Loading...
HomeMy WebLinkAboutRainier Street & 20th Street WTF Offsite UtilitiesCONFORMED DRAWINGS C o n t r a c t D r a w i n g s F o r Water Treatment Facility Site Work and Off-Site Utilities Port Townsend, WA August 2015 HDR Project No. 224954 City Project No. 6161 VICINITY MAP LOCATION MAP I N D EX O F D R A W I N G S GENERAL: 1 00G-01 COVER SHEET 2 00G-02 GENERAL SYMBOLS AND LEGEND 3 00G-03 KEY PLAN 4 00G-04 SURVEY CONTROL PLAN 5 00G-05 CONSTRUCTION SEQUENCING REQUIREMENTS WATER TREATMENT FACILITY AND 5MG RESERVOIR SITE: 6 00C-01 OVERALL SITE PLAN AND STAGING 7 00C-02 GRADING PLAN 1 8 00C-03 GRADING PLAN 2 9 00C-04 5MG AND WTF TESC PLAN 10 00C-05 SITE GRADING SECTIONS WTF 11 00C-06 SITE GRADING SECTIONS RESERVOIR AND BOOSTER PUMP STATION 12 00C-07 MISC SECTIONS AT WTF AND 5 MG RESERVOIR SITE 13 00C-08 STORMWATER PIPING, BIO-SWALE AND DITCH PROFILES 14 00C-09 STORMWATER EXISTING CONTROL STRUCTURE MODIFICATIONS 15 09C-10 WATER PIPE PLAN AND PROFILE STA 38+20 TO 43+00 16 09C-11 WATER PIPE PLAN AND PROFILE STA 43+00 TO 47+00 OFFSITE UTILITIES: 17 09C-12 WATER PIPE PLAN AND PROFILE STA 47+00 TO 52+00 18 09C-13 WATER PIPE PLAN AND PROFILE STA 52+00 TO 57+00 19 09C-14 WATER PIPE PLAN AND PROFILE STA 57+00 TO 63+00 20 09C-15 WATER PIPE PLAN AND PROFILE STA 63+00 TO 68+00 21 09C-20 SANITARY SEWER PLAN AND PROFILE STA 7+00 TO 12+00 22 09C-21 SANITARY SEWER PLAN AND PROFILE STA 12+00 TO 16+00 23 09C-22 SANITARY SEWER PLAN AND PROFILE STA 16+00 TO 21+00 24 09C-23 SANITARY SEWER PLAN AND PROFILE STA 21+00 TO 26+00 25 09C-24 SANITARY SEWER PLAN AND PROFILE STA 26+00 TO 31+00 26 09C-25 SANITARY SEWER PLAN AND PROFILE STA 31+00 TO 36+20 27 09C-30 20th STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 1 28 09C-31 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 2 29 09C-32 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 3 30 09C-33 20TH STREET TRAIL BAKER ST TO SE CORNER OF SITE SECTIONS AND PROFILES 31 09C-33A 20TH STREET TRAIL HOWARD ST TO ST. HELENS ST SECTIONS AND PROFILES 32 09C-34 TYPICAL TRAIL SECTIONS 33 09C-35 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD SECTIONS PHASE 2 OFFSITE UTILITIES (CONT): 34 09C-40 DUCT BANK PLANS 1 35 09C-41 DUCT BANK PLANS 2 36 09C-42 DUCT BANK PLANS 3 37 09C-43 DUCT BANK PLANS 4 38 09C-44 DUCT BANK PLANS 5 39 09C-45 POWER AND TELECOMMUNICATION VAULTS LAYOUT TRAFFIC CONTROL: 40 09C-47 ROAD CLOSURE AND DETOUR 41 09C-48 ONE LANE TWO WAY RANIER STREET ESC & RESTORATION PLANS: 42 09C-50 OFFSITE UTILITIES ESC & RESTORATION PLANS 1 43 09C-51 OFFSITE UTILITIES ESC & RESTORATION PLANS 2 44 09C-52 OFFSITE UTILITIES ESC & RESTORATION PLANS 3 45 09C-53 OFFSITE UTILITIES ESC & RESTORATION PLANS 4 46 09C-54 OFFSITE UTILITIES ESC & RESTORATION PLANS 5 47 09C-55 OFFSITE UTILITIES ESC & RESTORATION PLANS 6 48 09C-56 OFFSITE UTILITIES ESC & RESTORATION PLANS 7 49 