larger holes
(greater than 1 ") follow DuPont' Tyvek® Water -Resistive
Barriers Installation Guidelines.
• Only capped temporary fasteners shall be used with
3 -coat stucco and stone veneer applications unless an
intervening layer is used.
Selection and use of temporary fastening methods is an
option dependent on building schedule, cladding options
and local building practices. If temporary fasteners are used
per this guideline, DuPont will provide a 10 -yr limited
product replacement or materials and labor warranty.**
* For more detail on installation guidelines, please refer to
the DuPontf' Tyvek® Water -Resistive Barriers Installation
Guidelines at www.construction.tyvek.com.
** For more detail on the DuPont 10 -yr limited product
replacement or materials and labor warranty, please refer
to the DuPont 10 -yr limited product replacement or
materials and labor warranties detailed at
www.Construction.Tyvek.com.
Note: These Temporary Fastening Guidelines are subject to
change based on new technology or testing information
and may be superseded at any time. It is always important
to follow the latest guidelines which may be found on
www.construction.tyvek.com.
11 v2
Technical Specifications
DuPont'" Tyvek® WRBs used in construction products is made from
100% flash spunbonded high density polyethylene fibers which have
been bonded together by heat and pressure, without binders or fillers,
into a tough, durable sheet structure. Additives have been incorporated
into the polyethylene to provide ultraviolet light resistance. DuPont
requires that DuPont'" Tyvek® WRBs be covered within four months (120
days) of installation.
DuPont"" Flashing Systems products are made from a synthetic rubber
adhesive and a laminate of polyethylene film, elastic fiber, synthetic
rubber adhesive, polyurethane adhesive, and a top sheet of flash
spunbonded high density polyethylene fibers. Additives have been
incorporated into these materials to provide ultraviolet light resistance.
DuPont requires that DuPont'"' Flashing Systems products be covered
within four months (120 days) of installation.
Warning
DuPont— Tyvek® WRBs are slippery and should not be used in any
application where it will be walked on. In addition, because it is
slippery, DuPont recommends using kickjacks or scaffolding for
exterior work above the first floor. IF ladders must be used, extra
caution must be taken to use them safely by following the
requirements set forth in ANSI Standards 14.1, 14.2 and 14.5 for
ladders made of wood, aluminum, and fiberglass, respectively.
DuPont— Tyvek® is combustible and should be protected from a flame
and other high heat sources. DuPont— Tyvek® will melt at 275°F
(135°C) and if the temperature of DuPont— Tyvek® reaches 750°F
(400°C), it will burn and the fire may spread and fall away from the
point of ignition. For more information, call 1-800-44-Tyvek.
DuPont— Flashing Systems products and their release paper are
slippery and should not be walked on. Remove release paper from
work area immediately. DuPont— Flashing Systems products will melt
at temperatures greater than 250°F (121°C). DuPorrt— Flashing
Systems products are combustible and should be protected from
flame and other high heat sources. DuPontm Flashing Systems
products will not support combustion if the heat source is removed.
However, if burning occurs, ignited droplets may fall away from the
point of ignition. For more information, call 1-800-44-Tyvek.
DuPont"m Weatherization Sealant is irritating to skin, eyes, and
respiratory tract. For proper usage, follow directions stated on the
product label. For health information, refer to the Material Safety
Data Sheet or call Chemtrec at 1-800-424-9300.
For more information about DuPont—
Tyvek`k'1ltloatMerizatoon Systems,
pjea.so call 1-800-44-Tyvek or visit us at
www.Constructian.Tyvek.com
Note
When installed in conjunction with other building materials, DuPontf'
Flashing Systems products must be properly shingled with these
materials, such that water is diverted to the exterior of the wall
system. DuPont'"' Tyvek® products are WRBs and not the primary
water barrier (the outer facade is the primary barrier). You must follow
fagade manufacturer's installation and maintenance requirements for all
facade systems in order to maintain water holdout properties and
ensure performance of DuPont' Tyvek®. Use of additives, coatings or
cleansers on or in the facade system may impact the performance of
DuPontf' Tyvek® water -resistive barriers. DuPont- Tyvek®
Weatherization Systems products are to be used as outlined in this
installation guideline. DuPont— Flashing Systems products should only
be used to seal penetrations and flash openings in houses or
buildings. DuPont" Flashing Systems products are not to be used in
roofing applications. For superior protection against bulk water
penetration, DuPont suggests a system combining a quality exterior
facade, a good secondary WRB, an exterior sheathing, appropriate
flashing materials and details. In addition, DuPont suggests to use
high quality windows and doors with particular attention to proper
installation of each component. In a system where no exterior
sheathing is used and DuPont"" Tyvek® is installed directly over the
wall studs, exterior facade materials should be selected to ensure
maximum protection against water intrusion. Careful workmanship
and proper installation of each component is very important.
DuPont believes this information to be reliable and accurate. The
information may be subject to revision as additional experience and
knowledge is gained. It is the user's responsibility to determine the
proper construction materials needed.
For complete warranty information, please call 1-800-44-Tyvek.
To submit a warranty claim, please contact DuPont at
www.Construction.Tyvek.com or call 1-800-44-Tyvek. Warranty
coverage requires submission of proof of purchase of the DuPont—
Tyvek® at issue.
This information is not intended to be used by others for advertising,
promotion or other publication for commercial purposes.
l '1111
T
M
0
The miracles of science -
Copyright 02008E. L du Pont de Nemours and Company. All rights reserved. The DuPont Oval Logo, DuPonP"! The miracles of sciencem, TyvekO, TyvekO llomeWrapO, TyvekO StuccoWrapO, TyvekO DminWrapl"
TyvekO CommercialWrapO, DuPontm ThermaWrapTM, DuPontm FlexWrapTM! and DuPontwStraightFlashw are registered trademarks or trademarks of DuPont or its affiliates. K-1628202/08
❑ APPROVED � ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection pro, Ing.
Inspector �.Date
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
s " $
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: 12-/o 0,06
PERMIT NUMBER: 6Lh0 6 —08P
SITE ADDRESS: r � ls- L EUC
PROJECT NAME:
CONTRACTOR:
CONTACT PERSON:
PHONE:
TYPE OF INSPECTIONUC9
�-
��-.lJ n'lf�(a
w - ----- ------------ - — -- - --------------------------
L'1111
�.i o 'V k'
�..°�'
�.
P3 �� W,
F R
d'
.,
�c
........ ............ ...
�mm �.1 ... .......,
❑ APPROVED � ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection pro, Ing.
Inspector �.Date
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
JAN t
JLHCONSULTOQ GMAIL.COM
November 29, 20o8
Tom and Mark Johnson
Nordland Construction Co Inc
62 Garden Club Road
Nordland, WA 98358
Re: Perkins Building
Dear Tom and Mark,
(� i I �, 0 6 e
This letter is to document the discussion at my meetings with you on October 30 (Mark) and
November 7 along with my subsequent meetings for concurrence with Leonard Yarberry, City
Building Official, on November 12 and November 2o. The meetings concerned specific building
code requirements including their pertinence to elevator lobbies and exit enclosures.
Fje_yaor L9 1 S — One question that you had concerned the requirement for elevator lobbies
and fire -resistance rated door openings into such lobby. International Building Code (IBC)
Chapter 30 El t v e , Section 3002 an
specifically Subsection 3002.1 Ho waye i requires that elevator, dumbwaiter
and other hoistway enclosures shall be shaft enclosures complying with Section 707. Subsection
3002.1.1eni9,prat v requires that openings in hoistway enclosures be protected in
accordance with Chapter 7.
Subsection 707.14.1 Elev b contains exceptions to the lobby requirements for shaft
enclosures that connect more than three stories.
Exception #1— Enclosed elevator lobbies are not required at the street floor, provided
the entire street floor is equipped with an automatic sprinkler system in accordance with Section
903.3.1.1;
Exception #4 — In other than Group I-3, and buildings having occupied floors located
more than 75 feet above the lowest level of fire department vehicle access, enclosed elevator
lobbies are not required where the building is protected by an automatic sprinkler system
installed in accordance with Section 903.3..11 or 903.3.1.2.
As these exceptions appear to cover your situation, no elevator lobby requirements apply.
e idor PrQLecdon — Fire-resistant construction requirements due to required corridor
Protection would require an elevator lobby door (for smoke control) and potentially rated
openings from other spaces into those corridors,
1606 TAYLOR STREET
SORT TOWNSEND, WA 98368
360.53 1 .0794
Table 1017.1 requires a one half-hour rating for corridors in R
occupancies equipped throughout with an automatic sprinkler system where the corridor serves
an occupant load greater than 1o. According to Table 1004.1.1xi AD"w n
Ra pant the floor area per occupant in residential occupancies is 200 square feet.
According to these code requirements, if the occupant load of each floor is no greater than 1o, a
rated corridor is not required. Additionally, corridors are required to be rated for both M
(mercantile) and B (business) occupancies where the occupant load exceeds 30 unless the
building is equipped throughout with an automatic sprinkler system. As your building is
equipped throughout with a sprinkler system, no corridor rating is required for these spaces.
Rated openings are not required, into unrated corridors (hallways).
— IBC Chapter 3o , specifically
Section 3006 N
jar u RQpM, governs the fire -resistance rating of machine rooms, as well as
other machine room requirements. As we discussed, subsection 3oo6.4 requires the rating of
the machine room to be not less than the required rating of the hoistway enclosure, in this case
2 -hours. The openings shall be protected with assemblies with a rating not less than that
required for the hoistway enclosure doors. According to Table 715.4 Eirl.,
Eim ro the required assembly rating for this fire door is go minutes (1 V2
hours).
I have attached Section 30o6 and WA State Amendment 3oo6.2 Ygnti for your reference.
— Your questions pertained specifically to openings
in exit enclosure exterior walls.
Subsection 1020.1.4 requires compliance with Section 704 for
exterior walls. It further requires a minimum of 1 -hour protection of walls, and 3/4 -hour
protection of openings within those exterior walls, when the building exterior walls are located
within 10 feet horizontally of a nonrated wall or unprotected opening where nonrated walls or
unprotected openings enclose the exterior of the stairway and the walls or openings are exposed
by other parts of the building at an angle of less than 18o degrees.
In your case, the exterior walls of the Perkins building that are in question face Lawrence Street.
IBC Section 704.5 Fire -resistance rating requires that exterior walls be rated in accordance with
Tables 6o1 and 602. Table 602 " e- cetin s e
does not require a rating for walls with a fire separation distance
equal to, or greater than, 30 feet. Chapter 7 (item #2) defines fire separation distance as the
distance to the centerline of a street, an alley or public way. As Lawrence Street is 73 feet in
width, your exterior walls are greater than 30 feet and therefore require no rating based on fire
separation distance. However, since some walls/openings are adjacent to bay windows, an angle
of less than 18o degrees, 3/4 hour opening protection and 1 -hour walls are required at those
locations (as the Perkins building is a Type V-A building, exterior walls are of one-hour
construction regardless).
— As we discussed, the residential areas may comply with the WSEC
and Ventilation and Indoor Air Quality (VIAQ) code for residential occupancies by providing
source specific and whole house ventilation fans within each unit
The non-residential areas require compliance with the outdoor air requirements of Table 3-4,
2oo6 VIAQ.
Venting for the elevator machine room shall be in compliance with IBC 3oo6 and WA State
Amendment 3oo6.2 (attached).
Thank you for the opportunity to assist you. If you have questions regarding the items contained
in this letter, please let me know.
N
Attachments
ELEVATORS AND` CONVEYING SYSTEMS
ited to, anticipated loads, structural stability, impact, vibration,
-" stresses and seismic restraint. The design shall account for the
construction, installation, operation and inspection of the hoist
tower, car, machinery and control equipment, guide members
and hoisting mechanism. Mdditionaliy, the design of personnel
hoists shall include provisions for field testing and mainte-
nance which will demonstrate that the hoist device functions in
accordance with the design. Field tests shall be conducted upon
the completion of an installation or following a major alteration
of a personnel hoist.
SECTION 3006
MACHINE ROOMS
300%1 AAn approved means ofaocess shall be provided
to el vator machine rooms and overhead machinery spaces.
3006.2 Venting. Elevator machine rooms that contain
solid-state equipment for elevator operation shall be provided
with an independent ventilation or air-conditioning system to
protect against the overheating of the electrical equipment. The
system shallbe capable of maintaining temperatures within the
range established for the elevator equipment.
.3 Pressurization. The elevator machine room serving a.
pressurized elevatorhoistway shall be pressurized upon activa-
tion of a heat or smoke detector located in the elevator machine
room.
3006.4 Machine rooms and machinery spaces. Elevator
machine rooms and machinery spaces shall be enclosed with
fire barriers with a fire -resistance rating not less than the
required rating of the hoistway enclosure served by the
machinery. Openings shall be protected with assemblies hav-
ing a fire -protection rating not less than that required for the
hoistway enclosure doors.
30065_ Shunt trip. Where elevator hoistways or elevator
machine rooms containing elevator control equipment are pro-
tected with automatic sprinklers, a means installed in accor-
dance with NFPA 72, Section 3-9.4, Elevator Shutdown, shall
be provided to disconnect 'automaticall'y the main line power
supply to the affected elevator prior to the application of water.
This means shall not be self -resetting. The activation of sprin-
klers outside the hoistway or machine room shall not discon-
nect the main line power supply.
3006.6 Plumbing systems. Plumbing systems shall not be
located in elevator equipment. rooms.
2006 INTERNATIONAL BUILDING OOD9,* " 527
,2006 INTERNATIONAL BUILDING CODE
W
W
30061 Venting. h+ achirsmy-spa es, imachine roonis,control
spaces, and control rooms that, contain solid-state ealuilarrwent
for elevator opm, lion shall be provided with an independent
ventilation tar air-conditioning system to protect agan^mst the
overheating of the electrical c uiprner w Veni latiurm s;vsteaaas
shall use outdoor makeup air. The systema shall service the
equipment space only, and shall be capable of Maintaining ttae
terriper-ature and humidity within the range established by the
manufacturer's specifications, Where no mnanufactura,r
specifications are available, the equipment space iernperaurre
shall be maintained at no less than 55'F and no snore than
(rF
7"he cooling brad for the equipment shall include the BTU
output of the elevator operation equipment as specified by the
raaauufaeturer baseal carr trate Maur trfc ratiraaaaau"s type anon. The
outdoor design temperature for ventilation shall be l"rorn,, the
0,5% column for summer frotra-the Puget Sound Chapter of
AHl' AE publication "Recornmended Ours 6o;,Davign
T'emperaturFt-,v„ Washington Siam." 77h following Formuls
shall be used to calculale Clow tate for ventilation:
CFM,- BTU output of'elevator inachine room equipment 1
11,48".x (acceptable machine room temp - roalceup air tomp))
Exception: For buildings four stories or less, natural or
anechanical means may be used in lieu of an independent
ventilation or air-condirionint, system to keep the
equipment space ambient air temperature and humidity hi
the range specified by the elevator equipment
manufacturer.
