Loading...
HomeMy WebLinkAboutBLD06-196 le 0 #0*ponr7.94 CITY OF PORT TOWNSEND ~ ' DEVELOPMENT SERVICES DEPARTMENT ` _ ?'f�cr INSPECTION REPORT �.. For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 1 -5 -Q-7 PERMIT NUMBER: 5 Lip O(Q - I q 49 SITE ADDRESS: 5 O3 C ,s f e( an o Po r i YY\jr' s PROJECT NAME: Spy') fool V Q.I I CONTRACTOR: K y) ,( Li Yv (S CONTACT PERSON: `J ^tee, PHONE: 3OC1 (]73 TYPE OF INSPECTION: 0 h(i ers)ab p 1 Dr' b ti 1?_.5 _.;),_.„. /:,,"'-f (17_ti";,,....") (I (--i C t`-177 C't,'c.../ A i r t(--'1'1 /t( U2--- <3( PIP----k'T. L----(kil fel_ clu I(__ 4,T: 4)a ----/- .„ ,. , .A t :. .: ,.'f', , oi< ---/-7 'oil i( FL ( ________. ________ ________ ..., ---_____ --- ,.._ pkti\ii0 -.--' ( -1---7',/olL \\,.. ii/u5:16;6,r0.0'1,--/I rc. . ❑ APPROVED ) ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will he Call for re-inspection before ,f checked at next inspection proceeding. I ��I_—. Inspector ' 1 C r° • CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT 181 Quincy Street, Suite 301A, Port Townsend WA 98368 PLUMBING CERTIFICATION PRESSURE TEST BUILDING OWNER PERMIT# ADDRESS q DATE OF TEST e1 570 PLUMBING CONTRACTORAIC l4'141l"(/-?J T 1 J 1' LICENSE# pL/lt'I f /I jMj'g'6 Q C 2 J GROUND WORK '-=9 ROUGH-IN PLUMBING 's FINAL DWV WATER SERVICE Air PSI Air PSI Water I b )' ) Head Water wa�S I Working Pressure Time Minutes Time Minutes NOTE: TESTING REQUIREMENTS(SECTION 318 UNIFORM PLUMBING CODE)MINIMUMS: Water Test-- 10' Head— 15 Minutes Test at Working Presure Air Test—5#PSI—15 Minutes 50#PSI—15 Minutes I hereby certify the information provided above is the result of the Plumbing System pressure test conducted by the undersigned at the indicated address and date. Misrepresentation of this certification is a gross misdemeanor under RCW.9A.72.04 subject to a two-year statute of limit ion. VISUAL SYSTE IJo ECTION IS REQUIRED BEFORE COVER. ! S CI 5— ignature Y/ Date • d10. To: File From: Rick Sepler Planning Director Date: October 18, 2006 Re: Spring Valley BSPLUP05-098 and BLD06-196 The following clarification of conditions of approval have been reviewed and approved by the Director(clarification in double underline text): 1. Prior to the issuance of more than one (1) residential building permit, project infrastructure must be installed, inspected and approved by the City. 2. All landscaping along public and private rights-of-w.ys (i.e. street trees, etc.) must be installed before the issuance of more than one (U residential building permit. Bonding may be used for remaining landscape improvements. 3. The storage and common building may be constructed concurrent with the -7 establishment of project infrastructure. 4. The Final Binding Site Plan must be recorded and filed with the Jefferson County Auditor before the issuance of more than one (1)residential building permit. 111. fame- 49oweraw CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT ‘ For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 1Z - la (v PERMIT NUMBER: EjL� 6v - 96 , SITE ADDRESS: , t:t u M d. d...0 6-re LL q&Lv PROJECT NAME: CONTRACTOR: Kr Vkt 614 LL d. Lq'Ci iS CONTACT PERSON: k. PHONE: SO 9 - t '7 / TYPE OF INSPECTION: rn L a L L.. 4 IC LI APPROVED ) ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector (C.V Date % f Approved plans and permit card must be on-site and available at lime of inspection. A re-inspection fee may be assessed if work is not ready for inspection. 11. vpr°� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT 4›, INSPECTION REPORT 'W For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: ( � �(.� PERMIT NUMBER: SITE ADDRESS: _; �1. � ..' 'TN (4: 0 L L sc.. Llf/u' PROJECT NAME: CONTRACTOR: -.2 i 11 ��% • CONTACT PERSON: I C PHONE: TYPE OF INSPECTION: —I-0(j f / 'L{ I ; 1'151'7 f , f / F1 ... L(4:` 1 'i y ,1 L7 'u fL , �._.... I t,_..' I ... 11.. ❑ APPROVED ❑ APPROVED WITH IJ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before (") checked at next inspection proceeding. Inspector C.t` Date t! _ Approved plans and permit card must he on-site and available at time of inspection. A re-inspection,fee may be assessed if work is not ready for inspection. 410 Waterman&Katz Building 181 Quincy Street,Suite 301 Port Townsend,WA 98368 Phone:(360)379-3208 Fax:(360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT& INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385-2294 Before 3P.M. Permit Number: BLD06-196 Issued: 10/12/2006 Parcel Number: 001 022 024 Job Address: San Juan Ave. Zoning: R-III Type: V-B Occupancy: U Nature of Work: Construct detached storage Owners: Kimball&Landis LLC Contractor: Kimball& Landis LLC KIMBALL996D3 ACTIVE GENERAL CONDITIONS APPLY—SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical—Contact Labor&Industries @ 360-417-2702 *** All elements of engineering including holdowns,framing, nailing and other engineering connections require inspection prior to cover. *** REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION& SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Anchor Bolts& Washers EXTERIOR BRACED WALL PANELS (MUST BE INSPECTED PRIOR TO COVERING) FRAMING—all members and connections require inspection prior to cover Fasteners, hangers, etc. in contact with treated material must be hot dipped galvanized Trusses w/clips Roof Venting—gave and ridge vents Fire Blocking Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 • • 411 Permit#BLD06-196 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department(379-3208) prior to making changes to the approved plans. 10. PO_ • PERMIT ON-SITE WITH THE APPROVED PLANS. 2--)D APPLICAN SIGNATURE DATE Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 OM • Permit#BLD06-196 PUBLIC WORKS FINAL (approval required prior to scheduling building final) FINAL Final—Building 1% 40r // Ord QQ C� GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3