Loading...
HomeMy WebLinkAboutBLD06-126w� 1pofRkT CITY OF PORT TOWNSEND c DEVELOPMENT SERVICES DEPARTMENT 'l =_ INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: 3- � _ O / PERMIT NUMBER: B L -7) Q SITE ADDRESS: (7 -5 2-01 7�—D-r PROJECT NAME: _'E�7 -� CONTRACTOR: CONTACT PERSON: AGjh �], ►� r1 G�� I PHONE: TYPE OF INSPECTION: ❑ APPROVED ❑ APPROVED WITH U NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be checked at next inspection Inspector f 1`- Date Approved plans and permit card roust be on -site and available at time c he assessed if work is not ready for inspection. Call for re- inspection before proceeding. J h"- !f inspection. A re- inspection fee may RT rp`�ti CITY OF PORT TOWNSEND c DEVELOPMENT SERVICES DEPARTMENT s : INSPECTION REPORT awn For inspections, call the inspection Line at 360 -385 -2294 by 3:00 PM the day before you want tl�e inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: G PERMIT NUMBER: /._A ���� ► C.,_� __ SITE ADDRESS: PROJECT NAME: / ° b�� CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: r �l 111 i' �..., - .. I/ `ti.... ...... A 1 i r ❑ APPROVED ❑ APPROVED wrni F1 NOT APPROVED CORREC'T'IONS -- --F Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Ins p ector� Date � f -��, ••� -1 � Approved plans and permit card must be on -site: and available at time of inspection. A re- inspection fee may be assessed if work is not reactvfor inspection. PORT Ta CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT re .. INSPECTION REPORT wn For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: YJ �I PERMIT NUMBER: r 02 o SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: - 1111 1.�")m'�(" . 1.' "wur. -. r. t ❑ APPROVED ❑ APPROVED WITH CORRECTIONS ' . Ok to proceed. Correction, checked at next inspection Inspector` ❑ NOT APPROVED vill be Call for re- inspection before proceeding. Date Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may " zessed if work is not ready,for inspection. o�po'�rr CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: I– 0 SITE ADDRESS: PROJECT NAME: —CONTRACTOR: l G CONTACT PERSON: PHONE: TYPE OF INSPECTION: r; ___ ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS - -• -- Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector If Date A). Approved plans and permit carol must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. PORT TO CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT wn9 For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: Q& PERMIT NUMBER: O LD O �— mm_ SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: ONE: �- TYPE OF INSPECTION: S`T ----- -- --- t, A I ❑ APPROVED ❑ APPROVED WITH F NOT APPROVED CORRECTIONS '-- --•••- Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector '-... Dates! r Approved plans and permit card must be on -site and available at time of'inspection. A re- inspection fee may be assessed if work is not readvfor inspection. 0 0 CITY OF PORT TOWNSEND Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3P.M. Permit Number: BLDO -126 Issued: 08/14/2006 Parcel Number: 972 -906 -001 Job Address: 814 58th St. Zoning: R -II Type: V -B Occupancy: R -3 Nature of Work: Construct addition to single family dwelling Owners: Dolores Stewart Contractor: Kane Enterpriser - _KANEE * *023PN GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360- 417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * ** 1?1F(1TT1-1]F11 TVQPF.d"T -F 1NC APPRnvF,D/DATF TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks — 10' from 58th St. p /l, 5' from side p /1, 68' from rear bank p /l. Footings Forms Reinforcement Hold downs MUST BE TIED IN PLACE NO WET STICKING LIFER Ground ied to footing rebar steel) Call 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page 1 of 4 Permit #BLD06 -126 FOUNDATION WALLS Forms Reinforcement Hold downs Anchor Bolts & Washers Vents Foundation drain Ditch & pipe to be exposed until inspected PLUMBING: Rough -In (D -V-T & Clean outs) Water Supply Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint — strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Pan Expansion tank Licensed Plumbing Contractor's Signature & License Number: Sign here FLOOR FRAMING CALL FOR INSPECTION BEFORE COVER Jo i sts Girders Posts Hangers Block joists ends & intermediate supports Positive Connections Treated Wood to Concrete Pressure treated plate connections Anchor Bolts & Washers Hold downs DOUBLED BCI'S REQUIRE FILLER BLOCK Shear wall nailing (TO BE INSPECTED & APPROVED PRIOR TO COVERING) ALTERNATE BRACED WALL PANELS — SEE PLANS FOR DETAILS STANDARD BRACED WALL PANELS Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 2 of 4 Permit #BLD06 -126 MECHANICAL Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R -4) (on ducting in unheated space) FRAMING — all members and connections require inspection prior to cover Fasteners han ers etc, in contact with treated material must be hot dipped galvanized Walls Headers Rafters (hurricane clips) Trusses Roof Sheathing Joists (hangers) Blocking Roof Venting — eave and ridge vents Windows - egress Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp, time. Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R -30) Walls (R -21) Vault (R -30) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL FINAL Address Numbers — 5" minimum Smoke Detectors Final -- Building Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 3 of 4 • • Permit #BLD06 -126 GENERAL COAR L M 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385.2294. A minimum of twenty-four hours notice is required. Public Works a2eroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. -<Zr -z9,_4 APPLICANT SIGNATURE DATE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 4 of 4