(insert Facing Page; 27)
Effective July 1 2007
2006 Edition
TABLE 3-4
OUTDOOR AIR REQUIREMENTS FOR VENTILATION'
Occupancies not Subject to Sections 302 and 303
Application Estimated MaximotW Occupancy Outdoor AirRequiremeots
P11 it' or 100 mr cfm/uerson
Dry Cleaners, Laundries'
Commercial laundry
10
25
Commercial dry cleaner
30
30
Sto , nick un 30 35
Coin-opersted laundries 20 15
Coin-opented dry cleaner 20 15
Dwelling Units in Buildings Greater Than Four Storm or Attached to I -Occupancy Facilities
Bedrooms & living arcasu
15
Food and Beverage Service
Dinning rooms 70
20
Cafeteria. fast food 100
20
Bars. cocktail loua es 100
30
Kitchens(cooi 20
15
Garages. Repair. Service Stations
Enclosed oarldn¢ a 1.50 cfm/&so.
Auto repair rooms
1.50 cWfLsq.
Hotels. Motels, Resorts. Congregate Residences
with More Than Four StorieO
Bedrooms
30 cfm/room
Living Rooms
30 cfin/room
Bath
35 cfin/room
Lobbies
30
15
Conference rooms
50
20
Assembly rooms
120
15
Gambling casinos 1,20 30
Offices
Office space 7 20
Re tion area 60 15
Telecommunication centers � 60 20
and data entry areas
Conference rooms 50 20
Public Spaces
Corridors and utilities 0.05 cfm/fLsa
Public reshvom
50 cfin/wc or urinal
Lockers and dressing rooms
0.50 cfin/ft.so.
Smolcmn lounge
70 60
Elevators
1.0 cfm/ft.so.
Retail Sto Sales /"loo , and Show
Room Floors
B ent and street
30 0.30 chVLsa.
Upper floors
20
0.20 efm/Rsa.
Storage rooms
15
d15 of n/ft.sq.
Dressing rooms
0.20 efin/fLso.
Malls and arcades
20
0.20 cf m/ft.sq.
Shipping and receiving,
10
j 0.15 efin/ft.so.
Sm lounge
70
60
Warehowes
5
1 0.05 cfin/ft.sa.
14 Effective 7101/07
Inspection Report
Projectmz,—,
s i � Permit #Al���
�..
Date Inspe for Inspection & Notes
{
. . .......... . ..... ..
. . . ..... ..
..........
__ _ ..._.._........... _._ ...............
- - --- - ----
. . . . . ... . . . .................... . . . . . ..........
__ w....:.._._
Vam
�G�1 &ASSOCIATES, INC.
GEOTECHNICAL ENGINEERING * ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
June 16, 2008
Mr. Tom Johnson
Nordland Construction NW, Inc.
123 Ponderosa Place
Nordland, WA 98358
RE: Lawrence Building
Port Townsend, WA
Dear Mr. Johnson:
KA Project No.: 106-08091
Permit No.:
�0
In accordance with your request and authorization, the following test data are presented on the following reports,
which are enclosed:
May 15
May 29
Cylinder Report No.(7 day Break) 33134
Field Report No. 92447
Referenced concrete reports and compressive strength data will be mailed following 28 -day tests, if applicable.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office.
Respectfully submitted,
Penn Seely, Laboratory Manager
Peninsula Division
PS: mds
Enclosures
cc: City of Port Townsend/ (e-mail)
q
o
°Y ih4 iy fN�u�GVyyi
With Offices Serving The Western United States
20714 State Hwy. 305 NE, Suite 3C • Poulsbo, Washington 98370 • (360) 598-2126 • Fax: (360) 598-2127
4aK4,1�0Ux & Associates, Inc.
GEOTECHNICAL ENGINEERING - ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING AND INSPECTION
DATE:�J�
P ROJ ECT #:
PROJECT:.�
LOCATION: � 7-
KRAZAN PROJECT MANAGER: 8
:IELD REPORT NO: 098327
CONTRACTOR:�a
JURISDICTION: '7
PERMIT #: ;E-1-0 0 6—
INSPECTOR: G /LL / C Z-Ic,1/
WEATHER: /'i / . TEMP: �5 S
if = oma' �i / �i> "i "cam ' s v �'�s� Zf-
ro the best of my knowledge, the above 6)WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements.
Superintendent/Representative: Technician:
Serving the Western United States
his field report indicates our inspector's observation and testing results based on the site condition and contractor's activities. This information is subject to review prior to fill V.,
ty signing this report, our inspector does not accept responsibility for validity of results. Some Information on this report has been provided by others on site.
Revision 2
15' OFFSET" TO PROPERTY
CORNER, FOUND PK NMR'.
IN ASPHALT, -�'M
15' OFFSET' 70 GRIDUNE
L ON GRIDLINE 5, SET'
PK NUL IN ASPHALT.
GRlDL7NE 1 ON
GROW 3,. SET
NUB WRN 'TACK.
10 5 0 10
SCALE IN FEET
GRIDUNE L ON
GRIDUNE 7.. S£T
Moe WBTH TACK::-
� a
SET PK NUL.,...r"
IN CONCRETE.. p ''
h FOUND TACK
IN DECK..- 0,
�4.
6' OFFSET TO GRIDLINE f I ON ,,,r^"
GRIDLINE E. PUT' K fN
CONCRETE NEM TO COE,UAAV:•
or
EXISTINGf"
BUILDING
i
POINT ON PROPERTY
SET NUB WRN
LEGEND:
0 DENOTES FOUND OR SET AS NOTED.
27' OFFSET TO
PROPERTY CORNER, SET
PK NAIL IN ASPHALT.
27' OFFSET" TO GRID LINE
I ON GRID UNE E SET
PK NAIL IN ASPNALT.�
17' OFFSET TO
GRID LINE A ON
GRID UNE 5, SET
TACK IN RAMP,
REBAR WITH CAP.
caar o
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 b 3:00 PM the da before you want
P � P Y Y
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION:
SITE ADDRESS: �
PROJECT NAME:
CONTACT PERSON:
TYPE OF INSPECTION.`
PERMIT NUMBER:
�. _.- .................. ............
CONTRACTOR:
PHONE:
R d
❑ APPROVED
❑ APPROVED WITH t,',r" OT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
Inspector m.._. .,[gal �r
...--------
Approved plans and permit card must be on-site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
For:
J&J Perkins Building
1223 Lawrence St
"ort Townsend, WA
CG Project Number: 06068.10
Submitted to:
Taylor Gregory Butterfield
654 5th Ave South, Suite 300
Edmonds, WA
u
4 .110
2504 Ih Avenue S, Suite 200
Edmonds, WA 98020
(425) 778-8500
L
Pro Lew Description
A new four story building with daylight basement, top three stories will be condominiums,
bottom two stories will be office space, will be built at 1223 Lawrence St. Port Townsend, WA.
Construction:
Wood -framed with shear walls; slab -on -grade
Sekmic Loading:
SS: 1.260
S1: 0.45
Site Class: D (assumed)
SDC: D
Wind Loading
Speed: 85 mph (3s gust)
Exposure: C
Snow LoadinY:
25 psf
Live L ,oadigg:
esaytion
Project Description
Residential
40 psf
Exit
100 psf
Office
50 psf
Dead Loading:
Roof: 18
Floor: 28
Wall: 10 psf (face of wall)
Soil Allowable Pressure.
Report: Assumed
Bearing: 2000' psf
Project_Description.xlsProject_Desc
esaytion
Project Description
", MD
Mar 5/12/2006
Qvcrk-W
DAIC
ENGINEERING
SCOW
Shoes No.
250 4th Ave. South
1.000
pvq° cl
Job No'
Suite 200
J&J Perkins Building
06068.10
Edmonds, WA 98020
Project_Description.xlsProject_Desc
I,.
Roofing
2.5 psf
5/8" sheathing
1.3
trusses @24" oc
2.9
Insulation
1.2
Ceiling (2layers5/8" gyp)
5.6
Sprinklers
2
6:12 slope
0.8
Misc.
1.8
Total
18.0 psf
Flooring (carpet)
1.0 psf tile in laundry roomadd 9psf
3/4" ply
2.3 hardwood in kitchen
add 3 psf
117/8"" TJI@ 16"o.c.
2.3
Ceiling (2layers5/8" gyp)
5.6
1 1/2" gyperete
13.0
Sprinklers
2
Misc.
1.8
Total
28.0 psf 4-
Live Load
20 psf
Snow load:
25 psf
residential 40 psf
office 50 psf
exit corridors 100 psf
.................
'Description MD ate 5/1/2006
("hecked Date
gravity loads
ENGINEERING Scale Sheet No.
250 4th Ave South project lob No. 1 001
Suite 200 AJ Perkins Building 06068.10-'
Edmonds, WA 98020
58'-0'
9,-0*
,
�-r------r------`
34
2504th Ave. South Project
Suite 200 U -Tp
Edmonds, WA 98020
Job No ...-®l 1 0 0 3
f/T
YL
40---
,ry
130 A
P5,
A�
1,--, P4-
'2 -x 2 -
Description
By
Date
Checked
Date
ENGINEERING
Scale
Sheet No.
2504th Ave. South Project
Suite 200 U -Tp
Edmonds, WA 98020
Job No ...-®l 1 0 0 3
C � DescriptionBy
�:�f-s at��
Checked Date
ENGINEERING Scale Sheet No.
250 4th Ave. South
Suite 200 Project \, J p
Job No.
Edmonds, WA98020 I D b(�` 0 , Q t
in 1
f
160
�."K.
_..
ti
r
i
�Iy
u
.
r
f
y e
... ,.,
-6.
..._
..... .�..... _ ,..
..
..X..
a
.,
l
n (5,r�....... r
tr
�.... ,.. m,,..,.. ,. m, , ... , _... ,,.�,..,.,.P _.
..�..... ..,......,..
....
.._, a r,. ,.... ... �..
h
.� y
FM
r
�
Q
1- z
b.
s ...,.., .A ,...,..,� _
.yy .....,. „ i....
tl
_.
�q
4.`���. - f .. �..A....,.. ... _
R ...YYY
J (q
u
r
too 2 -1
-
VV i
Description 14�I IT—/
I ZOO —
Byec
c I D f
1.'-- -._
e1
rr _
.��
ChkDat
ENGINEERING
Scale
Sheet No.
2504th Ave. South
Suite 200
Pro.
��
JobWNo.
1 005
1 Edmonds, WA 9 8020
C(Description C) 4 V, R-00 BY Daste 11I b
Checked Date
ENGINEERING Scale Sheet No.
250 4thAve. South " m
Project Job No. 1 0 0 6
Suite 200 v
Edmonds, WA98020
u
xd
f I
mm
t
_ w ...
i t
j\A
L
_
-7
16
K
017,
s ,
4
�
r
i
v
,
I
t
�p I
r
..m
r
t+D S 'r 0 L U, -A J P Lhi i 1 n 1
�.. . .. .... ... ...... . ... ....
t
C
0.G
s
04
i
f�rp ppp
C(Description C) 4 V, R-00 BY Daste 11I b
Checked Date
ENGINEERING Scale Sheet No.
250 4thAve. South " m
Project Job No. 1 0 0 6
Suite 200 v
Edmonds, WA98020
1
4-08�-6'
1 6'-3- 91-0. 6'-6- 5-6- 5-4� S-2' � 4'-0-
1, '' , 1
RZ
Qb)
R43
R42
RM
,
Description �-�'� By Date
Checked _ Date
ENGINEERING scale Sheet No.
250 4th Ave. South ."
Job No.
Suite 200 Project
Edmonds, WA98020 60 coo, ��
250 4thAve. South
Suite 200
Edmonds, WA 98020
Job No.
1 009
610(0$, 10
C
ENGINEERING
Description By 99
Iff hec0e I Date
2504th Ave. South Project
Suite 200
Edmonds, WA98020
Scale
Job No.
O D.. o, to
Sheet No.
1 010
C
ENGINEERING
Description -1 AAA 1 lr( 4J1! By S5
2504th Ave. South
Suite 200
Edmonds, WA 98020
Scale
Job No.
Date
:Is10�
Date
Sheet No.
1 Oil
IN ICC
58'-0"
4'-0- V 8'-6- 1 6--3- V 5--9- 9.-0.
FJi
7771719M
CMST14 S AP W/ OLK FULL
ENGTH OF JALL TOP 'k OTTOM
So,
OF NDO% TM GMD L
6'-6- V-6- W 5'-4- v 3'-2* 1 4'-0'
SIMF
--y 18/ril97)
U se
Description
-Date
Bhecked
Date
..... .....
Scale
Sheet No.
Sv C,
AL
.. ..
...... I
... .. ...
(5) ...... . ..... . ..
(VA,
'T
... . . .........
.. . . ......
J
U se
Description
-Date
Bhecked
Date
ENGINEERING
Scale
Sheet No.
2504th Ave. South Project
ect -T3-,F
Suite 200
Edinonds,WA98020
Job No.
. . ........... - ------------------ 1 013
0(170(9'?, 10
250 4thAve. South Project
Suite 200
Edmonds, WA98020
Job No.
. _., �ee.� _� _ em.._ ..�.....r.
�....... �, .� � t ...,__ w., � � .;, .�_,�. m
.� e ,_
.. __...
5B'-0' .�
4'-0' 8"-6 6'-3' 5"-9' g" -p. 6'-6' S-6" 4� %� 4'-0'
1
Fji
2SW3
'
FJI
2SW3
FJ
FJ1.
p
rOF__..
1 COLO N = 19
"tea
,
SEE 0fA11 6/56.1
I NL y UNDER EE D
SHEAR ALLS TYP, fS6.1
i
Ell
7
HGUS7 5/12 T OF
I FJIr'12S C LUMN 1'-9"
V
6M BM LL HM! 6
_ HGUS7.25/12'' S61
f 11F'J1Fm1B
mow-'
FJI Fil—
�,
_
_.._� .m. . _ .,_ �._
13N3 sw 1
6�2
(S2,�x.° 10
P
i i 1 ryry ,y�,w.
0
v
N W �
r
7w�
C Description w e BY
SS DatSx.....
Checked Date
ENGINEERING Seale Sbeet No.
2504th Ave. South Project 0 l� %
Job No. _.._
Suite 200 7 � 1
Edmonds, WA 98020
o� �d
m
�
o
u
P
i i 1 ryry ,y�,w.
0
v
N W �
r
7w�
C Description w e BY
SS DatSx.....
Checked Date
ENGINEERING Seale Sbeet No.
2504th Ave. South Project 0 l� %
Job No. _.._
Suite 200 7 � 1
Edmonds, WA 98020
2504th Ave. South Project
Suite 200
Edmonds, WA98020
Job No. W + O 1
040(08, \13
i
,
bnl _ m..
116)
s
a
� PA w
i
A i
S
�
s
e
I
_ '
I
I
i
r
u
r � f
I �
SIJ
a
�,t�
yy p q
µ
I
1 n I
1
F, 240 ., . a
'
p { 1
l�
s�
d
.
---------------------
R�.
Description
By
_ ..__ Da�
� „_m,
Checked
Date
ENGINEERING
scale
sheet No.
2504th Ave. South Project
Suite 200
Edmonds, WA98020
Job No. W + O 1
040(08, \13
A/
4m
Description
C'I�� .1/ Z ��op-
S
Date
Checked
Dates+�,��
0
ENGINEERING
Scale
Sheet No.
