Loading...
HomeMy WebLinkAbout93-030RESOLUTION NO. 93- ~C> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND AUTHORIZING THE MAYOR TO APPROVE A CHANGE ORDER FOR THE EXISTING STRUCTURE AT THE WASTEWATER TREATMENT FACILITY. WHEREAS, Change Orders are a necessary and regular occurrence on large construction projects such as the Wastewater Treatment Facility expansion and as such have been included as 5 % of the contract amount; and WHEREAS, Change Orders are actual changes to the original contract, requiring fair negotiation and signatures by the City, the Engineer (CH2M Hill), the Contractor (IMCO), and the State (DOE); and WHEREAS, Changes are necessary to existing structures at the Wastewater Treatment Facility at this time that were discovered when the rehabilitation work began recently, including replacing exis~ng doors, old valves, handrails and corroded pipes; and WHEREAS, These changes have been approved by DOE and are grant eligible and will bring total costs for changes orders to about 2 % of the appropriated 5 %, NOW THEREFORE Be it resolved that the City Council of the City of Port Townsend does hereby authorize the Mayor to authorize the Public Works Director to sign Change Order #8 for the existing structure. Adopted by the City Council of the City of Port 5th day of April, 1993. ATTEST: IYa~id A. Grove, City Clerk  Mayor this Mayor J--~ ~. ~-~s~ APPROVED AS TO FORM: