November 15, 2007
Mr. Jolly Wahlstrom
625 S St.
Port Townsend, WA 98368
SUBJECT: Request for Building Permit Extension- BLD06-147
Dear Mr. Wahlstrom:
I have received your request for an extension of time on the building permit issued for the
construction of your new studio. I reviewed our file on the project and noted that the last
inspection that was completed occurred in March of 2005. A permit is valid for a period of 180
days and is considered as expired if the work is suspended for more that 180 days without a valid
inspection(to indicate that work is progressing) or a request for extension. It has been over 21/2
years since the last inspection and the permit must be considered to be expired.
You can simply fill out a new application, we will prorate the permit fee based upon the work
that has been done and issue a new permit to complete the project. .
Sincerely,
‘ I % N
---11 ■11110111111” ___ ,---\-\\:. ,
Leonard YarbeN` - - — - 1L _L5
. ... E- . ..
Development Services Director ----- - -- —
\0 :.. -- . _... -_r .-_.._ (' -�.,..-
''.24*.e.- _---- -VD - ---C.-4,,,...4_, ,* ,..
-.scc– __
_ _
_,
----- - u
w4 b S , 4,ob a , k ✓ � '
m.µ ter++ �, S ;,, +� ,
" ar 4.',, i, nera 494
�p - . s+. ..X
r ". pp ,7ah r 5 w ` •} "" tt i f'4" "7 F...y R 7.1,
,k .>ti. ' ''..,, ' - - .w.^.'m 9v eke--. --016:1,,,t. 7 « . ' ,5��,� �ts
W W
A NA'T'IONAL MAIN STREET COMMUNITY WASHINGTON'S HISTORIC VICTORIAN SEAPORT
r r\A I it n("1 � h J ucjio
P
ci 1A0t pl.£ YY10 t )ti ,
The S k€ 4 i i v (034- I A.c(-E.V' s �a►��
Cc (\r,eLiilk) - h o`orn
n Fe._ct 43 be. 1 rts �c,‘ )) 6,c _he 44. U,(1_
h xf r r , sec-� c) v1 , keok te- you +6 ✓
r Cc c Vc,-1-;o
3i- -3 3 2.
B L D 6.67-
°ATr° !ITY OF PORT TOWNSE PUBLIC WORKS
Ply= DEVELOPMENT SERVICES DEPARTMENT
°F.WASe INSPECTION REPORT
PERMIT NUMBER: UJOL-( 75-
Address Zr S S+ ,
ivy\ Contractor :TO L Gc h ✓v-�
`tkb,`b Owner
1
Date of Inspection 2-71 O(/
Worksite or Cell Phone# 3 7 3'3 2—
❑ Erosion/Sedimentation ❑ Plumbing/Top Out ❑ Drywall/Fire Wall
geRi1►► Setbacks/Footings/UFER ❑ Gas Pipe/Pressure Test ❑ Gas/Wood Appliance
❑ Foundation Walls ❑ Propane Tank/Line ❑ Manufactured Home Set-up
❑ Slab Interior Footing/Insulation ❑ Mechanical ❑ Public Works
❑ Groundwork/Plumbing Test ❑ Framing ❑ Other/Consultation
❑ Underfloor Framing ❑ Insulation
❑ Shear Wall/Holdowns ❑ Interior Shear/BWP Nail ❑ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction.Additional fees may be assessed for multiple re-inspections.
For Re-inspection,call Inspection Message Line at(360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
❑ VIOLATION 4PPROVAL CJ CORRECTION REQUIRED
❑ APPROVED WITH CORRECTION ❑ NEED APPROVED PLANS & PERMIT ON SITE
Approved pans and permit card must be on-site and available at time of inspection.
Inspector . Date a v�7 0.