250 4thAve. South
1 019
Project-JS F
Job
Suite 200
�Noo.�
D Q t a
Edmonds, WA 98020
1
,�, ((
�J' OP rnt'j _ r, 6- at +� ..� ',OaiMp'W
Ilk A D
rn� �.
05
4 4+— •a P F ..._ . ,"".." _ ...... ,..
F
pfi
Flip
14d
�a ,"
I,b w
��.. ...
i
16 W
"
AA
k
I
i
l
I � I
�
-
C
,
I/.,., x I I�St ,
2 o E Knr14i
8
.. f' I���
W 4
% 3
�
eF"�yw�aN➢u.k-' I"��p�r,atias�niF gti�� .Q...,. }��� .?""",.,� ��?O
i,e & �, .. � a��,
2�8a
fes+/
4mDescription ✓ By U -S liatC13 1O G,
C-, 2A -v tTy z— ��o
Checked Date
ENGINEERING Scale sheet No.
250 4thAve. South_.m
Protect ��P ...'..Job No.
Suite 200
Edmonds, WA 98020
. ,
4- .4a s _P� . ,4 .� .. w w., ':�'e �,.........,,.
w r �'
o
�. _ .. 1"'1
Description
ENGINEERING
250 4th Ave. South Project
Suite 200
Edmonds, WA98020
By Date
Checked Date
Scale Sheet No.
Job No. O 7
O{40t0,9, Ib L
k
F$' xy .. .�." r
Y - 8,11411
1P _`
P „ 9 1� __-t� " fi _
"
k
Nk
9
n
.
��,`L
N
✓
,
a i
k r
a
k X
,e,°M t-
i
W' f
,
q , i
y I _
F^L,t
t
�. t4 t.A, {.
_
�. _ .. 1"'1
Description
ENGINEERING
250 4th Ave. South Project
Suite 200
Edmonds, WA98020
By Date
Checked Date
Scale Sheet No.
Job No. O 7
O{40t0,9, Ib L
250 4th Ave. South_ .....
Suite 200 Project TF
Edmonds, WA98020
Job .N......_...._..
0 Lr o (, 9, 1-6
s N s ��t✓�
i
._.
0
N
e
I
1
i
LI
��ryry y. 40i- 'yq
eP
M
0
y j+
d
„
LL) i -S,
Description
By
Date
_
Checked
Date
ENGINEERING
Scale
Sheet No.
250 4th Ave. South_ .....
Suite 200 Project TF
Edmonds, WA98020
Job .N......_...._..
0 Lr o (, 9, 1-6
_. n
Description
C, C14'V 1 T -"i
ENGINEERING
250 4th Ave. South
Project
Suite 200 �
Edmonds, WA 98020
B' 51�i
Late
-- �u�a �- 1 o
"a c.
Checked Date
Scale Sheet No.
.._��_.
Job No. 1 O Z 3
1 0?4
COMPANY PRO. -T
WooidWorks'
xoaa wnsem,v woos; PTrVGv .
May 3, 2006 10:01:35 4x64LDF#1
Design Check Calculation Sheet
Sizer 2004
LOADS: ( lbs, psf, or plf )
Load I Type Distribution
Magnitude
Start End
Location [ft]Pattern
Start End Load?
Loadl Live Axial
7830 (Eccent;city
= 0.00 in)
MAXIMUM REACTIONS (lbs):
0'
_ -7 ib 6,lvC-
10'
Lumber Post, D.Fir-L, No.1, 4x6"
Self Weight of 4.57 plf automatically included in loads;
Pinned base; Loadface = width(b); Ke x Lb: 1.00 x 10.00= 10.00 [ft]; Ke x Ld: 1.00 x 10.00= 10.00 [ft]; Load combinations: ICC -IBC;
SECTION vs. DESIGN CODE NDS -2001: (stress=psi, and in)
Criterion Analysis Value Design Value Analysis/Design
Axial fc = 409 Fc' 408 fc/Fc' 1.00
Axial Bearing fc = 409 Fc* = 1650 fc/Fc* = 0.25
ADDITIONAL DATA:
FACTORS: F CD CM Ct CL/CP CF Cfu Cr Cfrt Ci LC#
Fc' 1500 1.00 1.00 1.00 0.247 1.100 - - 1.00 1.00 2
Fc* 1500 1.00 1.00 1.00 - 1.100 _ - 1.00 1.00 2
Axial : LC# 2 = L, P = 7876 lbs
(D=dead L=live S=snow W=wind I=impact C=construction CLd=concentrated)
(All LC's are listed in the Analysis output)
DESIGN NOTES:
1. Please verify that the default deflection limits are appropriate for your application.
2. SCL - Columns (Structural Composite Lumber): the attached SCL selection is for preliminary design only. For final member design contact your
local SCL manufacturer.
1 025
kw4m p55, Ver 5.8.0, 1-Dee•2003
13.2003 ENERCALC Engineerin0 S OP6 are
Description
Title :
Dsgnr:
Description
Scope
Steel Column
Job #
Date: 12:20PM, 4 MAY O6
Page 1
col umns.ecw: Cal cu I ati ons
__..
General Information
......... _
_. _....... _
Code Ref: AISC 9th ASD, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Steel Section TS4X4X114
Fy
46.00 ksi
X-XSidesway:
Restrained
18.20 ksi
Duration Factor
1.000
Y -Y Sidesway :
Restrained
Column Height 10.000 ft
Elastic Modulus
29,000.00 ksi
9.09 ksi
End Fixity Pin -Pin
X -X Unbraced
0.000 ft
Kxx
1.000
Live & Short Term Loads Combined
Y -Y Unbraced
10.000 ft
Kyy
1.000
Loads
30.36 ksi
... ....
.. ........
_....��._...
Axial Load...
0.00 ksi
0.00 ksi
Dead Load 15.38 k
0.00 ksi
Ecc. for X -X Axis Moments
0.000 in
27.60 ksi
Live Load 17.25 k
Ecc. for Y -Y Axis Moments
0.000 in
Fb:yy : Allow [F1-7] & [F1-8]
Short Term Load k
27.60 ksi
27.60 ksi
27.60 ksi
imirrtalry I Column Design OK
Section : TS4X4X174, Height = 10.00ft, Axial Loads: DL = 15.38, LL = 17.25, ST = 0.00k, Ecc. = 0.000in
Unbraced Lengths: X -X = 10.00ft, Y -Y = 0.00ft
Combined Stress Ratios Dead Live DL + LL DL + ST + (LL if Chosen)
AISC Formula H1 - 1 0.2353 0.2639 0.4991 0.4991
AISC Formula H1 - 2 0.1552 0.1741 0.3292 0.3292
AISC Formula H1 - 3
XX Axis : Fa calc'd per Eq. E2-1, K*Ur < Cc
Stresses
Allowable & Actual Stresses
Dead
Live
DL + LL DL + Short
Fa : Allowable
18.20 ksi
18.20 ksi
18.20 ksi
18.20 ksi
fa : Actual
4.28 ksi
4.80 ksi
9.09 ksi
9.09 ksi
Fb:xx : Allow [F1-6]
30.36 ksi
30.36 ksi
30.36 ksi
30.36 ksi
Fb:xx : Allow [F1-7] & [F1-8]
30.36 ksi
30.36 ksi
30.36 ksi
30.36 ksi
fb : xx Actual
0.00 ksi
0.00 ksi
0.00 ksi
0.00 ksi
Fb:yy : Allow [F1-6]
27.60 ksi
27.60 ksi
27.60 ksi
27.60 ksi
Fb:yy : Allow [F1-7] & [F1-8]
27.60 ksi
27.60 ksi
27.60 ksi
27.60 ksi
fb : yy Actual
0.00 ksi
0.00 ksi
0.00 ksi
0.00 ksi
.
Analysis Values
.. ..........
........
_
1111
F'ex : DL+LL
23,745 psi
Cm:x DL+LL
0.60
Cb:x DL+LL
1.00
F'ey : DL+LL
0 psi
Cm:y DL+LL
0.60
Cb:y DL+LL
1.00
F'ex : DL+LL+ST
23,745 psi
Cm:x DL+LL+ST
0.60
Cb:x DL+LL+ST
1.00
F'ey : DL+LL+ST
0 psi
Cm:y DL+LL+ST
0.60
Cb:y DL+LL+ST
1.00
Max X -X Axis Deflection
0.000 in
at 0.000 ft Max Y -Y Axis
Deflection
0.000 in at
0.000 ft
1 O`?h
_ Y I
W-6° 5'-6" '' - 2" 4'-0"
-� 2SW3 ... 25 ...
FJ2
FSI'%
4
E PLA1f
B. \ 843
2SW3 3
HGU 25/12
� 6
FJt FJI
—Hr.US 25/12
16
M5 B
—BL
7R' %BALLS. T, 6
X pu a
� e �
I
SW3 SW3 SW3�
_
mm g*
B"'-6" 6'_3-
g p.
i" THICK
BASE PLATE
Fd9
p
4p
k
N-
FX
FJl
3
ew
_ Y I
W-6° 5'-6" '' - 2" 4'-0"
-� 2SW3 ... 25 ...
FJ2
FSI'%
4
E PLA1f
B. \ 843
2SW3 3
HGU 25/12
� 6
FJt FJI
—Hr.US 25/12
16
M5 B
—BL
7R' %BALLS. T, 6
X pu a
� e �
I
SW3 SW3 SW3�
AM,
'Y-1 4`�-r
L
61$ 4-, 35t -2
I
1-7
7A D
J,
�)A &C-7
r -Y 'r,
�12
�
16 7!
41,44
I'
'or
0
ENGINEERING
V_" I T-4 �Fl.00 By Ts
Checked
Scale
250 4th Ave. South
Suite 200 Project Job No.
Edmonds, WA 98020 0 (,, 0 (O'g, 0
IJULU s1,3 to C,
Date
Sheet No.
02
RAA ...1._®.
f a
�r+
_..,. y ti
t
A
Lf
��
..- � E.� ��! ., R..°'�"�, .. .. �. .,. _ , .. ,., �.
,.,. ..- ,.. � u•,'+�--+--.�„{
r✓�
691
y,.
.. ,.,
1
.0 .,
LID
....
,,,
ff o b
Yescr6pti0a
Sa—
By
Date
Checked
Date
ENGINEERING
Seale
Sheet No.
250 4th Ave. South Project
Suite 200 `S S F
Edmonds, WA 98020
Job No.
0(,0(,00.10 1 029
C� Description Cl Lkv' T-� I
ENGINEERING
250 4th Ave. South Project
Suite 200 STP
Edmonds, WA98020
By -IS
Checked
Scale
Job No
opo(Os, �o
s(,-I.L
Sheet No.
1 039
11
Yz 2 Is
as
f'
7��°..dSl��
e
=6,12 S3
t
i
v
`T = .� . �
r
Rssm
—
1 Y41,
3,3X5 , 2tir-U �I `� o x, � ._.
1!6+I ,ice,
loa .� Gil 9 �.
r. .
— —-4
tl
16,
I G 0 . 2
,
_ ' 4.
=.� �'w u� K Get ...._. t���'
l p ii
2,471
LTL 4
C� Description Cl Lkv' T-� I
ENGINEERING
250 4th Ave. South Project
Suite 200 STP
Edmonds, WA98020
By -IS
Checked
Scale
Job No
opo(Os, �o
s(,-I.L
Sheet No.
1 039
iXL S
�
1
� X Sri
r
� i
rL�,
_._,�►��..m��
�..
Y
ATL
f
_...
Description
C
By
�__
Date
__ _ .N....�.
Date
Checked
ENGINEERING
scale
Sheet No.
2504thAve. South
_.......
1 031
project
lob No.
Suite 200
Edmonds, WA98020
C
ENGINEERING
250 4thAve. South
Suite 200
Edmonds, WA 98020
By TS
Checked
Scale
Job No.
Ou 0,69, to
tAto low
Date
Sheet No.
1 03?
JP..CUUN F,.TIN,GS
�........ ..
:... �__._...._..� ....._
..REP/,A
, . R war 1 hjC7 V'nesss . e,m
UNITS ,. ,.
1p �
A8:4
i
a , ,.._ 10:8 e .. ,;� 9.7 ..... _.�, _._..�...
4,. ,. ,. ,. 1,281"-
4#5 `
Al1
�., 5 ..., ..
B1,4
f
4 882 C 8.5,
3.. _ 2042
B5 '
31.95 40.25
2006
7, #5
16
B6";
812 i�... 20......r
5. 11W
.. 5..#5
12
C8 4
9.2 111
4 '1269
A O -%A
_,-..1452; w_a
' ... , .,�
_.
F5 ;
14.6 . 18;7 ��
5 1332.
F7
12.4 1610 i
4 1825;
.... r
3- _ 1380 ...
6 ;
13.5 17:4
4 1:931 rz
ti
�H8.5
15.4. ... ..20 2 .__ ....®..
— _'1424
r
�..
n
I i
�
;
j
7
W
ti
f
'
V
j P
y
72,000
k
i
t1
,
-
,
_._
C
ENGINEERING
250 4thAve. South
Suite 200
Edmonds, WA 98020
By TS
Checked
Scale
Job No.
Ou 0,69, to
tAto low
Date
Sheet No.
1 03?
Wax: KW,0605155, Ver 513.0, 1 -Dec -2003
(c)1983-2003 ENERCALC Engineering Software
Description 3ft
Title :
Dsgnr:
Description
Scope :
Square Footing Design
Job #
Date: 8:53AM, 12 MAY 06
Page 1
General Information
1,200.56 psf
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
mmm Dead Load
5.000 k
Footing Dimension
3.000 ft
Live Load
4.500 k
Thickness
12.00 in
Short Term Load
0.000 k
# of Bars
3
Seismic Zone
4
Bar Size
5
Overburden Weight
0.000 psf
Rebar Cover
3.250
Concrete Weight
145.00 pcf
f'c
2,500.0 psi
LL & ST Loads Combine
Fy
60,000.0 psi
Load Duration Factor
1.000
Column Dimension
0.00 in
Allowable Soil Bearing
2,000.00 psf
Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by virtue of their references to ACI 318-02 for concrete design.
Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C.2
.....
Reinforcing
Rebar Requirement
Actual Rebar "d" depth used
8.438 in
As to USE per foot of Width
0.259 in2
200/Fy
0.0033
Total As Req'd
0.778 in2
As Req'd by Analysis
0.0005 in2
Min Allow % Reinf
0.0014
Min. Reinf % to Req'd
0.0014%
Immary Footing OK
3.00ft square x 12.Oin thick with 3- #5 bars
Max. Static Soil Pressure
1,200.56 psf
Vu : Actual One -Way
14.41 psi
Allow Static Soil Pressure
2,000.00 psf
Vn'Phi : Allow One -Way
85.00 psi
Max. Short Term Soil Pressure
1,200.56 psf
Vu : Actual Two -Way
54.68 psi
Allow Short Term Soil Pressure
2,000.00 psf
Vn'Phi : Allow Two -Way
170.00 psi
Alternate Rebar Selections...
