Loading...
HomeMy WebLinkAboutBLD06-171 0 0 • • • oFp°per°`� CITY OF PORT TOWNSEND :� c3 i,;r a DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT cwwAs. For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: % PERMIT NUMBER: 12>0-, P / l SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: I / r frr-t-kc U t,a ❑ APPROVED \ ❑ APPROVED WITII ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector r" I Date _._., ' Approved plans and permit card must be on-site and available at time of inspection..A re-inspection fee may be assessed if work is not ready for inspection. •• 0 • . ' CITY OF PORT TOWNSEND lic) DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT "v4 p,ebe cw For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 62 /14/'O'7 PERMIT NUMBER: (30 O(c. 17 1 SITE ADDRESS: 1<ct 11.0 On ti P . PROJECT NAME: )11/, L.) (11 ey) 5 (c4 CONTRACTOR: a er.;j ,_S -fr CONTACT PERSON: PHONE: /0-1 ,-34 77 . , TYPE OF INSPECTION: t....6 ifile. ----(1/- I, 4.7pL/4..vi':(: —le' - P2--ii:- v.__ i---- 61- 14-7'4//1i,/o',F )(APPROVED 0 APPROVED WITH 0 NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. -- Inspector CI: 4,,,;- -L),(41. --,_::,...fe..„,/,,,-,_,,,./..., Date -*(--1/';- ,„ 7 Approved plaris and permit card Must he on-site and available at time of in,spection. A re-inspection fee may be assessed if work is not ready fir inspection. • • ��powrrn� CITY OF PORT TOWNSEND �� -� e DEVELOPMENT SERVICES DEPARTMENT ri ..E,.. t 'e '=% INSPECTION REPORT For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. pc, DATE OF INSPECTION: i.2 1 elo(p PERMIT NUMBER: aLD 0 C- (7 1 SITE ADDRESS: I KCM t,) PROJECT NAME: "1-Y))i) i,)f x,S k'/ CONTRACTOR: r h P,(`(,c,( c.e)`r CONTACT PERSON: ( PHONE: �J TYPE OF INSPECTION: UI-I 1 Oa,L t. . 1 r f ❑ APPROVED n APPROVED WITH IJ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector i is . Date .' �c ✓ Approved plans and permit card must he on-site and available at time of inspection_ A re-inspection fee may he assessed if work is not ready fnr inspection. • 4 41 CITY OF PORT TOWNSEND z = 'It 1 DEVELOPMENT SERVICES DEPARTMENT 3:(1r;-,flr, INSPECTION REPORT °kw� For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 12 - .a-b e:7 PERMIT NUMBER: -5 6 6 - 17 SITE ADDRESS: I 44444 ']<t \(E PROJECT NAME: fl' i L.-LE !XIS K Y CONTRACTOR: 61 E 0.I-4 S`r ee L CONTACT PERSON: PHONE: 3o l - 9.9-415 TYPE OF INSPECTION: cv" Vlflr O 4 $4; e SPA L... f _cu Q K(.2_gCf7c ki 7qC ( l'( l --- 4r---..-._ 7). /tit 0 ti^ ---'t,C I 1-cc ( C' &_. (/' _..' f'') 6 ('3 4c)pa(G r) diEWIEINIMIZIE _, 17 APPROVED ❑ APPROVED WITH [l NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before / .. _. ..p ._.._on / proceedinb. checked at next inspection Inspector '-""'' Date t?."P 9 3/e)'6 Approved plans and permit card must he on-site and available at time of inspection. A re-inspection fee may he assessed if work is not ready for inspection. • ?our rots. 46, CITY OF PORT TOWNSEND � DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT WA� For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: L 1/a770(p PERMIT NUMBER: o Z--r c - j'7 SITE ADDRESS: GG [ Kin l) PROJECT NAME: AA I)11 e nF3 kx. CONTRACTOR: Ch err-4 < t CONTACT PERSON: PHONE: , 6)j 9 945 TYPE OF INSPECTION: f OC -1 h \ jol(>mh( v� COKTe • ;, l _ al.lt � 1-Et C7 APPROVED LJ APPROVED WITH C] NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector 1. Date / 2 Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may he assessed if work is not ready for inspection. r • • p4001rrod CITY OF PORT TOWNSEND =�-- 111 0 DEVELOPMENT SERVICES DEPARTMENT 'SA 4.:-. w(Ike INSPECTION REPORT Cli WA For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. tt DATE OF INSPECTION: (f 2--/e e PERMIT NUMBER: / (--,- (;''& ^ 1 ] 1 SITE ADDRESS: :IF- i „Ai) t) _12—. PROJECT NAME: Ail ii L_i_.i V, S K' CONTRACTOR: Igt' C f.c,'i(.f'it i°,. CONTACT PERSON: PHONE: TYPE OF INSPECTION: 1 i &'V/" / .