Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLD08-112562501 PGS*A REV
0912712011 12:55 PM SWOO CIT PORT TOWNSEND
Jefferson County WA Auditor's Ofv - Donna Eldridge, Auditor
mill IFT'INAT. LIMZC I of IIA10 IVU-1111111
City of Port Townsend
Development Services Department
250 Monroe Street, Suite 3
Port Townsend, WA 98368
RESCISSION OF NOTICE TO TITLE
Grantors: City of Port Townsend, a municipal corporation
Grantee: Andrew and Catherine Siegel, husband and wife
Reference: Notice to Title, recorded under AFN 549871, Records of Jefferson County
THIS RESCISSION OF NOTICE TO TITLE is made and entered into this Z`l1%i day of
Sep4-- , 6e,- , 2011, by the City of Port Townsend, hereinafter referred to as "the City," and
Andrew and Catherine Siegel, hereinafter referred to as "Owners", the legal and equitable owners
of the real property described herein.
A. RECITALS
1. Legal Description: This Rescission of Notice to Title shall remove a previously recorded
Notice, recorded under AFN 549871, Records of Jefferson County, on the real property ("the
property") legally described as follows:
Lot 2, 111arkview Short Plat. No, 1 as per plat recorded in
Volume 5 of Short Plats, pages 47 and 48, records of
Jefferson. County, Washington
Parcel #: 964-201-912
2. Improvements "l1e subject property was previously pet•l-pitted to be developed with a single-
family dwelling and an attached Accessory Dwelling Unit (ADU) under building permit 1 LD08-
1, l2. Its 2010, a Notice to Title was recorded as a condition of building permit approval for the
ADU (Jefferson County Auditor's File No. 549871).. Per the terms of the recorded Notice,
current and future yawners were advised that the property owner must reside on the subject.
property, in either the principal residence or the ADU, in order to rent or lease the other unit.
Rescinding of Notice to Title Page 1
2. Conversion of Structure to a Duplex. The current Owners have applied for the permit
necessary permit to convert the structure into a duplex, which included providing each unit with
a separate water connection (MIP 11-041). That work was completed, inspected and approved by
city staff. City staff also reviewed the duplex conversion for compliance with the building and
zoning codes in effect. The building was constructed with the appropriate one -hour fire
separation between the two units and parking standards for a duplex would be met on -site.
NOW, THEREFORE, as the benefits derived by the Notice to Title are no longer
needed, the City authorizes and the Owner agrees to, the rescission and removal of the Notice to
Title recorded under Auditor's File Number 549871, records of Jefferson County, and the same
shall be of no further effect. The filing of this document with the Jefferson County Auditor,
including any, fees for such, shall be the responsibility of the owner. The original version of this
document shall be returned to the City with a copy provided by the City to the owner.
Dated this day of IT
i-_i -nn_ , 2011.
I^
At r Siegel Owner Ca lI4rielegel, O ner
Rescinding of Notice to Title Page 2
I ick Seple •, DSD Dire for �
City of l o, Townsend
STATE OF WASHINGTON)
) ss
COUNTY OF JEFFERSON )
On this day personally appeared before me, Rick Sepler, to me known to be the
individual described in and who executed the within and foregoing instrument, and
acknowledged that he signed the same as his free and voluntary act and deed, for the uses and
purposes therein mentioned.
Given under my hand and official seal this '2--b", day of .2011.
NOTARY P1, f,1C in anftf�orll State of Washington
residing at R,-+ —rov-h-, V"6'
My commission expires: 12- —L S--13
.�� A.
_ an o�1YP
7
A
Approved as to form:
'
John Watts, City Attorney
Rescinding of Notice to Title Page 3
CERTIFICATE OF ACKNOWLEDGMENT OF EXECUTION OF AN
INSTRUMENT
Sofia, Bulgaria
Embassy of the United States of America
I, Rifat Awan, Consular Associate of the United States of America at the
Embassy of the United States of America at Sofia, Bulgaria, duly commissioned
and qualified, do hereby certify that on this IP day of September 2011, before me
personally appeared Andrew Siegel and Catherine Siegel, known to be the
individuals who executed the annexed instrument and who duly acknowledged to
me that they executed the same freely and voluntarily for the uses and purposes
therein mentioned.
s
c ' In winless whereof" l have licteuriao set any hand and
�official seal the day and year last above written..
ell
« .
Ri rat Awail
Consular Associate of the United States of"America
Receipt Number: 11 _0515 9
. ....... ..
Receipt Date. 0�912712011 Cashier: MWAY Payer/Payee Name: Andrew Siegel
[111111 "I'll, . . .. . ........... . .................. . . . . . ............ . .....
IOriginal: Fee Amount Fee
pe r m it Parcel Fee Description Amount, Paid Balance
Staff time fee for CAM
$25.00
$25.00 $0.00
Legal Document Preparation Not Tied
$65.00
$65.00 $0.00
Total:
$90.00
.
. .........
Previous Payment History,
...... ........... . .
........................
. . .. .. . . . . ...... .. . . ........ ............... .
Receipt #
Receipt, Date
...... . . . .....
..... ........ Fee Description
Amount Paid
. ... .....
Permit, #
. ... .. ........
Payment
Check
Paymenti
Method
Number
..... . . ........
ArnoUnt
CHECK
5624
$90.00
Total- $90.00
M1zF*1MMM=
-Jefferson count.V, WA
Jefferson County Auditor
'1820 Jeffersorl st.
Port Townsend, WA 98368
Recelpt,° 1104163
Pr'loduct
Narne
RED'"
R&,,ccati�iijoPj
Docwjjiet #
Pages
Total
'Tender (Che(,�Ik�
Check #
5 (32 3
PaidBy
ANDREW SIEGEL.
Tender(Cash)
PaidBy- CITY OF PORT
FOWNSEND
UIEMM
9/27/11 12:55 PM bonnie
Page 1 of 1
Extended
$65.00
562501
4
$65.00
$64. 00
$1M
Page 1 of 4
John McDonagh
From:
John McDonagh
Sent:
Wednesday, February 16, 2011 10:17 AM
To:
'Siegel'
Cc:
'Teresa'
Subject: RE: Eddy Court
I checked on the last question I had with our building official & it's a non -issue. You'll just have to deal
with items 3 & 4 in my previous e-mail (below).
Thank both of you for your patience with this & good luck with the rest of your decisions.
Regards,
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: John McDonagh
Sent: Tuesday, February 15, 2011 1:17 PM
To: 'Siegel'
Cc: Teresa'
Subject: RE: Eddy Court
Hi Andy,
Of course, I'm glad it's working out and it is (part of) what we do.
I must say that in hindsight (this is for Teresa's info more than yours), the next time we have a confusing
situation like this we'll need to require a Pre -Application be submitted to sort out the issues. This was a
bit of an unusual case and quite of bit of extra staff time (not just mine) has gone into this to get
everybody to this point. Pre -Applications are only $150 and I've spent at least that much time off my
time in figuring this out. While we do our best to help facilitate every project, I've been spending time
on this that's kept me from getting to other projects that have paid $$$ for the work on their projects.
Please don't construe this as a complaint against either of you, but it's also not fair to the other
"customers" we serve when we delay working on theirs to meet a real estate closing deadline.
Now that I'm through griping, I've put the following items together so the file is properly documented:
I've resolved my questions concerning the adequacy of the addresses for this (425-A
Eddy Court & 425-B Eddy Court). Again, if we had this to do over the addressing we
assigned to the lots as they were created would be spread out further. Since they're on
the face of the short plat, we'll have to live with it and follow a similar pattern if other
lots are developed with a duplex or an SFR and ADU. So, no action is required
2/16/2011
Page 2 of 4
concerning the addressing of the duplex.
2. The building permit file for this project (BLD08-112) demonstrates that the structure was
built with one hour fire separation between the units. Without it, this couldn't be a
duplex so that issue is taken care of. In addition, the building permit file demonstrates
that additional bracing per a structural engineer's recommendations has been installed for
the wooden bridge (i.e. the driveway) to ensure it can withstand the various forces that
would be imposed from vehicles driving onto it and parking there. So that issue is taken
care of as well.
3. You'll need to correct the utility hook-up situation (but you already knew that). There
may be more than one way to solve this issue but they're both going to cost about the
same (I think). You should contact our engineering staff when you're ready to do that.
It'll need to be done before the following item is addressed, which is:
4. The rescinding of the Notice to Title concerning the ADU will need to get done. When
you've applied to correct the utility hook up, I'll then work to draft the document
necessary to do that. We'll bill for this work at $65 per hour and I estimate it'll take me 1
to 1.5 hours. That document will then need to be recorded at the County Auditor's at
your cost (which will be in the range of $65 to $70).
5. I have one final item that I need to check with the building official on but I can't do
that until tomorrow, as he is out. I will follow this e-mail up with you both tomorrow
between 10 a.m. and 11 a.m. our time.
Thanks
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Siegel [mailto:siegelathome@gmail.com]
Sent: Monday, February 14, 2011 9:56 PM
To: John McDonagh
Cc: Teresa'
Subject: RE: Eddy Court
Hi John, thanks very much for working with us on this. Do I have your commitment that as soon as the utility
question is addressed to provide a separate water supply and meter for the other side of the house, that the
notice to title will be removed? As you can tell, I have to rely on your promise in this connection - we're about
to plunk down a bunch of money for a house whose only use to us is to be a duplex...
Thanks much
Andy
From: Teresa [mailto:teresago@olypen.com]
Sent: Tuesday, February 15, 2011 2:30 AM
2/16/2011
Page 3 of 4
To: 'John McDonagh'
Cc: 'Siegel'
Subject: RE; Eddy Court
Here is the reply from John M. I called the roofer but had to leave a message.
You could stay the same and know you will need to do it sometime.
You can ask the seller to do it and not increase the price.
You could ask the seller to do it and maybe increase the price a bit.
I am not sure what to suggest. The seller has said he fixed all the items.
so we didn't have to ask for that.
I am sorry to use the wrong address I deleted the old one from my contacts but
it still pops up in the automatic window and if I am in a hurry it gets checked
instead of the new one.
T
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things........ the things you look at. .......... change
From: John McDonagh [mailto:jmcdonagh@cityofpt.us]
Sent: Monday, February 14, 2011 3:26 PM
To: Teresa'; 'Siegel'
Subject: RE: Eddy Court
That's correct.
Thanks for finding the property corner....
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Teresa [mailto:teresago@olypen.com]
Sent: Monday, February 14, 2011 1:37 PM
To: 'Siegel'
Cc: John McDonagh
Subject: Eddy Court
2/16/2011
Page 4 of 4
Hi, Well John and I met at the site this morning. We measured and yes indeed it has the required length
for off street parking. So it would qualify for a duplex but
he would not remove the covenant from the title until the utilities are in place.
Please correct me if I am wrong John M.
T
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things....... the things you look at. .......... change
2/16/2011
Page 1 of 4
John McDonagh
From: Teresa [teresago@olypen.com]
Sent: Tuesday, February 15, 2011 3:05 PM
To: John McDonagh
Subject: RE: Eddy Court
sorry about that I would have thought of that except Andrew emailed and then
we just went with what happened. I thought it was exceptional help so thank
you.
101
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things....... the things you look at. .......... change
From: John McDonagh [mailto:jmcdonagh@cityofpt.us]
Sent: Tuesday, February 15, 2011 1:17 PM
To: 'Siegel'
Cc: Teresa'
Subject: RE: Eddy Court
Hi Andy,
Of course, I'm glad it's working out and it is (part of) what we do.
I must say that in hindsight (this is for Teresa's info more than yours), the next time we have a confusing
situation like this we'll need to require a Pre -Application be submitted to sort out the issues. This was a
bit of an unusual case and quite of bit of extra staff time (not just mine) has gone into this to get
everybody to this point. Pre -Applications are only $150 and I've spent at least that much time off my
time in figuring this out. While we do our best to help facilitate every project, I've been spending time
on this that's kept me from getting to other projects that have paid $$$ for the work on their projects.
Please don't construe this as a complaint against either of you, but it's also not fair to the other
"customers" we serve when we delay working on theirs to meet a real estate closing deadline.
Now that I'm through griping, I've put the following items together so the file is properly documented:
I've resolved my questions concerning the adequacy of the addresses for this (425-A
Eddy Court & 425-B Eddy Court). Again, if we had this to do over the addressing we
assigned to the lots as they were created would be spread out further. Since they're on
the face of the short plat, we'll have to live with it and follow a similar pattern if other
2/16/2011
Page 2 of 4
lots are developed with a duplex or an SFR and ADU. So, no action is required concerning the
addressing of the duplex.
2. The building permit file for this project (BLD08-112) demonstrates that the structure was
built with one hour fire separation between the units. Without it, this couldn't be a
duplex so that issue is taken care of. In addition, the building permit file demonstrates
that additional bracing per a structural engineer's recommendations has been installed for
the wooden bridge (i.e. the driveway) to ensure it can withstand the various forces that
would be imposed from vehicles driving onto it and parking there. So that issue is taken
care of as well.
3. You'll need to correct the utility hook-up situation (but you already knew that). There
may be more than one way to solve this issue but they're both going to cost about the
same (I think). You should contact our engineering staff when you're ready to do that.
It'll need to be done before the following item is addressed, which is:
4. The rescinding of the Notice to Title concerning the ADU will need to get done. When
you've applied to correct the utility hook up, I'll then work to draft the document
necessary to do that. We'll bill for this work at $65 per hour and I estimate it'll take me 1
to 1.5 hours. That document will then need to be recorded at the County Auditor's at
your cost (which will be in the range of $65 to $70).
I have one final item that I need to check with the building official on but I can't do
that until tomorrow, as he is out. I will follow this e-mail up with you both tomorrow
between 10 a.m. and 11 a.m. our time.
Thanks
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Siegel [mailto:siegelathome@gmaii.com]
Sent: Monday, February 14, 2011 9:56 PM
To: John McDonagh
Cc: Teresa'
Subject: RE: Eddy Court
Hi John, thanks very much for working with us on this. Do I have your commitment that as soon as the utility
question is addressed to provide a separate water supply and meter for the other side of the house, that the
notice to title will be removed? As you can tell, I have to rely on your promise in this connection - we're about
to plunk down a bunch of money for a house whose only use to us is to be a duplex...
Thanks much
Andy
From: Teresa [mailto:teresago@olypen.com]
2/16/2011
Page 3 of 4
Sent: Tuesday, February 15, 2011 2:30 AM
To: 'John McDonagh'
Cc: 'Siegel'
Subject: RE: Eddy Court
Here is the reply from John M. I called the roofer but had to leave a message.
You could stay the same and know you will need to do it sometime.
You can ask the seller to do it and not increase the price.
You could ask the seller to do it and maybe increase the price a bit.
I am not sure what to suggest. The seller has said he fixed all the items.
so we didn't have to ask for that.
I am sorry to use the wrong address I deleted the old one from my contacts but
it still pops up in the automatic window and if I am in a hurry it gets checked
instead of the new one.
T
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things....... the things you look at. .......... change
From: John McDonagh [mailto:jmcdonagh@cityofpt.us]
Sent: Monday, February 14, 2011 3:26 PM
To: Teresa'; 'Siegel'
Subject: RE: Eddy Court
That's correct.
Thanks for finding the property corner....
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Teresa [mailto:teresago@olypen.com]
Sent: Monday, February 14, 2011 1:37 PM
To: 'Siegel'
Cc: John McDonagh
2/16/2011
Page 4 of 4
Subject: Eddy Court
Hi, Well John and I met at the site this morning. We measured and yes indeed it has the required length
for off street parking. So it would qualify for a duplex but
he would not remove the covenant from the title until the utilities are in place.
Please correct me if I am wrong John M.
T
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things....... the things you look at. .......... change
2/16/2011
r
-Icy � C of
Page 1 of 6
John McDonagh
From: John McDonagh
Sent: Wednesday, February 09, 2011 9:49 AM
To: 'Teresa'; 'Siegel'
Cc: sailor@olypen.com
Subject: RE: Eddy Court
The consequences of renting out both the primary residence and its associated ADU can lead to code
enforcement, potential for fines and/or liens, etc. I realize that practice of renting out both the house and
ADU has occurred in town (and certainly still does) but when we are made aware of it we're obligated
to enforce the code as currently written. It's the chief reason why we require people who build a house
with an ADU to sign and record the Notice to Title, so they are aware of the potential consequences.
The way to try and make this a duplex is (in addition to securing an additional utility connection which
your client says he's aware of) is to verify that it has two full on -site parking spaces for each unit. I may
be wrong about where I think the property line is as I couldn't find any property stakes. You might want
to contact the surveyor who worked on the project (Michael Anderson) to see if he could help locate or
reestablish the front property corners. If the parking spaces can be confirmed to be 19 feet, that issue
goes away.
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Teresa [mailto:teresago@olypen.com]
Sent: Monday, February 07, 2011 2:11 PM
To: John McDonagh; 'Siegel'
Cc: sailor@olypen.com
Subject: RE: Eddy Court
So what happens when someone doesn't live there as a resident And this is just rented as a duplex.
I know a lot of places in town that have been lived in and then circumstances change and they rent out
the resident side and leave town. Then it is a duplex. What are the consequences???
Next question: What I am hearing is there is no way to make this a duplex right??
Teresa
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
2/9/2011
Page 2 of 6
When you change the way you look at things....... the things you look at. .......... change
From: John McDonagh [mailto:jmcdonagh@cityofpt.us]
Sent: Monday, February 07, 2011 1:26 PM
To: Teresa'; 'Siegel'
Cc: sailor@olypen.com
Subject: RE: Eddy Court
Hi Teresa, Andy, et al,
Here's what can be varied through a Minor Variance (similar to what you & David recently obtained for your
outbuilding):
"Variance, minor"means a variance which would permit one of the following:
A. Up to five percent below the minimum lot size and/or lot width for infill development;
B. Up to five percent below the minimum lot area for planned unit developments (PTMC t .,2.0);
C. Up to a 20 percent reduction of one setback in the residential zoning districts (PTMC "17.16_9C Q)..
So unfortunately the size of parking spaces isn't one of the things we can adjust via a Minor Variance.
To do so for this property would require going through a Major Variance, which involves public notice,
a hearing in front of our Hearing Examiner, and approval by him for the standard being varied. Our
department makes a recommendation on the Variance request but the Examiner makes the decision. The
fee for that process is around $1,600.
I've talked this through with my co-workers and the DSD Director. Each of us felt that while this is a
minor deficiency, we wouldn't likely be supportive of a Major Variance request for this. The original
project proponents always intended for these lots to be built with single family residences (per their
original submittals) and there's really no "hardship" (which is a chief approval criteria for a Major
Variance). While I realize this is not the fault of anyone involved now, it is nonetheless the result of
past actions of the original developer. Ignoring those actions now for someone else does not alleviate
the problem and, at the very least, sets a bad precedent.
I went out today & measured myself the distances involved. Attached are some photos. The on -site
portion of the driveway is a little over 18' 2". As near as I could determine, the property line begins at
the top of the sloped concrete driveway and not the bottom (see the 3rd photo showing the water meter
boxes in the foreground, which typically are set in the right-of-way and at the property line); however, I
could not find actual property line markers. The closest thing to a property marker I could find is in the
4th photo (see the rebar stake, which is on the west side of the driveway). This stake lined up with the
water meter boxes (which are on the east side of the driveway).
If the sloped portion of the driveway(s) is actually on the private property, this might be a different
story. Any additional info you can provide about the property line may be helpful and may result in a
different answer. Even though this is a recent subdivision, I'm sure the actual survey pins were
damaged and/or removed during construction.
2/9/2011
Page 3 of 6
Regards,
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Teresa [mailto:teresago@olypen.com]
Sent: Monday, February 07, 2011 9:32 AM
To: John McDonagh; 'Siegel'
Cc: sailor@olypen.com
Subject: RE: Eddy Court
John, Is there not a possibility of getting a variance. I do understand your concerns about someone thwarting
the system,
however that person no longer benefits from this home it was foreclosed on.
It is my belief that if we are only one foot short depending on how one measures we could apply for the 10%
variance factor, true or not.
Thank you for you attention to a solution for this property.
Teresa
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things....... the things you look at. .......... change
From: John McDonagh [mailto:jmcdonagh@cityofpt.us]
Sent: Friday, February 04, 2011 3:40 PM
To: 'Siegel'
Cc: Teresa Goldsmith'; sailor@olypen.com
Subject: RE: Eddy Court
Andy,
I'm sorry your time frame for this is so short. And of course, we have no control over that.
Unfortunately we're not going to be able to investigate your realtor's results and if determine if they'd
meet the on -site parking requirements for a duplex until the middle or end of next week.
I did a quick drive by today on my lunch break and the parking situation there is quite unique with the
2/9/2011
Page 4 of 6
bridge, dual sloped driveway, etc. If your realtor's measurements are correct (as I understand them) and
there's only 18 feet of parking space in the driveway, then it doesn't meet the minimum required
standard of 19 feet. As I believe I stated previously, the developer of this dwelling purposely worked to
thwart zoning rules and standards in building this house and ADU.
I'm going to need to pull the as-builts drawings for the land division on this project to try and determine
just where the property line is (and the right-of-way begins). That won't be until Monday afternoon or
Tuesday as I am working on other matters that were submitted before your request this last Monday.
I will be back in touch as soon as I have a determination on the adequacy of parking for a duplex.
John McDonagh, Senior Planner
Development Services Dept.
City of Port Townsend
Pt. Townsend, WA 98368
360-344-3070 office
360-344-4619 fax
From: Siegel [mailto:siegelathome@gmail.com]
Sent: Friday, February 04, 2011 2:25 PM
To: 'Siegel'; John McDonagh
Cc: Teresa Goldsmith'; sailor@olypen.com
Subject: RE: Eddy Court
Hi again John, so our time is kind of running out to make a decision on the deal — any conclusion on this?
Thanks
Andy
From: Siegel [mailto:siegelathome@gmail.com]
Sent: Thursday, February 03, 2011 9:43 PM
To: 'John McDonagh'
Cc: Teresa Goldsmith'; 'sailor@olypen.com'
Subject: RE: Eddy Court
Hi John — more on the parking situation — our realtor went out and measured the exterior parking I mentioned
below — see her results below. Does this satisfy the requirement? If so, is there anything else we would need to
do to remove that notice to title and have the property be a legal duplex?
