Loading...
HomeMy WebLinkAboutBLD06-128O� VOPT TOE E CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. Z DATE OF INSPECTION: 1 " PERMIT NUMBER: SITE ADDRESS: ,1f, 1� I C PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: + ""A e- APPROVED ❑ APPROVED WITH F1 NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector Date cz Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed i f work is not readv for inspection. 0 0 o�VORT CITY OF PORT TOWNSEND v DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: T ( - PERMIT NUMBER: LrJ C3(g SITE ADDRESS: G PROJECT NAME: \ J k r1s(5Vt CONTRACTOR: CONTACT PERSON: T C boe'IC PHONE: TYPE OF INSPECTION: ❑ APPROVED lr �yl /' ❑ APPROVED WITH CORRECTIONS Ok to proceed. Corrections will be checked at next inspection Inspector _ Date q o 3 F1 NOT APPROVED Call for re- inspection before proceeding. Approved plans and permit card must be on -site and available at time gf'inspection. A re- inspection fee may be assessed if'work is not ready fi)r inspection. VORTr CITY OF PORT TOWNSEND o DEVELOPMENT SERVICES DEPARTMENT • to INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: d PERMIT NUMB Lo ER: 15 L QC L..- B SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE- TYPE TYPE OF INSPECTION: )(�I�r APPROVED Inspector ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Date Approved plans and permit card must be on -site and available at time oJ'inspection. A re- inspection fee may be assessed if work is not ready fbr inspection. a 40 p�poprTOw CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: d_7 PERMIT NUMBER: — az-1 SITE ADDRESS: PROJECT NAME: CONTRA I TOR: CONTACT PERSON: PHONE: 77.4 _ a-o TYPE OF INSPECTION: C% LL APPROVED L7 APPROVED WITH ❑ NOT APPROVED CORRECTIONS to proceed. Corrections w� be Call for re- inspection before c ... K - --� t next inspection '� proceeding. ked a _ Z�h; Inspector 1'r+ Date Approved plans and permit card must he on -site and available at time of inspection. A re- inspection.fee may be assessed if work is not ready for inspection. 0 40 o�VORTT CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT ¢ For 'inspections, call the inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: _ /I� PERMIT NUMBER: "do SITE ADDRESS: ���' /s'�' OJECT NAME: (:�� 4N�'� CONTRACTOR: �O 6 ONTACT PERSON: &1 M PHONE: TYPE OF INSPECTION: 7 % ' f * itP i r r r r '1 r C' A �� ti f r ""fir ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS ill be Call for re- inspection before Ok to proceed. Corrections w - -- checked at next inspection proceeding. Date /,'' / Inspector - Approved plans and permit card must he on -site and available at time cif inspection. A re- inspection fee may be assessed if'work is not ready.for inspection. o�poRrr CITY OF PORT TOWNSEND AL c3 �� DEVELOPMENT SERVICES DEPARTMENT a INSPECTION REPORT Imo For inspections, call the Inspection line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: Q PERMIT NUMBER: pinto SITE ADDRESS: 'S+ PROJECT NAME: r) CONTRACTOR: !� CONTACT PERSON: � PHONE: 7 7^f b L TYPE OF INSPECTION: LL -All LL "X0 L (- 7-t-- C /-�_. 11 APPROVED ❑ APPROVED WITH IJ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before,- checked at next inspection roceedin . Inspector Date Approved plans and permit carol must he on -.site and available at time of inspection. Are- inspeelinn fee mcry he assessed if)work is not readvfi)r inspection. 'r l T , J Li, 'lice_ P1) ( "t- /1 /` .C..'(;'1 LL -All LL "X0 L (- 7-t-- C /-�_. 11 APPROVED ❑ APPROVED WITH IJ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before,- checked at next inspection roceedin . Inspector Date Approved plans and permit carol must he on -.site and available at time of inspection. Are- inspeelinn fee mcry he assessed if)work is not readvfi)r inspection. tl�eoarra�y s� PERMIT NUMBER: 0 0 CITY OF PORT TOWNSEND STREET &UTILITY INSPECTION REPORT sLDP o� - o2-fro Site Address S I (--D - Contractor Owner r 1 Date of Inspection Worksite or Cell Phone# ❑ Sewer Main / Manhole ❑ Street Paving ❑ Hydrant Side Sewer ❑ Driveway Prep / Installation ❑ ROW Landscaping ❑ Water Main ❑ Storm Drainage / Culvert L] Temporary Occupancy ❑ Street Prep ❑ Trail(s) ❑ Final Infrastructure )3rA npI I ` Tc&) D-(\ tr" Erosion / Sediment Control Additional fees may be assessed for multiple re- inspections. For Re- inspection, call Inspection Message Line at (360) 385 -2294 prior to 8.00 AM. (NO OCCUPANCY UNTIL APPROVED BY DSD.) ❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED t• SEE BELOW SEE COMMENT(S) BELOW Approved plans and permit card must be on -site and available at time of inspection. f Inspector Date Acknowledged by Date pOiiT Td�Y CITY OF PORT TOWNSEND G DEVELOPMENT SERVICES DEPARTMENT ' f " INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: NO PERMIT NUMBER: 15 SITE ADDRESS: S � I St PROJECT NAME: , _ ii OL56—?