Loading...
HomeMy WebLinkAboutBLD06-151 • S 49OR7Tpk CITY OF PORT TOWNSEND e -"' 't t DEVELOPMENT SERVICES DEPARTMENT '4- :Ville INSPECTION REPORT For inspections,call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections,call by 3:00 PM Friday. DATE OF INSPECTION: q ipz.I}O CP PERMIT NUMBER: c( L,,J O(p" 15 1 SITE ADDRESS: a 1 0 (.00,51,, I Y1 .) PROJECT NAME: o CONTRXCTOR: C.�� JIs CONTACT PERSON: 1( tlej-vi P 3 PHONE: 25 2 5:-_ 9 737 TYPE OF INSPECTION: P n et ,1 01)i!'_ \)fL. 'a `D X19 L ffn M Ati‘N, et)k4 OS r- ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED C CORRECTIONS (.........______ Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector Date Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for inspection. • 0 /4' . *POar roz.s CITY OF PORT TOWNSEND r /� u 4 =a� `�; DEVELOPMENT SERVICES DEPARTMENT . )t.1 1..�._f�./� ,4:,i' 4. '7 file INSPECTION REPORT 5'63 PERMIT NUMBER: ci 6 - 1 / SITE ADDRESS: Z_ I d I L )A- S l'\,I /11, rbI/1 -. CONTRACTOR: W['_LZ care‘o -B 411 K DATE OF INSPECTION: ` Z' L� °� WORKSITE OR CELL PHONE #: 5Q 3 " 2 E 9 TYPE OF INSPECTION REQUESTED: JGl, .Su D2F- 1 b &l For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED NOTED BELOW CALL FOR RE-INSPECTION BEFORE PROCEEDING ... ..... ........ //L) ( (. 1 t_ yr / C ki (y) C1 62. R (5T-(1--(:ft t21 c� r ' f Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be sessed if work is not ready for inspection. Inspector I ( ' ( — l e k Date F-1 7,--7 V 0 Acknowledged Date 461-1---1 / 1-Fi — 6 U 1- 6( -Li d • • , , .. „,,,, I, CITY OF PORT TOWNSEND t U.LI a DEVELOPMENT SERVICES DEPARTMENT kc:.-",, rifil INSPECTION REPORT PERMIT NUMBER: 8 Lt) C*-- 15 I SITE ADDRESS: 1 J U) a sk ( r� `j-51/\._ ( W )ks c�� O .r`"Q, a) CONTRACTOR: M nQ r aI d (ii e,-1--I -e. DATE OF INSPECTION: S/2 2/n(P WORKSITE OR CELL PHONE #: \ , TYPE OF INSPECTION REQUESTED: EPdera-L,e5 til.) / ( For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ❑ APPROVED AP APPROVED WITH CORRECTIONS ❑ NOT APPROVED / NOTED BELOW CALL FOR RE-INSPECTION BEFORE PROCEEDING \::)Nir? Oil 0 C lL 14� /4.)(p (.�..1 ;eau '30 L_ ( s a.Ci/W Cpe e) S 7C c.fy,) c), 7-;e, (-_ ,,-- L)/f_k_ / 1 ,......___________ _ Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may b ssessed if work is not ready for inspection. Inspector I (j< 7) LOVL' _ Date P_/? ./ Acknowledged J 1 VW?c.\ k f c --- Date •ITY OF PORT TOWNSEND S PERMIT ACTIVITY LOG DATE RECEIVED: PERNIIT# G L • • SCOPE OF WORK: ,? - n• • ROD INITIALS IMOACTION DATE Entered into TRIPS ESA—to Planning S hor6 i h e� -no evidence of ESA- Vested Date MilChecked for Completeness )ifth � 1�t f.?�.,�. ,s.- �... : 004d RIM tatg df 41 1\Bcd_pertnitsVvrms\BC1ILDTNGTermitActivity Y..og.dac C.�i-ccd-- • • City Hall Annex,Development Services 250 Madison Street,Suite 3 Port Townsend,WA 98368 Phone:(360)379-5095 Fax:(360)344-4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 by 3:00 PM for Next Day Inspections Permit Number: BLD06-151 Issued: 08/21/06 Parcel Number: 957602803 Job Address: 2101 Washington Street Zoning: NC of Use Nature of Work: Replace roof on commercial building: composition/built-up w/ rigid insulation. Owner: Wells Fargo Bank Contractor: McDonald and Wetle Roofing—MCDONWR944DW NOTE: Roofing materials to be installed per manufacturer's specifications, approved plans and IBC Chapter 15. GENERAL CONDITIONS APPLY—SEE LAST PAGE RE I UIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Existing sheathing—no new proposed. ROOF VENTING Existing venting with roof and cave/soffit vents INSULATION—rigid as per plans DRAINAGE—see also plan detail 11 New scuppers to be installed in flat portion of roof; two (2) each side; slope roof for drainage ROOFING -Install all roofing material per IBC Section 1510 and manufacturer's installation instructions Felt/Laps-- 12-gauge roofing nail; 2" minimum lap @ horizontal joints; 4" side lap @ end joints; 6"from both sides over hips and ridges Ice and Water barrier/Laps—per manufacturer's installation instructions,' 2" minimum at side ; 4" minimum @ end laps Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 • 0 Permit 4B1,D06-151 REQUIRED INSPECTIONS APPROVED/DATE FLASHING Pipe penetration flashing Metal step flashing Perimeter Wall Flashing Base Flashing/Counterflashing--details 9 and 10 FINAL Final—Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor& Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control(TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. 7. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit#BLD06-151 8. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-5095 prior to making changes to the approved plans. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS, if applicable. "7;1% a. / (0 Signature Date Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 of pORT rod •City of Port Townsend : k Planning Department City Hall, 250 Madison Street, Suite 3, Port Townsend, WA 98368 `� f (360)379-5095 FAX(360)385-7675 OF PORT TOWNSEND SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT EXEMPTION WASHINGTON STATE SHORELINE MANAGEMENT ACT (RCW 90.58) Applicant: McDonald & Weltle Roofing Inc. Case Number: LOP-06-109 For: Wells Fargo 2101 Washington Street Port Townsend, WA 98368 (360) 379-2629 Project Location and Legal Description: Commercial parcel located at 2101 Washington Street, City of Port Townsend, and Jefferson County, Washington. All of that portion of Tideland District No. 110, being tidelands of the First Class, contained within Lots 1-4 inclusive, Block 28 L.B. Hastings 2nd Addition to Port Townsend, as per the plat there of, recorded in Vol. 1 of Plats, Page 29, records of Jefferson County WA; Excepting therefrom the Northwesterly 65 feet of Lots 2 and 4 Block 28. NW '/4 of Section 11, Township 30N, Range 1W, W. M. Jefferson County, Washington. Proposal: Re-roof the existing commercial building. Adjacent Waterbody: Strait of Juan de Fuca Admiralty Inlet _X Port Townsend Bay SMP Shoreline Designation: X_Urban Suburban Natural Conservancy ,Aquatic PT Urban Waterfront Special District Findings & Conclusions 1. The proposal made by the applicant to undertake the repairs described above within the shoreline of the City of Port Townsend and/or its associated wetlands is exempt from the requirement of a substantial development permit. Specifically, the proposal constitutes: X Normal Maintenance and Repair Development not exceeding $2,500 Single-family home for owner's use Other: 2. Replacing the roof on the existing commercial building in the urban designation will not materially interfere with the public use of public lands and waters or the private use of adjacent private lands nor will it result in any material expansion or change in use beyond that previously existing. 3. Normal maintenance and repair of legally established buildings is consistent with the policies of the Shorelines Management Act(SMA) and the City's Shorelines Master Program (SMP). • Page 2 Conditions 1. All development shall be in substantial conformance with the development plans submitted in the application for Shoreline Exemption. There shall be no further expansions to or addition of any structures seaward of the existing permitted development (i.e., within the allowed setback area) without prior review for conformance With the Shoreline Master Program and any other applicable laws and ordinances. 2. This exemption does not excuse the proponent from complying with other local, state and federal ordinances, regulations, or statutes applicable to the proposed development including but not limited to the city's environmentally sensitive areas ordinance. 3. Pursuant to Section 3.401 of the SMP, this exemption shall automatically expire one year from the date of issuance. In;consider_. on of the above, the proposal is found exempt from the requirement of a shoreline substantial e elopment permit. "CCP Judy SurbeI Shorelines Administrator Date of Issuance City of Port Townsend