Thanks
Andy
--------- Original Message --------
From: Sheila Christensen <sailor@olypen. com>
To: teresago <teresago@olypen. com>
Subject: 19 feet for Eddy Court 2nd park space
Date: Thu, 3 Feb 2011 10:28: 31 -0800
The wood part of the driveway is 18 feet, then it turns into concrete and
2/9/2011
Page 5 of 6
slopes down to connect with the sidewalk for approx another 3 feet. Total
distance from the garage door and the sidewalk is about 21 feet, but you
might want the city to look at it since the last 3 feet are not level.
From: Siegel [mailto:siegelathome@gmail.com]
Sent: Wednesday, February 02, 2011 8:49 PM
To: 'John McDonagh'
Subject: FW: Eddy Court
Hi John — you know, now that I look at these pictures again, I don't think we should have a parking problem. As
you'll see, each side has a one -car garage, but there's also room to park a second car in the driveway in front of
the garage doors.
(I'm operating a distinct disadvantage here as I have not seen the house in person! We're overseas and I'm
having to rely upon my realtor, inspector, etc...., Crazy, but true)
Thanks
Andy
From: Teresa [mailto:teresago@olypen.com]
Sent: Wednesday, December 29, 2010 12:18 AM
To: 'Andrew Siegel'
Subject: Eddy Court
I will send some pictures and a couple of videos in various emails.
The agent for the house said that the right side is rented so I only saw the
left side. It is new and appears to be of good quality. The rent being charged
on the right side is $1000.00 a month.
It is a new neighborhood and there are several vacant lots so there will be more
homes in the area.
Any questions just ask.
T
Teresa Goldsmith
Broker Manager
John L. Scott Real Estate
Port Townsend, WA 98368
800-869-7834
360-385-4115 Office
360-301-0099 Cell Phone
360-385-4196 Fax
When you change the way you look at things......... the things you look at. .......... change
2/9/2011
Page 6 of 6
No virus found in this message.
Checked by AVG - www.aVg ppjn
Version: 10.0.1191 / Virus Database: 1435/3344 - Release Date: 12/28/10
2/9/2011
T6_
(ems s v�
�tr �hhI-
City of Port Townsend
Development Services Department
City Hall
250 Madison Street, Suite 3, Port Townsend WA 98368
(360) 379-5095 FAX (360) 385-7675
TO: File
CC: CL Flint
FROM: Rick Sepler, Director
DATE: November 16, 2009
RE: BLD08-112
Issue: During routine building inspections on the above referenced property, staff
identified the following issues:
1) The elevation change between the adjoining street and the garage was not shown
on the approved building plans. (Bridge not constructed per engineered plans).
Due to difference in elevation, a driver must accelerate up a ramp and cross over
the bridge to enter the garage. This action may cause racking and it is unclear
whether the bridge has been designed appropriately. Furthermore, it is unclear
whether the bridge was designed to allow vehicles to be parked on the bridge.
2) Although the building permit identifies the building as a single-family home with
an ADU, there is some question as to whether the units are intended to be sold
separately (i.e., a duplex). There are two front entrances to the building while the
city's ADU provisions allow a single front entrance.
Background:
Prior Director's Interpretation
This interpretation states: "Except
Ordinance 2928 will apply for any
there is a substantially complete bt
the recording of the plat." (in other
BLD 08-112 (issued on May 15, 2(
no additional parking space is requ
application. Plans show two off-st
The issued permit shows two front
u
from
time
message
_...
best call back Ur FL_ cmtt
City of :fort Townsend A
Development Services Department a
City Hall
250 Madison Street, Suite 3, Port Townsend WA 98368 LL
(360) 379-5095 FAX (360) 385-7675
TO: File
CC: CL Flint
FROM: Rick Sepler, Director
DATE: November 16, 2009
RE: BLD08-112
Issue: During routine building inspections on the above referenced property, staff
identified the following issues:
1) The elevation change between the adjoining street and the garage was not shown
on the approved building plans. (Bridge not constructed per engineered plans).
Due to difference in elevation, a driver must accelerate up a ramp and cross over
the bridge to enter the garage. This action may cause racking and it is unclear
whether the bridge has been designed appropriately. Furthermore, it is unclear
whether the bridge was designed to allow vehicles to be parked on the bridge.
2) Although the building permit identifies the building as a single-family home with
an ADU, there is some question as to whether the units are intended to be sold
separately (i.e., a duplex). There are two front entrances to the building while the
city's ADU provisions allow a single front entrance.
Background:
Prior Director's Interpretation (December 12, 2006, and revised January 11, 2007):
This interpretation states: "Except, ADU parking rules in effect prior to adoption of
Ordinance 2928 will apply for any lot for single family plus ADU development where
there is a substantially complete building permit application on file within 18 months of
the recording of the plat." (in other words, July 12, 2008)
BLD 08-112 (issued on May 15, 2008) was deemed complete prior to July 12, 2008, thus,
no additional parking space is required for an ADU unit completed as part of this
application. Plans show two off-street parking spaces consistent with this interpretation.
The issued permit shows two front entrances.
Resolution:
1) Applicant will need to submit a report by a Washington State licensed structural c C
engineer confirming that the ramp and bridge design meet standard engineering "
requirements given the anticipated load and racking. Also, the report needs to /f/
clarify whether or not there are limitations to parking on the bridge. Any
deficiencies identified will need to be corrected prior to final inspection, ~ �`
2) If the applicant proposes to sell the units separately, he/she must disclose this
information before the city issues a final inspection on BLD08-112. Prior to final
inspection, the applicant must demonstrate that FOUR on -site parking spaces
have been provided, applicable System Development Fees (SDCs) have been
Siµ paid, fire wall separatio has been constructs per the IBC'. A second address will
M', �`" - need to be assigned. f 2 B
9/ x / "
3) If the applicant intends to follow through with the originally proposed single-
family home and ADU, prior to final inspection, a Notice to Title must be
recorded to notify future property owners of the limitations in Section 17.16.020
of the Port Townsend Municipal Code. A second address must be assigned. — q2113 f er SF,
" L'eby TA .
cbr-
g ( 2 s®l U 7- ('�Spe
7/
m
ul
-7-&
o
Ao
as (�ok
LY
4- cd
.......................
. . ....... ... .
j-- co-
dres -
;� Puelex
c a4q,-e— ut
C14
Iti
WN
IL
CD
C4
ti
cc
i/18011''?
c
tx
0
co
CL
o
.2
co
CL
0
CL
tnz
cz
0
CD
F.
Cl)
ILL
U)
Lu
Ca
o
z
LU
U
CO
rn
cn
C,4
.0
N.
co m
>
cr)
U)
ITO,
CL
0
A,
ca
U)
w
m
CITY OF PORT TOWNSEND
PERMIT ACTIVITY LOG
PERMIT # 102 DATE RECEIVED
SCOPE OF WORK: � a
��.... _. ...._ . ............. . _. ...... � ...._....�.����..��...w _ �..... ...M
DATE ACTION INITIALS
ENTERED
.............m ���...........a .. .........�� .._���_..
ERED INTO CHET
........
CHECKED FOR COMPLET .........SS
.....
ENE
Plan Review
_... _. _.........._..
# Bedroom(s) _ # Baatli(s) Heat Typemmmmmm .
..... _ ..... ....... _........_... . __ _
_n. :_. .. �aa.............
L ��
_......__...... ...
...M _...
-.....__.. /!g riff
Yo
Setbacks OK?
r/
_Lot Size: _
(, ....
Building Size: ~ � ' ....
_M ....... ._ ......_ . Lot Coverage:
FAR OK? _ ..
...� ..._ _ mm.. _.. _.. W ..W__ ....... .�..mm........ _
Height OK?
Parking OK? .....
Critical Area?
Demo. _ ....-....._
Historic Rev?
Notice to Title?
Lots of..Recorrd—................� �... �............
.- _-----
_...................� � ......_��.. ��. _...... _..... ��.........��� .����_ ...
?
BUILDING PERMIT
IT
xrw
City of Port Townsend
.. Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information
Permit #
BLD08-112
Permit Type Residential - Single Family - New
Project Name
New Single Family Residence with
Site Address 425 EDDY CT
Parcel #
ADU
964201912
Project Description
New Single Family Residence (replaces BLD07-166)
Names Associated with this Project
License
Type Name Contact
Phone #
Type License # Exp Date
Applicant Williams Valorie
(360) 531-0747
Owner Williams Valorie
(360) 531-0747
Contractor Owner Builder
Q -
STATE exempt 12/31 /2008
* * * SEE ATTACHED CONDITIONS * * *
Ca11385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the own !r of the property or aulhorized agent of the owner.
PrintName
(� Date Issued: 05/15/2008
(
Issued By: SWASSMER
UILDIN : Ei��'i I "
VO r
City of Port Townsend
Development Services Department
M 250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information Permit # BLD08-112
Permit Type Residential - Single Family - New Project Name New -Single Family Residence with
Site Address 425 EDDY CT Parcel # ADU
964201912
Project Description
New Single Family Residence (replaces BLD07-166)
Conditions
10. Property corner survey pins must be located at time of footing inspection to verify setbacks. Minimum setbacks 20
foot from Eddy Ct., 5 foot side yards and 10 foot rear yard.
20. Temp. erosion control measures must be installed and maintained prior to approval of any building inspections.
30. Common walls to be one -hour construction per IRC 317.1. Details must be submitted for approval prior to
inspection.
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner.
Print Name Date Issued: 05/15/2008
Issued By: SWASSMER
BUILDERS CAPITAL
M O R T G A G E
February 3, 2010
TO: Rick Sepler, Director
Development Services Dept.
Port Townsend, WA
Response to your letter dated November 16, 2009, we have taken the following steps
in compliance with your requests:
1. A study of the ramp -bridge has been completed by a Washington State licensed
structural engineer, Hayden Watson, and is being sent to you directly.
All modifications recommend by the engineer will be completed prior to final
inspections by the city inspector.
2. Since building permit BLD08-112 was issued for a single family home and ADU
structure, and the city approved the current plans as submitted and has inspected
and signed off on the various stages of construction, we agree to the current use
and have prepared a NOTICE of TITLE, which will be recorded after signing.
We request that the water meter be installed and made ready for our plumbing contractor
to complete the hook-up and testing of the water system.
We will notify the building inspection department when all work is complete for final
inspection and issuance of an Occupancy Permit.
Thank you for your assistance and attention to this project.
J ect Manager
www.builders•capital.com
1109 First Avenue, Suite 200 . Seattle, Washington 98101
P 206.267,2650 F 206.261.1301
Watson Structural Engineering Phone 360544-8574
1062 NW Redwing Dr. Fax 360-544-8619
Oak Harbor, WA 98277 email haydenwse@msn.com
Watson Structural Engineering
Wednesday, February 03, 2010
City of Port Townsend
Development Services Department
City Hall
Attn. Rick Sepler
250 Madison Street, Suite 3
Port Townsend, WA 98368
Dear sir:
Subject: BLD08-112, Residence at 425 Eddy Ct., Port Townsend, WA
98368
On Friday, January 29, 2010, Watson Structural Engineering investigated the
driveway bridge at the residence at 425 Eddy Ct., Port Townsend, WA for
conformance to the requirements of the 2006 IBC for residential vehicular loads.
This investigation is to address several structural issues noted in Project Memo from
Rick Sepler, Director dated November 16, 2009. The site visit was performed to
make a non-destructive evaluation of the existing structural condition.
A general review of the bridge structure yielded the following observations. The
general condition and workmanship of construction appears to be above average of
that seen in exterior residential construction. All lumber members were observeved
to be structural select graded pressure treaded hem -fir. All observed fastenings and
hardware were hot dip galvanized. The components appeared property
interconnected with strapping, post base and caps, blocking and lagged comers.
(See exhibits 1-6)
The investigation dealt with two primary concerns relating to the bridge / driveway
1. Lateral loads / Racking.
a. Loads in direction of travel (LDT).
LDT are due primarily to vehicular braking and acceleration and to a
lesser extent to code prescribed seismic loads. The structure is
framed between a cast -in -place concrete retaining abutment wall
(exhibit 3) at the roadway and the main level floor at the residence.
(exhibit 7) The bridge framing is supported vertically by a line of posts
and beams at the residence. The LDT are resisted by direct contact
and bolting & blocking to the main level diaphragm. By inspection, the
residence structure has more than sufficient lateral capacity for all
• Page 2 February 4, 2010
vehicular and other lateral loads induced to the diaphragm in this
direction.
b. Loads perpendicular to travel (LPT).
LPT are due primarily to code prescribed seismic loads. The structure
is anchored for LPT at both ends. By inspection, the retaining
abutment wall has sufficient lateral capacity. The post and beam line
at the mid -point of the bridge currently has no lateral bracing, but due
to the geometry of the side decks, this load is currently being
transferred to the front elevation. (exhibit 4, 5 & 6) The lower level of
the front elevation may likely have capacity for the 14 foot bridge
tributary lateral loads that are currently being resisted. To verify this
would require a full lateral evaluation of this section of the residence. It
is recommended that the majority of this load be resisted at the center
post and beam line by the installation of a bay of lumber cross bracing.
(See exhibit 8 for details of construction.)
2. Gravity loads
a. Passenger / light truck loads.
Analysis has shown that the existing framing has greater capacity than
required for support of passenger / light truck loads. (See attached
calculations.) The controlling member, which is the girder adjacent to
the residence, has a capacity in excess of 85 pounds per square foot.
This is more than twice the required capacity for passenger vehicles.
b. Truck load ratings / restrictions.
All structural elements have been analyzed for capacity to support
heavy truck induced point loads. This analysis shows that the
controlling member is the typical floor joist. The maximum
recommended truck load for this bridge should be an H10 rated truck
load. This is a 20,000 pound (10 ton) truck with 16,000 pound rear
axle load.
Please let me know if I can be of any further assistance.
Sincerely,
rI. Watson, P.E., S.E.
/ Principal
i Structural Engineering
Page 3
Exhibit 1
Exhibit 2
Exhibit 3
February 4, 2010
• Page 4
February 4, 2010
Exhibit 4
Exhibit 5
Exhibit 6
0 Page 5
REMOVE EXISTING
BOLT & REPLACE
W! i4 0 x 0'-6"
{ " HOT -DIP GALV. BOLT
ADD6X6 PT H.F, #1
SPACER W/'/z"e
HOT -DIP GALV. BOLT
4.)
T-0"
REMOVE EXISTING
BOLT & REPLACE
W/ wo x 0'-0"
HOT -DIP GALV. BOLT
Exhibit 8
February 4, 2010
Exhibit 7
ADD 2x8 PT H.F.#1 BRACE
EA SIDE AS SHOWN
• Page 6
February 4, 2010
Uniformly Loaded Flour Beam? 20M International Building Code (05 NOS) i Ver. 7.01.14
By: Hayden H. Wa lsor PE. SE, W l son Structural Engineering on: 02-04-2010 : 06:53:58 AM
ProoecL JI0003 GRAVITY- Locatim Grid 3 &der - limit 85 pif
Surnmww-
IN x 11.5 IN x 14.0 FT ! Select S ruckwal - Hem -Fir - Dry Use
Seofion Adequate BY 0-21% Controlling Factor. Section Modulus I Depth Required 11A8 In
De ice:
Dead Load:
DLD=
0.09
IN
Live Load:
LLD=
0.42
IN = L GQ7
Total Load:
TLD=
0.51
IN = 1-1330
Reackons (Each End'):
Live Load-,
LL4Fur=
2820
LB
Dead Load:
DL4bm=
674
LB
Total Load:
TL4bm=
34M
LB
Bearing LeiVM Required (Beam only, support capacity not checked:
BL=
1.88
IN
Beam Data:
Span:
L=
14.0
FT
Unbraced Trip of Beam:
Lu=
0.0
FT
Live Load Deflect. Criteria:
L f
300
Total Loud DeflecL Cnberix
Lf
240
Floor Loading:
Floor Live Load -Side One:
LL1=
00
PSF
Floor Dead Loa"ide One:
DLt=
0.0
PSF
Tributary WidbSideOne:
7W1=
0.0
FT
Floor Uwe Loa"ide Two:
LL2=
85.11
PSF
Flora Dead Load -Side Two:
OL2=
iS.Q
PSF
Tributary Width -.Side Two:
TW2=
4.75
FT
Live Load Duration Factor.
Cd=
t.00
Wall Load:
WALL=
0
PLF
Beare Loading:
Beam Total Live Load:
NL=
404
PLF
Beam Self Weight:
SSW=
11
PLF
Beam Total Dead Lead:
wD=
82
PLF
Total Ma dmum Load:
wT=
406
PLF
Properties For: Select Structural- Hem -Fr
Bending ass:
Fb=
13M
PSI
gear Stress:
Fjr—
140
PSI
Modulus of Elasticit-
E=
130OD00
PSI
Adiusdled Modulus of FJasbcity:
E-Min=
4700'00
PSI
Stress Perpendicular to Grain:
Fe perp=
405
PSI
F
(rens :
FV=
1300
PSI
� ushnent Fes: 00 Cd=1.00 CF=1.
Fyn^;
Fv"=
140
PSI
Adjustment Factom. Cd=1.00
Deygn ire
Controlling Moment
w
11900
FT4.B
7.0 ft horn lest support
Critical moment created by combining am dead and me bads.
Controlling Show.
V=
2992
LB
At a distance d from support.
Critical shear created by combkii ngi al dead and Ive bads.
Comparism s'WW�dh Requiredn
Seotiran Modulus ( ent):
Sreq=
1093.85
IN3
S=
110-21
IN3
Area (Strearj
Area=
32.00
IN2
A=
57.50
IN2
Moment of Inertia (Deflection):
Ireq=
575.10
IN4
I=
633.70
IN4
User Added Notes:
CONTROLING MEMBER FOR UNIFORM LOADING
Capacity of girder at face of bilding is in excess of 85 punds per square foot
• Page 7
February 4, 2010
I.Irr' Floor Beam[ 20D0 Inkswidionall Buildintt Code (05 NDS)1 Ver: 7.01.14
EN HaydenH. WatsonPE, SE. Watson Structural Engineering : 02434-2010 : 00:5140 AM
IMM GRAVITY» IocaCicn: Grid 2 girder- limirrt200 pill
5.0 IN x 11.5 IN x 7.0 Fr / Select Structural - Herr -Fir - Dry Use
Sect on Adequate By- 0.2% Controlling Factor Section MDdulus
! Depth Requinad 11.49 In
Deflections:
Dead Load:
DLD=
0.01
Live Load:
LLD=
0.12
Total Load:
TLD=
0.13
Reactions (Each Earl
Live Load':
LL4;bn=
6300
Dead Load:
DL-Pjm=
510
Total Load:
TL-Fbn=
6810
Bearing Lenplh Requied (Beam only, support capacity not checked),: BL=
3.30
Beam Data:
Span:
L=
7.0
Unbrwed -Top of .
Lu=
0.0
Live Load DeVed. Criteria:
U
380
Total Load Deflect Critarix
U
240
Floor Loading:
Floor Live Load -Side One:
LL1=
21a0
Floor Dead '- -S'ide One:
DL1=
15.0
Tributary Wid i One:
TW1=
4.25
Floor Live Load -Side Two:
LL2=
200.0
Floor Dead toad -Side Two:
DL2=
15-0
Tributary Widb wide Two:
TW2=
4.75
Lime Load Duration Factor_
Cd=
1.011
Wall Load:
WALL=
0
Beare Laadina:
Beam Total live Load:
yam=
IBM
Beam Self Wejght:
BSW=
11
Beam Total Dead Load:
wD=
140
Total Maxirmun Load:
w7
1940
PYoperties For: Select Structural- Reran -Fr
0endtnp Stress:
Flr
1390
Shear Stress:
Fr—
140
Modulus of Elasticity:
E=
130D000
Adiusted Modulus of Elasticity:
E--taro=
470000
Stress Perpendicular to
Fe
405
A4usted Properties
FW (rension):
FV=
1300
Adjustment Farrdors; Cd=1.00 CF=1.00
Fv'::
r=bf=
den
Adiustment Factors: Cd=1.00
Desiun Reauiremwvk:
Contrallina Momert
3.5 ft bun "rapport
Critical moment d by combining all dead and live loads.
Controlling Shear
At a distance d t'rorn support.
Critical shear meted by combining a9 dead and We lands.
Cornparisons, With Required SectionE
ection Modulus (Motnwd):
Area (Sirearj
Moment of Ineriia (D " ):
ilser Added Notes.:
Capacity of kberior girder is in excess. of 2011 ptmds per square foot
IN
IN = U712
IN = LAM
LB
LB
LB
IN
FT
FT
PSF
PSF
FT
PSF
PSF
FIF
4"
PSI
PSI
PSI
PSI
PSI
PSI
PSI
w
11910
FT -LB
V=
5039
LB
Sreq=
i 10.01
IN3
S=
110.21
IN3
Areq=
53.99
IM2
A=
57.50
IN2
Ireq=
320.52
I N4
I=
633,70
IN4
ty Page 8
February 4, 2010
Floor,boisg 2DDB International Building Code (05 NDS) ) Ver: 7.01.14
By Hayden K Watson PE, SE. Watson Structural Engineering on: 02414-2010 : 05-.57:54 AM
Pmjimect J 10003 GRAVITY - t ocaliew bridge joist - limit 250 psf
SuanmaPy.
3-5INx11.5INx9-5FT a24O.C.r#2-Ifern-Fir-Dry Use
Section By: 5.1 % Controlling Faror. Section Modulus I Depth Required 11.22 In
Center Stem Deflections:
Dead Load:
DL r=
0.01
IN
Live Load:
LLD -Center-
0.16
IN = U718
Total Load:
T r=
0.17
IN = LM 7
Center Sow Left End Reactions (Support A).
Live Load:
LL Rxn-A=
2375
LB
Dead Load:
DL- xn-A=
143
LB
Total Load_
TL4bn-A=
2518
LB
Bearing Lerwffi Rem" (Beam only, support capacity not checked):
BL,A=
1.78
IN
Center Span Right End moans (Support B):
Live Load:
LL-lxm-B=
2375
LB
Dead Load:
OL-Rjvr-B=
143
LB
Total Load
TL4Rxm43=
2518
LB
Bearing L,erVM Required (Beam only, support capacity notchecked)c
BL-B=
1.78
IN
Joist Data:
Center SpanLenWh:
L2=
9.5
FT
Floor sheathing appfied to top of joish-lop ofjoids fully braced.
Live Load Duri6m Factor
Cd=
1.011
Live Load Deflect_ Criteria:
U
480
Total Load DetlecL Criteria:
Lr
360
Center Span Loading:
Uniform Floor Loading:
Live Load:
LL-2=
2500
PSF
Dead Load:
DL-2=
15.0
PSF
Total Load:
TL-2=
205.0
PSF
Total Load Adi for Joist Spacing:
WT,2=
530
PLF
Properties For: #2- Hrwm+ir
Sendina Stress.
