HomeMy WebLinkAboutBLD06-119o�p°RT ° CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
r = INSPECTION REPORT
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:000 PM Friday.
DATE OF INSPECTION: - /Z ��`" — a / PERMIT NUMBER: z64 ";2'
SITE ADDRESS: 21,559 7; 6 4.5;�W
PROJECT NAME: ��.LL�� CONTRACTOR:
CONTACT PERSON: PHONE: 94 -- Z-5
TYPE OF INSPECTION: �A141
❑ APPROVED ❑ APPROVED WITH L� NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proce ding.
Inspector Date
Approved plans and permit card must be on -site and available: at time of inspection. A re- inspection flee may
be assessed if work is not ready,for inspection.
0 0
°gypoST CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
M a INSPECTION REPORT
°kwAS For inspections, call the Inspection Line at 360 -38.5 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: - - -7 PERMIT NUMBER: L. Qn
SITE ADDRESS:
PROJECT NAME: A I L en __ CONTRACTOR:
CONTACT PERSON: Kg,�PHONE: 7q 6
TYPE OF INSPECTION:
❑ APPROVED F1 APPROVED WITH L NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector L _K Date % 2-
Approved plans and permit card must be on -site and available at time cif inspection. A re- inspection fee may
be assessed if work is not ready far inspection.
O�VORTpO� CITY OF PORT TOWNSEND
u DEVELOPMENT SERVICES DEPARTMENT
r f INSPECTION REPORT
�wa
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME: f-fi LL f-, CONTRACTOR: K0, C?
CONTACT PERSON: PHONE:
TYPE OF INSPECTION: �I� c _ Cl F �- �� 4A L .[ � �
�- A
( ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector (" _ Date )
approved plans and permit curd must be on -site and available at lime of inspection. a re- inspection fee may
be assessed if work is not readv f6r inspection.
RT
' ram �
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3-00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME: CONTRACTOR: L-1), C_C�L[A
CONTACT PERSON: PHONE: -4a^ - 4_��
TYPE OF INSPECTION: in C41
❑ APPROVED Ll APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re-inspection before
checked at next inspection proceed' "g.
Inspector
Date
Approved plans and permit card must be on-site and available at time of inspection. A re- inspection fee may
be assessed if work is not reactyfir inspection.
•
�V UGC
fN-
V
C; C]
r
� r
� m
� T .
`d
C,
r
1�rj S�
F
S
V
y�
CL
00
y�
00
I
�r
y O I
y
�o
fi CD
C W
m Cp
yy
N >
`My
IJJI
,
I Cups y
ol
ro
.�
CL
ro
Vf
I
It
cr
�.
z
i
C"
�II
�V UGC
fN-
V
C; C]
r
� r
� m
� T .
`d
C,
r
1�rj S�
F
S
V
y�
CL
00
y�
00
I
�r
y O I
y
�o
0 0
o�VoRTra�y CITY OF PORT TOWNSEND
c3 DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
TWA
For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: Qom% PERMIT NUMBER: L_
SITE ADDRESS:
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: _ _ PHONE:
TYPE OF INSPECTION:
❑ APPROVED
Inspector
❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection
procee 'ng.
Date
F
Approved plans and permit card must he on -site and available at time of'inspection. A re- inspection fee may
be assessed ij'ivork is not rear v.for inspection.
0
1 0 CITY OF PORT TOWNSEND
ti
DEVELOPMENT SERVICES DEPARTMENT
-.e INSPECTION REPORT
¢ WA
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: -7 PERMIT NUMBER: =g
SITE ADDRESS:
PROJECT NAME: - A en _ CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
E APPROVED
� f
Inspector
❑ APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
Date
F1 NOT APPROVED
Call for re- inspection before
proceeding.
r
Approved plans and permit card must he on -site and available: at time of inspection. A re- insl)ection,fee may
be assessed if work is not ready for inspection.
0 0
pFVOAT CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
F = ; INSPECTION REPORT
�w
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION:
'P4 SITE ADDRESS:
PERMIT NUMBER: r� i, o LL I
PROJECT NAME: 41pn CONTRACTOR: _i f C
CONTACT PERSON: KR-Q-- PHONE: - 4 ._
TYPE OF INSPECTION:
0
(,Z; f,
G`L. 6P r2- (-)okti
❑ APPROVED �' ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
- Ok to proceed. Corrections will be Call for re- inspection before
! checked at next inspection proceeding.
9
Inspector Date
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may
he assessed if work is not ready for inspection.
r'
o� V onT rod
CITY OF PORT TOWNSEND
c3 DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME:
CONTACT PERSON:
TYPE OF INSPECTION:
v 'U
CONTRACTOR:
PHONE:
❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector Date �n '�f�,� (7
Approved plans and permit card mast be on -site and available at time of inspection. A re- inspection fee may
be assessed if work is not reaciv f n- inspection.
0 0
n�VoRTr °� CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
¢WA
For inspections, call the Inspection Line at 360 -3$5 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS: L `~
PROJECT NAME: CONTRACTOR: Cc HA
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
Ll APPROVED L APPROVED WITH F1 NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector +�
Date
Approved plans and permit curd must he on -site and available at time of inspection. A re- inspection -lee may
he assessed if work is not ready,fnr inspection.
nt
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -5095 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385-2294 Before 3P.M.
