HomeMy WebLinkAboutBLD06-118o�poRT�p� CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want
then ection For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS: ��'% .5'¢ -sue ,,✓✓ ////
PROJECT NAME: P,40,64 /U CONTRACTOR:
CONTACT PERSON: _ %�9/(/ PHONE: ygel - Y.�?j
TYPE OF INSPECTION: KIN-44
}h L. :
1104� 1
LAPPROVE D ❑ APPROVED WITH L NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proccedi g.
Inspector Date`
Approved plans and permit card must he on -site and available at time of inspection. A re- inspection fee may
be assessed if work is not ready for inspection.
q�,Folly rod
c�
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: 77- 1 2 - b: _ PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME: _ a l lbP1]a "CONTRACTOR: X
CONTACT PERSON: PHONE: °4 GIO — -4aE
TYPE OF INSPECTION:
❑ APPROVED ❑ APPROVED WITH F1 NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector
Lu Date � % 2 d
S y
Approved plans and permit card must be on site and available at time of inspection. A re- inspection fc:e. may
be assessed if work is not ready, far inspection.
,PONT pp�
�" WA
.kb
0 0
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS: 77 'Sb(1LfGL'
PROJECT NAME: b 6 CONTRACTOR: K G G{ `f A _
CONTACT PERSON: ,�e,� PHONE:
TYPE OF INSPECTION:
Ll APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
_-� CORRECTIONS
-
Ok to �"1 p roceed. Corrections will he Call for re-inspection before
checked at next inspection proceeding.
Ins ector -K C.' -� Date
Approved plans and permit card must he on -site and available at time of'inspection. A re- inspection fie may
be assessed if work is not ready, for inspection.
CITY OF PORT TOWNSEND
� y
c3 DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection line at 360 -3$5 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3,,::r000 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER: G
SITE ADDRESS:
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: ,erg PHONE: 4qgfi - 4
TYPE OF INSPECTION:
I
❑ APPROVED ❑ APPROVED wins ❑ NOT APPROVED
�. CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector .. Date
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may
be assessed if work is not ready for inspection.
M`
• 0
paaTr CITY OF PORT TOWNSEND
i; DEVELOPMENT SERVICES DEPARTMENT
F ° INSPECTION REPORT
�w
For inspections, call the inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
i;Tj X �A tL/�,
1,
1
�:...�,
❑ APPROVED ❑ APPROVED WITH C7 NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection procee ing.
Inspector
Date
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may,
be assessed if work is not readv for inspection.
b
w
�n
i�
I
I
i
�C
n � �
� rro
R. W�
u
� � C
CD
C C.
CL
n N
�b m
Sro�
f y d
CD
y�•�
?9 �
Ln
CD
say CD
A 4
zo
P,
C C)
o Q.,
a�2
b
vi a,
� � C
C
-3
C!1
n
z
w
0
z
CC
n
y
n
c
y�ab
� I i
I I i
K'
II
I
I
�I
1+ i
CA
fl �
III
Iail
I
III
I �
�o
CA
ID
n CA
J)
K;
Gf
C
C
0
7C
M
0
n
z
C"
n
`v
r
rc�
b
c
z
7�
a
o
z
C H
w
r �
d
C� r
y� ZO
� �C7 tz7
Ll
yON
oa
0 •
O�pOW'rTp� CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION:
' SITE ADDRESS:
PERMIT NUMBER: A LYZ(p l _
PROJECT NAME: CONTRACTOR: _ KC-C-H
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
C, �d--
❑ APPROVED ❑ APPROVED WITH El NOT APPROVED
.'f CORRECTIONS
`- Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
Inspector ( _ Date k)
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee In qv
be assessed if work is not ready for inspection.
VOINT CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: 210 (Q PERMIT NUMBER: J5
SITE ADDRESS: CZ1717
PROJECT NAME: On ej- CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
I �� � l �"� ',�♦ � t'�'C' c� "y � / '�� ( � l �`� C` r� / /cal (�
7�
❑ APPROVED /0 APPROVED WITH F NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be all for re-inspection before
e
CORRECTIONS
at next inspection proceeding.
Inspector Da'te
Approved plans and permit card must be on-site and available at time of inspection. A re- inspection, ee may
be assessed if work is not ready,for inspection.
0
VORT CITY OF PORT TOWNSEND
c3 p DEVELOPMENT SERVICES DEPARTMENT
"e INSPECTION REPORT
fig` wn�
For inspections, call the Inspection Line at 360 -385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: PERMIT NUMBER:
SITE ADDRESS:
PROJECT NAME:
CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
Low - - --
❑ APPRO VED L] --.-., r.. "" � APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
Inspector �- P� Date
Approved plans and permit card must be on -site and available at time r
be assessed if work is not ready•for inspection.
❑ NOT APPROVED
Call for re- inspection before
procee ing.
>f'inspection. A re- inspection fee may
PORT ray
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: .2n PERMIT NUMBER: -15L.Qn62- 11
SITE ADDRESS:
PROJECT NAME: p CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
APPROVED
l
❑ APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
Inspector f, Date
❑ NOT APPROVED
Call for re- inspection before
proceeding.