Fb=
850
PSI
Shear Stress:
Fr-
150
PSI
Modulus of Elasticity
E=
1300DOU
PSI
Adiusted Modulus of Elasticity
E-Min=
4700M
PSI
Stress Perpendicular to Crain:
Fc.perp=
405
PSI
FI (Tension):
Fb`=
978
PSI
t Factors: Cd=1.00 CF=1.00 Cr-1.15
Fit:Fr/=
950
PSI
Adiurstinent Factors: Cd=1.00
Des-n Requirementw
Contrallirto Moment
1&
5970
FT4J3
4.75 Ft from WO support of sw 2 (Cervter )
Critical moment d by combining al dead loads and live bads an span(s) 2
Controlling Shear.
V=
2014
LB
At a distance d iron left supoort of span 2 (Center Spun)
Critical shearcreated by combining a® dead bads and We bards an span(s) 2
Carnpansms VtViAh Rerluimd eons:
Sedan Modulus jMo nent):
Sreq=
7140
IN3
S=
77.15
IN3
Area (S ream
Meg=
20.14
IN2
A=
40.25
IN2
Moment of Inertia (Deflection):
Ireq=
290-74
IN4
1=
443.59
IN4
User Added Notes:
Capacity of typical joist is in excess of 250 pu nds per square foot
• Page 9
February 4, 2010
Mu Floor Beam( 2000 International Building Code (05 N( ) 1 Ver 7.01.14
Br. HwAten IT Watson PE SE , WatsonStructural, Engineering on: 02-04-2010 : OB:58:26 AM
Proiw: J10003 GRAVITY- : typical lomstpoint bad max nxxnent
3.5 IN x 11.51N x 825 FT ! Select Struckwal - Hem -Fir - Dry Use
Section lnadlectuwate By. 0.5% Conboling Factor: Section Madrdus 1 Depth Required 11.53 In
Center Span Deflections:
Dead Load:
DL.D-Center=
0.00
Live Load:
LLD4rAMt1er-
0.10
Total Load:
TL
0.11
Center Span Left End Reactions (Support A):
Live Load:
LL =
1702
Dead Load:
DLL u=
113
Total load
8earinq Lerah Required (Beam only, support capacitor not checkedy
BL-Ai=
1-28
Center Span ITipht Fri Roactions (Support B):
Live Load:
LL4Zvv43=
100ti
Dead Load:
DL-bm-B=
113
Total Load:
TL-P-mn-B=
1811
Reaming Leio Required (Beam only, support capacity not checkedy
BL-8=
1.28
Beam Data:
Cyr Span Lenoft
L2=
8.25
Center Span Lk&aced Lena&Tap of -
Lu2-T
0.0
Center Spawn Lk raced Lend of Bearn:
Lu2-Bobom--
825
Live Load Det1. Criteria:
L1
360
Total Load Deflect i
11
240
Center Span Loading,:
Unit on
Flow Live Load:
FLL-2=
0.0
Floor Dead Load:
FDL-2=
10.0
Floor Trbutary Width Side One:
Tdb-1-2=
2.0
Floor Tributary Widkb Side Two:
Tdb-2-2=
0.0
Beam SeN Weight:
BSW=
B
Wall Load-
wall 2=
0
Total Live
wL-2=
0
Total Oead Load:
wD-2=
20
Total Load:
wT2=
28
Point toad
Live Load:
PL2=
3400
Dead Load
P
Location (From left end of span
Properties For, Select Structural-
-2=
4.12
w
Bending S
Fb,=
1400
Shear Stress-
Fr
ISO
Modulus of EbsticiW--
E=
10=00
Adiusfed Modulus
o(El _ W.
E-Mn=
WWDO
Stress Perpendicular
to
Fc_ 'carp=
405
A*mtod Properties
FW (Tension):
FW =
1120
Adjustment Factors. Cd=1.00 CF=1.00 Ci�.80
Fv":
FM'=
150
Adjusbnent Factors: Cd=1.00
IF:E'=
C-Ain': E-W=
Adiusbrent F Cm=1.O0 Ci=i_95
Design Requirements-.
Moment CoWrall nqq
41 125 Ftft m left support of span ', K Start
Cwitical moment created by coftining al dead loads and live leads on span(s) 2
Controlling Shear
At a distance d from let support of span 2 (Center Span1
Critical shear created by combining an dead s and live: bads on span(s) 2
Comparisons With Required ins.
Section Modulus (Moment): sretr-
FAILED S=
Area=
A=
Ireq=
1=
Area (S rear'
Moment of Inertia (Deflection):
User Added Notes:
COHTROLING 0.5%overstress. SAYOKAY
Capacity of joist with H t0 truck load boated to giro ntaxurwrn moment
w
V=
IN
IN = LJ971
IN = L1032
LB
LB
LB
IN
LB
LB
LB
IN
FT
FT
FT
PSF
PSF
FT
FT
PLIF
PLF
PLF
PLF
PLF
LB
LB
FT
PSI
PSI
PSI
PSI
PSI
PSI
PSI
152DDOO PSI
551000 Psi
7238 FT4-B
1791 LB
7T-55 IN3
77-15 HO
17.01 iN2
4025 IN2
184A0 IN4
443-59 IN4
• Page 10
February 4, 2010
Mull" -Span Floor Seamf 2000 In u m ! Buildina Code (00 Nile ) Ver 7..01.14
By: HaydenH. Watson PE, SE, Watson Structural Engineering : 02-W2010 : 00:58. 3 AM
Wit: J10D03 GRAVITY- Location: typical joist point' ad max shear
Summaryr_
3.5 IN x 11.5 IN x 8.25 FT 1 Select Struchral - Hem -Fir- Dry Use
Secfion By: 30.8% ContimIling Factor_ Area / Depth Required 8.70 In
Center Span Deflections.
Dead Load:
D
D-M
IN
Live Load:
LLD-C`,enter—
D.04
IN = L/2681
Total Loadr
TLD r=
0.04
IN = L9304
Center Span Left End Reactwns {Support A):
Live Load:
LL-bm-A=
2088
LB
Dead Load:
DL-Rm-A=
113
LB
Total Load
TL4Rvr-A=
3101
LB
Bearing Lerath Requked (Beam only, support capacity not checkedy
BL-A=
2-18
IN
Center Span Right End Reactions (Support B)-.
Live Load:
LL-Pm-B=
412
LB
Dead Load:
DLB=
113
LB
Total Load:
TL-Rm-fit=
52e
LB
Bearing Length Requied (Beam only. support capacity not checked]:
BL-B=
0.37
IN
Beam Data',
CenterSpan Len0h:
L2=
8.25
FT
Center Span Unbraced Lenaltk-Top of Bearn:
Lug Tap.=
OLD
FT
Center Len n of Beam:
tu2=
8.25
FT
Live Load Deft -a, Criteria:
Lf
300
Total Load Deflect Criteria.
Lf
240
Center Span Loading:
Uniform Loaad:.
Floor Live Load:
FLL-2=
0.0
PSF
Floor Dead Load:
FDL-2=
10.0
PSF
FloorTrbutaryWidth Side One:
Trip-1-2=
211
FT
Floor T►&Aary Width Side Two:
Tdb-2-2=
0.0
FT
Beam Self 'Weight:
SSW=
B
PLF
Wall Load:
wall-2=
0
PLF
Total Live Load:
WL-2=
0
PLF
Total Dead Lam:
wD-2=
20
PLF
Total Load:
wT-2=
28
PLF
Point road
Live Load:
PL-2=
3400
LB
Dead Load:
PD 7=
D
LB
Location {From left end of Sporn
X-=
1-11
FT
Pyoperfies For SeW Structural- Hem-Fir
Sendina ass:
Fb=
1400
PSI
Shhear Stress:
PW—
150
PSI
Modulus of Elasticity:
E=
1000ODD
PSI
Adiusfed Modulus of Elasticity:
E-Mn=
5MOD
PSI
;Stress Perperrckovlar to Crain
Fcj3erp=
405
PSI
A*nbeF Pmperfies
(Tension):
Fb'L
11211
PSI
Adj i Fes: Cd=1.00 CF=1.D0 0=0.80
F`i':
FY=
150
PSI
Adjushrs:nent FactoCd=1.00
E':
E'=
152aD00
PSI
E-Min':
E
5510011
PSI
Adjustment F : Cm=1.00 Qi 13-95
Design
Controlling Mom
M=
3aB4
FT -LB
1.0?3 Ft*w lent support of wain 2 (Center Span)
Crifigal mom crea4ed by combining ail dead toads and live k)ads an span(s) 2
Controllina Shear.
V=
3076
LB
At a distance d from kit support of span 2 {Center Span)
Otcal shear mated by combining al dead bads and liwe loads an span(s) 2
Compansons With Required ons:
S+ection Modulus ( ent):
Smq=
3183
1N3
S=
77.15
IN3
Area (Shear]:
Area=
30.76
1N2
A=
40-25
IN2
Monwrt of Inertia (D "on):
Ireq=
80.01
IN4
1=
443,50
IN4
User Added Notes:
Capacity of joist with H 1 D buck load located to give maximum shear
Watson Sb' uct uirau Eng,oaweeR hug Phone 360-544-8574
1062 NW Redwing Dr. Fax 360-544-8619
Oak Harbor, WA 98277 email haydenwse@msn.com
Watson. :ral En—gineering
Wednesday, February 03, 2010
City of Port Townsend
Development Services Department
City Hall
Attn. Rick Sepler
250 Madison Street, Suite 3
Port Townsend, WA 98368
Dear sir:
Su ecll: L 112, Resildence at 425 Eddly CC, Port Townsend, WA
98368
On Friday, January 29, 2010, Watson Structural Engineering investigated the
driveway bridge at the residence at 425 Eddy Ct., Port Townsend, WA for
conformance to the requirements of the 2006 IBC for residential vehicular loads.
This investigation is to address several structural issues noted in Project Memo from
Rick Sepler, Director dated November 16, 2009. The site visit was performed to
make a non-destructive evaluation of the existing structural condition.
A general review of the bridge structure yielded the following observations. The
general condition and workmanship of construction appears to be above average of
that seen in exterior residential construction. All lumber members were observeved
to be structural select graded pressure treaded hem -fir. All observed fastenings and
hardware were hot dip galvanized. The components appeared properly
interconnected with strapping, post base and caps, blocking and lagged comers.
(See exhibits 1-6)
The investigation dealt with two primary concerns relating to the bridge / driveway.
1. Lateral loads / Racking.
a. Loads in direction of travel (LDT).
LDT are due primarily to vehicular braking and acceleration and to a
lesser extent to code prescribed seismic loads. The structure is
framed between a cast -in -place concrete retaining abutment wall
(exhibit 3) at the roadway and the main level floor at the residence.
(exhibit 7) The bridge framing is supported vertically by a line of posts
and beams at -the residence. The LDT-are resisted by direct contact
and bolting & blocking to the main level diaphragm. By inspection, the
residence structure has more than sufficient lateral capacity for all
Page 2 February 3, 2010
vehicular and other lateral loads induced to the diaphragm in this
direction.
b. Loads perpendicular to travel (LPT).
LPT are due primarily to code prescribed seismic loads. The structure
is anchored for LPT at both ends. By inspection, the retaining
abutment wall has sufficient lateral capacity. The post and beam line
at the mid -point of the bridge currently has no lateral bracing, but due
to the geometry of the side decks, this load is currently being
transferred to the front elevation. (exhibit 4, 5 & 6) The lower level of
the front elevation may likely have capacity for the 14 foot bridge
tributary lateral loads that are currently being resisted. To verify this
would require a full lateral evaluation of this section of the residence. It
is recommended that the majority of this load be resisted at the center
post and beam line by the installation of a bay of lumber cross bracing:
(See exhibit 8 for details of construction.)
2. Gravity loads
a. Passenger / light truck loads.
Analysis has shown that the existing framing has greater capacity than
required for support of passenger / light truck loads. (See attached
calculations.} The controlling- member, which- is th e�girder adjacent to
the residence, has a capacity in excess of 85 pounds per square foot.
This is more than twice the required capacity for passenger vehicles.
b. Truck load- ratings / restrictions.
All structural elements have been analyzed for capacity to support
heavy truck induced point loads. This analysis shows that the
controlling member is the typical floor joist. The maximum
recommended -truck load -for this bridge- should- b&an H1 0- rated= truck
load. This is a 20,000 pound (10 ton) truck with 16,000 pound rear
axle load.
Please let me know if I can be of any further assistance.
Sincerely,
Hayden H. Watson, P.E., S.E.
Owner / Principal
Watson Structural Engineering
HHW
Page 3
Exhibit 1
Exhibit 2
Exhibit 3
February 3, 2010
0 Page 4
m
February 3, 2010
Ad
V Exhibit 4
IMS Exhibit 5
Exhibit 6
V Exhibit 4
IMS Exhibit 5
Exhibit 6
0 Page 5
BOLT & REPLACE—
W/',Ro x 0'-8'
HOT -DIP GALV. BOLT
February 3, 2010
Exhibit 7
• Page 7
February 4, 2010
Uniformly Loaded Floor Beamf 2006 International Buildinq Code (05 NDS)1 Ver: 7.01 „14
By: Hayden H. Watson PE, SE, Watson Structural Engineering on: 02-04-2010
: 00:12:09 AM
Project: J10003 GRAVITY - Location: Grid 2 girder - limit 200 plf
Summary:
5.0 IN x 11.5 IN x 7.0 FT / Select Structural - Hem -Fir - Dry Use
Section Adequate By: 0.2% Controlling Factor: Section Modulus / Depth Required 11.49 In
Deflections:
Dead Load:
DLD=
&01
IN
Live Load:
LLD=
0,12
IN = L/712
Total Load:
TLD=
0,13
IN = L/658
Reactions (Each End):
Live Load:
LL-Rxn=
6300
LB
Dead Load:
DL-Rxn=
510
LB
Total Load:
TL-Rxn=
6810
LB
Bearing Length Required (Beam only, support capacity not checked):
BL=
3.36
IN
Beam Data:
Span:
L=
7.0
FT
Unbraced Lenqth-Top of Beam:
Lu=
0.0
FT
Live Load Deflect. Criteria:
L/
360
Total Load Deflect. Criteria:
L/
240
Floor Loadinq:
Floor Live Load -Side One:
LL1=
200.0
PSF
Floor Dead Load -Side One:
DL1=
15.0
PSF
Tributary Width -Side One:
TW1=
4.25
FT
Floor Live Load -Side Two:
LL2=
200.0
PSF
Floor Dead Load -Side Two:
DL2=
15.0
PSF
Tributary Width -Side Two:
TW2=
4.75
FT
Live Load Duration Factor:
Cd=
1.00
Wall Load:
WALL=
0
PLF
Beam Loadinq:
Beam Total Live Load:
wL=
1800
PLF
Beam Self Weiqht:
BSW=
11
PLF
Beam Total Dead Load:
wD=
146
PLF
Total Maximum Load:
wT=
1946
PLF
Properties For:. Select Structural- Hem -Fir
Bendinq Stress:
Fb=
1300
PSI
Shear Stress:
Fv=
140
PSI
Modulus of Elasticity:
E=
1300000
PSI
Adjusted Modulus of Elasticity:
E-Min=
470000
PSI
Stress Perpendicular to Grain:
Fc_perp=
405
PSI
Adjusted Properties
Fb' (Tension):
Fb'=
1300
PSI
Adjustment Factors: Cd=1.00 CF=1.00
Fv':
Fv'=
140
PSI
Adjustment Factors: Cd=1.00
Design Requirements:
Controllinq Moment:
M=
11918
FT -LB
3.5 ft from left support
Critical moment created by combining all dead and live loads.
Controllinq Shear:
V=
5039
LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment):
Sreq=
110.01
IN3
S=
110.21
IN3
Area (Shear):
Areq=
53.99
IN2
A=
57.50
IN2
Moment of Inertia (Deflection):
Ireq=
320.52
IN4
1=
633.70
IN4
User Added Notes:
Capacity of interior girder is in excess of 200 punds per square foot
• Page 8
February 4, 2010
Floor Joistf 2006 International Buildinq Code (05 NDS) 1 Ver: 7.01.14
By: Hayden H. Watson PE, SE, Watson Structural Engineering
on: 02-04-2010 :
00:12:18 AM
Protect: J10003 GRAVITY - Location: bridge joist - limit 250 psf
Summary:
3.5 IN x 11.5 IN x 9.5 FT (@ 24 O.C. / #2 - Hem -Fir - Dry Use
Section Adequate By: 5.1 % Controlling Factor: Section Modulus / Depth Required 11.22 In
Center Span Deflections:
Dead Load:
DLD-Center=
0.01
IN
Live Load:
LLD -Center=
0.16
IN = L/718
Total Load:
TLD-Center=
0.17
IN = L/677
Center Span Left End Reactions (Support A):
Live Load:
LL-Rxn-A=
2375
LB
Dead Load:
DL-Rxn-A=
143
LB
Total Load:
TL-Rxn-A=
2518
LB
Bearinq Lenqth Required (Beam only, support capacity not checked):
BL-A=
1.78
IN
Center Span Riqht End Reactions (Support B):
Live Load:
LL-Rxn-B=
2375
LB
Dead Load:
DL-Rxn-B=
143
LB
Total Load:
TL-Rxn-B=
2518
LB
Bearing Length Required (Beam only, support capacity not checked):
BL-B=
1.78
IN
Joist Data:
Center Span Lenqth:
L2=
9.5
FT
Floor sheathing applied to top of joists -top of joists fully braced.
Live Load Duration Factor:
Cd=
1.00
Live Load Deflect. Criteria:
L/
480
Total Load Deflect. Criteria:
L/
360
Center Span Loadinq:
Uniform Floor Loading:
Live Load:
LL-2=
250.0
PSF
Dead Load:
DL-2=
15.0
PSF
Total Load:
TL-2=
265.0
PSF
Total Load Adjusted for Joist Spacing:
wT-2=
530
PLF
Properties For: #2- Hem -Fir
Bendinq Stress:
Fb=
850
PSI
Shear Stress:
Fv=
150
PSI
Modulus of Elasticity:
E=
1300000
PSI
Adjusted Modulus of Elasticity:
E-Min=
470000
PSI
Stress Perpendicular to Grain:
Fc-perp=
405
PSI
Adjusted Properties
Fb' (Tension):
Fb'=
978
PSI
Adjustment Factors: Cd=1.00 CF=1.00 Cr=1.15
Fv':
Fv'=
150
PSI
Adjustment Factors: Cd=1.00
Design Requirements:
Controllinq Moment:
M=
5979
FT -LB
4.75 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controllinq Shear:
V=
2014
LB
At a distance d from left support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment):
Sreq=
73.40
IN3
S=
77.15
IN3
Area (Shear):
Areq=
20.14
IN2
A=
40.25
IN2
Moment of Inertia (Deflection):
Ireq=
296.74
IN4
1=
443.59
IN4
User Added Notes:
Capacity of typical joist is in excess of 250 punds per square foot
• Page 9
February 4, 2010
Multi -Span Floor Beam[ 2006 International Buildinq Code (05 NDS) 1 Ver: 7.01.14
Bv: Hayden H. Watson PE, SE, Watson Structural Engineering on: 02-04-2010
: 00:12:14 AM
Project: J10003 GRAVITY - Location: typical joist point load max moment
Summary:
3.5 IN x 11.5 IN x 8.25 FT / Select Structural - Hem -Fir - Dry Use
Section Inadequate By: 0.5% Controlling Factor: Section Modulus / Depth
Required 11.53 In
Center Span Deflections:
Dead Load:
DLD-Center=
0.00
IN
Live Load:
LLD -Center=
0.10
IN = L/971
Total Load:
TLD-Center=
0.11
IN = L/932
Center Span Left End Reactions (Support A):
Live Load:
LL-Rxn-A=
1702
LB
Dead Load:
DL-Rxn-A=
113
LB
Total Load:
TL-Rxn-A=
1816
LB
Bearinq Lenqth Required (Beam only, support capacity not checked):
BL-A=
1.28
IN
Center Span Riqht End Reactions (Support B):
Live Load:
LL-Rxn-B=
1698
LB
Dead Load:
DL-Rxn-B=
113
LB
Total Load:
TL-Rxn-B=
1811
LB
Bearing Length Required (Beam only, support capacity not checked):
BL-B=
1.28
IN
Beam Data:
Center Span Lenqth:
L2=
8.25
FT
Center Span Unbraced Lenqth-Top of Beam:
Lu2-Top=
0.0
FT
Center Span Unbraced Length -Bottom of Beam:
Lu2-Bottom=
8.25
FT
Live Load Deflect. Criteria:
L/
360
Total Load Deflect. Criteria:
L/
240
Center Span Loading:
Uniform Load:
Floor Live Load:
FLL-2=
0.0
PSF
Floor Dead Load:
FDL-2=
10.0
PSF
Floor Tributary Width Side One:
Trib-1-2=
2.0
FT
Floor Tributary Width Side Two:
Trib-2-2=
0.0
FT
Beam Self Weight:
BSW=
8
PLF
Wall Load:
Wall-2=
0
PLF
Total Live Load:
wL-2=
0
PLF
Total Dead Load:
wD-2=
20
PLF
Total Load:
wT-2=
28
PLF
Point Load
Live Load:
PL-2=
3400
LB
Dead Load:
PD-2=
0
LB
Location (From left end of span):
X-2=
4.12
FT
Properties For: Select Structural- Hem -Fir
Bendinq Stress:
Fb=
1400
PSI
Shear Stress:
Fv=
150
PSI
Modulus of Elasticity:
E=
1600000
PSI
Adjusted Modulus of Elasticity:
E-Min=
580000
PSI
Stress Perpendicular to Grain:
Fc_perp=
405
PSI
Adjusted Properties
Fb' (Tension'):
Fb'=
1120
PSI
Adjustment Factors: Cd=1.00 CF=1.00 Ci=0.80
Fv':
Fv'=
150
PSI
Adjustment Factors: Cd=1.00
E':
E'=
1520000
PSI
E-Min':
E-Min'=
551000
PSI'
Adjustment Factors: Cm=1.00 Ci=0.95
Design Requirements:
Controllinq Moment:
M=
7238
FT -LB
4.125 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controllinq Shear:
V=
1791
LB
At a distance d from left support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment):
Sreq=
77.55
IN3
FAILED S=
77.15
IN3
Area (Shear):
Areq=
17.91
IN2
A=
40.25
IN2
Moment of Inertia (Deflection):
Ireq=
164.40
IN4
1=
443.59
IN4
User Added Notes:
CONTROLING 0.5% overstress. SAY OKAY
Capacity of joist with H10 truck load located to give maximum moment
Nr Page 10
February 4, 2010
Multi -Span Floor Beamr 2006 International Buildinq Code (05 NDS) j Ver: 7.01.14
By: Hayden H. Watson PE, SE, Watson Structural Engineering
on: 02-04-2010 :
00:12:16 AM
Project: J10003 GRAVITY - Location: typical joist point load max shear
Summary:
3.5 IN x 11.5 IN x 8.25 FT / Select Structural - Hem -Fir - Dry Use
Section Adequate By: 30.8% Controlling Factor: Area / Depth Required 8.79 In
Center Span Deflections:
Dead Load:
DLD-Center=
0.00
IN
Live Load:
LLD -Center=
0.04
IN = L/2661
Total Load:
TLD-Center=
0.04
IN = L/2394
Center Span Left End Reactions (Support A):
Live Load:
LL-Rxn-A=
2988
LB
Dead Load:
DL-Rxn-A=
113
LB
Total Load:
TL-Rxn-A=
3101
LB
Bearinq Lenqth Required (Beam only, support capacity not checked):
BL-A=
2.19
IN
Center Span Riqht End Reactions (Support B):
Live Load:
LL-Rxn-B=
412
LB
Dead Load:
DL-Rxn-B=
113
LB
Total Load:
TL-Rxn-B=
526
LB
Bearing Length Required (Beam only, support capacity not checked):
BL-B=
0.37
IN
Beam Data:
Center Span Lenqth:
L2=
8.25
FT
Center Span Unbraced Lenqth-Top of Beam:
Lu2-Top=
0.0
FT
Center Span Unbraced Length -Bottom of Beam:
Lu2-Bottom=
8.25
FT
Live Load Deflect. Criteria:
L/
360
Total Load Deflect. Criteria:
L/
240
Center Span Loading:
Uniform Load:
Floor Live Load:
FLL-2=
0.0
PSF
Floor Dead Load:
FDL-2=
10.0
PSF
Floor Tributary Width Side One:
Trib-1-2=
2.0
FT
Floor Tributary Width Side Two:
Trib-2-2=
0.0
FT
Beam Self Weight:
BSW=
8
PLF
Wall Load:
Wall-2=
0
PLF
Total Live Load:
wL-2=
0
PLF
Total Dead Load:
wD-2=
20
PLF
Total Load:
wT-2=
28
PLF
Point Load
Live Load:
PL-2=
3400
LB
Dead Load:
PD-2=
0
LB
Location (From left end of span):
X-2=
1.0
FT
Properties For: Select Structural- Hem -Fir
Bendinq Stress:
Fb=
1400
PSI
Shear Stress:
Fv=
150
PSI
Modulus of Elasticity:
E=
1600000
PSI
Adjusted Modulus of Elasticity:
E-Min=
580000
PSI
Stress Perpendicular to Grain:
Fc_perp=
405
PSI
Adjusted Properties
Fb' (Tension):
Fb'=
1120
PSI
Adjustment Factors: Cd=1.00 CF=1.00 Ci=0.80
Fv':
Fv'=
150
PSI
Adjustment Factors: Cd=1.00
E�:
E'=
1520000
PSI
E-Min':
E-Min'=
551000
PSI
Adjustment Factors: Cm=1.00 Ci=0.95
Design Requirements:
Controllinq Moment:
M=
3064
FT -LB
1.073 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controllinq Shear:
V=
3076
LB
At a distance d from left support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Seclfions:
Section Modulus (Moment):
Sreq=
32.83
IN3
S=
77.15
IN3
Area (Shear):
Areq=
30.76
IN2
A=
40.25
IN2
Moment of Inertia (Deflection)„
Ireq=
60.01
IN4
1=
443.59
IN4
User Added Notes:
Capacity of joist with H10 truck load located to give maximum shear
VC1t'VV1 -kD'.