09C-60 20th STREET IMPROVEMENT PLAN AND SECTIONS 50 09C-61 20th STREET IMPROVEMENT TESC AND RESTORATION PLAN 51 09C-62 20th STREET IMPROVEMENT PROFILE AND SECTIONS DETAILS: 52 09C-70 TYPICAL TRENCH SECTIONS AND SURFACE RESTORATION DETAILS 53 09C-71 TESC DETAILS 1 54 09C-72 TESC DETAILS 2 55 09C-73 ROADWAY DETAILS 56 09C-74 WATER APPURTENANCE DETAILS 1 57 09C-75 WATER APPURTENANCE DETAILS 2 58 09C-76 SEWER DETAILS 59 09C-77 STORMWATER DETAILS 1 60 09C-78 STORMWATER DETAILS 2 61 09C-79 STORMWATER DETAILS 3 62 09C-80 CATHODIC PROTECTION DETAILS 63 09C-81 BOLLARD DETAILS HVF X 20 WTL WTL WTL 100 YEAR 75.8 SANITARY SEWER MANHOLE SANITARY SEWER PIPELINE CATCH BASIN CULVERT STORM DRAIN PIPELINE 175+00 WATER PIPE CENTERLINE WATER PIPE SINGLE LINE WATER PIPE DOUBLE LINE ISOLATION VALVE TRENCH PLUGS BLIND FLANGE CATCH BASIN INSERT A IRR SD UGF UGTV OHE OHF OHT OHTV MONUMENT MONUMENT IN CASE REBAR & CAP SCRIBED "X" PK NAIL METAL SIGN POST WOOD SIGN POST SANITARY SEWER MANHOLE STORM DRAIN MANHOLE CATCH BASIN WATER METER GAS VALVE TRAFFIC JUNCTION BOX TRAFFIC SIGNAL POLE W/ LUMINAIRE LUMINAIRE (SINGLE FIXTURE) LUMINAIRE (SINGLE FIXTURE) W/CONDUITS TO UNDERGROUND ELECTRICAL JUNCTION BOX POWER METER TELECOMMUNICATION JUNCTION BOX CABLE TV JUNCTION BOX JUNCTION BOX TELECOMMUNICATION RISER UTILITY POLE UTILITY POLE W/CONDUITS TO UNDERGROUND GUY ANCHOR GUY POLE X XXX GENERAL PLAN AND PROFILE ESC AND RESTORATION TRAFFIC CONTROL SPECIAL CROSSINGS 00 01 02 03 04 REPRESENTATIVE LOCATION OF DETAIL X - DETAIL NUMBER DETAIL SCALE: 3" = 1'-0" ELEVATION SCALE: 3" = 1'-0" X ELEVATION LETTER DETAIL MARKER XX * DRAWING WHERE ELEVATION IS LOCATED SINGLE ELEVATION OR PHOTO MARKER * IF PLAN AND SECTION, OR DETAIL CALL-OUT AND NUMBER IS REPLACED BY A LINE (-). DETAIL ARE SHOWN ON SAME DRAWING, DRAWING GENERAL NOTES B-101 TP-101 CIVIL SYMBOLOGY EXISTING CIVIL SYMBOLOGY GATE POST MAIL BOX CONIFEROUS TREE DECIDUOUS TREE TEST HOLE (WITH FIELD IDENTIFIER) YARD LIGHT OR LUMINAIRE W/NO MAST GRATE INLET CORRUGATED POLYETHYLYNE PIPE REINFORCED CONCRETE PIPE CAST IRON PIPE CORRUGATED METAL PIPE DUCTILE IRON PIPE WATER MANHOLE WATER VALVE FIRE HYDRANT GENERAL CIVIL ELECTRICAL G C E 1 5255 20 MHHW WTL WTL WTL EOP CB OHW POWER VAULT ASPHALT OVERLAY CONCRETE GRAVEL, DRAIN ROCK OR AGGREGATE BASE SANDBAG REVETMENT CRUSHED GRAVEL SURFACING DEMOLITION RIPARIAN SALT WATER EDGE WET NATIVE SEED MIX LOW GROW SEED MIX/ LAWN SEED MIX UPLAND UPLAND SEED MIX EROSION CONTROL BLANKET OR MATT CP ## 21 21 CONSTRUCTION NOTES 1. VERIFY THE LOCATIONS, ELEVATIONS, DIAMETERS, MATERIALS, AND OTHER PARAMETERS OF EXISTING FACILITIES TO WHICH NEW FACILITIES CONNECT BEFORE BEGINNING ANY WORK. 2. LOCATION OF UNDERGROUND UTILITIES (UGT) IS APPROXIMATE. VERIFY UGT LINE LOCATION BEFORE TRENCHING. 3.VERIFY INVERT ELEVATION OF EXISTING UTILITIES BY POTHOLING A MINIMUM OF 200 FEET AHEAD OF WATERLINE INSTALLATION. 