-'(r e 47v1 fai ft L.?)h LL._ , UU6t i Li iL'( 71-eptoti[IN' OK 7.7 Eft%/14? 2 ❑ APPROVED ❑ APPROVED WITH r NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector "_. Date /7 /4 -?/ek i Approved plans and permit card must be on-site and available at time of inspection. A re-inspection.fee may be assessed if work is not ready fir inspection. • III • 04 OBI rnit CITY OF PORT TOWNSEND ~� .:, ti DEVELOPMENT SERVICES DEPARTMENT 43, =}` ' ..Ai INSPECTION REPORT vo For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want oPtv 1\'')\ the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 14/3 Q/Q(p PERMIT NUMBER: f' W - / 71 SITE ADDRESS: ` 1 Karl u 0 r PROJECT NAME: ' t V 11,p n5 CONTRACTOR: C ,4�/ St- CONTACT PERSON: I PHONE: !1 TYPE OF INSPECTION: I onr `P'r'cLr71L k0A V riIk-( ;/ i. r (r) / ),,L -/'`,) "t. ❑ APPROVED ❑ APPROVED WITH n NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector , 1 Date /(' / O r, rr Approved plans and permit card must be on-site and available at time of inspection. A re-inspection,fee may be assessed if work is not ready,for inspection. r • ,vony ro,to CITY OF PORT TOWNSEND := DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT w For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 2..-19 60 PERMIT NUMBER: 39 r* 171 SITE ADDRESS: Kan U Orly e PROJECT NAME: MO e h i kj CONTRACTOR: C 7 St-- CONTACT PERSON: PHONE: -34 77 TYPE OF INSPECTION: Oif-0 c),(< 70' -H ❑ APPROVED .1 L] APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector Psi c Date ") Z. Approved plans and permit card roust be on-.cite and available at time of-inspection. A re-inspection fee may be assessed if work is not ready•for inspection. • O4 PORTro =W ,,� CITY OF PORT TOWNSEND cc =`�• ,,,,, )� DEVELOPMENT SERVICES DEPARTMENT 03, '�` ''.fiti INSPECTION REPORT 14¢wA For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: 1 Q/ Q 1,p PERMIT NUMBER:15L OIp — I -7 1 SITE ADDRESS: 1 1 q,nv PROJECT NAME: Thin e S k y CONTRACTOR: t 'er c •i-' CONTACT PERSON: PHONE: TYPE OF INSPECTION: -, .p. CernC)" 4 7/) (°) 0 1) n `. .g i t/l/4 L L.- jrG- C' Ic r'. -A-Pfrk)fA C c:_iZc‘-, 11-2,00 .F _ \d)(,)e4__ .._____________„....„... ❑ APPROVED n APPROVED WITH CJ NOT APPROVED --_____ CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector (-..1 Date f o ' _ ) Q 6 Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may he assessed if work is not ready fbr inspection. • • • Development Services Department 250 Madison Street,Suite 3 Port Townsend,WA 98368 Phone:(360)379-5095 Fax:(360)344-4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT& INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385-2294 Before 3P.M. Permit Number: BLD06-171R-1 Issued: 01/05/2007 Parcel Number: 952-700-001 Job Address: 1 Kanu Dr. Zoning: R-II Type: V-B Occupancy: R-3 Nature of Work: Revision#1: Revise deck Owners: Steve&Elizabeth Mullensky Contractor: Owner GENERAL CONDITIONS APPLY—SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical—Contact Labor& Industries @ 360-417-2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRVIENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. *** All elements of engineering including holdowns,framing,nailing and other engineering connections require inspection prior to cover. REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS—as applicable Setbacks Footings Forms Reinforcement Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 • • • • Permit#BLD06-171R-1 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING CALL FOR INSPECTION BEFORE COVER Stairs Joists Hangers Beams Posts Positive Connections Treated Wood FINAL—see also original Inspection Record Handrails Stairs Rise,Run,Nosings Landings—maximum I"threshold Stair Illumination Guardrails Final —Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 • • • • Permit#BLD06-171R-1 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if work is not begun within 180 days of issuance, or if the work authorized by the permit is suspended or abandoned for a period of 180 days after the work is begun. The building official may grant as one-time 180 day extension if a request is received in writing, and the lack of progress occurred for a justifiable cause. . 