HomeMy WebLinkAboutBLD01-173J CITY OF PORT TOWNSEND Waterman & Katz Bwldv~g 181 Quinry Street, Swte 307 Port TowmerW, WA 98368 Phorw: (360) 379-32D8 Fax (360) 385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOl-173 Issued: 08/27/01 Parcel Number: 991 100 014 Job Address: 270 Woodland Ave Zoning: R_H Type: V_N Total Occupant Load: 5 Occupancy: R-3 Nature of Work: Construct Sinele Family Residence Owner: Schonfield & Clunis Contractor: Fred Kimball (360) 385-4915 ****All elements of engineering including holdowns, framing, nailing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS -Contractor shall offer proof of compliance with State and local licensing ~/ 2 ~~~ J Setbacks G Footings Forms Reinforcement -Prescriptive Interior F -Prescriptive exterior porc ^ E ~ U `~ U Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 S' PmmitNBLD01-773 ^~- REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement -Prescriptive Anchor Bolts & Washers -refer also to engineering Engineered Holdowns Vents Crawl Access Beam Pockets (if applicable) I O FLOOR FRAMING NOTE: Engineered LPI floor joist plan to be on-site at time of Inspection Girders Joists Posts Radiant Heat Tubing Blocking Shield under Posts Positive Connections Girder to Concrete Positive Connection Posts-To-Foundation Wall Treated Wood to Concrete 1 Anchor Bolts and Washers Foundation Vents PLUMBING: Rough-In (D-V-T & Clean outs) ,/ /_ ~ Water Supply r/y~~'"r/ / Vt,~JJ ~ t~S ~l~ O Z V Gas Supply rJ Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground ,~ Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 5 t-' Pemtit M BLDOI-173 RF.OTTTRF,11 TNSPF,CTIONS APPROVED/DATE -- ------ - ---- -- - $oi r -installation instructions shall be on ite at ti of inspection LPG Fire Whole House Fan -Central Hall Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), 2/~Z~Oj- insulation (R-4) and terminus (located 3' from opening) FRAMING: Walls -engineered shear walls & hold dawns ~~/ S~0 Treated Wood to Concrete Engineered Posts, Beams & Headers Ceiling/Roof Roof Positive Connection Roof Venting - @ 1/ISO -only eave vents shown Windows -escape Windows -safety glazing Windows U-factor - .45 or better NFRC window sticker must be on windows and doors at Inspection time Air Seal resh Air Intake (Window Ports) oors U-factor - .40 or better Fire Blocking Weather Resistive Barrier INSULATION Floor - (R-30) rr'~ -7 ~~i7~~ /j- Walls - (R=19) Ceiling - (R_30) Baffles Vapor Barrier required: paint and faced batts 6 mil black poly in crawl space DRY WALL NAILING Walls / „/J / // ~Ti~/~7i ~/ Ceiling - % l Enclosed Usable Space under Stairs • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Permit k BLIJ01-173 '- ..:~ FnvAL LpG T Public Works Sign-Off House Numbers - S" LPG Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building ~v_6_~ ~~~s/o2. 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily • stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior fo cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of S Permit # BLDOI-173 ~ 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the Tield. Contact the Building Department (379-3208) prior to making changes to the approved plans. l0e POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 r Y ~ _d ,I ®1 u