4.PROTECT ALL EXISTING UTILITIES, SERVICE CONNECTIONS AND ALL SURFACE IMPROVEMENTS. CONTRACTOR SHALL REPAIR ALL SERVICE CONNECTIONS WHETHER SHOWN ON THESE PLANS OR NOT. 5. PROTECT ALL EXISTING UTILITIES AND SURFACE IMPROVEMENTS. CONTRACTORS SHALL COORDINATE WITH PROPERTY OWNERS DURING CONSTRUCTION TO AVOID DAMAGING EXISTING FACILITIES. CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY AND LOCATE ALL EXISTING UTILITIES ON PRIVATE PROPERTY. 6. CONSTRUCTION ACTIVITIES SHALL NOT EXTEND BEYOND THE CONSTRUCTION LIMITS SHOWN IN THE PLANS WITHOUT PRIOR APPROVAL OF THE ENGINEER. 7. REFER TO EROSION AND SEDIMENTATION CONTROL DRAWINGS FOR PROTECTION AND RESTORATION REQUIREMENTS. 8. CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY ACCESS ROADS AND RESTORATION OF CONSTRUCTION AREAS TO PRE-CONSTRUCTION CONDITION OR BETTER. 9. EXCESS TRENCH MATERIALS MUST BE HAULED OFF SITE. NO SPOILS SHALL BE SPREAD IN WETLANDS OR WETLAND BUFFERS. NO MATERIALS SHALL BE STOCKPILED IN WETLANDS OR WETLAND BUFFERS. 10.TURBID WATER GENERATED FROM CONSTRUCTION ACTIVITIES, INCLUDING TURBID DEWATERING WATER, SHALL NOT BE DISCHARGED DIRECTLY TO ANY SURFACE WATER. TEMPORARY SEDIMENT PONDS OR PORTABLE TANKS SHALL BE USED AS NECESSARY TO ALLOW THE TURBID WATER TO SETTLE BEFORE DISCHARGE. DEWATERED GROUNDWATER CAN BE TREATED USING PORTABLE TANKS ONSITE OR TREATED AND DISPOSED OFFSITE, PER APPLICABLE RULES AND GUIDELINES OF THE DEPARTMENT OF ECOLOGY NPDES PERMIT. GENERAL SYMBOLOGY X XXX X XXX X XXX FIRST CUT ARROW INDICATES SCALE: 1/4" = 1'-0" PLAN SECTION SCALE: 3/8" = 1'-0" SECTION LETTER PLAN NORTH DIRECTION OF SECTION VIEW IS* DRAWING WHERE FLAG INDICATES DIRECTION OF SECTION CUT SECTION LETTER * DRAWING WHERE SECTION VIEW IS LOCATED DETAIL NUMBER * DRAWING WHERE DETAIL IS LOCATED SECTION CUT MARKER WATER PIPE STATIONING AND TICKS TRAFFIC STRUCTURAL CATHODIC PROTECTION T S CP DETAILS CATHODIC PROTECTION DECOMMISSIONING WATER SERVICE LINES 05 06 07 08 DRAWING DISCIPLINE ABBREVIATIONS (1ST DIGIT) DRAWING SERIES DESIGNATIONS (1ST TWO DIGITS) IDENTIFICATION SYMBOLOGY ARROW INDICATES POINT OF VIEW ELEVATION IDENTIFICATION LETTER * DRAWING WHERE POINT OF VIEW MARKER CAN BE FOUND GENERAL NOTES 1.ALL WORK AND MATERIAL SHALL CONFORM TO THE PROJECT SPECIFICATIONS AND THE STANDARDS AND SPECIFICATIONS OF THE CITY OF PORT TOWNSEND. A SET OF APPROVED PLANS AND SPECIFICATIONS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION. 2.THE CONTRACTOR SHALL ARRANGE AND ATTEND A PRE-CONSTRUCTION CONFERENCE PRIOR TO THE START OF CONSTRUCTION. 