HomeMy WebLinkAboutBLD06-162 111 111, City Hall Annex,Development Services
250 Madison Street,Suite 3
Port Townsend,WA 98368
Phone:(360)379-5082 Fax:(360)344-4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 by 3:00 PM for Next Day Inspections
Permit Number: BLD06-162 Issued: 08/15/06 Parcel Number: 001012021
Job Address: 1048 Jackson Street Zoning: R-II Type: V-N Occupancy: 'R
Nature of Work: Remove existing cedar shingles and replace with composition shingles, replace
sheathing.
Owner: Richard Bartha
Contractor: Hope Roofing—HOPER**043N7
NOTE: Roofing materials to be installed per manufacturer's specifications and IBC Chapter 15.
GENERAL CONDITIONS APPLY--SEE LAST PAGE
REQUIRED INSPECTIONS APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing inspection required prior to cover with felt.
ROOF VENTING
Ridge Venting
Install per IBC Section 1203
ROOFING
Install all roofing material per IBC Section 1510
FINAL
Final—Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit#BLD06-162
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor& Industries contractor's
registration number and a City business license. Failure to provide proof of this
documentation prior to work may result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be
installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall
include installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently
stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for
a non-residential project.
7. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
8. Revisions require submittal & approval prior to making changes in the field. Contact the
Building Department @ 379-5095 prior to making changes to the approved plans.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS, if applicable.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2