Loading...
HomeMy WebLinkAbout20-041 Authorizing the City Manager to Execute a Contract with Jacobs Engineering Group Inc. for the Design of the Gaines Street Lift Station Upgrade and Corrosion Mitigation Project Resolution 20-041 RESOLUTION NO. 20-041 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND, WASHINGTON, AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH JACOBS ENGINEERING GROUP INC. FOR THE DESIGN OF THE GAINES STREET LIFT STATION UPGRADE AND CORROSION MITIGATION PROJECT WHEREAS, the Gaines Street lift station is critical infrastructure for the City of Port Townsend wastewater utility; and, WHEREAS, the pump station was rebuilt approximately twenty years ago, is nearing the end of its useful life, and is significantly corroded; and, WHEREAS, Jacobs Engineering Group Inc. completed a study of the lift station in 2019 and presented several options for repairs; and, WHEREAS, the preferred option is to install a new liner that will extend the useful life of the lift station; WHEREAS, Jacobs Engineering Group Inc. is an entity familiar with the lift station and is member of the MRSC consultant roster; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend, Washington, that the City Manager is authorized to execute an agreement with Jacobs Engineering Inc for the design of the Gaines Street Lift Station upgrade and corrosion mitigation project. ADOPTED by the City Council of Port Townsend, Washington, at a regular meeting thereof, held this 3rd day of August 2020. Michelle Sandova . Mayor Attest: Approved as to form: Joanna Sanders, MMC.............__ � �� Heidi Green )ot 1 City Clerk City Attorney