Mu :Actual
2.06 k -ft / ft
4 # 4's 3 # 5's
2 # 6's
Mn ' Phi : Capacity
11.26 k -ft / ft
2 # 7's 1 # 8's
1 # 9's 1 # 10's
1 033
User: KW -0605155, Ver 5.6.0, 1 -Dec -2003
(c)083.2003 ENERCALE ErnONa eer w 0 Software
Description 4ft
General Information
Title :
Dsgnr:
Description
Scope :
Square Footing Design
Job #
Date: 8:53AM, 12 MAY 06
Page 1
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
Dead Load
10.800 k
Footing Dimension
4.000 ft
Live Load
9.700 k
Thickness
12.00 in
Short Term Load
0.000 k
# of Bars
4
Seismic Zone
4
Bar Size
5
Overburden Weight
0.000 psf
Rebar Cover
3.250
Concrete Weight
145.00 pcf
fc
2,500.0 psi
LL & ST Loads Combine
11.26 k -ft / ft
Fy
60,000.0 psi
Load Duration Factor
1.000
Column Dimension
0.00 in
Allowable Soil Bearing
2,000.00 psf
Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by virtue of their references to ACI 318-02 for concrete design.
Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C.2
Reinforcing
....... ... __.. .....
Rebar Requirement
Actual Rebar "d" depth used
8.438 in
As to USE per foot of Width
0.259 in2
200/Fy
0.0033
Total As Req'd
1.037 in2
As Req'd by Analysis
0.0012 in2
Min Allow % Reinf
0.0020
Min. Reinf % to Req'd
0.0020 %
arraxr1 ar y III Footing OK
MOMMUMMIll
4.00ft square x 12.Oin thick with 4- #5 bars
Max. Static Soil Pressure
1,426.25 psf
Vu: Actual One -Way
27.91 psi
Allow Static Soil Pressure
2,000.00 psf
Vn'Phi : Allow One -Way
85.00 psi
Max. Short Term Soil Pressure
1,426.25 psf
Vu : Actual Two -Way
118.63 psi
Allow Short Term Soil Pressure
2,000.00 psf
Vn'Phi : Allow Two -Way
170.00 psi
Alternate Rebar Selections...
Mu :Actual
4.36 k -ft / ft
6 # 4's 4 # 5's
3 # 6's
Mn " Phi: Capacity
11.26 k -ft / ft
2 # 7's 2 # 8's
2 # 9's 1 # 10's
1 03/
user: M-0605155, ver 5.8.0, 1-Qec-2003
gcp1983•2003 ER ERCALC EngMee6ng Software
Description 5ft
Title :
Dsgnr:
Description
Scope:
Square Footing Design
Job #
Date: 8:54AM, 12 MAY 06
Page 1
General Information
1,597.00 psf
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 N PA 5000
Dead Load
15.300 k
Footing Dimension
5.000 ft
Live Load
21.000 k
Thickness
12.00 in
Short Term Load
0.000 k
# of Bars
5
Seismic Zone
4
Bar Size
5
Overburden Weight
0.000 psf
Rebar Cover
3.250
Concrete Weight
145.00 pcf
fc
Fy
2,500.0 psi
60,000.0 psi
LL & ST Loads Combine
Load Duration Factor
1.000
Column Dimension
4.00 in
Allowable Soil Bearing
2,000.00 psf
Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by virtue of their references to ACI 318-02
for concrete design.
Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C.2
VReinforcing
Rebar Requirement
Actual Rebar "d" depth used
8.438 in
As to USE per foot of Width
0.259 in2
200/Fy
0.0033
Total As Req'd
1.296 in2
As Req'd by Analysis
0.0018 in2
Min Allow % Reinf
0.0020
Min. Reinf % to Req'd
0.0024%
tmmary Footing OK
5.00ft square x 12.Oin thick with 5- #5 bars
Max. Static Soil Pressure
1,597.00 psf
Vu: Actual One -Way
40.06 psi
Allow Static Soil Pressure
2,000.00 psf
Vn"Phi : Allow One -Way
85.00 psi
Max. Short Term Soil Pressure
1,597.00 psf
Vu : Actual Two -Way
141.80 psi
Allow Short Term Soil Pressure
2,000.00 psf
Vn"Phi : Allow Two -Way
170.00 psi
Alternate Rebar Selections...
Mu :Actual
6.77 k -ft / ft
7 # 4's 5 # 5's
3 # 6's
Mn ' Phi : Capacity
11.26 k -ft / ft
3 # 7's 2 # 8's
2 # 9's 2 # 10's
1 035
Title : Job #
Dsgnr: Date: 8:55AM, 12 MAY 06
Description
Scope :
nev: aBuvou
User, KW-0dr05155,Ver5.80.1-Dec-2003 Square Footing Design Page 1
tc,II983-2003 ENERCALC Enaineerdna software fcoNn9s.erw: alcvWA)n
Description 6ft
General Information
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
Dead Load
31.950 k
Footing Dimension
011
6.000 ft
Live Load
40.250 k
Thickness
16.00 in
ShortTerm Load
0.000 k
# of Bars
7
Seismic Zone
4
Bar Size
5
Overburden Weight
0.000 psf
Rebar Cover
3.250
Concrete Weight
145.00 pcf
f c
2,500.0 psi
LL & ST Loads Combine
Fy
60,000.0 psi
Load Duration Factor
1.000
Column Dimension
5.00 in
Allowable Soil Bearing
2,200.00 psf
Note: Load factoring supports 2003 IBC and 2003 NFPA 5000 by
virtue of their references to ACI 318-02 for concrete design.
Factoring of entered loads to ultimate loads within this program is according to ACI 318-02 C.2
Reinforcing
Rebar Requirement
Actual Rebar "d" depth used
12.438 in
As to USE per foot of Width
0.346 int
200/Fy
0.0033
Total As Req'd
2.074 in2
As Req'd by Analysis
0.0016 in2
Min Allow % Reinf
0.0020
Min. Reinf % to Req'd
0.0022 %
6.00ft square x 16.Oin thick with 7- #5 bars
Max. Static Soil Pressure 2,198.89 psf Vu : Actual One -Way
Allow Static Soil Pressure 2,200.00 psf Vn*Phi : Allow One -Way
Max. Short Term Soil Pressure 2,198.89 psf Vu : Actual Two -Way
Allow Short Term Soil Pressure 2,200.00 psf Vn*Phi : Allow Two -Way
Alternate Rebar Selections...
Mu :Actual 13.30 k -ft / ft 11 #4's 7 # 5's
Mn * Phi : Capacity 19.55 k -ft / ft 4 # 7's 3 # 8's
Footing OK
40.15 psi
85.00 psi
133.36 psi
170.00 psi
5 # 6's
3 # 9's 2 # 10's
1 036
A nnnnrin Cn—ud:9R, IM Q in n/e
@Toe
Designer select
#0@0.1n all horiz. reinf. 6�-5-...--„
@ Heel T_1„
1 037
User, 9,VV,(W5`1 55. ver 513.0. 1
tca uvta�..� rr�rrr�c r<r�
Description
Criteria
Title : Job #
Dsgnr: Date: 11:21AM, 9 MAY 06
Description
Scope:
Code Ref: ACI 318-02, 1997 UBC, 2003 IBC, 2003 NFPA 5000
Cantilevered Retaining Wall Design
grid 11 between grids J -L
Retained Height =
8.25 ft
Wall height above soil =
0.00 ft
Slope Behind Wall =
0.00: 1
Height of Soil over Toe =
9.00 in
Soil Density =
110.00 pcf
Wind on Stem - 0.0 psf
Surcharge Loads
Surcharge Over Heel =
0.0 psi
Used To Resist Sliding & Overturning
Surcharge Over Toe =
0.0 psf
Used for Sliding & Overturning
Soil Pressure Less Than Allowable
Design Summary
1,456 psi
Total Bearing Load _
2,419 lbs
...resultant ecc. -
23.89 in
Soil Pressure @ Toe =
1,040 psf OK
Soil Pressure @ Heel =
0 psf OK
Allowable =
2,000 psf
Soil Pressure Less Than Allowable
ACI Factored @ Toe =
1,456 psi
ACI Factored @ Heel =
0 psf
Footing Shear @ Toe =
15.0 psi OK
Footing Shear @ Heel =
0.0 psi OK
Allowable =
93.1 psi
Wall Stability Ratios
_
Overturning =
1.51 OK
Sliding =
N/A
Sliding Calcs Slab Resists
All Sliding!
Lateral Sliding Force =
2,007.3 lbs
Footing µDesign Results
IS --- o -il Data
Allow Soil Bearing
= 2,000.0 psf
Equivalent Fluid Pressure Method
Heel Active Pressure
= 35.0 psf/ft
Toe Active Pressure
= 0.0 psf/ft
Passive Pressure
= 250.0 psf/ft
Water height over heel
= 0.0 ft
FootingjjSoil Friction = 0.300
Soil height to ignore
for passive pressure = 0.00 in
Lateral Load A lied to S
Apptem
Lateral Load = 60.0 #/ft
...Height to Top = 8.50 it
...Height to Bottom = 0.00 ft
Page 1
___ ........ .. . .......... ...
Footing Strengths & Dimensions
fc = 3,000 psi Fy = 60,000 psi
Min. As % = 0.0014
Toe Width = 6.42 ft
Heel Width = 0.67
Total Footing Width = ____7.W
Footing Thickness = 12.00 in
Key Width -
0.00 in
Key Depth
0.00 in
Key Distance from Toe -
6.58 it
Cover @ Top = 3:00 in
@ Btm.= 3.00 in
Axial Load Applied to Stem
Axial Dead Load =
30.0 lbs
Axial Live Load =
0.0 lbs
Axial Load Eccentricity =
0.0 in
Stem COn strUCtlOn
Top Stem
Heel
A
Stem OK
Design height
ft=
0.00
Wall Material Above "Ht"
=
Concrete
Thickness
_
8.00
Rebar Size
_
# 5
Rebar Spacing
_
9.75
Rebar Placed at
Toe Reinforcing
Edge
Design Data
Heel Reinforcing
--
fb/FB + fa/Fa
=
0.939
Total Force @ Section
lbs=
2,891.9
Moment.... Actual
ft-#=
9,253.1
Moment..... Allowable
=
9,850.5
Shear..... Actual
psi =
38.9
Shear..... Allowable
psi =
85.0
Bar Develop ABOVE Ht. in = 23.40
Bar Lap/Hook BELOW Ht. in = 8.96
Wall Weight
Toe
Heel
Factored Pressure
= 1,456
0 psf
Mu': Upward
= 19,982
0 ft-#
Mu': Downward
= 6,700
0 ft-#
Mu: Design
= 13,282
0 ft-#
Actual 1 -Way Shear
= 14.99
0.00 psi
Allow 1 -Way Shear
= 93.11
0.00 psi
Toe Reinforcing
= # 5 @ 10.50 in
Heel Reinforcing
= None Spec'd
Key Reinforcing
= None Spec'd
Bar Develop ABOVE Ht. in = 23.40
Bar Lap/Hook BELOW Ht. in = 8.96
Wall Weight
=
96.7
Rebar Depth 'd'
in=
6.19
Masonry Data
f'm
psi =
Fs
psi =
Solid Grouting
Special Inspection
=
Modular Ratio 'n'
Short Term Factor
-
Equiv. Solid Thick.
Masonry Block Type =
Normal Weight
Concrete Data ...........................
f'c
psi =
2,500.0
Fy
psi=
60,000.0
Other Acceptable Sizes & S cIngs
Toe: 44@ 26.00 in, #5 0.50 in, 46@ 48.25 in, #7@ 48.25 in, #8@ 48.25 in, #9@ 4
Heel: Not req'd, Mu < S' Fr
Key: No key defined
1 038
Title : Job #
Dsgnr: Date: 11:21 AM, 9 MAY 06
Description
Scope:
Code Ref: ACI 318-02, 1997 UBC, 2003 IBC, 2003 NFPA 5000
m Cantilevered Retaining Wall Design
......�.. � Page 2
560014U KW -06=5 ver .L1.CL 1 -Dec 2003
(0 1 983-2003 ENE ALC En lfl aeon SdIw are foofings ecwwr;Cdck, aflor ,
Description grid 11 between grids J -L
�urnma of Overturnin & esistin.� Forces & i111crnents
__
..... OVERTURNING ........
RESISTING.....
Force Distance Moment
Force
Distance
Moment
Item lbs ft ft-#
lbs
ft
ft-#
Heel Active Pressure = 1,497.3 3.08 4,616.8
Soil Over Heel =
7.08
Toe Active Pressure =
Sloped Soil Over Heel =
Surcharge Over Toe =
Surcharge Over Heel =
Adjacent Footing Load =
Adjacent Footing Load =
Added Lateral Load = 510.0 5.25 2,677.5
Axial Dead Load on Stem=
30.0
6.75
202.5
Load @ Stem Above Soil =
Soil Over Toe
529.3
3.21
1,698.1
SeismicLoad =
Surcharge Over Toe =
Stem Weight(s) =
797.5
6.75
5,382.6
Total = 2,007.3 O.T.M. = 7,294.3
Earth @ Stem Transitions=
Res lsting/OverturnIng Ratio = 1.51
Footing Weight =
1,062.4
3.54
3,762.3
Vertical Loads used for Soil Pressure = 2,419.2 lbs
Key Weight =
6.58
Vert. Component =
Vertical component of active pressure NOT used for soil pressure
Total =
2,419.2
lbs R.M.=
11,045.4
1 039
$_00005in Concw/#5 0 14 in o/c
Title : Job #
Dsgnr: Date: 11:21 AM, 9 MAY 06
Description
Scope:
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
gww �,
User KW-=5158.Ver 58.0, 1 -Dec-= Cantilevered Retaining Wall Design
(c)1983-2003 ENERCALC Engnaerinq Sothvare
Description on grid L between grids 3-5 and 6-8
Criteria
Retained Height =
6.50 ft
Wall height above soil =
0.00 ft
Slope Behind Wall =
0.00:1
Height of Soil over Toe =
9.00 in
Soil Density =
110.00 pcf
Wind on Stem = 0.0 psf
�_......... .._
Surcharge Loads
928 psf OK
Surcharge Over Heel =
0,0 psf
Used To Resist Sliding & Overturning
Surcharge Over Toe =
0.0 psf
Used for Sliding & Overturning
1,338 psf
Design Summary
lmrrirwwlwlnn
41
29 psf
Total Bearing Load
2,093 lbs
...resultant ecc.