3.THE LOCATION, TYPE, NUMBER, SIZE, AND MATERIAL OF ALL EXISTING UTILITIES SHOWN ON THESE PLANS IS APPROXIMATE AND SHOULD NOT BE CONSIDERED COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES THAT MAY AFFECT OR ALTER THE IMPLEMENTATION OF THIS PROJECT BY POTHOLING, VISUAL INSPECTION, COORDINATION WITH EXISTING UTILITY COMPANIES, OR OTHER MEANS AS APPROPRIATE. THE CONTRACTOR SHALL CALL (1-800-424-5555) AND ARRANGE FOR FIELD LOCATION OF THE EXISTING FACILITIES PRIOR TO CONSTRUCTION, AND THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS FOR PROTECTION OF EXISTING UTILITIES DURING CONSTRUCTION. RESPONSIBILITY FOR UNDERGROUND FACILITIES OR UTILITIES IS GOVERNED BY THE PROVISIONS OF CHAPTER 19.122 REVISED CODE OF WASHINGTON. 4.OVERHEAD ELECTRICAL POWER, TELEPHONE, CABLE TV, AND OTHER OVERHEAD LINES ARE GENERALLY NOT SHOWN. THE LINES THAT ARE SHOWN ARE LOCATED BY POINT-TO-POINT, POLE OR TOWER TO POLE OR TOWER. DETERMINE THE EXTENT OF HAZARDS OR IMPACTS ON CONSTRUCTION ACTIVITIES CREATED BY OVERHEAD OR UNDERGROUND ELECTRICAL POWER, TELEPHONE, CABLE TV, AND OTHER LINES IN ALL AREAS, AND FOLLOW PROCEDURES DURING CONSTRUCTION AS REQUIRED BY LAW AND REGULATIONS. PRIOR TO CONSTRUCTION, MEET WITH UTILITY OWNERS TO DETERMINE THE EXTENT OF HAZARDS AND TAKE WHATEVER PRECAUTIONS AND REMEDIAL MEASURES THAT MAY BE REQUIRED TO PROTECT PERSONS AND PROPERTY AND TO AVOID DISRUPTION OF SERVICE. 5.MAINTAIN CONVEYANCE OF STORM DRAINAGE AND SEWAGE FLOWS DURING THE CONSTRUCTION AND DURING THE REPLACEMENT, MODIFICATION OR RESTORATION OF EXISTING FACILITIES. 6.SMALL HORIZONTAL AND VERTICAL ANGLE POINTS SHOWN ON THE PLAN AND PROFILE ARE FOR ALIGNMENT ONLY. FOR DEFLECTIONS LESS THAN 5 DEGREES, IT IS NOT INTENDED TO CUT THE PIPE TO PROVIDE DEFLECTION AT THAT EXACT LOCATION. PIPE DRAINS AND AIR VALVE LOCATIONS SHALL BE ADJUSTED TO THE HIGH AND LOW POINT RESPECTIVELY. 7.ELEVATIONS SHOWN ON THE PLAN AND PROFILE DRAWINGS ARE CENTERLINE OF PIPE ELEVATIONS UNLESS OTHERWISE NOTED. STATIONS AND ELEVATIONS AT VERTICAL BENDS ARE AT PIPE CENTERLINE UNLESS OTHERWISE NOTED. 8.PIPELINE SLOPES SHOWN ON THE PLAN AND PROFILE SHEETS ARE APPROXIMATE. IN CASE OF A DISCREPANCY BETWEEN THE SLOPE AND THE STATION/ELEVATION CALLOUTS, THE STATION/ELEVATION CALLOUTS SHALL CONTROL. 9.CONSTRUCT PIPE ON UNIFORM SLOPE BETWEEN INDICATED ELEVATION POINTS. 10.HORIZONTAL DIMENSIONS ON PLAN AND PROFILE SHEETS TO PIPELINES, MANHOLES, AND OTHER FACILITIES, ARE TO THE CENTERLINES OF THOSE FACILITIES UNLESS SPECIFICALLY NOTED OTHERWISE. 11.CLEARING LIMIT IS SAME AS ROAD RIGHT-OF-WAY OR TEMPORARY EASEMENT LINE WITHIN PRIVATE PROPERTY, UNLESS INDICATED OTHERWISE. 12.CONSTRUCTION LIMITS ARE SHOWN ON THE PLAN, PROFILE, ESC PLAN, AND RESTORATION DRAWINGS. WHERE CONSTRUCTION LIMITS ARE REDUCED TO AN AREA LESS THAN THE FULL EASEMENT WIDTH, THESE LIMITS ARE DEFINED ON THE ESC PLANS AND SHALL ALSO APPLY TO ALL CONSTRUCTION SHOWN ON THE PLAN AND PROFILE DRAWINGS. 