Permit Number: BLD06 -119 Issued: 07/27/2006 Parcel Number: 955 -900 -037
Job Address: 2159 Shasta Pl. Zoning: R -I Type: V -B Occupancy: R -3
Nature of Work: Construct 2 story single- family Residence - Lot 037
Owners: KCCHA -Allen Contractor: Owner
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -- Contact Labor & Industries @ 360 - 417 -2702
NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO
RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF
CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION.
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * **
REQUIRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL — call
Francesca at 385 -2294 for inspection
See General Condition No. 2
Silt Fence as needed.
Gravel drive off mat to restrict sediment from leaving the site; 4"
not required
Wheel wash as needed
FOOTINGS
Setbacks — 10' from Shasta Pl. p /l, 5' from side p /1's, 10' from
rear p /1.
Footings
Forms
Reinforcement
UFER Ground (tied to footing rebar steel)
Interior Pads
Call 48 hours before you dig for utility line locates
1 -500- 424 -5555
Page 1 of 5
0
RF(IITIRFY) INS%PFC`'TInN�
0 Permit #BLD06 -119
APPROVED/DATE
FOUNDATION WALLS
Reinforcement
Foundation Vents
Hold Downs
Anchor Bolts & Washers
Holdowns — must be tied in place at time of inspection; no
rvetsticking
GARAGE SLAB
Floor to be sloped towards garage door opening for drainage
FOUNDATION DRAIN
Stormwater Master Plan requires directing water to street
drainage facilities; applicant will install 6" pipe in ROW outside of
pavement for connection to street catch basin and tight line 4 inch
pipe from homes for both foundation drainage and roof run -off to
direct stormwater to catch basin.
Must be inspected prior to covering ditch & pipe
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrester (on dishwasher, ice maker & clothes washer)
Hose Bibs (backflow protection required)
Pipe Insulation (R -3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint — strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" — 24" above ground
Expansion tank
Licensed Plumbing Contractor's Signature & License Number:
Sign here
FLOOR FRAMING
CALL FOR INSPECTION BEFORE COVER
Joists
Double joists /Block under Braced Walls — double BCIs require filler
block
Girders
Posts
Hangers
Block joists ends & at intermediate supports
Positive Connections
Treated. Wood to Concrete
Pressure treated plate connections
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 5
0
REQUIRED INSPECTIONS
0
Permit #BLD06 -119
APPROVEDIDATE
SHEAR WALL NAILING (Inspection and approval required
prior to cover — may require several inspections) — See plans for
appropriate shear wall details.
Standard Braced Wall Panels — exterior panels may be placed
vertically or horizontally. Interior panel sheathing shall be placed
vertically. ABWP 1st story of 2 requires two inspections; vertically
sheathed on both sides with structural sheathing.
SW-1
SW -2 requires structural sheathing to be placed vertically.
WINDOW FLASHING/BUILDING PAPER
Inspection of window flashing required prior to cover with building
wrap; wrap shall be lappedper code and manufacturer's instructions
at vertical and horizontal joints and under window flashing at bottom
of window
MECHANICAL
Whole House Fan W/ 24 hour timer; window or wall ports required
Kitchen /Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ back draft dampers), Insulation
(R -4) (on ducting in unheated space)
FRAMING — all members and connections require inspection prior
to cover
Fasteners hangers, etc, in contact with treated material must be hot
dinned galvanized
Walls
Headers
Rafters (hurricane clips)
Trusses
Roof Sheathing
Joists (hangers)
Blocking
Stairs
Roof Venting — eave and ridge vents
Windows - escape
Smoke detectors (bedrooms, outside bedrooms and each floor)
Safety Glazing
Windows U factor - .40 or better
Doors U- factor - .20 or better
NFRC window sticker must be on window, skylights & doors at time of
inspection
Air Seal
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
1- 800 -424 -5555
Page 3 of 5
RF,QIJJRFI) INSPFC".TIONS
Permit #BLD06 -119
APPROVED /DATE
INSULATION
Floor (R -30)
Walls (R -2 1)
Attic (R -38; blown in requires thickness and R -value markers installed
for every 300 feet, facing attic access, affixed to trusses, and marked with
thickness of installed insulation with numbers a minimum of I inch)
Vapor Barrier: paint for walls and ceiling
Baffles
DRYWALL
SEE PLANS FOR SHEETROCK ORIENTATION ON SHEAR WALLS
Garage/House Separation —from plate to peak at common wall per
plans or, with architect's permission, on walls and ceiling ofgarage (no
attic access allowed in garage if sheetrock is not installed the full height
of the common wall)
PUBLIC WORKS FINAL — MIP06 -063
Public Works Sign -Off (prior to building final)
FINAL
Parking — 2 space required
House Numbers— 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final — Building
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 4 of 5
1 11 0 0 Permit #BLD06 -1.19
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until. Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty-four hours notice is re uired. Public Works a )roval must be received prior to
scheduling the Building De artme it's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -5095) prior to making changes to the approved plans.
9. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
APPLICANT SIGNA RE DATE
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 5 of 5