8.46 in
Soil Pressure @ Toe =
928 psf OK
Soil Pressure @ Heel =
20 psf OK
Allowable =
2„000 psf
Soil Pressure Less Than Allowable
ACI Factored @ Toe =
1,338 psf
ACI Factored @ Heel =
29 psf
Footing Shear @ Toe =
23.5 psi OK
Footing Shear @ Heel =
0.0 psi OK
Allowable =
85.0 psi
Wall Stability Ratios
_
Overturning =
1.52 OK
Sliding =
N/A
Sliding Calcs Slab Resists
All Sliding 1
Lateral Sliding Force =
1,279.1 lbs
_
1 Footin Dlr�.•• m.. ...
g sign Results
Soil Data
Allow Soil Bearing
= 2,000.0 psf
Equivalent Fluid Pressure Method
Heel Active Pressure
= 35.0 psf/ft
Toe Active Pressure
= 0.0 psf/ft
Passive Pressure
= 250.0 psf/ft
Water height over heel
= 0.0 ft
FootingIlSoil Friction = 0.300
Soil height to ignore
for passive pressure = 0.00 in
Lateral Load Applied to Stem
Lateral Load = 52.0 #/ft
...Height to Top = 6.50 ft
...Height to Bottom = 0.00 ft
Page 1
Footing Strengths & Dimensions
f c = 2,500 psi Fy = 60,000 psi
Min. As % = 0.0014
Toe Width = 3.75 ft
Heel Width = 0.67
Total Footing Width = --- C42 --
Footing Thickness = 10.00 in
Key Width -
0.00 in
Key Depth
0.00 in
Key Distance from Toe =
4.25 ft
Cover @ Top = 3:00 in
@ Btm.= 3.00 in
Axial Load Applied to Stem
Axial Dead Load =
303.0 lbs
Axial Live Load =
300.0 lbs
Axial Load Eccentricity =
0.0 in
Stem Construction
Top Stem
�rrAir
Factored Pressure
Stem OK
Design height
ft=
0.00
Wall Material Above "Ht"
=
Concrete
Thickness
_
8.00
Rebar Size
Actual 1 -Way Shear
# 5
Rebar Spacing
_
14.25
Rebar Placed at
-
Edge
Design Data-••••-•-
Heel Reinforcing
= None Spec'd
fb/FB + fa/Fa
Key Reinforcing
0.665
Total Force @ Section
lbs=
1,831.5
Moment.... Actual
ft-#=
4,590.8
Moment..... Allowable
_
6,906.8
Shear..... Actual
psi =
24.7
Shear..... Allowable
psi =
85.0
Bar Develop ABOVE Ht. in = 23.40
Bar Lap/Hook BELOW Ht. in = 6.85
Wall Weight
Toe
Heel
Factored Pressure
= 1,338
29 psf
Mu': Upward
= 6,805
0 ft-#
Mu': Downward
= 2,043
0 ft-#
Mu: Design
= 4,763
0 ft-#
Actual 1 -Way Shear
= 23.54
0.00 psi
Allow 1 -Way Shear
= 85.00
0.00 psi
Toe Reinforcing
= # 5 @ 16.50 in
Heel Reinforcing
= None Spec'd
Key Reinforcing
= None Spec'd
Bar Develop ABOVE Ht. in = 23.40
Bar Lap/Hook BELOW Ht. in = 6.85
Wall Weight
=
96.7
Rebar Depth 'd'
in=
6.19
Masonry Data -
--
f'm
psi =
Fs
psi =
Solid Grouting
Special Inspection
Modular Ratio'n'
Short Term Factor
Equiv. Solid Thick.
Masonry Block Type = Normal Weight
Concrete Data-.�.............
-
f'c
psi =
2,500.0
Fy
psi =
60,000.0
Other Acceptable Sizes & Spacings
Toe: #4@ 26.00 in, #5@ 40.50 in, #6@ 48.25 in, #7@ 48.25 in, #8@ 48.25 in, #9@ 4
Heel: Not req'd, Mu < S ' Fr
Key: No key defined
1 041
Title : Job #
Dsgnr: Date: 11:21 AM, 9 MAY 06
Description :
Scope :
Code Ref: ACI 318-02, 1997 UBC, 2003 IBC, 2003 NFPA 5000
rt(4v" �A � r�r� � _....... Ca_ ......... ._._ �. ._. ...... Page ...
Use '� Ver 1 -Dec- � Cantilevered Retaining Wall Design
w 9 9
Description on grid L between grids 3-5 and 6-8
....m.. _.................
s. ._
iarnma of Overturning & Resistina Forces & Moments
.„.„.OVERTURNING.....
.....RESISTING.....
Force Distance Moment
Force
Distance
Moment
Item lbs ft ft-#
lbs
ft
ft-#
Heel Active Pressure = 941.1 2.44 2,300.5
Soil Over Heel =
4.42
Toe Active Pressure =
Sloped Soil Over Heel =
Surcharge Over Toe =
Surcharge Over Heel =
Adjacent Footing Load =
Adjacent Footing Load =
Added Lateral Load = 338.0 4.08 1,380.2
Axial Dead Load on Stem=
303.0
4.08
1,237.3
Load @ Stem Above Soil =
Soil Over Toe =
309.4
1.88
580.1
SeismicLoad =
Surcharge Over Toe =
�.�........... _. .._.
Stem Weight(s) =
628.3
4.08
2,565.7
Total = 1,279.1 ` O.T.M. = 3,680.7
Earth ® Stem Transitions=
Resisting/Overturning Ratio = 1.52
Footing Weight =
552.1
2.21
1,219.2
Vertical Loads used for Soil Pressure = 2,092.8 lbs
Key Weight =
4.25
Vert. Component =
Vertical component of active pressure NOT used for soil pressure
Total =
1,792.8
lbs R.M.=
5,602.2
a nnflnr;. f'— —1 4Ar AN 4 A ;n ^1^
Title : Job #
Dsgnr: Date: 11:49AM, 9 MAY 06
Description
Scope :
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
er1WW 5155.Ver6.()t1-oec-2003 Cantilevered Retaining Wall Design
(C)V?&3-2003ENERC+L Enghoadn, Software
Description on grid L between grids 5-6
...... ........ _
Criteria
..... .
Retained Height =
6.50 ft
Wall height above soil =
0.00 it
Slope Behind Wall =
0.00: 1
Height of Soil over Toe =
9.00 in
Soil Density =
110.00 pcf
Wind on Stem 0.0 psf
Surcharge Loads
1,986 psf OK
Surcharge Over Heel =
0.0 psf
Used To Resist Sliding & Overturning
Surcharge Over Toe =
0.0 psf
Used for Sliding & Overturning
2,845 psf
Design Summary
0 psf
Total Bearing Load _
2,780 lbs
...resultant ecc. _
10.80 in
Soil Pressure @ Toe =
1,986 psf OK
Soil Pressure @ Heel =
0 psf OK
Allowable =
2,000 psf
Soil Pressure Less Than Allowable
ACI Factored @ Toe =
2,845 psf
ACI Factored @ Heel =
0 psf
Footing Shear @ Toe =
28.6 psi OK
Footing Shear @ Heel =
20.1 psi OK
Allowable =
85.0 psi
Wall Stability Ratios
_
Overturning =
1.54 OK
Sliding =
N/A
Sliding Calcs Slab Resists
All Sliding!
Lateral Sliding Force =
1,279.1 lbs
Footing Design Results
Soil Data
Allow Soil Bearing
= 2,000.0 psf
Equivalent Fluid Pressure Method
Heel Active Pressure
= 35.0 psf/ft
Toe Active Pressure
= 0.0 psf/ft
Passive Pressure
= 250.0 psf/ft
Water height over heel
= 0.0 ft
FootingllSoil Friction = 0.300
Soil height to ignore
for passive pressure = 0.00 in
Lateral Load Applied to Stem
Lateral Load = 52.0 #/ft
...Height to Top = 6.50 ft
...Height to Bottom = 0.00 ft
Page 1
__.
Footing Strengths & Dimensions
fc = 2,500 psi Fy = 60,000 psi
Min. As % = 0.0014
Toe Width = 1.67 ft
Heel Width = 2.00
Total Footing Width = --.TT
Footing Thickness = 10.00 in
Key Width
0.00 in
Key Depth -
0.00 in
Key Distance from Toe
- 1.83 ft
Cover @ Top 3.00 in
@ Btm.= 3.00 in
Axial Load Applied to Stem
Axial Dead Load
= 303.0 lbs
Axial Live Load
= 300.0 lbs
Axial Load Eccentricity
= 0.0 in
Stem Construction
Tapp Stem
Heel
Factored Pressure
Stem OK
Design height
ft=
0.00
Wall Material Above "Ht"
=
Concrete
Thickness
_
8.00
Rebar Size
_
# 5
Rebar Spacing
_
14.25
Rebar Placed at
_
Edge
Design Data -. _ -___-._
........................._
= None Spec'd
fb/FB + fa/Fa
=
0.655
Total Force @ Section
lbs=
1,831.5
Moment.... Actual
ft-#=
4,590.8
Moment..... Allowable
=
6,906.8
Shear..... Actual
psi =
24.7
Shear..... Allowable
psi =
85.0
Bar Develop ABOVE Ht. in = 23.40
Bar Lap/Hook BELOW Ht. in= 6.85
Wall Weight
Toe
Heel
Factored Pressure
= 2,845
0 psf
Mu': Upward
= 3,165
0 ft-#
Mu': Downward
= 403
1,045 ft-#
Mu: Design
= 2,762
1,045 ft-#
Actual 1 -Way Shear
= 28.58
20.10 psi
Allow 1 -Way Shear
= 85.00
85.00 psi
Toe Reinforcing
= # 5 @ 29.25 in
Heel Reinforcing
= None Spec'd
Key Reinforcing
= None Spec'd
Bar Develop ABOVE Ht. in = 23.40
Bar Lap/Hook BELOW Ht. in= 6.85
Wall Weight
=
96.7
Rebar Depth "d'
In=
6.19
Masonry Data
u
I'm
psi =
Fs
psi =
Solid Grouting
=
Special Inspection
=
Modular Ratio 'n'
_
Short Term Factor
=
Equiv. Solid Thick.
_
Masonry Block Type =
Normal Weight
Concrete Data
_.--... -
f'c
psi =
2,500.0
Fy
psi =
60,000.0
Other Acceptable Sizes & Spacings
Toe: #4@ 19.00 in, #5@ 29.25 in, #6@ 41.50 in, #7@ 48.25 in, #8@ 48.25 in, #9@ 4
Heel: Not req'd, Mu < S " Fr
Key: No key defined
1 044
1 045"
Title :
Job #
Dsgnr:
Date: 11:49AM, 9 MAY 06
Description
Scope:
Code Ref: ACI 318-02, 1997
UBC, 2003 IBC, 2003 NFPA 5000
._
...,. _ .. _ ...,m.._ ....................... .._._. ............._ g .....
Use KW-MIS5,Ver 58iA 1.000- 003 Cantilevered RetainingWall Design
Pae 2
9
(c)1483.2003 ENERCALC. n4 Pnewi 5dt« wa
�) s�M k nS
Description on grid L between grids 5-6
... .._............. _.._ _....m
SummaL4 of Overturnln2 & Resistin2 Forces & Moments
....OVERTURNING.....
.....RESISTING.....
Force Distance Moment
Force
Distance
Moment
Item lbs it ft-#
lbs
it
ft-#
Heel Active Pressure — 941.1 2.44 2,300.5
Soil Over Heel - =
953.3
3.00
2,859.4
Toe Active Pressure =
Sloped Soil Over Heel =
Surcharge Over Toe =
Surcharge Over Heel =
Adjacent Footing Load =
Adjacent Footing Load =
Added Lateral Load = 338.0 4.08 1,380.2
Axial Dead Load on Stem=
303.0
2.00
605.8
Load @ Stem Above Soil =
Soil Over Toe =
137.4
0.83
114.5
Seismici-oad =
Surcharge Over Toe =
Stem Weight(s) =
628.3
2.00
1,256.2
Total = 1,279.1 O.T.M. = 3,680.7
Earth @ Stem Transitions=
Resisting/Overturning Ratio = 1.54
Footing Weight =
458.2
1.83
840.0
Vertical Loads used for Soil Pressure = 2,780.4 lbs
Key Weight =
1.83
Vert. Component =
Vertical component of active pressure NOT used for soil pressure
Total =
2,480.4
lbs R.M.=
5,675.9
1 045"
8_00005in Conr_w/#4 0 1R_in n/r
@Toe
Designer select
0.iin _2� A
@ all horiz. reinf.
@ Heel
Title : Job #
Dsgnr: Date: 11:21AM, 9 MAY 06
Description ;.
Scope:
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
User: Kw4M155,Vet 5.&C,1 -Dec -M Cantilevered Retaining Wall Design
tct08a.2003 ENE RCALC to neefirig Softwe
Description grid 11 between grids E -F
Criteria
0.0 psf
Retained Height =
4.25 ft
Wall height above soil =
0.00 it
Slope Behind Wall =
0.00: 1
Height of Soil over Toe =
9.00 in
Soil Density =
110.00 pcf
Wind on Stem - 0.0 psf
SurchargeLoads
Surcharge Over Heel =
0.0 psf
Used To Resist Sliding & Overturning
Surcharge Over Toe =
0.0 psf
Used for Sliding & Overturning
Soil Pressure Less Than Allowable
Design Summar
2,493 psf
Total Bearing Load _
1,233 lbs
...resultant ecc. -
5.46 in
Soil Pressure @ Toe =
1,781 psf OK
Soil Pressure @ Heel =
0 psf OK
Allowable =
2,000 psf
Soil Pressure Less Than Allowable
ACI Factored @ Toe =
2,493 psf
ACI Factored @ Heel =
0 psf
Footing Shear @ Toe =
17.0 psi OK
Footing Shear @ Heel =
0.0 psi OK
Allowable =
85.0 psi
Wall Stability Ratios
0.326
Overturning =
1.53 OK
Sliding =
N/A
Sliding Calcs Slab Resists All Sliding !
Lateral Sliding Force =
556.5 lbs
[Fo'oting Design Results
...............
jSoil Data
Allow Soil Bearing
= 2,000.0 psf
Equivalent Fluid Pressure Method
Heel Active Pressure
= 35.0 psf/ft
Toe Active Pressure
= 0.0 psf/ft
Passive Pressure
= 250.0 psf/ft
Water height over heel
= 0.0 ft
FootingIlSoil Friction = 0.300
Soil height to ignore
for passive pressure = 0.00 in
Lateral Load Applied to Stem
Lateral Load - 28.0 #/ft
...Height to Top 4.25 ft
...Height to Bottom 0.00 ft
Page 1
Footing Strengths & Dimensions
f c = 2,500 psi Fy = 60,000 psi
Min. As % = 0.0014
Toe Width = 1.17 ft
Heel Width = 0.67
Total Footing Width =�
Footing Thickness = 9.00 in
Key Width = 0.00 in
Key Depth = 0.00 in
Key Distance from Toe = 1.58 ft
Cover @ Top = 3.00 in @ Btm.= 3.00 in
..... .... ......... . ........
Axial Load Applied to Stem
Axial Dead Load = 520.0 lbs
Axial Live Load = 0.0 lbs
Axial Load Eccentricity = 0.0 in
Stem Construction Ton Stem
�wwarrr
Stem OK
Design height ft=
0.00
Wall Material Above "Ht"
Concrete
Thickness _
8.00
Rebar Size
# 4
Rebar Spacing -
18.00
Rebar Placed at -
Edge
Design Data--
= 16.97
fb/FB + fa/Fa =
0.326
Total Force @ Section lbs =
739.7
Moment.... Actual ft-#=
1,191.1
Moment..... Allowable =
3,655.6
Shear..... Actual psi =
9.9
Shear..... Allowable psi =
85.0
Bar Develop ABOVE Ht. in = 18.72
Bar Lap/Hook BELOW Ht. in = 6.00
Wall Weight
Toe
Heel
Factored Pressure
= 2,493
0 psf
Mu': Upward
= 1,219
0 ft-#
Mu': Downward
= 186
0 ft-#
Mu: Design
= 1,034
0 ft-#
Actual 1 -Way Shear
= 16.97
0.00 psi
Allow 1 -Way Shear
= 85.00
0.00 psi
Toe Reinforcing
= # 4 @ 26.00 in
Heel Reinforcing
= None Spec'd
Key Reinforcing
= None Spec'd
Bar Develop ABOVE Ht. in = 18.72
Bar Lap/Hook BELOW Ht. in = 6.00
Wall Weight
=
96.7
Rebar Depth °d"
in=
6.25
Masonry Data
I'm
psi =
Fs
psi =
Solid Grouting
Special Inspection
-
Modular Ratio 'n'
-
Short Term Factor
Equiv. Solid Thick.
