Loading...
HomeMy WebLinkAbout3290 Related to the Water System and Amending Port Townsend Municipal Code Chapter 13.17 Cross-Connections (2)Ordinance 3290 Page I of 2 ORDINANCE NO. 3290 AN ORDINANCE OF THE CITY OF PORT TOWNSEND, WASHINGTON, RELATED TO THE WATER SYSTEM AND AMENDING PORT TOWNSEND MUNICIPAL CODE CHAPTER 13.17 CROSS -CONNECTIONS RECITALS: The City Council of Port Townsend finds as follows: 1. A water purveyor, such as the City of Port Townsend, must provide water to the customer at the meter that meets Washington state water quality standards. 2. A water purveyor must prevent the contamination of the public water system from the source of supply (i.e., to the customer's connection to the service pipe or meter). 3. The Washington State Department of Health (DOH) requires a water purveyor to establish a cross connection -control program satisfactory to DOH. 4. Cross -connections within the customer's plumbing system pose a potential source for the contamination of the public water supply system. NOW, THEREFORE, the City Council of the City of Port Townsends hereby ordains as follows: Section I.. Chapter 13.17 Cross Connections is amended as indicated in Exhibit A. Section 2. Severability. If any sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase or work of this ordinance. Section 3. Effective Date. This ordinance shall take effect and be in force five days after the date of its publication in the manner provided by law. Publication of this ordinance shall be by summary thereof consisting of the title. Ordinance 3290 Page 2 of 2 ADOPTED by the City Council of the City of Port Townsend, Washington, at a se.,ial., business meeting thereof, held this 6th day of June 2022 David J. Fai RR µ....,'w Mayor W City Clerk Approved as to Forin. C Ie�c i .amee0ooc" City Attorr°l�.y Ordinance 3290 Exhibit A Sections: 13.17.010 Purpose. 13.17.020 Cross -connection prohibited. 13.17.030 Cross -connection control policies and procedures. 13.17.040 Cross -connection control testing. 13.17.050 Customer responsibilities — Inspections. 13.17.060 Violations — Penalties — Chapter 1.20 PTMC applicable. 13.17.010 Purpose. The purpose of this chapter is to protect the city water supply from contamination or pollution from potential cross -connections and assure that approved backflow devices are installed and tested annually �yl]gfl gpplicable �'oT all new and existHIg a'onng�jio:ns uqbject to this chapteir. 13.17.020 Cross -connection prohibited. The installation or maintenance of any cross -connection which would endanger the water supply of the city is prohibited. Any such cross -connection without al)j?jQy��d pj(uj��ctjon 4the wateir 2stem js now existing or hereafter installed is hereby declared unlawful and shall be abated as Y set forth in the adopted cross -connection program. 41 +41t, desigff saffdafdqfflaoull; afffI/of pttfsuafft to affy eoffitAiaffee of def. 13.17.030 Cross -connection control policies and procedures. The control or elimination of cross -connections shall be in accordance with WAC 246-290-490 et seq as hereafter amended. The policies, procedures and criteria for determining appropriate levels of protection shall be in accordance with the Accepted Procedure and Practice in Cross Connection Control Manual — Pacific Northwest Section — American Water Works Association, 5th Edition or any superseding edition and the city's deSitfl StatidiffdS fnanualadopjj u,Toss connection contTol pj(gjID. 13.17.040 Cross -connection control testing. The city has ±he r4gh+ +e f eqffi+e_fljqy_Lequire new or existing customers to inspect and test for cross -connection control as required by state or federal law, t4e eagiaeefiag desigo s�aada-as ffiatitial, ftfiEWor pursuant to any compliance order. 13.17.050 Customer responsibilities — Inspections. Ordinance 3290 A. Customer Responsibility. Water service to any premises shall be contingent upon the customer providing cross -connection control in a manner approved by the city. Backflow devices required to be installed shall be a model approved by the Washington State Department of Health. B. Inspections. Inspection and right of entry for cross -connection control purposes shall be governed by Chapter 13.11 PTMC. Water service may be terminated or refused to any premises for failure to allow necessary inspections or to protect the water system from danger. l.a"i.aiilii Violations — Penalties — Chapter 1.20 PTMC applicable. A. Director's Authority. Whenever the public works director or his or her designee ("director") determines that a condition exists in violation of this chapter or anv standard reauired to be adhered to by this chapter, or in violation of any permit issued hereunder, he or she is authorized to enforce the provisions of this chapter. B. Chapter 1.20 PTMC Applicable. All violations of any provision of this chapter or incorporated standards, or of any permit or license issued hereunder, are declared nuisances and made subject to the administration and enforcement provisions of Chapter 1.20 PTMC, including any amendments, and including but not limited to abatement, criminal penalty, and civil penalty as set forth in Chapter 1.20 PTMC, which are incorporated by reference as if set forth herein.