549 , I PAS • 2 NT IT
02/17/2010 03:28 PM $63.00 FIRST AMERICAN TITLE
Jefferson County WA Auditor's Office - Donna Eldridge, Auditor
mill K, FRM 1101C KIM& I AAF. 0, M1111111
NOTICE OF TITLE
Grantors: Growth Capital Partners H LLC
Grantee: City of Port Townsend, a Washington municipal corporation
Reference: City Permit Number BLD 08-112
Legal description: Grantors/Owners own the following described real property:
Lot 2, Parkview Addition, Short Plat No. 1 as per plat recorded in Volume 5 of
Short plats, pages 47 and 48, records of Jefferson County, Washington
Assessors Property Tag Parcel No: 964964 201912
2
NOTICE IS HEREBY GIVEN to the Grantors/Owners of the above referenced
real property, to potential purchasers and future owners, to agents or
representatives, and to any other concerned person or entity:
1. An Accessory Dwelling Unity (ADU) with address of 425B Eddy Court is
proposed as an accessory living unit to a single-family residence at 425 Eddy Court.
The attached ADU is built through building permit BLD 08-112.
2. The Port Townsend Municipal Code (PTMC) requires that the property owner
reside on the subject property, in either the principal residence or ADU in order to
rent or lease the other unit. A one year hardship waiver may be granted by the
City in accordance with PTMC 17.16.020.C2. Additionally, neither the principal
nor accessory unit shall be used as a transient accommodation
(PTMC17.16.020.C3). A transient accommodation is deimed as a use less than 29
days (PTMC 17.08.060).
3. This notice may be removed or modified only with approval by the City.
Page 1 of 2
Growth Ca ital Parterers II LLC ADU Notice of Title
CITY OF PORT TOWNSEND
STATE OF WASHINGTON
I certify that I know or have satisfactory evidence that r C r.° 9 A St P 1 P. r ,
is the person who appeared before me, and who
Acknowledged that they signed the sam as their freee and voluntary act for the
Uses and purposes mentioned in the instrument.
Given my hand and official seal thisktday of 2010
" „; E
*
40
m ��
twy
�;F \*N
LLC
Chris l: aski . iVianaging Member
I certify that I know or have satisfactory evidence that
is the person who appeared before me, and who
Acknowledged that they signed the sam as their freee and voluntary act for the
Uses and purposes mentioned in the instrument.
Given my hand and official seal this&day of _ .„ 2010
01
Pule
'PageOF
r t rrrrw �"� l(/
,pOR r
City of Fort Townsend
Development Services Department
City Hall
250 Madison Street, Suite 3, Port Townsend WA 98368
(360) 379-5095 FAX (360) 385-7675
TO: File
CC: CL Flint
FROM: Rick Sepler, Director
DATE: November 16, 2009
RE: BLD08-112
Issue: During routine building inspections on the above referenced property, staff
identified the following issues:
1) The elevation change between the adjoining street and the garage was not shown
on the approved building plans. (Bridge not constructed per engineered plans).
Due to difference in elevation, a driver must accelerate up a ramp and cross over
the bridge to enter the garage. This action may cause racking and it is unclear
whether the bridge has been designed appropriately. Furthermore, it is unclear
whether the bridge was designed to allow vehicles to be parked on the bridge.
2) Although the building permit identifies the building as a single-family home with
an ADU, there is some question as to whether the units are intended to be sold
separately (i.e., a duplex). There are two front entrances to the building while the
city's ADU provisions allow a single front entrance.
Background:
Prior Director's Interpretation (December 12, 2006, and revised January 11, 2007):
This interpretation states: "Except, ADU parking rules in effect prior to adoption of
Ordinance 2928 will apply for any lot for single family plus ADU development where
there is a substantially complete building permit application on file within 18 months of
the recording of the plat." (in other words, July 12, 2008)
BLD 08-112 (issued on May 15, 2008) was deemed complete prior to July 12, 2008, thus,
no additional parking space is required for an ADU unit completed as part of this
application. Plans show two off-street parking spaces consistent with this interpretation.
The issued permit shows two front entrances.
Resolution:
1) Applicant will need to submit a report by a Washington State licensed structural
engineer confirming that the ramp and bridge design meet standard engineering
requirements given the anticipated load and racking. Also, the report needs to
clarify whether or not there are limitations to parking on the bridge. Any
deficiencies identified will need to be corrected prior to final inspection.
2) If the applicant proposes to sell the units separately, he/she must disclose this
information before the city issues a final inspection on BLD08-112. Prior to final
inspection, the applicant must demonstrate that FOUR on -site parking spaces
have been provided, applicable System Development Fees (SDCs) have been
paid, fire wall separation has been constructed per the IBC. A second address will
need to be assigned.
3) If the applicant intends to follow through with the originally proposed single-
family home and ADU, prior to final inspection, a Notice to Title must be
recorded to notify future property owners of the limitations in Section 17.16.020
of the Port Townsend Municipal Code. A second address must be assigned.
City of Fort Townsend
Public Works Department
250 Madison Street, Suite 2R, Port Townsend, WA 98368
(360) 385-7212 FAX (360) 385-7675
6 September 2007
d
Mr. C.L. Flint
2829 Katherine Street
Port Townsend, WA 98368
Re: ADU Parking at 425 Eddy Court
Dear C.L., 51
2. —7 e,� rn, lTy
& � 1 aj 44'4
I am writing in response to your verbal request to the Development Services Department to allow the use
of an on -street parking space to meet the parking requirement for an auxiliary dwelling unit (ADU)
associated with the construction of a single family residence at 425 Eddy Court. I have reviewed the
sketch of the proposed parking stall and visited the site.
The standard length for a parallel, on -street parking stall is 20'. This can be reduced to 18' when the stall
is located at the end of row of stalls or has open access at one end as is the case here. The stall that you
delineated on Eddy Court measured 19' from the edge of the driveway to the beginning of the corner
curve (back of the catch basin). RCW 46.61.570 which has been incorporated into the City Code prohibits
parking in front of a public or private driveway or within five feet of the end of the curb radius leading
thereto [RCW 46.61.570(1)(b)(i)]. Therefore the stall must be offset five feet from the edge of the
driveway. This leaves 14' for the parking stall which does not meet the minimum standard.
The topography of the parcel does fall away from the street making the installation of any off-street
parking a challenge. You are proposing to construct a driveway and garage however. This driveway could
be widened to accommodate an additional on -site parking space and still meet the maximum 20' wide
driveway standard. The additional impervious surface associated with the parking space would represent a
small increase to the overall impervious area on the site which the area drainage system should be able to
handle. The configuration of Eddy Court is such that the driveway locations leave little room for on -street
parking, in general, even with the relatively wide streets.
In light of the lack of space to meet the minimum standard for a parking stall adjacent to the property in
question and the shortage of available on -street parking in the area in general, your request for on -street
parking in lieu of on -site parking for an ADU cannot be approved.
This constitutes an administrative decision of the Public Works Director. There is no administrative
appeal for this decision.
Sincerely yours,
<signed & mailed 6 Sep 07>
Kenneth H. Clow
Public Works Director
cc: Francesca Franklin, Permit Specialist
Suzanne Wassmer, Planner
Scottie Foster
From: Suzanne Wassmer
Sent: Thursday, November 12, 2009 12:39 PM
To: Alex Angud; Francesca Franklin; Fred Slota; John McDonagh; Judy Surber; Scottie Foster
Subject: FW: Cl Flint Letter regarding Parking on Eddy Court
Attachments: On -Street Parking Req - Eddy Ct - Flint 5Sep07.rtf
On -Street
ng Req - Eddy
FYI — here is Ken's letter to CL regarding parking on Eddy Street.
Suzanne
Suzanne Wassmer
Land Use Development Specialist
(360) 385-0644
From: Kenneth Clow
Sent: Thursday, November 12, 2009 11:49 AM
To: Suzanne Wassmer
Subject: RE: Cl Flint Letter regarding Parking on Eddy Court
Suzanne,
A copy w/o signature is attached. Hope this helps.
Ken
1
From: Suzanne Wassmer
Sent: Thursday, November 12, 2009 11:23 AM
To: Kenneth Clow
Subject: Cl Flint Letter regarding Parking on Eddy Court
Hi Ken,
Do you still have a copy of a letter you wrote in May of 2008 to CL Flint
regarding no on -street parking for a proposed ADU on Eddy Street? It is
not in the file, and we are trying to unravel the events leading up to our
issuing the permits. The bank has it now and would like to final it.
Thanks,
Suzanne
Suzanne Wassmer
Land Use Development Specialist
2
City of Port Townsend
Public Works Department
250 Madison Street, Suite 2R, Port Townsend, WA 98368
(360) 385-7212 FAX (360) 385-7675
6 September 2007
Mr. C.L. Flint
2829 Katherine Street
Port Townsend, WA 98368
Re: ADU Parking at 425 Eddy Court
Dear C.L.,
I am writing in response to your verbal request to the Development Services Department to allow the use
of an on -street parking space to meet the parking requirement for an auxiliary dwelling unit (ADU)
associated with the construction of a single family residence at 425 Eddy Court. I have reviewed the
sketch of the proposed parking stall and visited the site.
The standard length for a parallel, on -street parking stall is 20'. This can be reduced to 18' when the stall
is located at the end of row of stalls or has open access at one end as is the case here. The stall that you
delineated on Eddy Court measured 19' from the edge of the driveway to the beginning of the corner
curve (back of the catch basin). RCW 46.61.570 which has been incorporated into the City Code prohibits
parking in front of a public or private driveway or within five feet of the end of the curb radius leading
thereto [RCW 46.61.570(l)(b)(i)]. Therefore the stall must be offset five feet from the edge of the
driveway. This leaves 14' for the parking stall which does not meet the minimum standard.
The topography of the parcel does fall away from the street making the installation of any off-street
parking a challenge. You are proposing to construct a driveway and garage however. This driveway could
be widened to accommodate an additional on -site parking space and still meet the maximum 20' wide
driveway standard. The additional impervious surface associated with the parking space would represent a
small increase to the overall impervious area on the site which the area drainage system should be able to
handle. The configuration of Eddy Court is such that the driveway locations leave little room for on -street
parking, in general, even with the relatively wide streets.
In light of the lack of space to meet the minimum standard for a parking stall adjacent to the property in
question and the shortage of available on -street parking in the area in general, your request for on -street
parking in lieu of on -site parking for an ADU cannot be approved.
This constitutes an administrative decision of the Public Works Director. There is no administrative
appeal for this decision.
Sincerely yours,
<signed & mailed 6 Sep 07>
Kenneth H. Clow
Public Works Director
cc: Francesca Franklin, Permit Specialist
Suzanne Wassmer, Planner
Appl ,Bl.D08-1 l Vmm
w
® 2,
C/`/15/2'0'07 Appbcarr#t�'VTIlT�L�mWl
Type "
......a .
.... ...
Expiration e �/54)9/2tplI Parcel lv�
Parent 0
.�L.O
.m m..
Ee-ssue Dae�, Site Address y CT
Date �Srrbmitted �'Q51t"4/� 0-0,
Date Clused FkAect Aare �Ne Sian e Family Resideamce with .c�.9
ec Complete . ."'
W
,.... ..
t u�rtmmarrI11/ 0J2009. ......._ ............ ..,....., ..................
6 a�,arrrrra �,C -lE
Drag Apprave+d�t1„"/l 5"
oi�Status
�...............
...� , ,
Data �rl�+p Staius it �a
t
Override Expire? r Government? f
Notes? p
,, — _. _t
-3 4 day(s) to process
New Application ; , Qumery,, Print
Fom i Letters ' Cupp Site Address j QuexyApp#i
tea amw«�; .;an/at
ac »rrte«.rApprwal `,aiar3m��mgr (aa�arrfiartia dar`rra - °'
Statos Wait briers,
i ua lit �°�pprraved By i IExpd Notes'
ll" I'll 1-1- I'll 11-11 1 � 1111-11-11 1 1 �p Tu105l 4/gat tls �f 1141200 JLeorwd Yarbem y 1 � 0 rm
?tint Jj5/�m`4/Gl Ali ;O"�flhJ�ltyem�armm �I� �.,.,
m lMld r e "4& t m f 0511 r/; 008 Leramram rl rrlae r' t� �.. � ,
r,
oo
mrentts
City of Port Townsend
TABLE 17.16.030
Residential Zoning Districts - Bulk, Dimensional and Density Requirements
DISTRICT
R-I
R-II
R-III
R-IV
MAXIMUM HOUSING
4 dwelling units (Multiple
8 dwelling units (Multiple
16 units per 40,000 sf
24 units per 40,000 sf
DENSITY (units per
dwelling units on a single lot
dwelling units on a single lot
of lot area
of lot area
40,000 square foot area)
must be contained within a
must be contained within a
single structure, except: a
single structure, except: a
permitted accessory dwelling
permitted accessory dwelling
unit (ADU) may be
unit (ADU) may be
established in a separate
established in a separate
building if allowed by
building if allowed by
17.16.020 PTMC)
17.16.020 PTMC)
( e per unit)
10,000 sf o lot area
(5,000 sf of lot area per unit)
MINIMUM AVERAGE
_
10 units where a parcel
15 units
HOUSING DENSITY
and/or contiguous parcels
(units per 40,000 square
under single ownership
foot area)
are 12,000 square -feet in
size or reater
�_... ....
MAXIMUM NUMBER
4 (Note: limited structures
....._
4 (Note: limited structures
.......... ..........
No limit
No limit
OF DWELLING UNITS
with more than 4 dwellings
with more than 4 dwellings
IN ANY ONE
per structure may be permitted
per structure may be
STRUCTURE
through the PUD process, see
permitted through the PUD
Chapter 17.32 PTMC)
process, see Chapter 17.32
PTMC.)
.............. _
MINIMUM LOT SIZE
....-..... ......._
10,000 sf = single-family
5,000 sf = single-family
3,000 sq It = single-family
detached
detached
detached; 5,000 sf =
single-family attached
(duplex); 7,500 sf =
single-family attached
(triplex); and 10,000 sf =
single-family attached
(fourplex) and multi-
familyl
MINIMUM LOT
50'
50'
30' except: 100'=
WIDTH
multifamily
MINIMUM FRONT
20' except:
10' except 20 feet for
20' except:
20' except;
YARD SETBACKS
50'= barns and agricultural
garages with vehicle access
10' w/side or rear
10' w/side or rear
buildings
facing a street right-of-way
parking/garages; garages
parking; no setback for
and 50'=barns and
with vehicle access facing
multifamily structures
agricultural buildings
a street right-of-way must
located within 200 feet
be setback 20'; no setback
of an abutting mixed use
for multifamily structures
zoning district
located within 200 feet of
an abutting mixed use
zoning district
n
INIMUM REAR
......,
20' except:
_
10' except:
10' except:
15' except:
YARD SETBACKS
50' = barns and agricultural
100' = barns and agricultural
no setback for multifamily
20' if directly abutting
buildings, and 100' if abutting
buildings
structures located within
an R-I or R-II district; no
a R-II, R-III, or
200 feet of an abutting
setback for multifamily
R-IV zoning district
mixed use zoning district
structures located within
200 feet of an abutting
mixed use zonina district
See Back
of This
Page
For More
t In order to achieve the minimum density, subdivision of parcels 12,000 square feet or greater shall not allow individual lots larger than
4,000 square -feet unless said lots are reserved for multi -family dwellings.
P: 0SDWormslBuilding FormsVnformation-Table 17.16.030 Res Zoning Districts,doc
Page 1 of 2 05115109
City of Port Townsend
TABLE 17.16.030
Residential Zoning Districts - Bulk, Dimensional and Density Requirements
DISTRICT R-I
R-II
R-III
R-IV
... .... J MINIMUM SIDE 5' except:
5' except:
5' except:
15' except:
YARD SETBACKS 10'= abutting a street r o w,
10'= abutting a street r-o-w;
10'= along a street r-o-w;
20' if directly abutting
20 feet for garages with
20 feet for garages with
20 feet for garages with
an R-1 or
vehicle access facing a street
vehicle access facing a street
vehicle access facing a
R-II district; no setback
right-of-way and 50' barns
right-of-way and 100'=
street right-of-way and no
for multifamily
and agricultural buildings and
barns and agricultural
setback for multifamily
structures located within
100' if abutting a R-II, R-III,
buildings
structures located within
200 feet of an abutting
or R-IV zoning district
200 feet of an abutting
mixed use zoning district
mixed use zoning district
MAXIMUM 30'
30'
35'
35'
BUILDING HEIGHT
MAXIMUM LOT 25%
35% except 40% where an
45%
50%
COVERAGE
ADU is included on the lot
�_.._. _._
MAXIMUM FENCE Front--4'; Side=8'; Side
Front=4', Side 8'; Side
Front—_4'; Side-8'; Side
..........
Front=4';Side=8';
HEIGHT* abutting a public right-of-way
abutting a public right -of-
1 abutting a public right -of-
Side abutting a public
=4'; rear-8'
way = 4'; rear=8'
way =4'; rear=8'
right-of-way =4';
rear=8'
NOTE: Maximum fence heights apply within any required front, side, or rear setback
area or along the edge of any required yard;
refer to Chapter 17.68 PTMC, Fences, Walls, Arbors, and Hedges for specific requirements.
(Ord. 2967 3 4.2.2008; Ord. 2939 33 1,2, 2007; Ord.
2913 3 2, 2005; Ord. 2925 3
4, 2003; Ord. 2782 3 4, 2001;
Ord. 2716 3 4.3,
1999; Ord. 2700 3 11, 1999; Ord. 2571 3 2, 1997).
P: IDSDIFormsWuilding Formsllnformation-Table 17.16.030 Res Zoning Districls.doc
Page 2 of 2 05115109
Development Services
oar ro250 Madison Street„ Suite
Port Townsend WA 9836ad
Phone: 350-379-5095.
: = Fax: .350-344-461 ,
www.cityofptms
Residential Building Permit Application
Address'
(_,�) 0 i 7 SiM�
Zoning: (L ai
Parcel # I(
AX l9 I
Addition: #): Legal Description (or Tax
...�-..._(—
Block --
Project Description: 9- 4 , I
.�..1r-- W A�
......... ... _.._
➢ Applications accepted by mail must include a check for initial plan review fee of $150
➢ See the "Residential Building Permit Application
➢ Requirements" for details on plan submittal requirements_ Lender Information:
Property wner:
Name: U�%LI.LI S
Address
c
CitylSt/Zip= _ .1 jL .LL
Phone �
Email:.�m��w.w......
.�„ _ �. ..� ...� ..... ........
Contact/ resentate
Name: KUWL.___ XLLA.d ..:. __
Address-
City/SUZip:. � � .��..�... �.� � ... . _...m__._......._ �._......�
Phone:. ..................... ........... .rcL -- _...................
Email:
# City BusinessLicense
Office Use'Onl
Per
Associated Permits:
Lender information must be provided for projects
over $5,000 in valuation per RCW 19.27.095.
Name: ............. U-k.A.09� .... _
Project Valuation: $
Building Information (square feet).
1 ° floor C�aragr
2rir . r..
�or � �'� Deck s...
V9 boor ..... _ . .�..e Porch(es): ..._____
Basement: Is it finished? Yes No
Carport: Other.
Manufactured Home ❑ ADU ❑ New
Addition ❑ Remodel/Repair ❑
Total Lot Coverage (`Building Footprint):'
Square feet: &q %�_m...... —.
Impervious Surface:*
Square feet: M *Total existing & progosed
�... structure, whITIT�mITm^V year was it
_���.�..�...
If an existing at y s it
built? tAk
Any known wetlands on the property? Y N
Any steep slopes (>! 5%)? Y N
..._ ... _.._. ._ ......... .. .... ..__-.......... ........ _......____ ---
hereby certify that the information provided is correct, that I am either the owner or authorized to act on behalf of the owner
and that all activities associated with this permit will be in accordance with State Laws and the Port Townsend Municipal Code.
Print Name- qk-LW,� ( I'll ( i j
Signature: 'Date:_�'
RESIDENTIAL BUILDING PERMIT APPLICATION
CHECKLIST
This checklist is for new dwellings, additions, remodels, and garages_ The purpose is to show what you
intend to build, where it will be located on your lot, and how it will be constructed.
❑ Residential permit application.
❑ Washington State Energy & Ventilation Code forms
❑ Two (2) sets of plans with North arrow and scaled, no smaller than = 1 foot:
❑ A site plan showing:
1. Legal description and parcel number (or tax number),
2_ Property lines and dimensions
3. Setbacks from all sides of the proposed structure to the property lines in
accordance with a pinned boundary line survey
4. On -site parking and driveway with dimensions
5. If creating new impervious surfaces, indicate measures utilized to retain
stormwater on -site
6. Street names and any easements or vacations
7. Location and diameter of existing trees
8. Utility lines
9. If applicable, existing or proposed septic system location
10. Delineated critical areas boundaries and buffers
❑ Foundation plan:
1. Footings and foundation walls
2. Post and beam sizes and spans
3. Floor joist size and layout
4. Holdowns
5. Foundation venting
❑ Floor plan:
1. Room use and dimensions
2. Braced wall panel locations
3. Smoke detector locations
4. Attic access
5. Plumbing and mechanical fixtures
6. Occupancy separation between dwelling and garage (if applicable)
7. Window, skylight, and door locations, including escape windows and safety glazing
❑ Wall section:
1. Footing size, reinforcement, depth below grade
2. Foundation wall, height, width, reinforcement, anchor bolts, and washers
3. Floor joist size and spacing
4. Wall stud size and spacing
5. Header size and spans
6. Wa!! sheathing, weather resistant barrier, and siding material
7. Sheet rock and insulation
8. Rafters, ceiling joists, trusses, with blocking and positive connections
9. Ceiling height ,
10. Roof sheathing, roofing material, roof pitch, attic ventilation
❑ Exterior elevations (all four) with existing slope of the land in relation to all proposed
structures
❑ If architecturally designed, one set of plans must have an original signature
❑ If engineered, one set of plans must have one original signature
❑ For new dwelling construction, Street & Utility or Minor Improvement application
MICHAEL 1. SSA SON
CMI Engineer a Land Su or
TO: Leonard Yarberry
Development Services Department
City of Port Townsend
FROM: Michael J. Anderson
SUBJECT: Pier Foundation Construction
Applicant: CL Flint
Lot 2, Parkview Short Plat No. 1
EXP. DATE: 05 / 05 / 10
This is to advise you that inspections were made by this office for the screw pile installation for
the southwest corner of the proposed single family residence at the subject site on March 27,
2008. Attached are the calculations made for the grade beam at that corner of the building.
Prior to the decision to use the piles, the excavation for the foundation of the building was done
in accordance with good procedures and small fills where made at the rear of the site utilizing the
material excavated at the front of the lot. Although it appeared that all the new foundation would
be sited into native, undisturbed material, it was decided that the southwest corner should receive
special consideration by the installation of the helical piers to provide redundant stability. In
addition, the grade beam was added to span between the screw piles.
The screw pile was installed by North Coast Drilling Company utilizing a bob -cat that was
modified to a skid steer machine that delivered a 6000 ft-lb torque to set the S S 5 Chance helical
piles at the locations shown on the calculation sketch. The depth of the piles varies between 9 ft
min. and 12 feet at the corner location. The rated strength of each pile is 70 kips. Please see
printout from the Chance website showing the pile specifications that is also attached. The
calculated load at the piles is 12915 lbs. and therefore, each pile provides more than 5 times the
strength required.
Please indicate if you need any additional information to complete the plan review and the
approval of the permits.
c: CL Flint, Owner;
NEW RESIDENCE
425 Eddy Court
Port Townsend, WA 98368
EXP. DATE: 05 / 05 / 10�
Michael J. Anderson
PE & PLS No. 27665
330 Cleveland Street
Port Townsend, WA 908368 w g
CITY Of MO TOWNSER)
DSD
� �w
r , . M..i.
� ..._ �,,, r��
..
�"��
s. e
P :��. ._ � �.. � � ..o �:, .
�� —
e �
a
y � , r
H
,��.�
�,
�.,
�' � ��
�.�,
� , ,
STRUCTURAL CALCULATIONS
LATERAIJ .ANALYSIS
DEVISED►
NEW RESIDENCE
425 Eddy Court
Port Townsend, WA 98368
EXP. DATE 05W / 05 / 10 1
Michael J. Anderson 16 1E
0 1
PE & PLS No. 27665 .""". .........
330 Cleveland Street
Port Townsend, WA 908368 AUG' 18
2008
-62
1110-11-
yy
�;7%9
41-71P�,7
7z
-72,03?� X
�Pa2
.. ................. .
94
7 7 4:r
O'c -
7-
111--61
. . .. . ... .
e6
71272,1'e— -07 Z,,*.
*ae�,n)
� -711
14 t t0x
Square Shaft (SS) Helical Product Ratings
AAIL p
COMM,;� 01$1 YRY
TORQUE RATING
ULTIMATE TENSION
UPLIFT/COMPRESSION
—
PRODUCT SERIES
ft-Ibs (Nm)
STRENGTH*
CAPACITY LIMIT
kip (kN)
kip (kN)
SS 125
4,000 (5400)
60 (267)
40 (178)
SS 1375
5,500 (7500)
75 (334)
55 (245)
SS 5
5,500 (7500)
70 (312)
55 (245)
SS 150
7,000 (9,500)
70 (312)
70 (312)
SS 175
11,000 (14,900)
100 (445)
110 (489)
SS 200
16,000 (21,700)
150 (668)
150° (668)
SS 225 23,000 (31,200) 200 (890) 20e (890)
* Based on Mechanical Strength of Coupling
* Based on Torque Rating — Uplift(Compression Capacity Limit = Torque Rating x Kt.
"Default" Kt for Type SS = 10 ft-' (33 rri 1)
# Based on Mechanical Strength of Coupling Bolt
Higher Compression Capacities Available with Helical Pulldown Micropile
1.50 -
Y XY
1.914
XY
• 1.75
2.00 —
Y XY
Y XY
X ..m .. X
X
r 2.268
XY ,
—.... 0
XYY 1
,w
Square Shaft Helical Cross Sections
— 2.25 --
Y
XY
X.........�w_.m.......X
XY
v
2.923
© 2006, Hubbell Power Systems, Inc. v1.0
All Rights Reserved OW2006
CnANCE i.
�,P,
mm". ssarsarHrs^: S:M
JATLA,S-
X iNAN 1"s Hisloitt
Chance®
Helical 1-1/2" Round Corner Square Shaft Products (Type SS5 Series)
COMMON EXTENSION CONFIGURATIONS
gJ........EXTENSION WITH HUn CAL. PL..ATE.
°A" Olds PLAIN EXTENSION
_._ ........................
.-..............._..-....�.
Product Designation
Plate Diameter
Weight
Helix
Length
(Ibs)
Grade
Helix Edge
A
B
C150-0047
T-0
28
C150-0008
5'-0
40
C150-0009
7'-0
57
C150-0048
101-0
78
C150-0158
10
5'-0
51
50
SLE
C150-0159
12
T-0
54
50
SLE
C150-0166
14
T-0
55
80
T150-0440
14
-
5'-0
60
80
C150-0167
14
5'-0
83
80
Chance Helical 1-1/2" Round Corner Square Shaft Products (Type SS5 Series) — Special Order
(Allow extra processing time for Special Orders)
Lead Section Special Orders -- Designation: S-SS5[']4[Helix Grade][Length]
(Example: S-SS5[G]14-14-14[GR80][10'-0])
Lead Bars - Specify Length (Insert above) t6 Helical Flights - Specify Diameter(s) (Insert above-�-�)
Available Lengths Weight Flight Size Descriptions
(Ibs)
Weight
(Ibs)
0' —10 7 6" dia x 3/8" thick. = 6
3
3' — 4 26 8" dia x 318" thick. = 8
5
5' — 0 39 1 8" dia x 1/2" thick. = 8T
7
6' — 8 52 10" dia x 3/8" thick. = 10
8
10' — 0 78 10" dia x 1/2" thick. = 10T
11
k
20' — 0 157 12" dia x 3/8" thick. = 12
12
12" dia x 1/2" thick. = 12T
16
14" dia x 3/8" thick. = 14
16
14" dia x 1/2" thick. = 14T
21
16" dia x 1/2'thick. = 16T
28
0 2006, Hubbell Power Systems, Inc. v1.0
All Rights Reserved Oct/2006
04/28/2008 00:19 6666356185 NORTHCOAT
Job:
Engineer.
Contractor
Installer:
A. B. Chance installation ti report
New House Construction
425 Eddy Court
Port Townsend, WA 98368
Mike Anderson
C. L Flint Construction
North Coast Drilling Co. A. B. Chance Certified
Date of installation: 3- 27 - 2008
Type of installation: Three A. B. Chance piers as compression piles for new house foundation.
A. B. Chance piers installed. SS5 type, 5' extensions with a single 10' helix
lead Section.
Installation record: Pier location was staked by contractor.
Piers were installed with a 6000 ft. pound torque head attached to a skid steer
machine. The first pier on the very corner of the foundation was installed 12 Ft.
deep to 4000 X pounds or 40.000 pounds of compression capacity. The piers
on each side of the first pier were installed 9 R, deep to a 40 kip capacity.
z2812U M M I, blu, Mix . - . (3t- M
\^ \
:(\ ± + .
v s1 « fJ»<I ? «<C< i<f«
i70-117�
Bill TO
CRY, State *»:,x»m4 WA
For Labor and ¥#»»« hmmbhed
Ph"
Now «??2}g < «,■
425 Eddy c4mrt
Pod Townsend, W A
Toull dam $250.00
Planner, City of Port Townsend
Tree Conservation Calculations
August 6, 2007
Parkview Short Plat 1 Lot # 2, City of Port Townsend per Chapter 19.06 PTMC
Table 19.06.120(D)(1) PTMC
Minimum Tree Density Requirements for Vacant or Redeveloping Lots.
Zoning District
RIII
Lot # 2
5000sf
Required Tree Unit Density
30 tree units per 40,OOOsf (4 Tree Units/5000sf)
Required Tree Units
4 Tree Units
Included please find 1 exhibit.
1. Tree Number Map
Thank you for your consideration,
Carol Bridge Owner Lot # 2
Valorie Williams Owner Lot # 2
Retained Tree Units
9 Tree Units
( 3 Douglas Fir Trees >20" d.b.h.)
9
r
CBtt
8 5 179
11210 .
205 8 5
197 c=�
201. co 163
195 Cb
A, ry
H.d'
177
241s
209
0 240
1
N x
-- Y 244 R1w
x
8-.
SPACE
T ,,c -r 8, 6PETaitieo
Tree Conservation Plan .-. Lot : Parkvicw Short Plat No.. I - 425 Pdd Couurt
Zoning: R-III
Tree Credits per zone: 30 Tree Units per 40,000 square feet of lot area
Lot Size: 5,000 square feet
Tree Unit Credits Req' d: 3.75 (rounds to 4)
—
Retained Tree
O
�
�.........
S ecies
L.F..__
..............................wawa..........
Size (d.b.h at 4.5 ft.
............. a. ,
�.._......
Tree Units Credit
Planted Tree II Species II Size at
Tree Unit Credit
-;5& f;7, d . u 1 111;7
Total Tree Unit Credis
& Planted)
11
o96
IJ
NVrTd UIS
8K86 VA0JNr,4SXMOJJ,-UOcl
XafloD AIGM Szt
JOJ Q:)uQPISONd &ON
LL: LL: � U:
(Ii vi ui vi
Lr) Lr) P- 00
LC) d'
0
(.0
F"S
LEGACY REPORT ER-5110
Reissued November 1, 2006
ICC Evaluation Service, Inc. Business/Regional Office r 5360 Workman Mill Road, Whittier, California 90601 w (562) 699-0543
Regional Office ■' 900 Montclair Road, Suite A, Birmingham, Alabama 35213 a (205) 599-9800
www.icc-es.ora Regional Office s 4051 West Flossmoor Road, Country Club Hills, Illinois 60478 a (708) 799-2305
Legacy report on the 1997 Uniform Building Code TM
DIVISION: 02—SITE CONSTRUCTION
Section: 02465—Bored Piles
HELICAL PIER® FOUNDATION SYSTEMS
HUBBELL CORPORATION/A. B. CHANCE CO.
210 NORTH ALLEN STREET
CENTRALIA, MISSOURI 65240
1.0 SUBJECT
HELICAL PIER® Foundation Systems.
2.0 DESCRIPTION
2.1 General:
The Hubbell Corporation/A. B. Chance Co. HELICAL PIER®
Foundation System is used to underpin foundations of
existing structures, and is used for deep foundations of new
structures. The system consists of foundation repair brackets
and foundation anchors. The foundation brackets are used to
connect the foundation of the structure to the foundation
anchor.
2.1.1 HELICAL PIER® Foundation Anchor Components:
The steel anchor components consist of one or more circular
steel helix plates welded to a central steel shaft. The depth of
the embedment of foundation anchors into the soil can be
extended by adding one or more steel shaft extensions,
coupled together to form one long continuous pier.
Extensions can be with or without steel helix plates attached.
Each steel helix plate is 3/9 inch (10 mm) thick and has an
outer diameter of from 6 to 14 inches (152 to 356 mm), and
an inner annulus either 11/2 or 13/4 inches (38 or 44.5 mm)
square. Each plate is formed with all radial sections normal to
the central longitudinal axis, t 3 degrees. The helix pitch is 3
inches (76 mm).
The central steel shaft of lead sections and extension
sections is a round cornered square (RCS) solid steel bar.
RCS bars are either V/2 or 13/4 inches (38 or 44.5 mm)
square.
Each lead section of a foundation anchor has provisions at
the top for a connection to an extension, and has an earth -
penetrating pilot at the bottom. Each extension has provisions
for a coupler at one end and a connection at the other. The
coupler is an integrally forged socket that slips over an RCS
shaft of the same size. Each socket has a transverse hole so
that lead sections and extensions can be connected using a
bolt and nut.
For all foundation anchor leads and extensions, helix plates
are welded to their respective shafts. Nominal spacing
between helix plates is not less than three times the diameter
of the lower helix. For example, a foundation anchor lead with
an 8-, 10- and 12-inch-diameter (203, 254 and 305 mm) helix
has a nominal 24-inch space between the 8- and 10-inch (203
and 254 mm) helix and a 30-inch (762 mm) space between
the 10- and 12-inch (254 and 305 mm) helix. Figure 1
illustrates the foundation anchors.
2.1.2 Foundation Brackets: The foundation repair brackets
used to address foundation settlement are Parts Nos. C150-
0121, C150-0298, C150-0299 and C150-0147. The brackets
consist of upper and lower steel bracket bodies
interconnected using two bolts. The bolts, described as
"lifting" bolts, are 7/B inch (22 mm) in diameter for the Nos.
C150-0121, C150-0298 and C150-0299 brackets and 1 inch
(25 mm) in diameter for the No. C150-0147 bracket. The
lower bracket body consists of steel sections shaped and
welded together to form a seat for the foundation of the
structure. The lower bracket body also has slots for
attachment of the bracket to the concrete foundation. The
upper bracket body is T-shaped, with the stem of the "T
being a steel pipe in which the shaft of the foundation anchor
is inserted. Brackets No. C150-0121 and No. C150-0298 are
used with foundation anchors having 11/2-inch (38 mm)
square shafts. Bracket Nos. C150-0299 and C150-0147 are
used with foundation anchors having 13/4 inch (44.5 mm)
square shafts. Figure 2 illustrates the brackets.
Brackets No. C150-0121 and C150-0298 are used to
address settlement of residential dwellings and light
commercial buildings. Brackets No. C150-0299 and C150-
0147 are used to address settlement of large dwellings and
commercial buildings.
The light -duty underpinning bracket No. C150-0239 is used
to address settlement of porches, patios and light concrete
slabs. This bracket consists of a steel bracket body with a
seat for the concrete slab and an anchor terminator
containing a 1-inch-diameter (25 mm) lifting bolt. The anchor
terminator is a round steel pipe with a drilled and tapped steel
cap on top, into which the foundation anchor shaft is inserted.
Figures 7 and 8 illustrate the bracket.
Slab repair bracket No. T150-0085 is used to address
settlement of existing concrete slabs on grade. This bracket
consists of a steel channel, an anchor terminator and a 1-
inch-diameter (25 mm) bolt. The anchor terminator is a
square steel tube with a drilled and tapped steel cap on top,
into which the foundation anchor shaft is inserted. Figures 3
and 5 illustrate the bracket.
New -construction foundation bracket No. C150-0132 is
used to support gravity loads. The bracket is used with steel -
reinforced, poured -in -place concrete foundations. The bracket
ICC-ES legacy reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed as
an endorsement of the subject of the report or a recommendation far its use.. There is no warranty by ]CC Evaluation Service, Inc., express or implied, as !o I
any finding or other matter in this report, or as to any product covered by the report. "
Copyright © 2006 Page 1 of 8
Page 2 of 8 ER-5110
consists of a '/Z inch -thick (13 mm) rectangular steel plate
welded to 21/2 inch -diameter (63.5 mm) steel tubing. Figures
4 and 6 illustrate the bracket.
2.2 Material Specifications:
2.2.1 Helix Plates: Material specifications for the helix
plates are noted in Tables 1 and 2. The plates have a Class
B-1, hot -dipped galvanized coating complying with ASTM A
153.
2.2.2 Anchor Shafts (Lead Sections and Extensions):
The 11/2- and 13/4 inch (38 and 44.5 mm) square RCS shafts
conform either to ASTM A 29 and AISI 1044, having minimum
yield and tensile strengths of 70 and 100 ksi (483 and 689
MPa), respectively, or to AISI 1530, having minimum yield
and tensile strengths of 95 and 120 ksi (655 and 827 MPa),
respectively. Anchor shafts have a Class B-1, hot -dipped
galvanized coating complying with ASTM A 153.
2.2.3 Foundation Brackets:
2.2.3.1 Bracket Body: The brackets are formed from '/4 ,
3/9 or'/Z inch -thick (6.4, 7.9, 10 or 13 mm) steel that
meets or exceeds the requirements of ASTM A 36, and have
a hot -dipped galvanized coating conforming to Class B-1 of
ASTM A 153.
2.2.3.2 Pipe Assembly: The pipe in the upper bracket body
of the C150-0121, C150-0298 and C150-0299 foundation
repair brackets is cold -formed, welded, and seamless carbon
steel structural tubing. Complying with ASTM A 500 Grade B,
the steel tube has minimum yield and tensile strengths of 42
and 58 ksi (290 and 400 MPa), respectively. The pipe in the
upper bracket body of the C150-0147 foundation repair
bracket is hot -rolled, electrical -resistance -welded, round steel
tubing. Complying with ASTM A 512 or A 513 Grade 1020,
the steel tube has minimum yield and tensile strengths of 50
and 62 ksi (345 and 427 MPa), respectively. All pipe
assemblies have a Class B-1, hot -dipped, galvanized coating
complying with ASTM A 153.
2.2.4 Bolts:
2.2.4.1 Steel Foundation Anchor: The sizes and types of
bolts connecting the steel foundation anchor extensions to
lead sections or another extension are described in Table 2.
All bolts are hot -dipped galvanized steel.
2.2.4.2 Foundation Brackets:
2.2.4.2.1 Lifting Bolts: The lifting bolts for the No. C150-
0121, C150-0298 and C150-0299 foundation brackets have
a'/B inch (22 mm) diameter and comply with SAE J429 Grade
5. The lifting bolt for the No. C150-0147 foundation bracket
has a diameter of 1 inch (25 mm) and complies with SAE
J429 Grade 5.
2.2.4.2.2 Cross Bolts: Cross bolts for the No. C150-0121,
C150-0298 and C150-0299 foundation brackets have a
diameter of 5/9 inch (16 mm) and comply with SAE J429
Grade 5. The cross bolt for the No. C150-0147 foundation
bracket has a % inch (22 mm) diameter and complies with
SAE J429 Grade 5.
2.2.4.2.3 Concrete Anchor Bolts: Anchor bolts shall be 5/e
inch (15.9 mm) in diameter for all foundation brackets.
Concrete anchor bolts are designed for each project.
2.2.4.3 Light -duty Underpinning Bracket: The bolt for the
light -duty underpinning bracket is a 1-inch-diameter (25 mm)
bolt complying with SAE J429 Grade 5.
2.2.4.4 Slab Repair Bracket: The bolt for the slab repair
bracket is a 1-inch-diameter (25 mm) bolt complying with SAE
J429 Grade 5.
2.2.4.5 New -construction Foundation Bracket: The bolt
used to connect the new -construction foundation bracket to
the foundation anchor is a 3/4 inch -diameter (19.1 mm) bolt
complying with SAE J429 Grade 5 for 11/2-inch (38 mm) RCS
shafts, and a'/e inch -diameter (22 mm) bolt complying with
ASTM A 193 Grade B7 for 13/4 inch (44.5 mm) RCS shafts.
