HomeMy WebLinkAboutBLD06-141tf
L-7
CITY OF PORT TOWNSEND
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 344 -461.9
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06 -141 Issued: 09/13/2006
Job Address: 1230 14th St, Zoning: R -H
Parcel Number: 948- 310 -405
Type: V -B Occupancy: R -3
Nature of Work: Construct Accessory Dwelling Unit within existing Single Family Dwelling
Owners: Jim Catley & Wesley Cecil Contractor: Owner
GENERAL CONDITIONS APPLY -- SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360 - 417 -2702
NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO
RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF
CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION.
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to coven * **
REQUIRED INSPECTIONS APPROVED /DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrester (on dishwasher, ice maker & clothes
washer)
Hose Bibs (backflow protection required)
Pipe Insulation (R -3)
Pressure Reduction Valve required
Water Heater - Tankless
Licensed Plumbing Contractor's Signature & License
Number:
Sign here
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 3
L:7
ft Permit #BLD06 -141
MECHANICAL
Whole House Fan W/ 24 hour timer
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ back draft dampers),
Insulation (R -4) (on ducting in unheated space)
FLOOR — CEILING ONE HOUR DWELLING UNIT
SEPARATION
WALLS — ONE HOUR DWELLING UNIT SEPRATION
FRAMING --- all members and connections require inspection
prior to cover
Fasteners han ems etc. in contact with treated material must be
hot damped galvanized
Walls
Headers
Blocking
Windows - egress
Smoke detectors (bedrooms, outside bedrooms and each floor)
Safety Glazing
Windows U factor - .40 or better
Doors U- factor - .20 or better
NFRC window sticker must be on window, skylights & doors at
insp. time.
Air Seal
Fire Blocking
Weather Resistive Barrier
DRYWALL
FINAL
Parking -- 2 space required
House Numbers — 5" minimum
Plumbing
Mechanical /Heating
Smoke Detectors
Final -- Building
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 3
•
• l-1 1 ly
Permit #BLD06 -141
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST TIN PERMIT ON -SITE WITH THE APPROVED PLANS.
ANT SIGNATURE
9p d 6
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 3 of 3