-
Masonry Block Type = Normal Weight
Concrete Data
--•-----.-••••�•-•-�.-
f'c
psi =
2,500.0
Fy
psi =
60,000.0
Other Acceptable Sizes & Spacings
Toe: #4@ 26.00 in, #5@ 40.50 in, #6@ 48.25 in, #7@ 48.25 in, #8@ 48.25 in, #9@ 4
Heel: Not req'd, Mu < S " Fr
Key: No key defined
1 047
Title : Job #
Dsgnr: Date: 11:21 AM, 9 MAY 06
Description
Scope:
Code Ref: ACI 318-02,1997 UBC, 2003 IBC, 2003 NFPA 5000
X14 2
Cantilevered Retaining _
Page x�v��;,
�v���.��.'�-�r� ing Wall Design .
kM�•.�
(01983-2003 SNERCALC~ Engineefln ScOwcve fooflr s ecmC �rq�„a hnfi")a^
Description grid 11 between grids E -F
Summar � of Overturnin & Resistin
...- _ ......... _ _ .................�._ ..�._._............
Forces & moments
.....OVERTURNING..... .....RESISTING.....
Force Distance Moment Force Distance Moment
Item lbs ft ft-# lbs ft ft -#
_..__._._..._....._..-......�.......... � � _.
Heel Active Pressure = 437.5 1.67 729.2 Soil Over Heel = 1.83
Toe Active Pressure =
Surcharge Over Toe =
Adjacent Footing Load =
Added Lateral Load = 119.0 2.88 342.1
Load @ Stem Above Soil =
SeismicLoad =
Total = 556.5 O.T.M. = 1,071.3
Res isting/OverturnIng Ratio = 1.53
Vertical Loads used for Soil Pressure = 1,233.2 lbs
Vertical component of active pressure NOT used for soil pressure
Sloped Soil Over Heel =
Surcharge Over Heel =
Adjacent Footing Load =
Axial Dead Load on Stem=
Soil Over Toe
Surcharge Over Toe =
Stem Weight(s) _
Earth @ Stem Transitions=
Footing Weight =
Key Weight =
Vert. Component =
Total=
520.0
1.50
779.7
96.2
0.58
56.1
410.8
1.50
616.0
206.2
0.92
188.9
1.58
1,233.2 lbs R.M.= 1,640.6
1 048
JJP Office and Condo
Vertical distribution of lateral forces
C..:M'va-.,A,..m;a1. ')()(1"2 TP('
Ss(%g)= 1.26
St(%g)= 0.4463
I= 1.0
R= 6.5
Fa 1.0
F,=1.55
Site Class D
T=Crh„314= 0.4
SDS 2/3FeS, 0.85
SDI= '/3F„SI 0.46
Use Group I
k= 1.0
SeismicDesign Category D
0.5SI /(R/I)= 0.034
0.044SDSI= 0.037
SDs/(R/I)= 0.13 1 SDII/(RT)= 0.17
Cs,,,i,,= 0.037
5383
DLrf(psf)= 18 DL4(psf)= 28 DL3(pst)= 26
DL:,trgiaicaaas(Ps `" 10 DL' .,,,":,(1 10
Level
W (k)
h (ft)
W(hk) (k -ft)
FX (k)
VX (k
R
64.8
50.2
3249
15.3
15.3
4
134.0
402
5383
25.4
40.8
3
142.8
30.2
4309
20.3
61.1
2
142.8
20.2
2881
13.6
74.7
1
139.2
10.2
1415
6.7
81.4
E
624
N
17237
81
V= 0.13 Wt
DLZ(psf)= 28 DL1(psf)= 28
Diaphragm Forces (ASD)
Fox (k)
FnX (k)min
Ftax (k)max
11.0
7.8
15.7
19.6
16.2
32.5
18.2
17.3
34.6
Level L W h (ft) Psc (Psf) PSA (Psfl (0n (elf) FX (k)
15.7
17.3
34.6
4 58 56.0 40.2 1.49 20.2 27.9 177 11.389
13.0
16.9
33.7
2 58 56.0 20.2 1.29 17.5 24.2 155 10.007
FPX=WXEFxi/EWxi/1.4
VLRFD(k) = 81.37 FX=VW(hk)/EW(hk) FPX min=0.2SDSIW/1.4
VASD(k) = 58.12 govel-ns VX=EW(hk)Xi FPX max=0.4SDSIW/1.4
Wind 2003 IBC 1609.6 Simplified wind load method Alternate ASD
For enclosed Bldgs, with flat, gabled and hip roofs, not on the upper half of an isolated hill. Building must have simple
diaphragms, be flexible, be approximately symmetrical in both directions, and have no expansion joints or separations
I,, 1.0
Exposure C Basic Wind Speed 85 mph mean roof height= 53.08 top of roof= 56.8 ft
P00C(Psf)= 10.4 p00A(psf) - 14.4 1= 1.0 a= 5.25 w= 1.3
Building Dimensions: roof slope 270 transverse lon itudiina'l
Level L W h (ft) Psc (Psf) PSA (Psfl (0n (elf) FX (k)
FX (k)
R 58 52.5 50.2 1 56 21.1 29.2 214 11.686
10.510
4 58 56.0 40.2 1.49 20.2 27.9 177 11.389
11.036
3 58 56.0 30.2 1.40 19.0 26.2 166 10.720
10.388
2 58 56.0 20.2 1.29 17.5 24.2 155 10.007
9.697
1 58 1 55.0 1 10.2 1.21 16.4 22.7 151 9.640
9.188
E V (k) = 53.441
50.819
seismic ;
(V T 4 5V-0-
B'-6' 6,
4'-0' 51-
9. 91-0.
12, 1
6'-6- a 5'-6- A 5-4' R S-2' @ 4-0'
58'-0'
4'-0' . 8'-6-
6'-3' T-9°` 9'-0' 6"-6- 5'-6' S'-4' 3"-2" 4'-0'
3" 0� Z-11 1 V-11 1/2' 3' 0_
�.�.
I
........ ....... —
4!-0* 1, 8'-6-
62.
6'-3- 5�-ql
T-11 1
58'-0"
9,-G,
2' -11 1/2*
Av ------ 4V
58'-0•
4'-0• B'-6• 6"-3« 5`-9. 9'-0• W-6• 5'-6' 2" 4'-0•
1 4-6
M 3 5 3'-0•
P"^
n
_ 9'.6- Y
6
El,
. r-7
4'_71/2' V ! 9
�-
� 61f
fl
WHOM= an
m �.-
" ... -�
$'-0 1/4'10
�
M
r _
-0•- 5-...�.. _ _
��--- 5 �.3 3 ��-3w
3'
2 3 4 6 7 w 6 4 6
2�`
2 005
7
4'-0' a8'-6*
2
91—o.
6'-6-
( 16,
2 000�
E/W Longitudinal line D, CB walls
Summary (Alt. ASD)
level dia thrn ni length
�' len it�h wall hei ht
wall wel t
floor weight
9.5
R
58
1
10.0 ft
10 psf
18 plf
3217
4
58
24.832
9.1 ft
10 psf
70 plf
2
3
58
23.916
9.1 ft
10 psf
378 plf
11.9
2
58
30.74
9.1 ft
10 psf
133 plf
1
58
27.0833
9.3 ft
10 psf
84 if
SW2
Loading:
2S
0.14
1.00
used
1
Level
Width 1 Width 2
F, 1 F, 2
R
9.5
7.6
2030
2111
4
9.5
9.4
3217
3283
3
9.5
9.1
2386
2435
2
4.0
11.9
713
2118
1
4.0
11.9
1 603
1,790
p
1.00
1.00
1.00
-1.00
Short Walls 1.00 calculated
Dia. Shear Chord Wall Shear
3
4.46
r,,,,, p
R 35'tl
4730
R
16.
Seismic
SW6
SW4
SW6
0.15
1.00
4 601
3909
4
375
Seismic
SW3
SW2
SW3""
0.13
1.00
3 52
l
3670
3
591
Seismic
SW2
2SW3
2S
0.14
1.00
2 32
1
8144
2
552
Seismic
SW2
2S"�'a'3
S 2
0.10
1.00
1 31
1
7924
1
673
Seismic
2SW42hW3
0.12
1.00
Wall O.T. 3 " Long Wall
4.46 ' Long Wall
7.3 ' Long Wall
R. Ma=
6925
MR=
531
T=
2442
Q
0
C:r)a•fa=
2217
P=
0
T@P=
2442
0
0
0
CC P,),F=
2217
4 M«=
21300
MR=
1257
T=
5694
0
0
Col -F=
6649
P=
til
T@P=
5694
®
0
0
C@Pt,E=
6649
3 Mo,=
43958
MR=
2112
T=
11902
®
0
0
Co,,,=
13507
P=
0
T@P=
11902
®
0
0
Cffj),R=
13507
2 Mo,=
65121
2 Mo,=
22473
2
Mo,=
36783
MR=
2565
MR=
2231
MR=
5978
T=
18291
T=
3822
©
T=
3415
CT, .r=
I9059
Cr,,.a=
4685
C-r>kt =
4849
0
P=
P=
0
:P=
T@P=
18291
0
T@P=
3822
®
T@P=
3415
CC@P'[),r,-.=19059
C@P't,t,=
4685
C@Pt,,t =
4849
1 Mot=
15389
1 M°`=
61583
1
Mot=
100797'
MR=
531
MR=
1761
MR=
4717
T=
5943
0
T=
10762
®
T=
10048
CD„t:=
0
Cts«E=
11606
Ctt,k=
11366
P_
0P=
0
P=
8200
T@P=
5943
<$>1
T@P=
10762
©
T@P=
2668
C@PD,E=
Q'1
C@PD,E=
11606
C@PD F=
19566
De ripimn
By
Checked
MD
D.a
Dale
6/14/200
Summary
ENGINEERING
Scale
Sb-1N.
250 4th Ave South
pr.j-
yob No
Suite 200
Edmonds. WA 98020
JJP Office and Condo
06068.10
007
E/W Longitudinal
Summary (Alt. ASD)
level diaphragm length
R 58
4 58
3 58
2 58
1 58
Lo adinsta
line F walls
wall length wall height
14.125
10.0 ft
36.125
9.1 ft
36.125
9.1 ft
28.625
9.1 ft
36.375
9.3 ft
Level Width 1 Width 2
F, 1 Fx 2
R
7.6
13.4
2111
3702
4
9.4
13.4
3283
4811
3
9.1
13.4
2435
3568
2
11.9
13.4
2118
2385
1
1 11.9
SW3
OK
OK
Dia. Shear
11 49
4 5,1
3 53
2 65'
1. 65
Wall O.T.
�R
4
3
2
0
wall weight
10 psf
10 psf
10 psf
10 psf
10 psf
198 plf
168 plf
168 plf
168 plf
168 plf
used
p
1.00
1.00
1.00
1.00
13.4
1790
2016
D- 6/14/200
Short Walls
1.00
Chord Wall Shear
Sh-N.
0.13
4.625
6.5
0
5893
R
41.2
Seismic
SW3
SW3
OK
' Lon8 Wall
3961
4
385
Seismic
SW3
OK
OK
318'0
3821
3
55.1
Seismic
SW2
OK
OK
CD
2743
2
85:1'',
Seismic
2SW3
OK
OK
CI)
2669
1.
734
Seismic 2SW3
2SW3
OK
4.625 'Long Wall
T@P=
3761
Mot=
26645
Mot= 168475
MR=
R
MR=
318'7'
10182
CD+E=
17962'
T=
401.3
T@P=
10182
Q
C@PD+E=
Ctz+n:
5481
Mot= 242492
MR=
32.372
P=
0
Ct>+1=
20703
T@P=
40.13
18233
8.5 °' Long all
1'3@P1),,1'=
C@Ptt,Mp;=
5481
Mot= 0
4 Mot=
41850
T= 0'
iNo.1, !
Mot=
49420
P= 0
MR=
9369
C@PD+E= 0
4
MR=
5961
T=
2825
0
T=
7432
O
CD+E=
5050
Cpt+1x=
10178
P=
0
P=
0
T@P=
2825
T@P=
7432
®
C@PD+E=
5050
C@Pty+px=
10178
3 Mo,=
101766
Mot=
82021
MR=
18738
3
MR=
5823
T=
7262
T=
13679
®
CD+E=
11712
CDIE =
54957
P=
0
P=
0
T@P=
7262'
T@P=
13679
®
C@PD+E=
11712
C@PD+E=
14957
6.5 " Long Wall
Mo,=
132469
2 Mor=
50643
2
MR=
7673
MR=
5479
T=
22415
<S>
T=
5318
Cp1,,,=
23692
Cps o, =
7053
P=
0
P=
0
T@P=
22415
Q
T@P=
5318
C@PD+E=
23692
Ct'p«?Ptt+ps=
7053
Moi
0
1 Mot=
62122
1
MR=
0
MR=
551.4
T=
0
Npl",!
T=
6680
0
Cn'r=
0
Cn.E=
11421
P=
0
P=
820()
T@P=
0'N(*r.!
T@P=-551
N.O.T.!
C@P-.=
nC@P":=
16626
1.00
calculated
r..
p
D- 6/14/200
0.38
1.00
S`.W
Sh-N.
0.13
1.00
250 4th Ave South
0.13
1.00
0.16
1.00
0.13
1.00
' Lon8 Wall
06068.10
9.5
Mot= 54737
MR=
13447
T=
318'0
Ctt=
6019
P= 0
T@P=
3180
C@PD+E=
6019
Mot= 101511
MR=
25151
T=
5880
CD11a=:
111190'
P,=
0
T@P=
3761
C@PDBE=
91208
Mot= 168475
MR=
36854
T=
10182
CD+E=
17962'
P= 0
T@P=
10182
Q
C@PD+E=
17962
Mot= 242492
MR=
32.372
T=
18233
Ct>+1=
20703
P= l'1
T@P=
18233
1'3@P1),,1'=
20703'
Mot= 0
MR= 0'
T= 0'
iNo.1, !
CD+E= 0.
P= 0
T@P= 0
Nc*.T.!
C@PD+E= 0
De-ptinn
Summary
BY MD
D- 6/14/200
ChxkM
Dm
D
S`.W
Sh-N.