2.3 Design:
2.3.1 General: Structural calculations must be submitted to
the building official for each building, and must be based on
accepted engineering principles. The design method is the
Load and Resistance Factor Design Specification in Chapter
22, Division II, of the code. The design strengths of individual
lead sections and extension sections are noted in Tables 1
and 2. Factored nominal loads must not exceed the design
strengths. The nominal loads must be factored in accordance
with Section A4 of the specification. The actual capacity of the
HELICAL PIER® Foundation System depends upon the
analysis of the interaction of the helix plates and the soil, and
may be less than the maximum design strengths noted in this
report. Column buckling of foundation anchors due to
compression loads, and combined flexural and compressive
stresses of foundation anchors used with foundation repair
brackets, shall be included in the analysis if this is deemed
necessary by the building official or structural designer.
Construction in Seismic Zones 3 and 4 requires compliance
with Section 1809.5.'1 of the code. A soil investigation report
is necessary ink ri u t in Iude consideration of:
1. Soil properties, including those affecting design.
2. Allowable soil bearing pressure.
3. Suitability for use in seismically active areas.
4. Information on ground -water table, frost depth and
corrosion.
2.3.2 Connection to Building Structure: Downward -acting
design strengths associated with each foundation repair
bracket are as follows: C150-0121 — 20 kips (89 kN); C150-
0298, C150-0299 and C150-0147 — 40 kips (178 kN); C150-
0239 - 5 kips (22.2 kN); C150-0132 —15 kips (66.7 kN). The
downward -acting design strength is 5 kips (22.2 kN) for the
T150-0085 slab repair bracket.
Factored design loads must not exceed the design
strengths for the brackets. The concrete foundation and slab
must be designed and justified to the satisfaction of the
building official for concentrated loads due to the foundation
and slab repair brackets. Bearing areas not exceeding 28,
34.5, 11.4, and 28 square inches (18,064, 22,258, 7,355,
18,064 and 18,064 mm2) shall be used to calculate the
concrete bearing stress at the seat of the C150-0121, C150-
0147, C150-0239, C150-0298 and C150-0299 foundation
brackets, respectively. In addition, if deemed necessary by
the building official, the effects of reduced lateral sliding
resistance due to uplift from wind or seismic loads shall be
considered for each project utilizing the C150-0121, C150-
0147, C150-0298 and C150-0299 foundation repair brackets.
2.3.3 Protection of Pier and Bracket Materials: Protection
of the pier and bracket materials must comply with Section
1807.9 of the UBC.
2.4 Installation:
2.4.1 General: The HELICAL PIER® Foundation System is
installed by A. B. Chance Co. certified installers, trained to
install the A. B. Chance Co. HELICAL PIER® Foundation
System.
2.4.1.1 Foundation Anchors: The foundation anchors are
installed using rotary motors having forward and reverse
capabilities. The foundation anchors must be positioned and
angled as specified in the approved plans. Foundation
anchors to be attached to the structure with the C150-0121,
C150-0147, C150-0298 and C150-0299 foundation repair
brackets are installed at an angle of 3 to 5 degrees from
vertical. Foundation anchors attached to structures by means
of the No. C1 50-0239 light -duty underpinning bracket, the No.
T150-0085 slab repair bracket or the No. C150-0132 new-
Page 3 of 8
E R-5110
construction foundation bracket, are installed vertically plumb.
The foundation anchors are installed in a smooth, continuous
manner, with the rate of rotation being within the range of 5 to
20 revolutions per minute. Extensions are connected to the
foundation anchor using the bolts specified in Table 2.
Coupling bolts must be tightened firmly with a wrench. The
foundation anchors are installed to the minimum depth shown
on the plans, but with the top helix not less than 5 feet (1524
mm) below the bottom of the foundation.
2.4.1.2 C150-0121, C150-0147, C150-0298 and C150-0299
Foundation Repair Brackets: The T-shaped upper bracket
body is slid over the end of the extension of the installed
foundation anchor. The lower bracket body is attached to the
concrete foundation by means of a concrete anchor
complying with the code or a current evaluation report. The
lower bracket body is attached to the upper bracket body
using the lifting bolts. A jack placed on top of the T-shaped
section of the bracket, with a jacking tool on top of the jack
and connected to the lifting bolts, is used to lift the lower
bracket body as it pushes down on the upper bracket body.
The nuts on the bolts are tightened and the jack is removed.
2.4.1.3 Slab Repair Bracket: The slab repair bracket is
installed on top of a foundation anchor that has been installed
through a 6-inch-diameter (152 mm) hole core -drilled through
the concrete slab. The top of the foundation anchor shall be
1 inch (25 mm) below the slab. Prior to installing the
foundation anchor, a 1-foot-deep (304.8 mm) pocket is
excavated in the subgrade beneath the hole in the slab. The
slab repair bracket tube is placed over the foundation anchor
shaft. The slab repair bracket channel is placed on top of the
bracket tube. The leveling bolt is threaded into the channel
and tube, positioning the bracket so that each end of the
channel is in contact with at least 4 square inches (2580 mmZ)
of the slab. The maximum torque on the bolt is 150 ft.-Ibs.
(203 N • m). See Figure 5 for typical installation details.
2.4.1.4 New -construction Foundation Bracket: The end
of the shaft of the installed foundation anchor is cut off, or the
pier is installed until the shaft top is a minimum of 3 inches
(76 mm) above the foundation subgrade or at a level where
the bracket will support an upper layer of steel reinforcing
bars in the concrete foundation. The new -construction
foundation bracket is placed over, and seated on the top of,
the foundation anchor shaft. The steel reinforcing bars of the
foundation are placed in direct contact with the top of the
bracket. If required, the bracket is connected to the
foundation anchor shaft with a 3/4 inch -diameter (19 mm) bolt
installed through a 13/16-inch-diameter (20.6 mm) hole
predrilled in 11/2-inch (38 mm) RCS foundation anchor shafts,
or a'/e inch -diameter (22 mm) bolt installed through a 1-inch-
diameter (25 mm) hole predrilled in 13/4 inch (44.5 mm) RCS
foundation anchor shafts. See Figure 6.
2.4.1.5 Light -duty Underpinning Bracket: The end of the
shaft of the installed foundation anchor is cut off or the
foundation anchor is installed until the shaft top is a minimum
of 1 inch (25 mm) below the bottom of the slab. The bolt
guide is placed on top of the foundation anchor shaft and the
pipe of the bracket is slipped over the shaft. The bracket is
attached to the concrete slab by means of concrete anchors
installed in accordance with the evaluation report on the
anchor. The lifting bolt is threaded into the pipe cap so that its
base engages the bolt guide inside the pipe. The maximum
torque on the bolt is 200 ft.-Ibs. (27.1 N - m). See Figure 8 for
installation details.
2.4.2 Special Inspection: Special inspection in accordance
with Section 1701 of the code shall be provided for the
installation of the foundation anchors and foundation
brackets. Items to be confirmed by the special inspector shall
include, but not be limited to, the manufacturer's certification
of installers, the installation torque and depth of the
foundation anchors and compliance of the installation with the
approved construction documents and this evaluation report.
In lieu of continuous special inspection, periodic special
inspection in accordance with Section 1701.6.2 of the code is
permitted provided that installers are certified by the
manufacturer and structural observations in accordance with
Section 1702 are provided.
Periodic inspections shall be performed in accordance with
the following schedule, subject to the building official's
approval:
1. Before the start of work —Verify manufacturer, verify
installer's certification by the manufacturer, and confirm
pier and bracket configuration compliance with
construction documents and this evaluation report.
2. Installation of first helical steel pier —Verify that location,
installation torque, and depth of helical steel piers comply
with construction documents. Verify that installers keep an
installation log.
3. First connection to building structure —Verify that
installation of foundation repair brackets or new
construction brackets complies with construction
documents and this evaluation report.
4. End of work —Verify that installation log complies with
requirements specified in the construction documents;
verify that installation of all structural connections
complies with construction documents and this evaluation
report.
2.5 Identification:
Foundation anchors have the word "CHANCE" stamped on
the top of the helix. The foundation anchors are also identified
by a tag or label bearing the name and address of A. B.
Chance Co., the catalog number, the product description, the
evaluation report number (ER-5110), and the name of the
inspection agency (RADCO). The brackets are identified by
labels bearing the catalog number and product description. In
addition, the letter "C" is stamped on the No. C150-0121, No.
C150-0298, No. C150-0299 and No. C150-0147 brackets.
3.0 EVIDENCE SUBMITTED
Material specifications, installation instructions, load tests and
a quality control manual.
4.0 FINDINGS
That the HELICAL PIER® Foundation Systems described
in this report comply with the 1997 Uniform Building
Code TM, subject to the following conditions:
4.1 The foundation anchors are manufactured at the A.
B. Chance Co. facility located at 210 North Allen
Street, in Centralia, Missouri, under quality control
program with inspections by RADCO (AA-650).
4.2 The foundation anchors are manufactured,
identified and installed in accordance with this
report.
4.3 Special inspection is provided in accordance with
Section 2.4.2 of this report.
4.4 Engineering calculations and drawings, in
accordance with recognized engineering principles
and design parameters, are provided to the building
official.
4.5 A soil investigation must be provided for each
project site in accordance with Section 2.3.1 of this
report.
4.6 The applied factored loads must not exceed the
design strength loads in Section 2.3 of this report.
This report is subject to re-examination in one year.
Page 4 of 8
TABLE 1—DESCRIPTION AND DESIGN STRENGTHS OF LEAD SECTIONS
ER-5110
DIMENSIONS1
MDES
GNM
HELIX PLATE
ITEM
CATALOG
STRENGTH
MATERIAL
SHAFT
NUMBER
NUMBER
A (feet)
B (inches)
C (inches)
D (inches)
E (inches)
F (Inch)
(kips)
SPECIFICATION
TYPE
1
C150-0002
5
11/2
8
—
5/16
20
2
C 150-0001
7
11/2
8
—
�_
5/ 16
20
3
C150-0058
5
11/2
10
—
5/
20
ASTM A 572 or
16
A 935 Grade 50
F = 50 ksi
4
C150-0003
7
11/2
10
-_.
5�16
20
=
Fu 65 ksi
5
C150-0242
5
11/2
12••-
5/16
20
6
C150-0004
7
11/2
12
5/16
20
7
C150-0243
5
11/2
14
5/16
16
ASTM A 656 or
A 936 Grade 80
F = 80 ksi
8
C150-0005
7
11/2
14
—
5/16
16
Pu = 65 ksi
9
C150-0086
3
11/2
6
6
1/4
27.5
10
C150-0244
3
11/2
6
8
1/4
27.5
11
C150-0030
7
11/2
6
8
--
1/4
27.5
RCSZ
Solid
12
C150-0160
3
11/2
8
10
1/4
27.5
ASTM A 572 or
A 935 Grade 50
Steel Bar
13
C150-0006
7
11/2
8
10
1/4
27.5
F = 50 ksi
14
C150-0031
101/2
11/2
8
10
--
1/4
27.5
Fu = 65 ksi
15
C150-0161
31/2
11/2
10
12
1/4
27.5
16
C150-0051
7
11/2
10
12
--
1/4
27.5
17
C150-0007
51/2
11/2
8
10
12
1/4
27.5
18
C150-0168
21/2
11/2
8
10
—
1/4
35
19
C150-0169
5
11/2
8
10
12
1/4
35
ASTM A 656 or
A 936 Grade 80
20
C150-0163
7
11/2
10
12
14
1/4
35
21
C150-0010
51/2
13/4
8
—.
5116
25
F = 80 ksi
PU = 90 ksi
22
C150-0011
51/2
13/4
10
5/
25
16
23
C150-0012
51/2
13/4
8
10
5/16
50
24
C150-0180
51/2
13/4
8
10
12
5/16
50
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 kip = 4.448 kN, 1 ksi = 6.895 Wa.
IFor description of dimensions, see Figure 1.
2RCS = Round cornered square.
Page 5 of 8
TABLE 2—DESCRIPTION AND DESIGN STRENGTH OF EXTENSIONS
ER-5110
DIMENSIONSI
MAXIMUM
DESIGN
COUPLING BOLTSZ
ITEM
NUMBER
CATALOG
NUMBER
Quantity
Slze
Type
HELIX PLATE
MATERIAL
SPECIFICATION
A (feel)
B (Inches)
C (Inches)
F (Inch)
STRENGTH
(kips)
1
C150-0047
31/2
11/2
27.5
2
C150-0008
5
11/2
3
C150-0009
7
11/2
4
C150-0048
10
11/2
53
C150-0159
5
11/2
12
1/4
64
C150-0166
31/2
11/2
14
1/4
ASTM A 320
12-inch helix:
1
3/4 inch
Grade L7
ASTM A 572 or
7 4
C150 0167
5
11/2
14
1 /q
A 935 Grade 50
F = 50 ksi
Fu = 65 ksi
14-inch helix:
ASTM A 656 and
8
C150-0144
31/2
11/2
—
—
35
9
C150-0145
5
11/2
--
- -
10
C150-0146
7
11/2
A 936
Grade 80
11
C150-0175
101/2
11/2
-
12 4
C150-0176
4
I
1 /2
14
Y 4
/
F = 80 ksi
FU = 90 ksi
13
C150-0183
31/2
13/4
14
C150-0013
5
13/4
15
C150-0014
7
13/4
......m
50
1
7/g inch
ASTM A 193
Grade B 7
7
16
C150-0184
101/2
13/4
174
C150-0185
4
13/4
14
5/16
For SL• 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 kip = 4.448 kN, 1 ksi = 6.895 MPa.
1For description of dimensions A through F, see Figure 1.
213olts connect extensions to lead sections or extensions.
3Design strength of helix is 20 kips.
413esign strength of helix is 16 kips.
Page 6 of 8
ER-5110
TYP
For SI: 1 inch = 25.4 mm.
A
TYP
FIGURE 1—HELICAL STEEL PIER
C150-0147 FOR
13/4' SHAFT
FIGURE 2—FOUNDATION REPAIR BRACKETS
T
1
C150-0121,C50-0298
AND C150-0299
Page 7 of 8
ER-5110
4" CHANNEL
�/ 15" LONG
T150-0085
=OR 11/2" SHAFT
INCLUDES:
4NNEL, BOLT, AND
,HOR TERMINATOR
For SI: 1 inch = 25.4 mm.
FIGURE 3—SLAB REPAIR BRACKET
CONCRETE
SLAB -ON -
GRADE
LIFTING BOLT
Y
LIFTING/
CHANNEL
HELICAL ---'
STEEL PIER
SLAB
REPAIR
BRACKET
FIGURE 5—TYPICAL INSTALLATION OF SLAB REPAIR BRACKET
4" x 7 3/4" STEEL PLATE
d
0
C 150-0132
FOR
11/2" AND 13/4"
SHAFTS
For SI: 1 inch = 25.4 mm.
FIGURE 4—NEW-CONSTRUCTION FOUNDATION BRACKET
RE-INFORCING
BARS I
O
CONCRETE
FOUNDATION
FIGURE 6—TYPICAL INSTALLATION OF NEW-CONTRUCTION
FOUNDATION BRACKET
Page 8 of 8
E R-5110
150-0239
11/2N SHAFTS
For SI: I inch = 25.4 mm.
FIGURE 7—LIGHT-DUTY BRACKET
CONCRETE ANCHOR
SLAB BOLT
LIFTING BOLT
PIPE CAP
30LT GUIDE
HELICAL PIER
FIGURE 8—TYPICAL INSTALLATION OF LIGHT -DUTY
UNDERPINNING BRACKET
q' � � ffiS � op�poop�p�ppo��pp Tr '•�
C7 Wa
��� • i �r
ppFQ�
a
�OnoTFNaF+NwF
WnF pmF
�PLNIMBI in
15
n
N�
dq @
0
J� 9. "µ.,„7i
F
O
aF
ss0000000
o�
malt
gy
Pi
N
m ry r 3 pl,,
o �
A-
vP
s�
�I
Q d pdd� �p^W! MUMS
Q
pQ dd "0.+m"' i9 fi5 p ,r�' , :� ddY 1Y' � ry... JL �.�.',$"£�n S
�.Tr .iLYjP9 � � .iN."'1�;,w �" l 1 -.h7, MY__
.„- Al
J
BB 6 fiu &� d�dtiie
os caoz
CIR
MOD
K as n s c o c E Pam"
cao
m
Y W
oa�c�n 3
� �Qo
W2 ti�-zW y
� aqa z
Ha aaU�ti�
�K WInOWJ
ON �=yqa
N �Z FFUa
V WOO`n�
j w�awo
W 3
O w
Art ,
CiT�
STRUCTURAL CALCULATIONS
LATERAL ANALYSIS
BEAMS
FOUNDATION WALLS
NEW RESIDENCE
425 Eddy Court
Port Townsend, WA 98368
EXP. DATE: 05 / 05 / 0881
Michael A Anderson
PE & PLS No. 27665
330 Cleveland Street
Port Townsend, WA 908369
wo -
XP
17,
r4 5.05;-"6�v'
451/7�-
Z,)3
T
- L
621
el�lvjl
(7`�P �
X� 'of
/9 "' 1157e-;r
PlAo,511 ZX'
. 7A2�,
76
A, 771-1-
�57
7
�3
7 7,
7 47
z- 's )
.v,
zpw
41�V ;qell
Ale,
;ell, -
49d
—2
74
ee
2V
7t77Z
/)
4-;?
-7 1 XYZIO
P�A
10L,
/I 3
-7k-
7Z';rF,'
04-,
o M9 -199 (£5Z) ua b£I£-£ti9 (09£) NvrICT
UX13 , U13sll floj
� I�IOI�I.,�QI�I
0
^»w
........_.....
�
89£86 VIA I CINHSNNioL Diod s
lI t
'w o
z�
Q �
xoj aauaprsa-a maN ®o
I
z
0
Q
0
w
0 M� -199 (£SZ) ul Kl£-Q9 (096
0096,
'AVMTnl'UKT'JA
Zhit'd VM- W LiusnS
..........
SrlrlVM UVrqHS 89H6 VM I CNEISNMOJ, DdOd
XEIOD AGGH SZt
r'HAE[r, 'aamorl < U,
joj QDUC/,) ;)Plso-d MON < a:
I
........... .......
0 b9L£-199 (£gZ) W Kl£-D9 (096 89£86 VM'CINHSNIAOJ,,L'dOcl
0086 VM',TVIA "I VIEH, CHI'd Nvr-id rlrlvm
-- - - ---- ------
W ij-us,nS VHHSJl-afloDzUIGH Sz� z C%q
"C*JL,doorld CrU Lu
w
ox% uoi2uT w
JOJ QDUDPISQ-d M;)N <
.qb.TV posuoorj
I
UD
P;
0
0
Prescriptive Approach — Simple Form
For the -Washington State Energy Code (2001 Edition)
Climate Zone 1
Site Information
r :.,,.. V_._ S
CW. P. y'.
State: 01-6 zV. rof�
Contact: t-
Q /
Phone: 0„3..
Phone 2:
Fax:
Building Department Use Only
Perna *
Notes:
Table 6-1
PRESCWVME, REQUMEMIUTi V FOR GROUP R OCCUPANCY
CUM47E ZONE 1
(IJnIiwAted: Gl Omni
Option
Gladng
Amato
Gl, i U-Factoor
Do
U_
Calini'
VsW d
was
Above
wall
11se
wall
Bt4
Floors
slaU
On
% of Floor
Vafical
Overheads r
factor
Ceilinle
Grade
Below
Grade
Below
Grade
Grade
GroupR3
0
0.59
020
R38
R30
R21
R21
R l0
R30
R10
Occupancy
,3
This project complies with the following,
✓ The project is a single family residence or duplex.
The project is wood frame OM all of the insulation is Interior or exterior of the framing.
✓ AN bulling components meet the requirements fisted In Table 6-1, Option Ill.
✓ The project will meet all other provislons of the MEC and VIAQ.
The p ject will tape advantage of the following exceptions to the prescriptive option:
6f&2.6 Exception 1. One door, that Is 24 it. or less, that does not moot the standards is allowed.
Location of the door taking this exception
❑ 602.6 Exception 2. Doors with a Ufactw of 0.40 meowed vAthatt calculatlons, _ 'on 11f only.
Location of the door(s) taking this exception d"L�
CapAl t 2= WSUCEEMOM
Copied by pontlWon from the V4 t Wn Slaw UnWraily Coowative awro on Er► ,gy P rant
Presc6pWo — Simple Farm -- Cknate Zorn 1 9311=
Devetopment Services
RT
° 250 Madison Street, Suite 3
` Port Townsend WA 98368
Phone: 360-379-5095
Fax: 360-344-4619
www.cityofpt.us
Tree Conservation Affidavit Form
BUILDING PERMIT/SITE DEVELOPMENT PERMIT NO. -I
THIS PERMIT AUTHORIZES 0" ,'LL).tJ1('a'r'-5
TO BEGIN WORK IN U r'
SUBDIVISION AND/OR AT THE FOLLOWING ADDRESS
THE AUTHORIZED PERSON ACKNOWLEDGES THAT HE/SHE IS RESPONSIBLE
FOR TAKING ADEQUATE STEPS TO:
1. Protect the tree retention areas on this lot as identified in the tree conservation plan
(normally the front, rear, and or side yard areas) in accordance with the standards of
Chapter 19.06 — Tree Conservation.
2. Field locate, mark, and protect all tree conservation areas on the site during
construction. Marking shall consist of tape, ribbon, or tags attached to the retained trees
and protective fencing secured by posts set at least 12" into the ground installed in
accordance with the requirements of 19.06.150. All tree identification and fencing shall
be installed prior to site development and construction and shall remain and be
maintained until home construction is 100% completed.
3. Install any trees on the lot required by the approved tree conservation plan.
FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL RESULT IN THE
ISSUANCE OF A STOP WORK ORDER OR OTHER CITATIONS.
CITY OFFICIAL
EFFECTIVE THIS / �' DAY OF
NOTE: DISPLAY THIS PERMIT AT THE MAIN POINT OF ACCESS
AND VISIBLE FROM THE STREET.
(Ord. 2837 § 1, 2003).
Page 1 of 1
17
c - B#21 I I- 11I (5�� I -
f
CO 85 179 7 9
-,21 0
-,)85
205 co
197
163
1
0
201
c,
195 A-)
190 177
19 3
1
241
I , ��D
209
�. 0 240,
CIV
245
X�l 2
2 53 AD
1,3 9
.. 8 -
PACE
TjCe;c--s 7-o 15,,- A9,G7-r.41A&,O
Parcel Details
Page 1 of 2
_._..