13.ACCESS FOR PRIVATE PROPERTY OWNERS SHALL BE PROVIDED AT ALL TIMES. TEMPORARY CLOSURES OF BUSINESS OR RESIDENTIAL ACCESS SHALL BE COORDINATED WITH PROPERTY OWNERS A MINIMUM OF 14 DAYS IN ADVANCE OF THE WORK. 14.CONTRACTOR SHALL SALVAGE AND REINSTALL OR REPLACE ALL EXISTING LANDSCAPING, IRRIGATION AND SLOPE DRAINAGE SYSTEMS REMOVED OR DAMAGED DURING CONSTRUCTION, UNLESS DIRECTED OTHERWISE. 15.SLOPE FINISH GRADES BETWEEN SPOT ELEVATIONS SHOWN. IF FINISH GRADE LINE IS NOT SHOWN, RESTORE SURFACE TO ORIGINAL GRADE ELEVATION. 16.PROPERTY CORNERS, SECTION CORNERS, RIGHT-OF-WAY MARKERS AND SURVEY CONTROL MONUMENTS WITHIN OR ADJACENT TO THE PROJECT SHALL BE PROTECTED DURING CONSTRUCTION. THE CONTRACTOR SHALL OBSERVE THE MONUMENT LOCATIONS PRIOR TO CONSTRUCTION AND NOTIFY THE OWNER OF WHICH MONUMENTS MAY BE DISTURBED BY CONSTRUCTION ACTIVITIES. THE CONTRACTOR WILL ESTABLISH REFERENCES FOR THE MONUMENTS WHICH MAY BE DISTURBED DURING CONSTRUCTION AND REPLACE THOSE MONUMENTS AFTER CONSTRUCTION. THE CONTRACTOR SHALL PROTECT THE REFERENCES UNTIL THE MONUMENTS HAVE BEEN REESTABLISHED BY THE CONTRACTOR. 17.SECURE ALL PERMITS NOT OBTAINED BY THE OWNER PRIOR TO CONSTRUCTION. THESE INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: TRANSPORTATION, BURNING, TEMPORARY CONSTRUCTION OF FIELD OFFICES, PREPARATION OF STAGING AREAS OUTSIDE OF ROW OR SIMILAR. 18.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS, AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 19.CONNECTIONS TO EXISTING SYSTEM SHALL BE MADE ONLY AFTER NEW WATERMAIN HAS PASSED PRESSURE AND PURITY TEST. FINAL CONNECTION PIPING AND FITTINGS SHALL BE SWABBED CLEAN. 20.CONTRACTOR SHALL GIVE CUSTOMERS MINIMUM 1 DAY WRITTEN NOTICE PRIOR TO TRANSFER OF SERVICES TO NEW MAIN. ADDITIONALLY, CONTRACTOR SHALL NOTIFY CUSTOMERS 30 MINUTES MINIMUM PRIOR TO TRANSFERRING THEIR SERVICES TO THE NEW MAIN. 21.CONTRACTOR REQUIRED TO PROVIDE A COMPETENT PERSON(S) TRAINED TO IDENTIFY EXISTING OR PREDICTABLE HAZARDS RELATED TO TRENCH SAFETY, SOIL CONDITIONS, AND SHORING REQUIREMENTS. IN ACCORDANCE WITH WAC 296-155 PART N, REPRESENTATIVES OF THE CITY SHALL NOT BE REQUIRED TO PERFORM THE ROLE OF COMPETENT PERSON FOR THIS PROJECT. NO WORKERS SHALL ENTER A TRENCH OR OTHER EXCAVATION FOUR FEET OR MORE IN DEPTH WITHOUT TRENCH SAFETY SYSTEM IN PLACE. 22.CONTRACTOR IS RESPONSIBLE FOR ALL SIGNAGE AND NOTIFICATION NECESSARY FOR THE EXECUTION OFCONSTRUCTION RELATED ACTIVITIES. 23.THIS IS A STANDARD DRAWING SHOWING COMMON SYMBOLOGY. ALL SYMBOLS ARE NOT NECESSARILY USED ON THIS PROJECT. 24.SCREENING OR SHADING OF WORK IS USED TO INDICATE EXISTING COMPONENTS OR TO DE-EMPHASIZE PROPOSED IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK. REFER TO CONTEXT OF EACH DRAWING FOR USAGE. SCHEDULE CONSTRAINTS AND SEQUENCING 1 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0G-02 GENERAL SYMBOLS AND LEGEND 26300G-02.dwg M. BLANCHETTE B. SHAHA K. GOSS R. CARPENTER 224954 08/12/2015CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0G-03 KEY PLAN 