HomeMy WebLinkAboutBLD06-173 •
(41019:T°�y�, CITY OF PORT TOWNSEND
W w,
U ,-, a DEVELOPMENT SERVICES DEPARTMENT
,� /r INSPECTION REPORT
c>p
For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections,call by 3:00 PM Friday.
DATE OF INSPECTION: ii/g"- . 7 PERMIT NUMBER: 412 A6-/73
SITE ADDRESS: SSZ/ ,4</Z L .. --77.
PROJECT NAME: kit FA/;../ CONTRACTOR: 3,4-1,--(E-
CONTACT PERSON: PHONE: 77`/ 1 �
TYPE OF INSPECTION: d eu I 0,2 &7 1 7-1 1 1 ,177I 3
/ Irto _ , r:( _
it i,1t- Ill. Y
*� ,- =
''
/\ )
if 1 i) r,' 1 7 "'i ii _ ),V ,ci i ,i 1: tr j i iiiii
fi - _
APPROVED t
APPROVED H A WITH n NOT APPROVED
"
F ,- CORRECTIONS
1 �`" Ok to proceed. Corrections will be Call for re-inspection before
�` checked at next inspection proceed' g.
Inspector ( ( ``-- Date ' s:-
r
Approved plans and permit card must he on-site and available at time of inspection. A re-inspection fee may
he assessed if work is not ready for inspection.
Development Services Department
250 Madison Street Suite 3
Port Townsend,WA 98368
Phone:(360)379-5095 Fax:(360)3444619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT& INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385-2294 Before 3P.M.
Permit Number: BLD06-173 Issued: 09/19/2006 Parcel Number: 936 904 605
Job Address: 5821 Hill Street Zoning: R-II Type: V-B
Nature of Work: Replace or build new stairs
Owners: Audrey Fain Contractor: Owner
GENERAL CONDITIONS APPLY—SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical--Contact Labor&Industries @ 360-417-2702
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
New riser openings 4" or less
FINAL
New or reworked hand rail, Guard rail & stair to meet
code
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
• Permit#BLD06-173
3. All elements of engineering including nailing, holdowns,sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department(379-5095)prior to making changes to the approved plans.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2