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department(379-5095) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. APPLICA T SIGNATURE DATE Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 • • Development Services Department 250 Madison Street,Suite 3 Port Townsend,WA 98368 Phone:(360)379-3208 Fax:(360)344-4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT& INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385-2294 Before 3P.M. II Permit Number: BLD06- S Issued: 09/28/2006 Parcel Number: 952-700-001 Job Address: 1 Kanu Dr.. Zoning: R-II Type: V-B Occupancy: R-3 Nature of Work: Construction addition to residence and remodel interior Owners: Steve& Elizabeth Mullensky Contractor: Owner GENERAL CONDITIONS APPLY—SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical—Contact Labor& Industries @ 360-417-2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. *** All elements of engineering including holdowns,framing, nailing and other engineering connections require inspection prior to cover. *** REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION& SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement UFER Ground (tied to footing rebar steel) Interior Pads FOUNDATION WALLS Reinforcement Hold Downs Anchor Bolts& Washers Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 • Permit#BLD06-171 Foundation drain Must be inspected prior to back-fill of foundation PLUMBING: Rough-In (D-V-T& Clean outs) Water Supply Water Hammer Arrester(on dishwasher, ice maker& clothes washer) Hose Bibs(backflow protection required) Pipe Insulation(R-3) Pressure Reduction Valve required Water Heater Seismic Restraint—strap tank @ 1/3 points Pressure relief valve drain to exterior,terminate 6"—24"above ground Licensed Plumbing Contractor's Signature&License Number: Sign here FLOOR FRAMING CALL FOR INSPECTION BEFORE COVER Joists Girders Posts Hangers Blocking Positive Connections Treated Wood to Concrete Pressure treated plate connections Anchor Bolts& Washers Hold downs Shear walls Per Engineering MECHANICAL Whole House Fan Kitchen/Bath/Laundry Fans Environmental Air Exhaust ducting(w/back draft dampers), Insulation(R-4)(on ducting in unheated space) FRAMING w..all members and connections require inspection prior to cover Fasteners, hangers, etc. in contact with treated material must be hot dipped galvanized Walls Headers Rafters(hurricane clips) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 • • • • Permit#BLD06-171 Roof Sheathing Joists(hangers) Blocking Roof Venting—eave and ridge vents Windows-egress Smoke detectors(bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor- .40 or better Doors U-factor- .20 or better NFRC window sticker must be on window, skylights&doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier INSULATION-ICYNENE Floor(R-30) Walls (R-21) Ceiling—vault(R-30 vault) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL FINAL Parking—2 space required House Numbers—5"minimum Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final—Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 • • • Permit#BLD06-171 sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if work is not begun within 180 days of issuance, or if the work authorized by the permit is suspended or abandoned for a period of 180 days after the work is begun. The building official may grant as one-time 180 day extension if a request is received in writing, and the lack of progress occurred for a justifiable cause. . 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. APPLICANT SIGNATURE DATE Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4