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS WATER TREATMENT FACILITY 0G-04 SURVEY CONTROL PLAN 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0G-05 CONSTRUCTION SEQUENCING REQUIREMENTS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0C-01 OVERALL SITE PLAN AND STAGING 0C-02 GRADING PLAN 1 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0C-03 GRADING PLAN 2 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0C-04 5MG AND WTF TESC PLAN 0C-05 SITE GRADING SECTIONS WTF 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0C-06 SITE GRADING SECTIONS RESERVOIR AND BOOSTER PUMP STATION 0C-07 MISC SECTIONS AT WTF AND 5 MG RESERVOIR SITE 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0C-08 STORMWATER PIPING, BIO-SWALE AND DITCH PROFILES 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 0C-09 STORMWATER EXISTING CONTROL STRUCTURE MODIFICATIONS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-10 WATER PIPE PLAN AND PROFILE STA 38+20 TO 43+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-11 WATER PIPE PLAN AND PROFILE STA 43+00 TO 47+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-12 WATER PIPE PLAN AND PROFILE STA 47+00 TO 52+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-13 WATER PIPE PLAN AND PROFILE STA 52+00 TO 57+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-14 WATER PIPE PLAN AND PROFILE STA 57+00 TO 63+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-15 WATER PIPE PLAN AND PROFILE STA 63+00 TO 68+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-20 SANITARY SEWER PLAN AND PROFILE STA 7+00 TO 12+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-21 SANITARY SEWER PLAN AND PROFILE STA 12+00 TO 16+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-22 SANITARY SEWER PLAN AND PROFILE STA 16+00 TO 21+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-23 SANITARY SEWER PLAN AND PROFILE STA 21+00 TO 26+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-24 SANITARY SEWER PLAN AND PROFILE STA 26+00 TO 31+00 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-25 SANITARY SEWER PLAN AND PROFILE STA 31+00 TO 36+20 9C-30 20th STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 1 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-31 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-32 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD PLAN 3 9C-33 20TH STREET TRAIL BAKER ST TO SE CORNER OF SITE SECTIONS AND PROFILES 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-33A 20TH STREET TRAIL HOWARD ST TO ST. HELENS ST SECTIONS AND PROFILES 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-34 TYPICAL TRAIL SECTIONS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-35 RANIER STREET TRAIL AND TEMPORARY HAUL ROAD SECTIONS PHASE 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-40 DUCT BANK PLANS 1 