CITY OF PORT TOWNSEND PUBLIC WORKS &
DEVELOPMENT SERVICES DEPARTMENT
wak0' INSPECTION REPORT
PERMIT NUMBER: q - 17s---
1
Address (2_f � 51
Contractor S0.44N12_
Owner l w - S iya I/Y►
Date of Inspection 3 /WO V
Worksite or Cell Phone# 3-7 -33
❑ Erosion/Sedimentation Li Plumbing/Top Out ❑ Drywall/Fire Wall
❑ Setbacks/Footings/UFER ❑ Gas Pipe/Pressure Test U Gas/Wood Appliance
' I,Foundation Walls CI Propane.Tank/Line ❑ Manufactured Home Set-up
❑ Slab Interior Footing/Insulation ❑ Mechanical ❑ Public Works
❑ Groundwork/Plumbing Test ❑ Framing ❑ Other/Consultation
❑ Underfloor Framing ❑ Insulation
❑ Shear Wall/Holdowns U Interior Shear/BWP Nail ❑ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction.Additional fees may be ass ssed for multiple re-inspections.
For Re-inspection,call Inspection Messa Line at(360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED B BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
❑ VIOLATION APPROVAL ❑ CORRECTION REQUIRED
❑ APPROVED WITH CORRECTION ❑ NEED APPROVED PLANS & PERMIT ON SITE
Approved ans per and must be on-site and available at time of inspection.
Inspector Date 3 -
I ` - 0 `vim
QOprr°`� IRTY OF PORT TOWNSENNPUBLIC WORKS
°�
�'_ _,�°
9 I16, BUILDING AND COMMUNITY DEVELOPMENT
°FWASHe INSPECTION REPORT
PERMIT NUMBER: BLi9O-f '" / 1 S
Address (0 IF' S _c"
Contractor J i Li (4)a. I si-7) i-p
Owner C
Date of Inspection 8/ 6 (ioy
Worksite or Cell Phone# 3 7 3 3 a 2-
❑ Erosion/Sedimentation ❑ Plumbing/Top Out ❑ Drywall/Fire Wall
❑ Setbacks/Footings/UFER ❑ Gas Pipe/Pressure Test ❑ Gas/Wood Appliance
❑ Foundation Walls ❑ Propane Tank/Line ❑ Manufactured Home Set-up
❑ Slab Interior Footing/Insulation ❑ Mechanical ❑ Public Works
Drci;.1 Groundwork/Plumbing Test ❑ Framing ❑ Other/Consultation
((rtes ❑Underfloor Framing LI Insulation
❑ Shear Wall/Holdowns ❑ Interior Shear/BWP Nail ❑ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction.Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at(360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY UILDING AND, IF APPLICABLE, PUBLIC WORKS.
❑ VIOLATION APPROVAL ❑ CORRECTION REQUIRED
Approved ans and permit card must be on-site and available at time of inspection.
Inspector Date -" 60
•
City of Port Townsend
250 Madison Street,Suite 3
Port Townsend,WA 98368
Phone:(360)379-5095 Fax:(360)344-4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 prior to 3:00 p.m. for next day Inspection
Permit Number: BLD06-147 Issued: 08/12/06 Parcel Number: 985 800 603
Job Address: 625 S Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct unheated shop
Owners: Jerome"Jolly"L.Wahlstrorn Contractor: Owner
GENERAL CONDITIONS APPLY--SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical--Contact Labor& Industries @ 360-417-2702
REQUIRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS—inspected as part of BLD04-175
Setbacks
Footings
Interior Footings
Forms
Reinforcement
UFER
GROUNDWORK PLUMBING—inspected as part of BLD04-
175
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
0
Permit#BLD06-147
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION—inspected as part of BLD04-175
Stern Wall
Forms
Reinforcement
Anchor Bolts
SLAB -
Reinforcement if applicable
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Hose Bibs (backflow protection required)
Pipe Insulation(R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint—strap tank @ 1/3 points
Pressure relief valve drain to exterior,terminate
6"—24" above ground
Expansion Tank
Licensed.Plumbing Contractor's Signature & License
Number:
Sign here
MECHANICAL—unheated space
SHEATHING
Braced Wall Panel Sheathing and Nailing requires
inspection prior to cover with building paper
BUILDING WRAP/WINDOW INSTALLATION
Requires inspection prior to cover
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
•
Penult#BLD06-147
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
Ceilings
Headers
Ridge Board
Blocking
Roof Rafters
Rafter Ties—see notes on plans for tie locations and
corresponding rafter spans
Roof Venting—eave and ridge vents
Windows—safety glazing
Windows U factor - .40 or better (unheated space but
Inspector can verify U-factors for windows and doors)
NFRC window sticker must be on windows &
doors at inspection time
Doors U-Factor— ,20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION—currently unheated space; applicant may
choose to insulate and have those values inspected and
verified for future conversion to heated space
Floor (R-30 )
Walls (R-2l )
Ceiling ( R-30vault/R-38 attic)
Vapor Barrier: paint for walls and ceiling
Baffles
DRY WALL NAILING—as applicable
Walls
Ceiling
FINAL
House Numbers—studio/shop only
Plumbing
Vapor Barrier Paint Certificate— if applicable
Insulation Certificate—if applicable
Smoke Detectors—if applicable; not required
Landings
Final—Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
i
Permit#BLD06-147
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor& Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance(see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-5095) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Signature Date
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
• 0 Waterman&Katz Building
181 Quincy Street,Suite 301
Port Townsend,WA 98368
Phone:(360)379-3208 Fax:(360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD04-175 Issued: 07/02/04 Parcel Number: 985 800 603
Job Address: 625 S Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct 2 story unheated shop/office.
