Loading...
HomeMy WebLinkAboutBLD06-219 • • 3 k011T°,. CITY OF PORT TOWNSEND z:: `� s DEVELOPMENT SERVICES DEPARTMENT .*/./ Olti INSPECTION REPORT :C" For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. n DATE OF INSPECTION: I °�/ M! 6(p PERMIT NUMBER: f3 LDO - I `1 SITE ADDRESS: 1 D ZO LOCC r PROJECT NAME: 1. 10--/A-Po ra CONTRACTOR: )A e_Oeod CONTACT PERSON: r`�r'd a'1 PHONE: c�6o f j-.,,qO 1 - I 755 TYPE OF INSPECTION: 1'( p 61 CA r-o\Mr\ he-EEre Doc i 3 o ,S 0 be c(u-\__ r)f)ee you . Cr"-----❑ APPROVED ❑ APPROVED WITI-i ❑ NOT APPROVED -`� __.— ----• CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before "' checked at next inspection proceeding. Inspector j <4 • - Date / 1/f 06 Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready.for inspection. Development Services Department 250 Madison Street Suite 3 Port Townsend,WA 98368 Fax(360)344-4619 Phone(360)379-5095 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 prior to 3:00 p.m. for next-day Inspection Permit Number: BLD06-219 Issued: 11/15/2006 Parcel Number: 989-703-904 Job Address: 1020 Water St. Zoning: C-III Nature of Work: Mortar joint repair Owner: Kathy Bradford Contractor: McLeod Masonry GENERAL CONDITIONS APPLY—SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All materials to be disposed of in Jefferson County Landfill or other approved disposal site BRICK REPOINTING/MORTAR RESTORATION In accordance with Port Townsend Municipal Code 17.30.140A all improvements in the Historic Overlay District must follow and conform with the Secretary of the Interior's Standards for the Treatment of Historic Properties. The Standards require that repointing occur with period mortar i.e., lime based mortar. See attached Preservation Brief on Repointing Mortar Joints in Historic Masonry Buildings Repointing Of Existing Mortar Joints Using Compatible Lime Based Mortar: - Mortar mix design must be pre-approved. A site-mixed inspection is required or mortar must be purchased from approved agency e.g., US Heritage. Once a mix design is approved, a test panel shall be prepared with a 7—14 day curing period, and then subsequent changes or adjustments can be made to the mix if needed. Provide documentation for approved mix prior to repointing work. Qualified masons are required for lime based mortar work. Periodic inspections and observation are required throughout the repointing project by a special inspector trained in the use of appropriate materials and methods for repointing mortar joints in historic masonry buildings. Special Inspector shall provided credentials or demonstrate competency to the Building Department prior to beginning work Inspection reports shall be copied to the Building Department in a timely manner.All corrections are the responsibility of the contractor. " Permit#BLD06-219 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor& Industries contractor's registration number and a City business license.Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control(TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294.Measures shall include installation of silt fencing and graveled construction entrance(see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,etc. Soils shall be permanently stabilized with seeding,plantings,sodding,etc.once construction is complete.Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected.For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required.Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if work is not begun within 180 days of issuance,or if the work authorized by the permit is suspended or abandoned for a period of 180 days after the work is begun.The building official may grant a one-time 180 day extension if a request is received in writing,and the lack of progress occurred for a justifiable cause. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5095 prior to making changes in the field. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. / Appli nt Signature Date