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-41 DUCT BANK PLANS 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-42 DUCT BANK PLANS 3 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-43 DUCT BANK PLANS 4 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-44 DUCT BANK PLANS 5 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-45 POWER AND TELECOMMUNICATION VAULTS LAYOUT DETOUR DETOUR DETOUR DETOUR DETOUR DETOUR DETOUR DETOUR 9C-47 ROAD CLOSURE AND DETOUR 1 A B C 2 3 4 5 6 7 8 D ISSUEDATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-48 ONE LANE TWO WAY RANIER STREET 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-50 OFFSITE UTILITIES ESC & RESTORATION PLANS 1 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-51 OFFSITE UTILITIES ESC & RESTORATION PLANS 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-52 OFFSITE UTILITIES ESC & RESTORATION PLANS 3 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-53 OFFSITE UTILITIES ESC & RESTORATION PLANS 4 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-54 OFFSITE UTILITIES ESC & RESTORATION PLANS 5 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-55 OFFSITE UTILITIES ESC & RESTORATION PLANS 6 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-56 OFFSITE UTILITIES ESC & RESTORATION PLANS 7 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-60 20th STREET IMPROVEMENT PLAN AND SECTIONS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-61 20th STREET IMPROVEMENT TESC AND RESTORATION PLAN 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-62 20th STREET IMPROVEMENT PROFILE AND SECTIONS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-70 TYPICAL TRENCH SECTIONS AND SURFACE RESTORATION DETAILS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-71 TESC DETAILS 1 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-72 TESC DETAILS 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-73 ROADWAY DETAILS S 5 S 6 S2 S7 S8 S9 S1 S 3 S 4 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-74 WATER APPURTENANCE DETAILS 1 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-75 WATER APPURTENANCE DETAILS 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-76 SEWER DETAILS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-77 STORMWATER DETAILS 1 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-78 STORMWATER DETAILS 2 1 A B C 2 3 4 5 6 7 8 D ISSUE DATE DESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-79 STORMWATER DETAILS 3 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-80 CATHODIC PROTECTION DETAILS 1 A B C 2 3 4 5 6 7 8 D ISSUE DATEDESCRIPTION PROJECT MANAGER: PROJECT NUMBER: FILENAME SCALE SHEET:Of01"2" DESIGNED BY: CHECKED BY: August 12, 2015 CAD: City of Port Townsend WATER TREATMENT FACILITY SITE WORK & OFF-SITE UTILITIES CONFORMED DRAWINGS 9C-81 TRAIL BOLLARD DETAILS June 26, 2015