Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLD00-102
Waterman & Katz Building
18l Quincy Street Suite 301
Port Townsend, WA98368
Phone (360) 379-3208 Fax (3G0) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-lO2R-1 Issued: 10/31/00 Parcel Number: 948305008
Job Address: 1323 Jackman Street Zoning: R-11 Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 7/4 Nature of Work: Revision #1: Install propane fireplace, chance elazin¢
(no change to WSEC compliancel. eliminate''/z wall, add
full height wall, etc.
Owner: Jim Carlson Construction Inc.
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LA5T PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFnTiTRFTI iNSPF.CTinNS
APPROVED/DATE
See also original inspection record
MECHANICAL ~
~~~
LPG Fireplace - nranzrfacturer's installation ~
instructions shall be on-site at time of inspection
Venting
Combustion Air
FRAMING:
Refer to original inspection record
INSULATION
Wall @ closet & bedroom (R-19 )
Vapor Barrier: paint
DRY WALL NAILING
Refer to original inspection record
FINAL
Refer to original inspection record
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Building Permit #BI.D00-102R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, boldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any correMions are completed.
6. The Building Department is unable to pass Gnal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a~
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
10. Revisions require review and approval prior to making changes in the Geld. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
Ca1148 hours before you dig Tor utility line locates 2
1-800-424-5555
Page 2 of 2
w.~~~ a tc,~ awwi~
iai Q~~Mr s<R«. sW~ w~
Part 1'ow~mend, WA 94366
Ppwr. 36BJ79J3a8 Fri 36Y3a5-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-IQZ Issued: 6/08/00 Parcel Number: 948305008
Job Address: 1323 Jackman Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 7/4 Nature of Work: New Sinele-family Dwelline w/ saraee
Owner: Jim Carlson Construction Inc.
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
DL'l1TTTDTi 71 TNCDTi !-'TT(1NC
TEMP EROSION & SDM'T CONTROL
Silt Fence
Drive Off Mat
See General Condition #1-inspection required
rior to concrete in ection ~ /l/O~ /
!/ C. -
GROUNDWORK PLUMBING
Pressure test
, ^
I
Pipe joints exposed ~ ~
~~ ~/J /Zy Q~
Pipe bedding
FOOTINGS
Setbacks
~f~/(~9 ~~
Footings l < 1
Forms
Reinforcement
Interior Footings/Continuous Footings
P ec Bay Piers
LIFER
A PPR nVF'n/nA TF.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 5
Building Permit #BLD00-I02
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall p
b~ 2100
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Waterproofing
SLAB
24" R-10 rigid insulation @ perimeter w/
thermal break @ garage
FLOOR FRAMING (okay @ framing)
Joists -Engineered BCI plan on-site at time of
/ ~~` ~I©~ 1-U
inspection c ~
Blocking for IBWP
Positive Connection
Beam Pockets (if applicable)
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Cln Outs)
!~I` 5~~~ I~
Water Supply G `y
Water Hammer Arrestor: at clothes & dishwasher
Gas Supply
'
1.L / ,~/ n
Hose Bibs (backflow protection required) ~
'
1 (v' lf
Pipe Insulation (R-3) l
Fressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
R-10 under if electric
Pressure relief valve drain to exterior;
elbow down; 6" - 24" above grade
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 5
HuiWing Pmnil #BLD00-102
u
RF.C)TiTRFT) TNSPF.CTTONS APPROVED/DATE
MECHANICAL
Heat Pump -split system
Ducts & Duct Insulation
Whole House Ventilation
HVAC Integrated Fresh Air
8" Smooth Duct
Automatic (electric) Damper: requires letter
of certification for flow rates
Source Specific Fans `~
f~~~ ~~
Environmental Air Exhaust ducting (with ~
backdraft damper), insulation (R-4) and
terminus (located 3' from opening)
FRAMING: ,~,~dd
Walls ~~~K1~t~~
Floor/Ceiling
Roof -Engineered truss plan required on-site
of framing inspection
Attic Venting
Posts, beams & headers
Windows -egress
Windows -safety glazing
Windows Ufactor - .65 max.
NFRC window sticker must be on
windows at inspection time
Air Seal
Door UValue - .40 max.
F.after/Truss Pos. Conn.
Fire Blocking
Weather Resistive Barrier
INSULATION „ J g ' ~'( j~~~ p~ a'
Slab (R-10) fit/
Floor (R-19 )
Wall(R-19)
Ceiling (R-30 )
Baf3les
Vapor Barrier: paint
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Pumd #BLD00-103
REQUIRED INSPECTIONS APPROVED/DATE
DRY WALL NAILING
Walls /
'~
~
Ceiling t
(Q~
t
Interior Braced Wall Panels
Garage/House Occupancy Separation
Enclosed Space Under Stairs
FINAL
Public Works Sign-Off
Fire Department Sign-Off (LPG) ~ f (Z~(Q~J ~i n
House Number 1 I l~
Plumbing
Mechanical
Ventilation Certification for /
Integrated System ci
/ ~'/`
/l1
Insulation Certificate (
(
V. B. Paint Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
•
1. Contractors working on this project are required to have a Labor 8c Industries contractor's •
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shat! be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection cs11385-2294, press 3; s
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Building Permit #BLD00.102
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
10. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
t