Owners: Jerome"Jolly"L.Wablstrom Contractor: Owner
GENERAL CONDITIONS APPLY—SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical—Contact Labor& Industries @ 360-417-2702
A Revision to this permit is required if space will be heated by a source other than a kiln
REQUIRED INSPECTIONS APPROVED/DATE.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Interior Footings
Forms
Reinforcement
LIFER
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Call 48 hours before you dig for utility line locates.
1-800-424-5555
Page 1 of 4
• • Permit#BLD04•175
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts
Holdowns
SLAB
Interior Footings
Anchor Bolts
Reinforcement
PLUMBING:
Rough-In(D-V-T &Clean outs)
Water Supply
Hose Bibs (backflow protection required)
Pipe Insulation(R-3)
Pressure Reduction Valve if>80 psi
Water Heater
R-10 under if electric
Seismic Restraint—strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6"—24" above ground
Licensed Plumbing Contractor's Signature& License
Number:
Sign here
MECHANICAL
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting(w/backdraft dampers),
insulation(R-4) and terminus (located 3' from openings)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
• r • Permit#BLD04-I 75
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Prescriptive&designed braced wall panel sheathing&
nailing must be inspected prior to cover
Floor-Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Walls
Shear Walls
Ceilings
Posts, Beams&Headers Roof
Ridge Beam
Blocking
Roof
Roof Venting—eave and ridge vents
Windows---safety glazing
Windows U factor- .40 or better
NFRC window sticker must be on windows&
doors at inspection time
Doors U-Factor—.20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls ( R-21 )
Ceiling( R-30vault/R-38 attic)
Vapor Barrier: paint for walls and ceiling
Baffles
DRY WALL NAILING
Walls
Ceiling
FINAL
Public Works Sign-Off
House Numbers--5"minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Stairs,Decks&Landings
Final—Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
• • Permit#BLDO4-175
GENERAL, CONDITIONS
1. Contractors working on this project are required to have a Labor& Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control(TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance(see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching,plastic
sheeting, etc. Soils shall be permanently stabilized with seeding,plantings, sodding,etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department(379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
• •
tAic( / ter? Me Or/- )/? i ( priec-/,
-r
Jr�f,it e( /22L� /)4cC c2
r- c/ /4/1, 5 - (cdcf 7/c
Jo
114. c j;., / e /a //I( I`/e/y j'/ ry,l r
( IC darn/ e Q/c/ CV/// /?O' ( 711,17(.&
w/ f/ f ?y iliftliG flec tvr///) / )P re.or/e&r-el
5/LP
/ (N. ('zP / t/( Sc// A. 5Pel //?P l r�4c;,/ c(
//,m e /i412, /. 674; f P / 7/7e 14 / / /.1 4i7z. �L�(
9 OW (e'tid l //1'
S reock eW f?(E) ec/ 76)
1 V
be er re o /0%,) if /1 P car;cme/ re Fci/
1 7 I ( '7 r/ /6i
J.1(1 Mi A / f r7�i�i`1
• •, " (. /eg/i
Veg
. 579- 334 a