HomeMy WebLinkAboutBLD06-177 fD
2 w m = o °c z
3 m
in = _ (U a � � �,
0 Z
_ �l o
m o .oeD V Z m co
—1 0
d s. � o 1( rn n, xi 0
C w ig m m' PP \ �l ^
x Q O El). CL
cr
e.n 0 - -. R ti .
j \n Q r- Cs Vi.O ---
ni z ° C 1'f 7 o CD
5 CD
N a m O es
Z W q "O r) .5
s
- a '°y1 v 3
m N N C I ( CD
S 0
O*pOR— - CITY OF PORT TOWNSEND
" DEVELOPMENT SERVICES DEPARTMENT
I'e °.��cr INSPECTION REPORT
¢N!► For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
p � P Y Y Y
the inspection. For Monday inspections,call by 3:00 PM Friday.
r,
DATE OF INSPECTION: 31� ,7 PERMIT NUMBER: 1���....
SITE ADDRESS: ,), e- Lr.
PROJECT NAME: d ' 14 CONTRACTOR:
CONTACT PERSON: ----.10/11 PHONE:
TYPE OF INSPECTION: f- 'i A/. t... -,� % r , P,
y C:' ., �` i itl �4j..
`.( ZvfJ!ct ; .� c! - C ` '',,
(/ 114.01J ! y i �. / (ti /4_._
A, ( , L c-) /e &_ c' -1,' i 1,
7-1 _ /M'r /if, '`i 6 ; _,,,-i (ML. /t.;/ic.
,,_
c4,-, -3, 7 - 2 c. c /•(L ,�.l / r' ,
i.„--, , /
lc R-. .
..______,
❑ APPROVED Li APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will lie Call for re-inspection before
nchecked at next inspection .....,proceeding. /`.-''' Air --7-
Inspector 1. 1 C _ ---___ _ Date ./
Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may
he assessed if work is not ready f or inspection.
I
Development Services Department
250 Madison Street,Suite 3
Port Townsend,WA 98368
Phone:(360)379-3208 Fax:(360)344-4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT& INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385-2294 Before 3P.M.
Permit Number: BLD06-177 Issued: 09/18/2006 Parcel Number: 989 704 402
Job Address: 229 Monroe Street Zoning: R-II Type: V-B Occupancy: R-3
Nature of Work: Repair/rebuild deck& stairs
Owners: John& Jill Buhler Contractor: Owner
SEPARATE PERMITS REQUIRED:
Electrical —Contact Labor& Industries @ 360-417-2702
_REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Deck& stair
FINAL Guardrail& handrail
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department(379-5095) prior to making changes to the approved plans.
4. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 1