ENGINEERING
250 4th Ave South
h"t
lob No,
Suite 200
Edmonds. WA 98020
JJP Office and Condo
06068.10
E/W Longitudinal
R M«-
line L walls
MR=
531
T=
2002
Summary (Alt. ASD)
2063
P=
0
T@P=
2002
C@P„+E=
level diaphragm lentlt
66652
wvall en -th wall height
wall wei,g,ht
floor wei x t
C@PD+E=
4265
R 58
1 Ma=
15,9994
10.0 ft
10 psf
18 plf
8973
T=
4 58
Q
l"
9.1 ft
10 psf
112 plf
0
3 58
5736
1'7
9.1 ft
10 psf
168 plf
2 58
Summary
2.5.5 .
9.1 ft
10 psf
14 plf
1 58
34
4.8 ft
10 psf
168 plf
1�0ading:
used
Level
Width 1 Width 2
F, 1
Fx 2
p
R
13.4 0.0
2858
0
1.00
4
13.4 1.5
4997
265
1.00
3
13.4 1.5
3706
249
1.00
2
13.4 1.5
2478
268
1.00
1
1 13.4 0.0
2016
0
Short Walls
1.00
calculated
Dia. Shear
Chord
Wall Shear
3
4.73
rm.x
p
R 49
CD
3360
R
152
Seismic
SW6
SW4
SW6
0.14
1.00
4 93
(D
2776
4
437
Seismic
SW3
0 OK
0.15
1.00
3 80
0
2607
3
655
Seismic
2SW4
0 OK
0.15
1.00
2 76
;D
2436
2
544
SeismicSl�
0 OK
0.10
1.00
1 72
1
2370
1
443
Seismic
SW30
OIC
0.08
1.00
Wall U
.T. 3 ' Long W
R M«-
6387
MR=
531
T=
2002
Cn+E=
2063
P=
0
T@P=
2002
C@P„+E=
2063.
66652
T@P=
'3830
MR=
C
all
4 " Lon Wall
10070
2 = 2784[)
843
T=
= 5421=
CD1E=
;MR6061=
P=
0=
T@P=
5421
C@P,,,= 6061
C @PD+E=
ENGINEERING
250 4th Ave South
Suite 200
Edmonds, WA 98020
4.73 'Long W
R Mo,=
10070
MR=
1320
T=
1790
CD1E=
2050.
P=
0
T@P=
1790
C @PD+E=
2050
all
5.5 ' Long Wall
2 Ma=
27352
47514
MR=
1593
T=
T=
3830
5272
Ctm+t
4265
T@P=
P=
0
66652
T@P=
'3830
MR=
C@PD+E=
4265
8973
1 Ma=
4371.2
P=
MR=
3267
8973
T=
5736
Q
CD+E=
6977
P=
0
T@P=
5736
C@PD+E=
6977'
J,y
Summary
&'hocked
0.7
=
L'ong,g W
4 Mom
47514
MR=
7346
T=
3527
CD+E=
5272
P=
0
T@P=
2520!
C@PD+E=
66652
3 M,,=
118727
MR=
16715
T=
8973
CD+E=
12943
P=
0
T@P=
8973
C@PD,E=
12943
13.5 ' 'Long Wall
1 Mo,=
40157
MR=
19681
T=
1027'
0
Cry+E=
3904
P=
0
T@P=
1027
C@PD+E=
3904
MD
Da1e
6/14/20
Job No. ;, 009
JJP Office and Condo 06068.10
NIS Transverse line 1 walls
Summary (Alt. ASD)
level
diaphragm length
wa 1 lett tG wall height
wall weight
floor weight
R
52.5
20N, 10.0 ft
10 psf
36 plf
4
56
23 9.1 ft
10 psf
28 plf
3
56
22 9.1 ft
10 psf
28 plf
2
56
30.4 9.1 ft
10 psf
28 plf
1
55
35. 9.3 ft
10 VSf
28 olf'
Loaddla : used
Level Width 1
Width 2
F„ 1
Fx 2
nem
ENGINEERING
$W.
p
250 4th Ave South
f ie=s
R 12.1
0.0
2591
0
Edmonds. WA 98020
JJP Office and Condo
1.00
4 12.1
0.0
3442
0
1.00
3 12.1
0.0
3040
0
1.00
2 12.1
0.0
2032
0
1.00
1 11 12.1
Dia. Shear
R 49
4 66
0.0
1
1
1828
Chord
3036
2855
0
Wall Shear
R
4
94
231
Seismic
Seismic
3.08333
SW6 SW6
SW6 SW4
Short Walls
6.333
OK
Old:
1.00
M
calculated
r...
0.09 1.00
0.08 1.00
3 68
2 65
1 61
Wall O.T.
Y 2681 3
1 2505 2
1 2351 1
3.08333 ' Long Wall
380
340
319
Seismic SW3 SW2
Seismic SW4 SW2
Seismic SW4 ISW2
6.333 ' Long Wall
OK
OK
OK
0.09
0.06
0.05
11.9 ' Long Wall
1.00
1.00
1.00
R
Mo,=
4037
R
Mo,=
8292
MR=
646
MR=
2727
T=
1380
©
T=
1095
Q
Q
Coht =1397
Cfa.,E=
1540
P=
0
P=
0
T@P=
1380
<3>
T@P=
1095
Q
0
C@1'ftE
1397
C@Pu,E=
1540
4
M«=
9109
4
Mc,=
18709
MR=
567
MR=
2393
T=
2348
Q
T=
1971
Q
0
Co,E=
2765
Co+e=
2751
P=
0
P=
0
T@P=
23481
<T>
T@P=
1971
©
Q
C@Pttj.tt=
2765
C@pp r� =
2751
3
M.=
24080
3
Mo,=
49459
MR=
756
MR=
4787
T=
6487
©
T=
5417
0
0
Clmi=
6904
Co.,E=
6977"
P=
0
P=
5
T@P=
6487
®
T@P=
5417
®
Q
CC4@pn+,.=
6904
C@Pt,,,E�=
6977
2
M4=
13426
2
M«=
19698
MR=
567
MR=
2393
T=
354110
T=
2530
1Q
O
1'Wt)o,,=
3959
Cn, r=
2872
P=
0
P=
0
T@P=
3541
Q
T@P=
2530
0
L"a4F,=
3959
Ct4tPD+,,=
2872
1
Mo,=
26251
1
Mo,=
46038
1
Mo,=
49495
MR=
762
MR=
3214
MR=
8569
T=
7085
T=
5314
<S>
T=
2516
0
Ca.E'=
7508
Coo.,=
61['4
Ct)*:tr='
3944
P=
0
P=
9800
t
P=
0
T@P=
7085
®
T@P=
,1307 61a 1".t
T@P=
2516
C@P-=
7508
C@P-=
15,c}04
C@PF=
3944
zx riP �n
Summary
ar MD
nem 6/14/2006
Chxked
nem
ENGINEERING
$W.
Sh« N.
250 4th Ave South
f ie=s
on x�•
7 ' 1
Suite 200
Edmonds. WA 98020
JJP Office and Condo
06068.10
NIS Transverse line 5 walls
Summary (Alt. ASD)
level diaphragm length
wall length wall height
wall weight
1Nrwar �wci rht
12.1
R
52.5
19.25
10.0 ft
10 psf
36 plf
4288
4
56
28.25
9.1 ft
10 psf
28 plf
2
3
56
28.25
9.1 ft
10 psf
28 plf
4.51828
2
56
2681
9.1 ft
10 psf
28 plf
SW2
1
55
X28.25
y28.5�
9.3 ft
10 asf
28 Of
2
Loads :
Seismic
SW2
OK OK
0.11 1.00
used
n
Level
Width 1 Width 21
Fx 1 F„ 2
R
12.1
4.5 1
2591
1159
4
12.1
4.5
4288
1611
3
12.1
4.5
3109
1117
2
12.1
4.5
2078
796
1
12.1
4.51828
3 70
678
p
1.00
1.00
1.00
1.00
Short Walls 1.00 calculated
Dia. Shear Chord Wall Shear
7.25 12
rm=.. p
R 49
O
3036
R
190
Seismic
-§W--6
OK OK
0.17 1.00
4 83
Ol
2855
4
338
Seismic
SW4
OK 01<
0.12 1.00
3 70
01
2681
3
488
Seismic
SW2
OK OK
0.11 1.00
2 66
01
2505
2
590
Seismic
SW2
OK OK
0.11 1.00
1 61
n
2351
1
631
Sersarsia
2SW4
OK OK
0.11 1.00
Wall O.T. 7.25 ' Long Wall
12 " Long Wall
21 ' Long, Wall
R Ma=
19290
R Ma=
31928
MR=
3574
MR=
9792
T=
1629
Q
T=
1358
Q
0
CD+t°.=
2635
y),E=
2938.
P=
0
P=
Oi
T@P=
1629
Q
T@P=
1358
Q
0
C@PD"g--2635
C@PD. g=
2938
4 Mo,=
50658
4
Mo,=
90861
MR=
6711
MR=
26318
T=
4586
©
O
T=
2166
0
C;o,,.r=
6475
CD+E=
4605
P=
0
P=
0
T@P=
4586
0
0
T@P=
1294
Q
C@Pt,.+E=
6475
C@Pb,c=
111463
3 Mo,=
95895
3
Mo,=
221891
MR=
6565,
MR=
52635
T=
9786
O
T=
5732
Ct+,,E=
10669
Co, E=
10610
P=
0
P=
0
T@P=
9786
®
0
T@P=
5732
0
C@Pta+t~=
10'669
C@PD+E=
10610
2 Ma=
150564
2
Mo,=
335000
MR=
8656
MR=
52635
T=
15571
O
T=
10673
Ct),,R=
16454
Ctr,=
13112
P=
0
P=
0
T@P=
15571
0
0
T@P=
10673
C@PD+E=
16454
C@I'r,,r.=
13112
1 Mo,=
210181
1 Mo,=
98675
1,
Mo,=
0
MR=
10777
MR=
8713
MR=
0
T=
218:74
®
T=
5539
Q
T=
0l^r1o*V
Lta+&„ ="
22770
CD+,r=
6978
CD+E=
0
P=
12000
P=
10200
P=
0
T@P=
11074
Q
T@P=
-2425
T@P=
0
No*.T.!
C@PD+E=
34770
C@PD+&=
1717
C@PD+E=
0
a <aP oo
®r MD
Chsked
Dam
Dale
6/14/2006
Summary
-N,,
ENGINEERING"'`
'un
M;,
2 011
250 4th Ave South
Pr ie =
N.
Suite 200
Edmonds. WA 98020
JJP Office and Condo
06068.10
NIS Transverse line 6 walls
Summary (Alt. ASD)
level
dict 71ra �
wall 1en th wall hei 1'tt
wall �wei tt
R
52.5
19.25 10.0 ft
10 psf
4
56
28.25 9.1 ff
10 psf
3
56
28.25 9.1 ft
10 psf
2
56
28.25 9.1 ft
10 psf
1
55
26.25 9.3 ft
10 psf
IRMWIM
Level Width 1 Width 2
F,t 1 FX 2
R
4.5
12.1
1159
2591
4
4.5
12.1
1611
4288
3
4.5
12.1
1117
3109
2
4.5
12.1
796
2078
4 38
1,
7693
4
338
floor
28 plf
28 plf
28 plf
f
28 o
1 4.5
12.1
678
1828
0.17
1.00
Short Walls
Dia. Shear
Chord Wall Shear
0.11
7.25
21
R 49
1
8181
R
1.90
Seismic
SW6
OK
OK
4 38
1,
7693
4
338
Seismic
SW4
OK
OR
3 36
(:D
7223
3
488
Seismic
SW2
OK
OK
2 34
6748
2
590
Seismic
SW2 ''OK
OK
1 33
1
6334
1
688
Seismic
2SW4 jOK
OK
Wall O.T.
7.25 ' Lung Wall
21 " Long Wall
R
Mo,
19290
R Moi
55874
R
MR=
3574
MR=
29988
T=
1.629
Q
T=
916
Q
Cn.tm=
2635
C-D,E=
3587
P=
0
P=
0.
T@P=
1629
Q
T@P=
916
Q
C@Pr,q, =
2635
C@1111y,,;-
3587
4
Mot=
50658
4 Mot=
146735
MR=
67111
MR=
56306
T=
4586
0
T=
2974
lO
Cct,.t �
6475.
Cu,,R=
8192
P=
0
P=
fJ
T@P=
4586
Q
T@P=
2974
Q
C('uPu,E=
6475
C(t,Pr'u a=
8192
3
Mot=
95895
3 Mot=
277765
MR=
6565
MR=
8262.3
T=
9786
T=
6539
Ctt,,r=
10669Cj,>,E=
14197
P=
0
P=
0
T@P=
9786'
Q
T@P=
6539'
Q
Ct Pr,.,.g=
10669
C@Pr,F,,=
14197
2
Mot=
150566
2 Mot=
390876
MR=
8656
MR=
72627
T=
15571
®
T=
12620
C�),,a,=
16454
C.t),a=
15059
P=
0 1
P=
0
T@P=
15571
Q
T@P=
1,2620
C@P,-,, :
16454
C@pcu E=
15059
1
Mot=
215566
1. Ma=
579152
MR=
10777'
MR=
90417
T=
22444
®
T=
19166
Ct,,,e,=
23339
Q;r,.a
2163:1
P=
8200
P=
5200
T@P=
15064
Q
T@P=
14486
Q
C@Pu+E=
31539
C@Pu+E=
26839
C �
ript��n
BY
Raked
MD
Summary
ENGINEERING
$..I.
250 4th Ave South
P,.j-
).bN.
Suite 200
Edmonds. WA 98020
JJP Office
and Condo
06068.10
used
p
1.00
1.00
1.00
1.00
1.00 I calculated
P
P
\+I
-I
1*1
C
No
Z Ol?
rm A
lr
0.17
1.00
0.12
1.00
0.11
1.00
0.11
1.00
0.12
1.00
15 " Long Wall
Mo,=
39910
MR=
15300
T=
1206
Q
Ca Mr=
3149
P=
0
T@P=
1206
Q
C@Peaor-=
3149
P
P
\+I
-I
1*1
C
No
Z Ol?
NIS Transverse line 11 walls
Width 1 Width 2
Fx 1 Fx 2
SUMMaU (Alt. ASD)
12.1
0.0
level diAPIra m len th wall length wall height wall weitht floor weight
R 52.5 3 10.0 ft
10 psf
36 plf
4 56 8 9.1 ft
10 psf
28 plf
3 5689.1 ft
(34.5 �
10 psf
28 plf
2 56 9.1 ft
1 55 9.3 ft
10 psf
10 p.sf
28 plf
28 plf
Loading:
0.0
2032
used
Level
Width 1 Width 2
Fx 1 Fx 2
R
12.1
0.0
2591
0
4
12.1
0.0
3442
0
3
'12.1
0.0
3040
0
2
12.1
0.0
2032
0
1
1 12.1
...0.0
1828
0
p
1.00
1.00
1.00
1.00
Short Walls 1.00
Dia. Shear
chord
Wall Shear
MR=
30
0
r_, p
R
49
1 3036
-505
R 62 Seismic
SW6
OK
#DIV/O!
0.06 1.00
4
66
1 2855
2958
4 140 Seismic
SW6
OK
#DIV/O!
0.05 1.00
3
68
1 2681
0
3 220 Seismic
SW6
OK
#DIVIO!