Home County Info
Parcel Number,. 964201912 [ SEARCH
Parcel Number: 964201912
a � � I �eUSearch
l,,ipter I rie"Ad y
Qwhdr,. +failing Address:
C FLIN.. _ . .. ,�. �� r-- V
HERINE ST
PORT TOWNSEND WA983684716
Site Address: y
425 EDDY CT
PORT TOWNSEND 98368
Section: 4 School District: Port Townsend (50)
Qtr Section: SE1/4 Fire Dist: Port Townsend (8)
Township: 30N Tax Status: Taxable
Range: 1W Tax Code: 100
Planning area: Port Townsend (1)
Sub Division: PARKVIEW ADD SHORT PLAT 1
Assessar's Lind Use Code; 9100 - VACANT LAND
Property Description:
PARKVIEW ADD SHORT PLAT 1 1 LOT 2 1 SUBJ TO EASE/REST OF RECORD I I
Click on photo for larger image.
1Xj No
�xj No2nd
Photo
Photo
Available
Available
,......
No Permit No Assessor
Data Tax A/V, Sales Info Ma Parcel Plats Surveys
Available Data Available
/g0 HOME I COUNTY INFO I DEPARTMENTS SEARCH
Best viewed with Microsoft Internet Explorer 6.0 or later
Windows - Mac
http://www.co.jefferson.wa.us/assessors/parcel/parceldetail.asp 8/17/2007
I
I
w
�gj
ry
�vo
Y
Pits
61 9,,
✓
z x;
z
F 4
U5 ec ti �-i
7
z
to
o
R Ell
X,
519431
Oiri2 2ea7 WA7P
M� YFR.nN �RT� I CA Mr. IQ A
After Recording Mail to:
CL Flint
P.O. Box 1428
Port Townsend, WA 98368 NO REAL ESTATE
EXCISE TAX PEOUIRED
JEFFERSON COUNTY TREASURER
BY.,
Document Title: Declaration of Covenants, Conditions and Restrictions
Grantor: C. L. Flint a single inan and Vernon 1. Gams(n L.L.C.
Grantee: The Public; Owners in Parkview Addition Short Plat No. I & Parkview Addition Short
Plat No. 2
Legal Description: Parkview Addition Short Plat No. I & Parkview Addition Short Plat No. 2,
City of Port Townsend
Assessor's Property Tax Parcel/Account Number: 964201901 & 964202001
DECLARATION OF COVENANTS,
CONDITIONS & RESTRICTIONS, and EASEMENT
The undersigned C. L. Flint and Vernon 1. Garrison, L.L.C. am the legal and equitable owners of
the following described real property located in Jefferson County, State of Washingtow
FLINT:
Lois I though 9, Parkview Addition Short Plat No. I to the City of PortTovatsend as
per plat recorded in Vol erne ,T of Short Plats. page �� records of leffawn
County, State of Washington;
GARRISON:
Lots I though 9, Parkview Addition Shod Plat No, 2 to the City of Port Townsend as
per plat recorded in Volumo 6_ of Short Plats, page 44 records of Jefferson
County, State of Washington;
Recitals: Owners desire to provide for present and future uses of said property consistent with its
highest and best for residential purposes, preserving views so far as possible, and providing for the
protection ad rvation of the charwer of the property and its neighborhood. Owners further
desire that the property shall be and remain subioct to the terms of these restrictive covenants for all
purposes, including but not limited to any future sale, transfer conveyance or lease of the property
or any portion of it or any future development thereof,
NOTE: Certain terms of this Declaration am estaillilkbeill pmunint to condition of City
of Port Townsend approval. See items below which shall not be amended or modified without
the written consent of the Development Services Department, City of Port Townsend.
PAGE I orb
Illlllllllllil�ll'JIIII4IIIIINI�III�IRIIIIIINIIIII�207P
THEREFORE it is hereby declared, covenanted and provided that:
A. COVENANTS AND DECLARATIONS AFFECTING ALL LOTS:
1. Restrictions created by this document affect all the above described parcels. They are and
shall be, construed running with the land binding upon the Owners and all subsequent owners and
occupiers of the land or any interest therein. It is the intent of the Owners that the restriction shall
bind and restrict the land, the Owners, its heirs, grantees, personal rep fives, successors and
assigns, alike.
2. These Declarations shall be governed by the laws of the State of Washington, and all
disputes between lot owners subject to these covenants will first be presented to arbitration, by a
Firm or Person, qualified and licensed to practice Arbitration in the State of Washington. The cost
of arbitration will be apportioned equally between the parties associated with the arbitration. (See
Section F for disputes subject to arbitration.)
3. All disputes between lot owners subject to these covenants unresolved by Arbitration and
any legal action involving the City will only be enforced in the Superior Court of the Canty of
Jefferson, State of Washington.
4. Grantors re -dedicate to the City for any uses in perpetuity any areas dedicated as streets or
rights of way in .Blocks 19 & 20, Johnston's Addition to the City of Port Townsend, as per plat
recorded October 10, ISS5 in Volume I of Plata, pap $5, Mcords of Jefferson County,.
Washington, togedher with all of vacated 26a` Street adJoining Block 19, and those streams shown as
Eddy Street and Eddy Court on Parkview Addition Short Plat No. 1 and Parkview Addition Short
Plat No. 2,, and agree no uses shall be made of said rights of way in Blocks 19 & 20, Johnston"s
Addition or vacated 26a Street adjoining Black 19, or Eddy Street and Eddy Court in. Parkview
Addition Short Plat No. 1 and Parkview Addition Short Plat No. 2, except as allowed by the City of
Port Townsend.
B. COVENANTS AND DECLARATIONS AFFECTING LOTS IN BOTH PARKVIEW
ADDPCION SHORT PLAT NO. I AND PARKVIEW SHORT PLAT NO.2
NOTE: The Covenants and Declarations in this Section B are NOT conditions of plat
approval determined by the City of Port Townsend As such, these conditions are NOT
enforceable by the City
1
5. The lots in the Parkview Community consisting of Parkview Addition Short Plat No. 1 and
Parkview Addition Short Plat No. 2 plats will be developed as a "3 Star Built Green Development",
and all Owners and Developers will be encouraged to adopt Built Green Construction Practices and
Techniques.
6. To encourage "Built Green' techniques and practices the owner(s) upon issuance of a
"Final Inspection and Certificate of Occupancy" by the City of Port Townsend and verification of
"Built Green Requirements" will grant a $2000.00 (two thousand) dollar rebate to all owners that
meet or exceed the" Built Green 3-Star Level Requirements"
7. No Mobile, Manufactured or Modular homes will be permitted to be erected, located or
parked on said parcels or low.
PAaa 2 "ea
S. 'here shall be no beat pumps or exterior mechanical heating, cooling or ventilation (fans,
etc.) devices on said parcels and lots.
9. Building exteriors shall not be clad or sided with Vinyl or Aluminum material.
10. Fences, arbors or trellis shall not be constructed of Vinyl or Aluminum materials.
11. A minimum roof pitch of 6/12 is required on all gable roofs. A minimum 30 Year
Amhitechaal Shingle is required on all gable roofs. All roofs less than 6/12 pitch will be concealed
with a minimum 24" parapet wall.
12. All mechanical equipment, fuel storage tanks, except solar collectors, shall be screened so as
not be visible from any Public Right of Way.
13. Landscape will be with plants appropriate for site topography and soil types, emphasizing
drought tolerant varieties with low watering requirements. Turf grass will be limited to 25% of
landscaped area and be a drought tolerant variety requiring less irrigation and minimal
maintenance.
14. Prior to "Final Inspection or Certificate of Occupancy issued by the City of Port Townsend,"
each parcel or lot owner will be required to plant on the owners lot one (1) - 4" diameter deciduous
tree, capable of obtaining a minimum 20' canopy at maturity, for each 20' of frontage along Eddy
Street/Court, up to a maximum of 4 trees.
15. Lot 5, Parkview Addition Short Plat No. 1 will be reserved for purchase by the owners of the
Parkview Community consisting of Parkview Addition Short Plat No. I and Parkview, Addition
Short Plat No. 2 short plats as a community property. The lot may be purchased whenever a 60 %
majority or l 1 owners (which ever is greater) of the Parkview Community give written notice to
the owner(s) of their intention to purchase Lot 5. Purchase price of the Lot will be $85,000. Terms
will be all cash at closing and the purchase price including all closing casts will apportioned
equally to the 18 parcels or lots in both Parkview Addition Short Plats. The property will be
reserved for 1 year beyond the date that I 1 lots have been purchased
16. All decisions concerning ownership, development or use of said Lot 5 will require a 60%
majority or l l votes whichever is greater. The owner(s) of each individual lot or parcel will
receive 1 vote per lot or parcel owned. The property may be used for any use(s) allowed by the Port
Townsend Municipal Code.
17. No inoperable vehicles, recreational vehicles, trailers (whether for recreational, utility,
storage or any similar uses) trailerable recreational devices such as boats, jet skis , personal
watercraft or off -road vehicles/motorcycles will be stored or parked adjacent to or along any
property line of said parcels and lots.
18. All garages, carports, outside storage or other accessory structures shall be attached to
permanent concrete foundations and comply with setbacks; be constructed to comply with roof
pitch and exterior wallhoof covering material contained herein.
PACE 3 af8
I III IINI IIIIII lul II� IIUI IIIII III IIIII III I4II519431:071
]a1/arson County Rud VERNON GRRR160N / CA DEC 30 00
ip., No temporary structures, signs„ tents, tarps or yurts (except for heel Estale Wes Signs) shall
be locatod or ere tod on said parcels and lots for longer than 7 bays.
20. All garages, carports, outside stortirgo or other accessory structures stall be oquipped with a
door adquato to prevent their contorts from being visible from any Public Right of Way and be
kept closed except when in use.
2'l . All Crash collection devices, rubbish containers, recycling containers or
appliances shall be located on the individual lots or parcels they serve. "fhey will be adequately
screened and maintained to prevent bird„ a ninaal, rodent or insect atnrnction or infostsLion.
22. All satellite dishes, radio antennas and other comrnutuestion devices must be permanently
suachod to the dwelling units they serve, They shall be tainted above the top odge of the fascia and.
may not project above the ridge of tile roof to which they are attached,
n improvements and maintonam for the sole use and benefit of any individual parcel or lot
shall be at the expense and burden of the owner(s) of those parcels or lots, free of hens or i isbil ity
against the owner(s) of the other parcels or lots, the owitera of which shall be held harrnioss 'for
such for such costa, unless lion is an advaatoa written agreement to the contrary between owners
who may agree to apportion and share in such expenses among them
24. Owners are limited in their use of the City street for parking as follows: no owner shall
utilize more than one on atrft4 puking space for the parking of vehicles its connection with rho
use of their lot. This limitation isintended to prevent one owner from using the street to park
more than one vehicle owned by that owner. This limitation does not prevent City parking
code enforcement, and no one has any assigned or private on street parking. This limitation
does not prevent temporary use of more than one space for guests and visitors. 'Me limitation
is intended as a private covenant effooting lot owners' n. Parkview Addition Short Plat No, I
and Parkview Addition Short Plat No. 2.
C; COVI�NANTSAND DECLARATIONS APFE4r:fllwlGALL iA7MM--Tiles ARE
CONDITIONS OF SHORT PLAT APPROVAL I)VrEMMD BY THE CITY OF PORT"
"I"O'l4NSENlkr 'The+ ovenan'ts and Declarations In Section. Care created by the Grantors
CL Flint and Vernon L Garrison, MX , and are conditions of plat approval determined by
the City of Port Towmend., As such, these conditions are enforceable by the City. Tbey are
also enforceable by other lot owners. Ste Section F below,
25. There shall be no' high -intensity exterior lighting units such as mercury vapor, halogen or
other lighting units designed for high levels of armor lighting„ all M torior lighting units shall be
installed and mainta ed only to project low intensity downward projecting flood or path lighting,
and shall not be permitted to intrude on the damn privacy of surrounding parcels and lots,.
26. The illumination intensity shill be kepi Cos minimum and all lighting fixtures shall be
shielded and pointed downward including lighting for signs. Polo mounted light lectures shall not
exceed 15 fast in height. All lighting shall be as approved by the City of Port Townsend Director of
Development Services Department,
PAGE 4 d0
������ IIIII 1111111 ���� ��� IIIIN 1111111II 111111111IIII OA M2 2aar 03:97P
f mlv AIA VFAN RRRA7RM1 I r.R nFr. iR —
27. Owners, purchasers and lessees are hereby notified that all lots are subject to the approved
Tree Conservation Plan on file with the City of Port Townsend Development Services Departmerd.
Limitations on tree removal, requirements to protect certain noes and/or plant now trees and
signing of a tree conservation affidavit as a condition of building or outer site development permits
may be required. Interested parties should contact the City ofPort Townsend for additional
information on tree conservation measures applicable to any IoL
a For any lot where there is a substantially complete boil ding permit application Illed with the
City within five j5j, yom of the recording of this Declaration, all stormwater created by impervious
surfaces on individual parcels or lots will be dotaincd, infiltrated, or dispersed on the individual lot
or parcel where it is created in accordance with the "2005 Western Washington Stormwater
MannuaV', as adopted by the City of Port Townsend in 2006 (without application of any
amendments thereto adopted by the City within the five year tim ) After the above
tirnefrarne, lot development shall comply wide the stormwater management regulations of the City
in effect at the time a substantially complete application is made.
29. All stormwater construction and maintenance shall be in accordance with the approved
"FINAL STORMWATER MANAGEMENT PLAN, PARKVIEW SHORT PLATS" dated
September 14„ 2006 and as amended, on file in the office of the City Engineer. Any change to the
adopted plant shall be with the written approval of the City of Port Townsend.
D. COVENANTS AND DECLARATIONS AFFECTING LOTS 1.4, PARKVIEW
ADDITION SHORT PLAT NO. I —THESE ARE CONDITIONS OF SHORT PLAT
APPROVAL DETERMINED BY THE CITY OF PORT TOWNSEND
30. The referenced Final Stormwater Management Plan prescribes the following minimum
maintenance requirements by the owners of Lots I through 4 of Parkview Addition Short Plat No.
1, as follows:
a. The lot owners adjacent to the surface storm water bioswales/ponds located
generally in the 251h Street right of way along the southerly lot line of said lots, shall be
required to mow the sweles twice a year, the first mowing by May 1 of each year and the
second mowing by October l of each year. The debris from the snowing operation shall be
deposited in a disposal site approved by the City Public Works Director.
b. Prior to October 1 of each year and within three days of all significant stoma, the
swales and ponds as constructed within 25'h Street right of way shall be inspected to
determine if debris and/or sediment have been deposited within the storm water facilities.
C. All debris shall be removed and any sediment removed to original constructed
grade to disposal site approved by the City Public Works Director.
d All swales and ponds shall remain operational and functional in the same manner
and degree as originally constructed Any repair or replacement for any reason shall be the
responsibility of the owners of said Lots 1 through 4.
e. In the event of any conflict between the Stormwater Plan and terms of this
Declaration, the Declaration shall prevail.
PAGE 5 of g
III IIIpillII111111519,43107P
owl 14
31, Tito obligations set forth in this Section Dam joint and sevatal obligations of the owners of
said Cots I through 4. This mom that in the event of a breach (or threateried breach) of an
obligation, the obligaton may be enforced against %U owners or only one or some of the owners,,
and any one owner may be held I iable for the entire correction and enforcement In the event of
correction and enforcement by one owner or I= than al l owners, Jaen that: owner or those owners
have the right of ocaatribution over and against theother owners of said tots I tlttoaagh 4, exoeltt
Them is no right of contribution by ono whose acts or omissions (including acts or onaissi:ons of
their guests, tow, ts, ropxesmattivres or invites) gave rise to the obligation.
E. EASEMENT AFFECTING LOTS 2 AND 3, PARKVIEW ADDITION SHORT PLAT
NO.1.
32. The easement across Lots 2 and 3, Parkview Addition Short Plat No. I are dedicated to the
City of Port Townsend for the purpose ofunderground utility easement rightsover, through, under
and across said lots in perpetuity for utility lines, arrd include the following;
& The City shall have the right at all times to enter the described easement area.
for the purpose of inspections and nuuntioning the property, including but not limited
to inspocting, maintaining improving. repairing. recownrWing,
locating, and relocating any utility lines or curb, gutter or sidewalk improvements..
Tito City shall provide notice of 24 how's for all scheduled work except in the case of
emergency.
b. Any costa associated with inspodion„ maintentmoc, improvwwa repair,
construction, recortattrcting, and improvements upon the property tindertaken by the
City shall be borne by the City.
C. Structures arulrror permanent storage within the above -described easement, or
any use of or within the easement that interferes in the City's judgment with the
City's use of the easement, are prohibited.
d In connection with any inspection, maintenance, improvement, repair, or
construction or reconstruction, the City shall restore the property (easement and any
immediately adjacent area.) to tough grading, conditions, but is not responsible for any
restoration or repair of Iandsraping, vegetation or any improvements within the
easement
e. Any darattge to the easement or improvements in the easement caused by a lot
owner or their guests,. tenants, representatives or invitees shall be'repaired at the sole
cost and expense of said owner.
F. VIOLATIONS & REMEDIES
33, yoning Code Violation — Applies Only to City Ernforcement of Paragraphs under Sections C,
D, arA E above, A violation of the terms of Paragraphs under Sections C„ D, and E of this
Deelaration is a violation of the raining code of the City of port Townsend, and the City may take
code enforcement for a violation or threatened violation of this Declaration in the same manner and
with all the rights available to the City under its zoning code.
34. Enlorcernent Rights — Applies to City for City E"ft=n=t0f Pet^agsraphs under Sections C,
D, and E above, and to Owner(s) for Enforcement of Paragraphs under Sections El & C above, Its.
PAGE 6 of a
431 07P
M1F MdlYIR P,dB'nA fFIW d d`a rwr, MIA ,
addition to any enforc araart action by the City„ the City may enforca Paragraphs under Sections C,
D, and'E, and any Owner(s) may enforce paragraphs under Sections f3 and C: above bringing an
action in law or in equity in a court of competent jurisdiction to enforce the terms of this
Declaration„ includira};:
To enjoin the violation, ex parte as necessary, by temporary or permanent
injunction; and/or
b. To require the restoration of any affected property to the condition that
existed prior to the injury arising from a violation of the terms of this Declaration-
35. Sae of Relief City's and/or Owners), rights under this Section apply equally in the event.
of either actual or threatened violations of than tore as of this Declaration. City's and/or s;)
remedies at Iaav for any violation of the terms of this Declaration are inadequate and City and/or
Olmer(s) altall be entitled, including, specific performance of the terms of this Declaration, without
the necessity of proving either actual damages or the inadequacy of otherwise available legal
remedies, City's remedies described in this Section shall be cumulative and shall ba m addition to
all remedies now or hereafter existing, at law or in equity. Specifically, nothing herein affects in any
way the authority of the City to enforce City codes and regulations.
The prevailing party in any judicial proceedings initiated to enforce the terms ofthis D olasation,
shall be entitled to reasonable expenses, including attorncy's fees, as determined by the Court
36. City's or Owner('s)'Forbearance, Forbearance by City or Owner(s) to exercise its rights
raider this Declaration in the event of any breach of any terms of this Declaration by s),
theiragents„ employees, contractors, family members,' invitees, or licensees, shall not be deemed or
construed to be a waiver by City or t rtta(s) of such term of any City's or Owner(s) rights under
this Declaration. No delay or omission by City or Owner(s) in the exercise of any right or remedy
upon any breach shall impair such right or remedy or be construed as a waiver.
Signed,.PZ 2007
Signed ,m / ✓� 2007
L Garrison, LLC
PAGE 7 of 8
IIIIII IIIII NINII NI III NIII IIIIIII II IIIII IIII IIII6102,12007 _07P
I.If.r�nn f xtv OW ViIIN�M MARTf.(IN / f.0 rw.. %A M
Approved as to terms applicable to City of Port Townsend (namely, paragraphs in Sections A, C,
D, E, and l7.
By: LeonardYarla , DSD r
Dated: —fL? 44�......._..,
State of Washington )
) ss:
County of Jefferson )
Signed and affirmed before me this
Garrison, Manager OfVOM `.
ex dte insinmient aelmow
nested in homnu
Commission
41
day o 2007, by C. L. Flint and Vernon I.
l LC, o frtnt on r that they were Authorized to
I it is to be a five and voluntary act for the rues and
PAGE8of8
36( 37g�
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3
Port Townsend WA 98368
360-379-5095 Fax 360-344-4619
REVISION TO BUILDING PERMIT #.".t -�"
. Revision #
OWNER: , 9 s �
v, SITE ADDRESS: G{ 2
Total Value of Revision: $ Impervious Surface Change? ❑ Yes
❑ No
Revisions require 2 sets of plans and a written scope of workthat fully describes the proposed change plus any
additional information that will be of assistance in issuing your revision. If your plans were stamped by a design
professional, all revision submittals require a stamp with a wet signature. Be aware that changes to the existing
approved plans may also require you to revise your original building permit application (lot coverage, impervious
surface, structure square footage, etc.) and energy code documents (changing windows, heat source, etc.) to
conform to your proposed changes.
Scope of
Applicant Signature
OFFICE USE ONLY:
Submittal date:
Two sets of plans for revision:
Approval of engineer of record (if original plans engineered): ❑ Yes ❑ No ❑ NA
PADSMDepartment Forms\Building Forms\ApplicatiorrRevision.doe
4
VORT BUILDING PERMIT
City of Port Townsend
w .m Development Services Department
TWA ^ 250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information Permit # BLD08-112
Permit Type Residential - Single Family - New Project Name New Single Family Residence with
Site Address 425 EDDY CT Parcel # ADU
964201912
Project Description
New Single Family Residence (replaces BLD07-166)
Fee Information
Project Details
Decks — Residential
Project Valuation
$266,265.86
Dwellings — Type V Wood Frame
Site Address Fee
3.00
Private Garages — Wood Frame
Building Permit Fee
1,928.95
Energy Code Fee - New Single
100.00
Family Unit
Mechanical Permit Fee per Dwelling
150.00
Unit - New Residential
Plan Review Fee
1,253.82
Plumbing Permit Fee per Dwelling
150.00
Unit - New Residential
State Building Code Council Fee
4.50
Technology Fee for Building Permit
38.58
Record Retention Fee for Building
10.00
Permit
Total Fees $3,638.85
1,130 SQFT
2,544 SQFT
616 SQFT
Ca11385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner.
