Loading...
HomeMy WebLinkAboutBLD06-118o�poRT�p� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want then ection For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: ��'% .5'¢ -sue ,,✓✓ //// PROJECT NAME: P,40,64 /U CONTRACTOR: CONTACT PERSON: _ %�9/(/ PHONE: ygel - Y.�?j TYPE OF INSPECTION: KIN-44 }h L. : 1104� 1 LAPPROVE D ❑ APPROVED WITH L NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proccedi g. Inspector Date` Approved plans and permit card must he on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. q�,Folly rod c� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: 77- 1 2 - b: _ PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: _ a l lbP1]a "CONTRACTOR: X CONTACT PERSON: PHONE: °4 GIO — -4aE TYPE OF INSPECTION: ❑ APPROVED ❑ APPROVED WITH F1 NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector Lu Date � % 2 d S y Approved plans and permit card must be on site and available at time of inspection. A re- inspection fc:e. may be assessed if work is not ready, far inspection. ,PONT pp� �" WA .kb 0 0 CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: 77 'Sb(1LfGL' PROJECT NAME: b 6 CONTRACTOR: K G G{ `f A _ CONTACT PERSON: ,�e,� PHONE: TYPE OF INSPECTION: Ll APPROVED ❑ APPROVED WITH ❑ NOT APPROVED _-� CORRECTIONS - Ok to �"1 p roceed. Corrections will he Call for re-inspection before checked at next inspection proceeding. Ins ector -K C.' -� Date Approved plans and permit card must he on -site and available at time of'inspection. A re- inspection fie may be assessed if work is not ready, for inspection. CITY OF PORT TOWNSEND � y c3 DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection line at 360 -3$5 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3,,::r000 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: G SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: ,erg PHONE: 4qgfi - 4 TYPE OF INSPECTION: I ❑ APPROVED ❑ APPROVED wins ❑ NOT APPROVED �. CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector .. Date Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. M` • 0 paaTr CITY OF PORT TOWNSEND i; DEVELOPMENT SERVICES DEPARTMENT F ° INSPECTION REPORT �w For inspections, call the inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: i;Tj X �A tL/�, 1, 1 �:...�, ❑ APPROVED ❑ APPROVED WITH C7 NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection procee ing. Inspector Date Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may, be assessed if work is not readv for inspection. b w �n i� I I i �C n � � � rro R. W� u � � C CD C C. CL n N �b m Sro� f y d CD y�•� ?9 � Ln CD say CD A 4 zo P, C C) o Q., a�2 b vi a, � � C C -3 C!1 n z w 0 z CC n y n c y�ab � I i I I i K' II I I �I 1+ i CA fl � III Iail I III I � �o CA ID n CA J) K; Gf C C 0 7C M 0 n z C" n `v r rc� b c z 7� a o z C H w r � d C� r y� ZO � �C7 tz7 Ll yON oa 0 • O�pOW'rTp� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: ' SITE ADDRESS: PERMIT NUMBER: A LYZ(p l _ PROJECT NAME: CONTRACTOR: _ KC-C-H CONTACT PERSON: PHONE: TYPE OF INSPECTION: C, �d-- ❑ APPROVED ❑ APPROVED WITH El NOT APPROVED .'f CORRECTIONS `- Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector ( _ Date k) Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee In qv be assessed if work is not ready for inspection. VOINT CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: 210 (Q PERMIT NUMBER: J5 SITE ADDRESS: CZ1717 PROJECT NAME: On ej- CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: I �� � l �"� ',�♦ � t'�'C' c� "y � / '�� ( � l �`� C` r� / /cal (� 7� ❑ APPROVED /0 APPROVED WITH F NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be all for re-inspection before e CORRECTIONS at next inspection proceeding. Inspector ­­­ Da'te Approved plans and permit card must be on-site and available at time of inspection. A re- inspection, ee may be assessed if work is not ready,for inspection. 0 VORT CITY OF PORT TOWNSEND c3 p DEVELOPMENT SERVICES DEPARTMENT "e INSPECTION REPORT fig` wn� For inspections, call the Inspection Line at 360 -385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: Low - - -- ❑ APPRO VED L] --.-., r.. "" � APPROVED WITH CORRECTIONS Ok to proceed. Corrections will be checked at next inspection Inspector �- P� Date Approved plans and permit card must be on -site and available at time r be assessed if work is not ready•for inspection. ❑ NOT APPROVED Call for re- inspection before procee ing. >f'inspection. A re- inspection fee may PORT ray CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: .2n PERMIT NUMBER: -15L.Qn62- 11 SITE ADDRESS: PROJECT NAME: p CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: APPROVED l ❑ APPROVED WITH CORRECTIONS Ok to proceed. Corrections will be checked at next inspection Inspector f, Date ❑ NOT APPROVED Call for re- inspection before proceeding. Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed zf work is not readv fbr inspection. • • Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -5095 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MOST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -118 Issued: 07/27/2006 Parcel Number: 955 -900 -036 Job Address: 2147 Shasta Pl. Zoning: R -1 Type: V -B Occupancy: R -3 Nature of Work: Construct single- family Residence - Lot #36 Owners: KCCHA - Daubenber er Contractor: Owner GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360- 417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * ** REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL — call Francesca at 385 -2294 for inspection See General Condition No. 2 Silt Fence as needed Gravel drive off mat to restrict sediment from leaving the site; 4" not required. Wheel wash as needed FOOTINGS Setbacks — 10' from Shasta A p /1, 5' from side p /1's, 10' from rear p /l. Footings Forms Reinforcement UFER Ground (tied to footing rebar steel) Tnterior Pads Call 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page I of 5 • 0 Permit #BLD06 -118 REQUIRED INSPECTIONS APPROVED /DATE FOUNDATION WALLS Reinforcement Foundation Vents Hold Downs Anchor Bolts & Washers Holdowns -- must be tied in place at time of inspection; no wetsticking GARAGE SLAB Floor to be sloped towards garage door opening for drainage FOUNDATION DRAIN Stormwater Master Plan requires directing water to street drainage facilities; applicant will install 6" pipe in ROW outside of pavement for connection to street catch basin and tight line 4 inch pipe from homes for both foundation drainage and roof run -off to direct stormwater to catch basin. Must be inspected prior to covering ditch & vipe PLUMBING: Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint — strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Expansion tank Licensed Plumbing Contractor's Signature & License Number: Sign here FLOOR FRAMING CALL FOR INSPECTION BEFORE COVER Joists Double joists /Block under Braced Walls — double BCLs require filler block Girders Posts Hangers Block joists ends & at intermediate supports Positive Connections Treated Wood to Concrete Pressure treated plate connections Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 2 of 5 0 0 Permit #BLD06 -118 REQUIRED INSPECTIONS APPROVED/DATE SHEAR WALL NAILING (Inspection and approval required prior to cover — may require several inspections) — See plans for appropriate shear wall details. STANDARD BRACED WALL PANELS — EXTERIOR PANELS MAY BE PLACED VERTICALLY OR HORIZONTALLY. INTERIOR PANELS SHALL BE PLACED VERTICALLY. ENGINEERED 24" PANEL — STRUCTURAL SHEATHING PLACED VERTICALLY PER PLAN. WINDOW FLASHING /BUILDING PAPER Inspection of window flashing required prior to cover with building wrap; wrap shall be lapped per code and manufacturer's instructions at vertical and horizontal joints and under window flashing at bottom of window MECHANICAL Whole House )~an W/ 24 hour timer; window or wall ports required Kitchen/Bath /Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R -4) (on ducting in unheated space) FRAMING -- all members and connections require inspection prior to cover Fasteners, hangers etc in contact with treated material must be hot di ed galvanized Walls Headers Rafters (hurricane clips) Trusses Roof Sheathing Joists (hangers) Blocking Stairs Roof Venting — eave and ridge vents Windows - escape Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at time of inspection Air Seal Fire Blocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 3 of 5 0 0 Permit #BLD06 -118 REQUIRED INSPECTIONS APPROVED/DATE INSULATION Floor (R -30) Walls (R -21) Attic (R -38; blown in requires thickness and R -value markers installed for every 300 feet, facing attic access, affixed to trusses, and marked with thickness of installed insulation with numbers a minimum of I inch) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL SEE PLANS FOR SHEETROCK ORIENTATION ON SHEAR WALLS Garage/House Separation —from plate to peak at common wall per plans or, with architect's permission, on walls and ceiling of garage (no attic access allowed in garage if sheetrock is not installed the full height of the common wall) PUBLIC WORKS FINAL — MIP06 -062 Public Works Sign -Off (prior to buildingfznal) FINAL Parking — 2 space required House Numbers — 5" minimum Plumbing Meehanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final — Building NERAL CONDLTI 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Call 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page 4 of 5 Permit #BLD06 -118 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385.2294. A minimum of twen -four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. Revisions require submittal and approval Rrior to making changes in the field. Contact the Building Department (379 -5095) prior to making changes to the approved plans. 9. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. APPLICANT SIGNA URE DATE Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 5 of 5