0.05 1.00
2
65
l 2505
-505
2 301 Seismic
SW4
OR
#DIV/O!
0.06 1.00
1
66
Q) 2351
2958
1 336 Seismic
SW4
JOK
#DIV/O!
1 0.06 _1.00_j
Wall O.T.
30 ' Long Wall
53595
0 '
Long Wall
0
0 ' Long Wall
IR
M.,= 26121
53709
R Mot=
0
0
R
mot= 0
MR=
61200
By MD
Ch
MR=
0
P.I.
MR=
snj
T=
-505
No*.TJ
T=
0
Nooff.!
T=
0
N(*T!
CD+Ef
2958
CD.E=
0
CD.Iff
0
P=
0
P=
0
P=
0
T@P=
-505
Nc*m!
T@P--
0
NOVU
T@P=
0
NOO-T!
C@Pt),.,L=
2958
Copn.f=
0
C@PMf
0
4 Mot=
53595
4 M,,,=
0
4 Ma=
0
MR=
53709
MR=
0
MR=
0
T=
-57
No*T.!
T=
()
Nool.!
T=
0
No*r.!
CD+E=
3339
CT>*F=
0
cwu=
0
P=
0
P=
0
P=
0
T@P=
-57
Nc*. r,!
T@P=
0
NOO>T!
T@P=
0
N(*T.!
C@PDIF=
3339
C@PD+E=
0
C@Pt)�E=
0
3 M.,=
137880
3 Mot=
0
3 Mot=
0
MR=
107419
MR=
0
MR=
0
T=
.503
T=
0
NL*]'.!
T=
0
NoQ>T.1
cf,).r.=
7421
CD,,F=
0
Coa,=
0
P=
01
U
P=
0
P=
0
T@P=
503
T@P=
0
Nco. r.!'
T@P=
0
Nc*.T.!
Cppj),F:=
7421
C@pt)-1i=
0
C@pr),F,=
0
2 Mot=
115434
2 Mot=
0
2 M,=
0
MR=
53709
MR=
0
MR=
0
T=
1377IT>
T=
0
N(*TJ
T=
0
NoQ>T.!
Co+'E=4836
ci)+I".=
0
cr),a=
0
P=
0
P=
0,
P=
0
T@P=
1377
<j>
T@P=
01
Nc*.T.!
T@P=
0
Nooff.!
C@pt).E--
4836
C@PD,r,=
Cffj)q,�,=
0
1 Mot=
131098
1 Mot=
0
1 Mot=
0
MR=
54459
MR=
0
MR=
0
T=
1736
T=
0
NO*F.!
T=
0
No*T. 1
Ct),F,=
5244
CD.Ef
0,
C
0
P=
0
P=
0
P=
0
T@P=
1736
T@P=
0
Nc*.T!
T@P=
0
Nc*-r-1
C@P-=
5244
1
C@P,,,=
0
C@PD+E=
01
Adpomm-
4= % --P
D-fip6m
Summary
By MD
Ch
we 6114/200 6
P.I.
ENGINEERING
250 4th Ave South
snj
Sh., N.,
013
Project
J.b No
Suite 200
Edmonds, WA 98020
JJP Office and Condo
06068.10
Lateral Design SuminaLy Key and Allowable Values
shearwalls: 1/2" OSB w/ HmF studs w/
SW6
8d@6 o.c.
242 plf
SW4
8d@4"o.c.
350 plf
SW3
8d@3"o.c.
455 plf
SW2
8d@2"o.c.
595 plf
2SW4
8d@4"o.c.
700 both sides
2SW3
8d@3"o.c.
910 both sides
2SW2
8d@2"o.c.
1 190 both sides
holdowns
MST48
(2)-2x
3635 #
MST 60
(2)-2x
4830 #
CMST14, 133" 16( 0
6490 #
CMST12, 167' 16( 0
9235 #
PHD6
(2)-2x
5480 #
HDQ8
(2)-2x
7210 #
HHDQ11
6x6 DF #1
11445 #
HHDQ14
6x6 DF #1
14700 #
2 -HD 15
6x6 DF #2
29305 #
diaphragms: 1/2"OSB w/
1 8d@6"o.c., unblocked 180 plf
2 8d@6'o.c.,blocked 270 plf
3 8d@4"o.c., blocked 360 plf
Z 014
Line D
Total Force [#]: 4141
Wall Length [ft]: 17.0
Diaphragm Length [ft]: 58.0
Max Collect Force [#]: 1193
Wall Length [ft]: 20.0
Length [ft] Force [#]
Open
Wall
Open
Wall
Open
Wall
Open
Wall
Open
Wall
Open
Wall
Open
0.0 0
4.0 -689
7.0 -189
4.0 -878
29.0 1193
6.0 160
5.0 517
3.0 0
0
0
0
0
0
Line I
Total Force [#]: 2591
Wall Length [ft]: 20.0
Diaphragm Length [ft]: 30.0
Max Collect Force [#]: 216
9.5
Length [ft] Force [#]
Open
0.0 0
Wall
3.3 -144
Open
2.5 72
Wall
6.7 -216
Open
5.0 216
Wall
6.7 -72
Open
2.5 144
Wall
3.3 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Line E/F
Total Force (#]: ...� ����....
5813
Wall Length [ft]:
9.5
Diaplwagm Length [ft]:
58.0
Most Collect Force [#]:
2430
Length [ft]
Force [#]
Open 24.3
2430
Wall 9.5
-2430
Open 24.3
0
Wall 0.0
0
Open 0.0
0
Wall 0.0
0
Open 0.0
0
Wall 0.0
0
Open 0.0
0
Wall 0.0
0
Open 0.0
0
Wall 0.0
0
Open 0.0
0
4.8
53
Line5
Total Force.
[#]:
3750
Wall Length [ft]:
19.5
Diaphragm Length [ft]:
50.5
Max Collect Force [#]:
1417'
0.0
Length [ft]
Force [#]
Open
16.5
1225
Wall
7.5
340
Open
14.5
1417
Wall
12.0
0
Open
0.0
0
Wall
0.0
0
Open
1 0.0
0
Wall
0.0
0
Open
0.0
0
Wall
0.0
0
Open
0.0
0
Wall
0.0
0
Open
0.0
0
Line L
Ely
MD
WWW a [#]:
Total Force ,�
...
2858
Wan Length [ft]:
DA.
16.0
Diaphragm Length [ft]:
45-5
Max Collect Force [#'
785'
Length [ft=
Force [#]
2'Open
J&J Perkins Building
12.5
785
2 Wall
2 015
3.2
418
1 Open
5.0
733
1 Wall
4.8
173
1 Open
7.0
612
1 Wall
4.8
53
1 Open
5.0
367
1 Wall
3.2
0
1 Open
0.0
0
1''Wall
0.0
0
1 Open
0.0
0
1 Wall
0.00
1 Open
0.0
0
1
1
1
1
1
1
1
1
C 4c�
Ely
MD
DA.
6/29/2006
ENGINEERING
0"
DA.
Roof Collector Forces
S=Ob.,
Sht.A No.
250 4th Ave S
J&J Perkins Building
Suite 200
2 015
06068.10
Edmonds, WA 99020
Collector Force Calculations
Line A/C
Total Force [#]:
10641
Wall Length [ft]:
25.0
Diaphn, grn Length [ft]:
47.0
Max Collect Force [#]:
987
24.3 5815
Length [ft]
Force [#]
Open
0.0
0 1
Wall
3.0
-598 1
Open
7.0
987 1
Wall
3.5
290 1
Open
0.0
290 1
Wall
3.0
-308 1
Open
0.0
-308 1
Wall
3.0
-906 ]
Open
8.0
906 ]
Wall
3.0
308 ]
Open
0.0
308 ]
Wall
3.0
-290 ]
Open
0.0
-290 ]
Wall
3.5
-987 ]
Open
7.0
598 ]
Wall
3.0
0
Open
0.0
0
Wall
0.0
0
Line 1
0.0 0
Total Force [#]:
6033
Wall Length [ft]:
21.0
Diaphragm Length [ft]:
43.0
Max Collect Force [#]:
1403
Length [ft]
Force [#]
Open
0.0
0
Wall
3.0
-441
Open
5.0
261
Wall
5.0
-474
Open
5.0
227
Wall
6.7
-753
Open
2.0
-472
Wall
6.3
-1403
Open
10.0
0
Line E/F/G
Total. Force [#]: ""...... 13907
Wall Length [ft]: 9.5
DiaphragrnLength [ft]: 58.0
Max Collect Force [#]': 5815
8.5 -2522
Length [ft] Force [#]
Open
24.3 5815
Wall
9.5 -5815
Open
24.3 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wail
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Line 5
Total Force [#]: - u 9649
Wall Length [ft]: 28.5
Diaphragm Length [ft]: 55.0
Max Collect Force [#]: 3596
Length [ft] Force [#]
Open
20.5 3596
Wall
7.5 2373
Open
6.0 3426
Wall
21.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
' Wall
0.0 0
Open
0.0 0
1
4
1
l
1
]
Line L
Total Force [#]:81,20
Wall Length [ft]: 17.0
Diaphragrn Length [ft]: 66.0
tvlax Collect Force [#" 2522
Length [ff Force [#]
Open
4.0 492
Wall
8.5 -2522
Open
41.0 2522
Wall
8.5 -492
Open
4.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
MD 6/29/2006
Chkd DAN
ENGINEERING Fourth floor Collector Forces
250 4th Ave S J&J Perkins Building
Suite 200 ?°b" °? " 0 16
C
06068.10
Edmonds, WA 98020
1
2
2
1
1
1
1
1
1
1
l
1
1
Line A/C
Total Force [#]: 4821
Wall Length [ft]: 23.9
Diaphragm Length [ft]: 45.9
Max Collect Force [#]: 469
Open
Wall
Open
Wall
Open
Wall
Length [ft] Force [#]
0.0 0
2.8 -266
7.0 469
3.2 160
0.0 160
3.0 -130
Open
Wall
Open
Wall
Open
Wall
'Open
0.0 -130
3.0 -420
8.0 420
3.0 130
0.0 130
3.0 -160
0.0 -160
Wall
3.2 -469
Open
7.0 266
Wall
2.8 0
Open
0.0 0
Wall
0.0 0
Line 1
0.0 0
Total Force [#]: 3040
Wall Length [ft]: 22.1
Diaphragm Length [ft]:_ 54.6
Max Collect Force [#]: 638
Length [ft] Force [#]
Open
10.0 557
Wall
2.8 332
Open
5.5 638
Wall
6.5 105
Open
5.5 411
Wall
6.5 -121
Open
2.0 -10
Wall
1 6.3 -529
Open
9.5 0
4= 0
ENGINEERING
250 4th Ave S
Suite 200
Edmonds, WA 99020
Line FJF/G
Total Force [#]:- 6003
Wall Length [ft]: 22.0
Diaphragm Length [ft]: 58.0
Max Collect Force [#]: 1708
3955
Length [ft] Force [#]
Open
16.5 1708
Diaphragm Length [ft]'
8.5 268
,Wall
Open
3.0 579
Wall
13.5 -1708
Open
16.5 0
Wall
0.0 0
Open
0.0 0
Wal
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
1 Open
Line 5
Total Force [#]: 4226
Wall Length [ft]: 28.5'
Diaphragm Length [ft]: 55.0
Max Collect Force [#]: 1575
Length [ft] Force [#]
Open
20.5 1575
Wall
7.5 1039
Open
6.0 1500
Wall
21.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
;Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Third floor Collector Forces
J&J Perkins
Line L
Total Force [#]:
3955
Wahl Length [ft]:
17.0
Diaphragm Length [ft]'
66.0
Max Collect Force [#
1228
Length [ft_
Force [#]
Z Open
4.0
240
1 Wall
8.5
-1228
1 Open
41.0
1228
Wall
8.5
-240
1 Open
4.0
0
1 Wall
0.0
0
1 Open
0.0
0
1 'Wall
OA
0
11 Open
0.0
0
1 Wall
0.0
0
l Open
0.0
0
1 Wall
0.0
0
1 Open
0.0
0
MD 1 6/29/2006
06068.10
2 027
1
2tions
Line A/B/C
Total Force [#]: 24413
Wall Length [ft]: 17.5
Total Force [#]:
-
18293
Wall Length [ft]:
1 Open
30.5
Diaphragrn Length
[ft]:
58.5
Max Collect Force
RI:
1594
1 Open
Length
[ft]
Force [#]
Open
0.0 0
0.0
0
Wall
0.0 0
3.3
-933
Open
0.0 0
5.0
631
Wall
0.0 0
7.3
-1451
Open
5.0
113
Wall
4.5
-1179
Open
8.0
1323
Wall
4.5
31
Open
5.0
1594
Wall
4.5
302
Open
0.0
302
Wall
3.5
-702
Open
5.0
861
Wall
3.0
0
Line 1
Total Force [#]:
11105
Wall Length [ft]:
30.5
Diaphragm Length [ft]:
50.5
Max Collect Force [#]:
963
Length [ft]
Force [#]
Open
0
Wall
3.1
-448
Open
5.0
652
Wall
6.9
-344
Open
5.0
756
Wall
6.9
-241
Open
5.0
859
Wall
6.9
-137
Open
5.0
963
Wall
6.7
0
Open
0.0
0
Wall
0.0
0
Open
0.0
0
C
ENGINEERING
250 4th Ave S
Suite 200
Edmonds, WA 98020
Line E/F/G
Total Force [#]: 24413
Wall Length [ft]: 17.5
Diaphragm Length [ft]: 58.0
IMax Collect Force [#]: 10207
14821
Length [ft] Force [#]
1 Open
24.3 10207
1 Wall
9.5 953
1 Open
0.0 953
2 Wall
8.0 -6840
1 Open
16.3 0
2 Wan
0.0 0
2 Open
0.0 0
1 Wall
0.0 0
2 Open
0.0 0
1 Wall
0.0 0
1 Open
0.0 0
1 Wall
0.0 0
1 Open
0.0 0
Line 5
Total Force [#]: 2874
Wall Length [ft]: 26.5
Diaphragm Length [ft]: 55.0
Max Collect Force [#]: 1071
14821
Length [ft] Force [#]
Open
20.5 1071
Wall
7.5 650
Open
6.0 963
Wall
19.0 -105
Open
2.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Wall
0.0 0
Open
0.0 0
Second floor Collector Forces
J&J Perkins Building
Line L
Total Force [#]:
14821
Wall Length [ft]:
25.5
Diaphragm Length [ft]:
58.0
Max Collect Force [#'
2172
Length [ft:
Force [#]
i Open
8.0
2044
l Wall
7.8
-480
l Open
5.0
798
i Wall
5.3
-912
l Open
6.0
621
l Wall
5.3
-1089
I Open
5.0
189
d Wall
73
-2172
l Open
8.5
0
& Wall
0.0
0
1 Open
0.0
0
1 Wall
0.0
0
1 Open
0.0-
0
MD f 6/29/2006
06068.10
2 018
v �
o'
b
3
o
6
I
ob
v �
,,tea ►
I
ob
�a
o
U
�z
A
c
� wU
v �
,,tea ►
4- >4
o•°d
a�
o
U
w
b b
z
t,
o
I