Print Name _ _ _ Date Issued: 05/15/2008
Issued By: SWASSMER
BUILDING PERMIT
0 City of Port Townsend
Development Services Department
WA 250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information
Permit Type Residential - Single Family - New
Site Address 425 EDDY CT
Project Description
New Single Family Residence with ADU
Names Associated with this Project
Type Name Contact
Applicant Williams Valorie
Owner Flint C L
Fee Information
Project Valuation
$407,804.48
Building Permit Fee
2,718.55
Plan Review Fee
150.00
Technology Fee for Building Permit
54.37
Record Retention Fee for Building 111)
Permit *°
Site Address Fee w 3.00
Total Fees '" $2,935.92
Permit # BLD07-166
Project Name PARKVIEW SHORT PLAT I
Parcel # 964201912
License
Phone # Type License #
(360)531-0747
�s
V
Project Details'
Dwellings Typ V` Wood Frame
Private Garages"'—' Wood Frame
fi
Exp Date
4,214 SQFT
270 SQFT
* * * SEE ATTACHED CONDITIONS * * *
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner_
Print Nam I Date Issued: Oi /25/2008
� 1 L I Issued By: FRONTDESK
Exp Date
4,214 SQFT
270 SQFT
* * * SEE ATTACHED CONDITIONS * * *
Call 385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations. I certify
that the information provided as a part of the application for this permit is true and accurate to the best of my knowledge. I further certify
that I am the owner of the property or authorized agent of the owner_
Print Nam I Date Issued: Oi /25/2008
� 1 L I Issued By: FRONTDESK
BUILDING PERMIT
MIT
City of Port Townsend
Development Services Department
250 Madison Street, Suite 3, Port Townsend, WA 98368
(360)379-5095
Project Information
Permit Type Residential - Single Family - New
Site Address 425 EDDY CT
Project Description
New Single Family Residence with ADU
Conditions
Permit # BLD07-166
Project Name PARKVIEW SHORT PLAT I
Parcel # 964201912
10. Prior to Final Inspection or Certificate of Occupancy, lot owner required to plant on the owner's lot �94i (1) 4"
diameter deciduous tree, capable of obtaining a minimum 20-foot canopy at maturity, for each 2911°I ct of frontage
along Eddy Street/Court, up to 4 trees.
20. Unit may not be used as Accessory Dwelling Unit until owner provides third on -site p,,u;k ng space, and recorded
Notice to Title, and DSD provides separate address for ADU. 11110,40
Ca11385-2294 by 3:00pm for next day inspection.
Permits expire 180 days from issuance if work is not commenced, or if work is suspended for a period of 180
days. Work is verified by obtaining a valid inspection.
The granting of this permit shall not be construed as approval to violate any provisions of the PTMC or other laws or regulations_ I certify
that the information provided as a part of the application for this permit is tree and accurate to the best of my knowledge_ 1 further certify
that I am the owner of the property or authorized agent of the owner.
Print Na 1 Date Issued: 01/25/2008
1 n A. ti ti I, 111 M, JAA G Issued By: FRONTDESK
fi
Development Services
ORT ro 250 Madison Street, Suite 3
Port Townsend WA 98368
Phone: 360-379-5095
Fax: 360-344-4619
www.cityofpt.us
Residential Building Permit Application
9 p ( )� OfficeJn
)y, a.w,
Project dress,.. �� �� Addition: Description on'�� Pei`" �t
or Tax
Zoning: R �_ Block:PA,
() _
90 O t � Z ., Permits,,,-,"""
Parcel # Lots):_ Associated
Project Description: /
➢ Applications accepted by mail must include a check for initial plan review fee of $150 1
➢ See the "Residential Building Permit Application Requirements" for details on
plan submittal requirements.
r
Phone:rr IM
®r w
• . tative
Phone-, 1'♦ Z
Contractor: Asarne aver"
Name:
Email: '/
State License #:
City Business License tt
hereby certify that the info
and that all activities assoc
Print Marne:
-0(2 ) �Qx-
Signature:
Lender Information:
Lender information must be provided for projects
over $5,000 in valuation per RCW 19.27.095.
Name: Ap
Project Valuation: $;
Building Information (square feet):
l stfloor r Uto?rwa
rage.
2nd floor Deck(s):
3`d floor Porch(es):
Basementsit finished? Yes Q
aroort" " Other:
fl l
Square
Homer ADU
dition I Remodel/Repair I
f Coverage (Building Footprint):" d yR.
feet:. % "U V0 �)o - x/07-
5 Olt r�
�c�usr0liqfi'Tatal
�
fee exis ina & n ron asod
Any known wetlands on the property? Y
Any steep slopes (>15%)? Y
on provided is correct, that I am either the owner or authorized to act on behalf of the owner
with this permit will be in accordance with State-Laws-and-the-P-ort Townsend Municipal Code..
Date ,C?611 7
"iJ
Development services
VORr 250 Madison Street, Suite 3
Port Townsend WA 98368
" Phone: 360-379-5095
Fax: 360-344-4619
W www. cityofpt. us
Tree Conservation Affidavit
BUILDING PERMIT/SITE DEVELOPMENT PERMIT NO.
THIS PERMIT AUTHORIZES
TO BEGIN WORK IN Tr4ha LO k j I
SUBDIVISION AT THE FOLLOWING ADDRESS
d
THE AUTHORIZED PERSON ACKNOWLEDGES THAT HE/SHE IS RESPONSIBLE
FOR TAKING ADEQUATE STEPS TO:
1. Protect the tree retention areas on this lot as identified in the tree conservation plan
(normally the front, rear, and or side yard areas) in accordance with the standards of
Chapter 19.06 — Tree Conservation.
2. Field locate, mark, and protect all tree conservation areas on the site during
construction. Marking shall consist of tape, ribbon, or tags attached to the retained trees
and protective fencing secured by posts set at least 12" into the ground installed in
accordance with the requirements of 19.06.150. All tree identification and fencing shall
be installed prior to site development and construction and shall remain and be
maintained until home construction is 100% completed.
3. Install any trees on the lot required by the approved tree conservation plan.
FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL RESULT IN THE
ISSUANCE OF A STOP WORK ORDER OR OTHER CITATIONS.
CITY OFFICI.
APPLICANT Ury
WA
EFFECTIVE THIS A-"- DAY OF
20 O�
NOTE: DISPLAY THIS PERMIT AT THE MAIN POINT OF ACCESS
AND VISIBLE FROM THE STREET.
A''tiN'fl'Iit
BLD07-166
BLD07-166
BLD07-166
BLD07-166
964201912
Technology Fee for Building Permit
964201912
Building Permit Fee
964201912
Record Retention Fee for Building P
964201912
Site Address Fee
R r i
.,. y cep l ,..,;,.
1= e o crap a`
07-0688
08/07/2007 Plan Review Fee
� t
Oe
fldletFtoad
Nurft bef
A!tt7h Ot9t1
CHECK
1007
$ 2,785.92
Total $2,785.92
Receipt Nurrtier: 0
$54.37
$54.37
$0.00
$2,718.55
$2,718.55
$0.00
$10.00
$10.00
$0.00
$3.00
$3.00
$0.00
Total:
$2,785.92
$150.00 BLD07-166
genpn trreceipts Page 1 of 1
P
Receipt Number:0�
v✓
P t.r�rn,11
Pari
BLD08-112
964201912
BLD08-112
964201912
BLD08-112
964201912
BLD08-112
964201912
BLD08-112
964201912
BLD08-112
964201912
EILD08-112
964201912
BLD08-112
964201912
BLD08-112
964201912
Plan Review Fee
$1,253.82
Technology Fee for Building Permit
$38.58
Energy Code Fee -New Single Famil
$100.00
State Building Code Council Fee
$4.50
Plumbing Permit Fee per Dwelling t
$150.00
Mechanical Permit Fee per Dwelling
$150.00
Building Permit Fee
$1,928.95
Record Retention Fee for Building P
$10.00
Site Address Fee
$3.00
Total
$1,253.82
$38.58
$100.00
$4.50
$150.00
$150.00
$1,928.95
$10.00
$3.00
$3,638.85
Permit
$0.00
$0.00.
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
genpm[rreceipts Page 1 of 1
31
36�
��. I [ Ilz
16
City of Fort Townsend
Development Services Department"
250 Madison Street Suite 3
Port Townsend WA 98368 firer
(360) 379-5095 FAX (360) 344-4619
MEMO
TO: Patty Voelker, Finance
FROM: Scottie Foster �!
CC: Valerie Williams
DATE: May 15, 2008
RE: Refund for BLD07-166
On January 25, 2008, Valerie Williams paid $2,785.92 in fees for BLD07-166. That
Permit was subsequently withdrawn. The $150 paid under an earlier receipt will be kept
as payment for plan review of the application.
Therefore, please refund $2,785.92 to: Valerie Williams, 2829 Katherine Street, Port
Townsend, WA 98368.
A copy of the receipt and of the FMS Report is attached for your records.
C!r of Port Townsend Development Services Department
G,errection Notice
PERMIT NUMBER A
OWNER
�._....
JOB LOCATION
Inspection of this structure has found the following.,violati,011sq,
You are hereby notified that no more work shall be done upon these premises until
the above violations are corrected, unless noted otherwv se. When corrections have
been mad call for inspection*
Date JInspectors' kr 'm
DSD Main Office (360) 379-5095 INSPECTION REQUEST (360) 385-2294
THIS NOTICE MUST BE KEPT WITH APPROVED PLANS ON SITE
1u
6M
00
00
�z
OWOO
C�
Cr
o
•r
o
h�
y
M
a
a�
C."
Q
0
�
N
LL
LL
O
❑ w
w
Z N
O O
❑ w
a=
W Z
QO
w
J
LU Ca
Z>
Oa
w
w co
IL
Vl
Z �
W Z
Ir Z
DgO
it W
>
as
J d
tea
�❑
LU
U a
z w
(N >:
= Z
F a
w a
>O D
�U
W U
Ix O
F w
00
Z LL
0 W
QW O
W 0.
a
J a
a a
z
O z 1
Q ❑
U J
O CO
'o�
U z
ILs
U)
Z _
U2
O
Lj =
aD
wa
aw
_z a_
❑ It
IL
a z
U
CO) a
=a
w
U
Or
a m
OD
0
0
N
a
O
J
H
z
a
w a
H �
z
O
O
a
co
t�i >
w >
C LT
o ZO a�
LLO
_C
O
z Z
O 'L
LU 0 U O J
F-
❑ a_
w
D N
N W
U) ❑
U
LU
a
w
00
0
cl
J
m
O
z
F-
Lu
IL
i
w
0
N
w
J
0')
[ifD
00
O
N
U
�
Of
>-
>
z
0)
�
0
w
Q
cli
O
Z
N
w
Z
a
a
O
U
w
a
❑
a
z
Z
O
F-
LU
a
z
zZ W
O
U
w
Q
❑
IL
U
z
z
O
t~i
w
a
Z
z
O
U
w
a
U)
z
Q
0
%F-
0a1 Z
N ir
Lf)ooO
LL
—aa
M O
O
J M
Q O
z Of
52
~a
U
W
a W
co
Z W
Z U
Q W
w
�w
co
W m
a to
w m
Oco
cn
D
W
z
O
F-
U
W
a
Z
VORT
CITE' OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
WA CALL THE INSPECTION LINE AT 360-385-2294 BY 3:00pm THE DAY BEFORE YOU
WANT THE I SPI+IC'I"ION. FOR MONDAY INSPECTION, CALL BY 3:OOPM FRIDAY.
DATE OF INSPECTION
�� _PER
:� �'° � ,MIT NUMBER:
"T 11 1� ����
�
SITE ADDRESS` i�, ;� „IS,`
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
❑ APPROVED
❑ APPROVED WITH
CORRECTIONS
II'��,
Ok to proceed. Corrections will be
❑ NOT APPROVED
Call for re -inspection before
checked at next inspection proceeding,
J ..
�t
Inspector d a °''�,' Lc Date°
Acki,iowledgenient
Date
Approved plans and permit card must be on -site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
Inspection Report
Per
Pra'ectw `�
J.. �__..p._�...� ._..W_ mit
# l
Date Ins ctoll Inspection & Notes
C L-C-'27
. . ........ . -
............ ...
7J
a m rv, yp jury
..ne.�...,,.w...,w., ��. ...� ..... .ri..� w.�r,....awv..�.....vw. .www ..r. ` m. �.........�....wr�....,.... wwxwiv.
11
.. ._._ m......_ ..._W _ m. ._.._
(t'k lo —i-kp-Da
............_W.._.._
Cu f5
m.. ... .......
__..
....I .._.... __.�.m.
.. _.mm...a_w ....... .. __ ..._ _._.a_.. _W..�...._ _ ......mm........ �.w...�.
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION:
Z'
SITE ADDRESS: '21
PROJECT NAME:
CONTACT PERSON:
PERMIT NUMBER.
CONTRACTOR:
TYPE OF INSPECTION: � ....�:�"..�
a A
fi,
I'
of
�
i
m„„„ 4��AI�1'lfi.➢'i7'"1"�ID
Q
Inspector
❑ APPROVED WITH
CORRECTIONS
�)k to proceed. Corrections will be
li"ked at next inspection
Date
❑ NOT APPROVED
Call for re -inspection before
l� a•o��t';,rl ur�� 8
�2,�r
' :.
Approved plans and permit card must be on-se"ond available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 b 3:00 PM the day before you want
P � p Y Y
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: 6 "s2-0 F' PERMIT NUMBER: (�� — fiJ
SITE ADDRESS: 47- �-7100L,t r-_J_
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION. 7
f
11
ElAPPROVED WITH ❑ NOT APPROVED
XAPPROVED
'IMC IONS
Ok to proceed. Corrections will be Call for re -inspection before
checked at next inspection proceeding.
����.m�.., �...._...�.._. .....�..�. ...a�i aicr H Date � a. -----
Approved plans and permit card must be on -site and available at time of inspection. A re -inspection fee may
be assessed if work is not ready for inspection.
Floor Joistf 2003 International Buildinq Code (01 NDS)1 Ver: 6.00.81
By: Leonard Yarberry, , City of Port Townsend on: 06-03-2008 : 4:21:58 PM
Project: - Location:
Summary:
1,5 IN11,26 I i 1 .0 FT ft, 24 0.C. /Select Structural- Hem -Fir- Dry Use
ctaon Adequate By. 7 ,6% Controlling Factor: Moment of Inertia / Depth Required 9.34 In
Center Span Deflections:
Dead Load:
DLD-Center=
0.07
IN
Live Load:
LLD -Center=
0.18
IN = U864
Total Load:
TLD-Center=
0.25
IN = U629
Center Span Left End Reactions (Support A):
Live Load:
LL-Rxn-A=
520
LB
Dead Load:
DL-Rxn-A=
195
LB
Total Load:
TL-Rxn-A=
715
LB
Bearinq Lenqth Required (Beam only, support capacity not checked):
BL-A=
1.18
IN
Center Span Riqht End Reactions (Support B):
Live Load:
LL-Rxn-B=
520
LB
Dead Load:
DL-Rxn-B=
195
LB
Total Load:
TL-Rxn-B=
715
LB
Bearing Length Required (Beam only, support capacity not checked):
BL-B=
1.18
IN
Joist Data:
Center Span Lenqth:
L2=
13.0
FT
Floor sheathinq applied to top of joists -top of joists fully braced.
Live Load Duration Factor:
Cd=
1.00
Live Load Deflect. Criteria:
U
480
Total Load Deflect. Criteria:
U
360
Center Span Loadinq:
Uniform Floor Loading:
Live Load:
LL-2=
40.0
PSF
Dead Load:
DL-2=
15.0
PSF
Total Load:
TL-2=
55.0
PSF
Total Load Adjusted for Joist Spacing:
wT-2=
110
PLF
Properties For: Select Structural- Hem -Fir
Bendinq Stress:
Fb=
1400
PSI
Shear Stress:
Fv=
150
PSI
Modulus of Elasticity:
E=
1600000
PSI
Stress Perpendicular to Grain:
Fc-perp=
405
PSI
Adjusted Properties
Fb' (Tension):
Fb'=
1610
PSI
Adjustment Factors: Cd=1.00 Cf=1.00 Cr=1.15
Fv':
Fv'=
150
PSI
Adjustment Factors: Cd=1.00
Design Requirements:
Controllinq Moment:
M=
2324
FT -LB
6.5 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads
on span(s) 2
Controllinq Shear:
V=
615
LB
At a distance d from riqht support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment):
Sreq=
17.32
IN3
S=
31.64
IN3
Area (Shear):
Areq=
6.15
IN2
A=
16.88
IN2
Moment of Inertia (Deflection):
Ireq=
101.94
IN4
1=
177.98
IN4
Parcel Details
Page 1 of 2
Parcel Number: 964201912 [sE RCH
Parcel Number: 964201912
Owner Mailing Address:
GROWTH CAPITAL PARTNERS II LLC
DBA BUILDERS CAPITAL MTG
1411 4TH AVE STE 850
SEATTLE WA981012216
Site Address:
425 EDDY CT
PORT TOWNSEND 98368
Printer Friendly
Section: 4 School District: Port Townsend (50)
Qtr Section: SE1/4 Fire Dist: Port Townsend (8)
Township: 30N Tax Status: Taxable
Range: 1W Tax Code: 100
Planning area: Port Townsend (1)
Sub Division: PARKVIEW ADD SHORT PLAT 1
Assessor's Land Use Code: 1100 - HOUSES (single units, non -farm)
Property Description:
PARKVIEW ADD SHORT PLAT 1 I LOT 2 I SUB] TO EASE/REST OF
RECORD I
Click on photo for larger image.
No Permit Assessor l�ld'
Data D,a„ta
Plats &
Surveys
http://www.co.jefferson.wa.us/assessors/parcel/parceldetail.asp 2/8/2010
V0ar
City of Port Townsend
Development Services Department
BUILDING ADDSS APPLICATION'
Name of Property Owner: N 5
Mailing Address:
5,& & --(-
Telephone: '2z
Pro per is located in:
At~ltlition: )� Blocks : Lots . _
Faces/Access is from: _ 1;:; 0, (2
Parcel Number mil , "e Z D — R Z_
Directions to the Property (draw vicinity man on back)
If this is a new ADU, has a building permit been applied for? VYes No Date: I —I- kt4` le
Notes:
ADDRESS NUMBER ASSIGNED:
Date of Approval:
,For De, 7 rtnten 0111
Application Fee Received ($3.00): Date:
Copy to: ❑ Finance []Fire Dept
❑ Sheriff ❑ Police
❑ Public Works ❑ DSD database
VVVrPORT TOWNSEND
tl �.l GIS �DSD
❑ Assessor's Office
PADSD\Fonns\Building Fonns\Application-Address Number.doc ; 2/5/09
City of Port Townsend ° %
Development Services Department
BUILDING NUMBER APPLICATION
_:... _�.w..
Name of Property Owner-
e- z�
Mailing Address: . _ ...: �._. _. -.
Telephone_
MF�Wjw
Property is located in:
Addition: LaIK%V 115 0 Block(s): Lot(s): „
Faces/Access is from: street .
Parcel Number 94 / / �` Z Q/ 9/ Z—
Directions to the Property (draw vicinity map on back)
If this is a new ADU, has a building permit been applied for? IZYCS
Notes:
No Date: g "'V- 6) %
HOUSE NUMBER ASSIGNED: 'T E DD 76v lJ fZ
Date of Approval:
Vicar ILeL�grhtienl (Ise 00
Application Fee Received ($3-00, TC 2200): �mamm Date: ti �ro
Copy to: ❑ Finance ❑ Fire Dept ❑ Post Office
❑ Sheriff ❑ Police ❑ GIS
❑ Public Works ❑ DSD database ❑ Assessor's Office
For address changes: ❑ Qwest Address Management Center — 246-504-1534
1S APP3
'IS PJeMOH
,IS saal
-1-i
CO
co
LO
C\j
a)
c—
C:
cu
C)
0
m
C)
w
z
0
0
0
'is App::1
0
City of Port Townsend
Development Services Department
BUILDING NUMBER APPLICATION
kLh q,-I(
Name of Property Owner ._:ro _ ... s d,.. e
Mailing Address: -.
Telephone Cb
Property is located in:
Addition�w ` _ d
Faces/Access is from:
Parcel Number 9 �, q z Q/ 9/ z—
Directions to the, Pro etydraw vicin4y map ou back
Date of Approval: 01f 1
Lot(s):.......
Application Fee Received ($3.00, TC 2200): Date:
Copy to: ❑ Finance ❑ Fire Dept ❑ Post Office
❑ Sheriff ❑ Police ❑ GIS
❑ Public Works ❑ DSD database ❑ Assessor's Office
For address changes: ❑ Qwest Address Management Center 206-504-1534
Street
r
CB#11
M WM
o
CB#1
3
WV
WV
16'-0" M 'W
#3 WCsi
o
d 82 _..
f'O�CN
I
�_J I
GAPAG� 1
M '�
0 loio�
O
Go W
r 195�} 5F co
LOVVFp Y F1w w....
� Y �
0)
Z �- w� • O
MIN,
2
." p'OPOSFI7 Q:51MNCF
0
50' 42 52.0'
Parcel Details
Pagel of 2
Parcel Number
Parcel Number: 964201912
Owner Mailing Address:
C FLINT
2829 KATHERINE ST
PORT TOWNSEND WA983684716
Site Address:
425 EDDY CT
PORT TOWNSEND 98368
Section: 4 School District: Port Townsend (50)
Qtr Section: SE1/4 Fire Dist: Port Townsend (8)
Township: 30N Tax Status: Taxable
Range: 1W Tax Code: 100
Planning area: Port Townsend (1)
Sub Division: PARKVIEW ADD SHORT PLAT 1
Assessor's Land Use Code: 9100 - VACANT LAND
Property Description:
WIMMMIROMM
PARKVIEW ADD SHORT PLAT 1 1 LOT 2 1 SUBJ TO EASE/REST OF RECORD I I
Click on photo for larger image.
No Permit
No Assessor
Data
Data Available
x—A1, , sajg4 nfci
map Parcel
Plats. & !iPry ys_
Available
/ i �„ , o%ii //i�i wi/i o//% lr/i//r//a it// �
°�,
Best viewed with Microsoft Internet Explorer 6,0 or later
r ' ��+p�ndow k - Mir
http://www.co.jefferson.wa.us/assessors/parcel/parceldetail.asp 8/17/2007
a
E
q 5 @s5
.a H MIMI
(D 0
�ecrG� 1
UUY W
O iyF a
2
Q'�al.
a4
2W az�W a
V) uuw��ig
wr
W a
Z
O
w
o
of
a