/-t- CONTRACTOR: CONTACT PERSON: G� (irk- PHONE: q TYPE OF INSPECTION: Ll ,' .k'f APPROVEI�j ❑ APPROVED WITH ❑ NOT APPROVED — CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector Date F' 7'. Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee. may, be assessed if work is not readv for inslaec-'lion. • 0 VORT TL1 �y CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection l.,ine at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: qla'11D�e PERMIT NUMBER t3LD D J 2 8"_ SITE ADDRESS: _1 PROJECT NAME: _ �7^hh n�S p h CONTRACTOR: _ slbh asp— CONTACT PERSON: I)C]C_ PHONE: ~7 7'4 - 2Q % 0 TYPE OF INSPECTION: I� - T7 tm� C r d APPROVED ❑APPROVED WITH ❑ NOT APPROVED ORREC'I'IONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proc eding. Inspector r Date �..,. Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not readv for inspection. powr Tn� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT awn For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: �f� PERMIT NUMBER: SITE ADDRESS: .< I 6.) PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: _�7 %8 TYPE OF INSPECTION: F(>Ub it innQ, Pel_rrm 1 4- 1,-A lAv /M /3-/ .Y))7�- i ter, ��A -Y> V-V)7j)e � _ nnlP . (Rtcl_ _ - IN "_ rr (a e)(A 6 tU(Vk__) c, ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector k Date Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready far inspection. CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: �7j 10(P PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: CA I C PHONE: -724 - .2018 1014 9a[IIa10fy90611130 / ? !.:I) ,(__ '/. /'.: /nom../ ., r _ .. / ❑ APPROVED ❑ APPROVED WITH NOT APPROVED kl( CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection \-_V�oceeding. Inspector__ Date Approved plans and permit card nriiist be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day inspection Call 385-2294 Before 3P.M. Permit Number: BLD06 -128 Issued: 08/24/06 Job Address: 851 G St. Zoning: R -II Type: V -B Nature of Work: Construct 2 story sinlzle- family residence Owners: The Johnson Familv Trust GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360 -417 -2702 Parcel Number: 984 - 900 -305 Occupancy: R -3 Contractor: Owner NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. RFOITIRF,n INfiPRCTI0N. APPR0VF.n/TlATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTING & FOUNDATION Setbacks — 1.0' from front G St. p /1, S' from side p /1's, 10' from rear p /1. Footings Forms Reinforcement Holdowns MUST BE TIED IN PLACE (NO WET STICKING) Anchor Bolts & Washers UFERGround (tied to footing rebar steel) Interior Pads FOUNDATION DRAIN: Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 1 CJ 0 Permit #BLD06 -128 DITCH & PIPE TO BE EXPOSED AT TIME OF INSPECTION. See sheet 9.1 — Engineered plan. PLUMBING: Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint— strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Expansion tank Licensed Plumbing Contractor's Signature & License Number: Sign here RADIANT FLOOR PIPING Shear wall nailing (TO BE INSPECTED & APPROVED PRIOR TO COVERING) — See plans for appropriate shear wall details. SHEARWALLS NO. 1 NO.2 NO.3 MECHANICAL Whole House Fan W/ 24 hour timer Kitchen/Bath/Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R -4) (on ducting in unheated space) LPG Tank LPG Piping LGP Stove FRAMING — all members and connections require inspection prior to cover Fasteners hap ors etc. in contact with treated material must be hot dipped galvanized Walls Headers Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 2 of 2 0 0 Permit #BLD06 -128 Rafters (hurricane clips) Trusses Roof Sheathing Joists (hangers) Blocking Hold downs Stairs Roof Venting — eave and ridge vents Windows - egress Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier INSULATION Footing -Floor (R -10) Walls (R -21) Vault (R -30) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL PUBLIC WORKS FINAL — SDP06 -046 Public Works Sign -Off (prior to building final) STORMWATER RUN -OFF TO BE RETAINED ON SITE FINAL Parking — 2 space required House Numbers — 5" minimum Plumbing Mechanical /Heating LPG Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final — Building Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 3 of 3 0 GENERAL CONDITIONS Permit #BLD06 -128 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty -four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. cc APPL C NT SIGNATURE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 4 of 4 J. 2-5-. 2 , DATE