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may
be assessed zf work is not readv fbr inspection.
• • Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -5095 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MOST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06 -118 Issued: 07/27/2006 Parcel Number: 955 -900 -036
Job Address: 2147 Shasta Pl. Zoning: R -1 Type: V -B Occupancy: R -3
Nature of Work: Construct single- family Residence - Lot #36
Owners: KCCHA - Daubenber er Contractor: Owner
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360- 417 -2702
NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO
RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF
CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION.
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * **
REQUIRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL — call
Francesca at 385 -2294 for inspection
See General Condition No. 2
Silt Fence as needed
Gravel drive off mat to restrict sediment from leaving the site; 4"
not required.
Wheel wash as needed
FOOTINGS
Setbacks — 10' from Shasta A p /1, 5' from side p /1's, 10' from
rear p /l.
Footings
Forms
Reinforcement
UFER Ground (tied to footing rebar steel)
Tnterior Pads
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page I of 5
• 0 Permit #BLD06 -118
REQUIRED INSPECTIONS APPROVED /DATE
FOUNDATION WALLS
Reinforcement
Foundation Vents
Hold Downs
Anchor Bolts & Washers
Holdowns -- must be tied in place at time of inspection; no
wetsticking
GARAGE SLAB
Floor to be sloped towards garage door opening for drainage
FOUNDATION DRAIN
Stormwater Master Plan requires directing water to street
drainage facilities; applicant will install 6" pipe in ROW outside of
pavement for connection to street catch basin and tight line 4 inch
pipe from homes for both foundation drainage and roof run -off to
direct stormwater to catch basin.
Must be inspected prior to covering ditch & vipe
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrester (on dishwasher, ice maker & clothes washer)
Hose Bibs (backflow protection required)
Pipe Insulation (R -3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint — strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" — 24" above ground
Expansion tank
Licensed Plumbing Contractor's Signature & License Number:
Sign here
FLOOR FRAMING
CALL FOR INSPECTION BEFORE COVER
Joists
Double joists /Block under Braced Walls — double BCLs require filler
block
Girders
Posts
Hangers
Block joists ends & at intermediate supports
Positive Connections
Treated Wood to Concrete
Pressure treated plate connections
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 5
0 0 Permit #BLD06 -118
REQUIRED INSPECTIONS APPROVED/DATE
SHEAR WALL NAILING (Inspection and approval required
prior to cover — may require several inspections) — See plans for
appropriate shear wall details.
STANDARD BRACED WALL PANELS — EXTERIOR PANELS
MAY BE PLACED VERTICALLY OR HORIZONTALLY.
INTERIOR PANELS SHALL BE PLACED VERTICALLY.
ENGINEERED 24" PANEL — STRUCTURAL SHEATHING
PLACED VERTICALLY PER PLAN.
WINDOW FLASHING /BUILDING PAPER
Inspection of window flashing required prior to cover with building
wrap; wrap shall be lapped per code and manufacturer's instructions
at vertical and horizontal joints and under window flashing at bottom
of window
MECHANICAL
Whole House )~an W/ 24 hour timer; window or wall ports required
Kitchen/Bath /Laundry Fans
Environmental Air Exhaust ducting (w/ back draft dampers), Insulation
(R -4) (on ducting in unheated space)
FRAMING -- all members and connections require inspection prior
to cover
Fasteners, hangers etc in contact with treated material must be hot
di ed galvanized
Walls
Headers
Rafters (hurricane clips)
Trusses
Roof Sheathing
Joists (hangers)
Blocking
Stairs
Roof Venting — eave and ridge vents
Windows - escape
Smoke detectors (bedrooms, outside bedrooms and each floor)
Safety Glazing
Windows U factor - .40 or better
Doors U- factor - .20 or better
NFRC window sticker must be on window, skylights & doors at time of
inspection
Air Seal
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
1- 800 -424 -5555
Page 3 of 5
0 0 Permit #BLD06 -118
REQUIRED INSPECTIONS APPROVED/DATE
INSULATION
Floor (R -30)
Walls (R -21)
Attic (R -38; blown in requires thickness and R -value markers installed
for every 300 feet, facing attic access, affixed to trusses, and marked with
thickness of installed insulation with numbers a minimum of I inch)
Vapor Barrier: paint for walls and ceiling
Baffles
DRYWALL
SEE PLANS FOR SHEETROCK ORIENTATION ON SHEAR WALLS
Garage/House Separation —from plate to peak at common wall per
plans or, with architect's permission, on walls and ceiling of garage (no
attic access allowed in garage if sheetrock is not installed the full height
of the common wall)
PUBLIC WORKS FINAL — MIP06 -062
Public Works Sign -Off (prior to buildingfznal)
FINAL
Parking — 2 space required
House Numbers — 5" minimum
Plumbing
Meehanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final — Building
NERAL CONDLTI
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 4 of 5
Permit #BLD06 -118
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385.2294. A
minimum of twen -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. Revisions require submittal and approval Rrior to making changes in the field. Contact the Building
Department (379 -5095) prior to making changes to the approved plans.
9. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
APPLICANT SIGNA URE DATE
Call 48 hours before you dig for utility line locates
1- 800 -424 -5555
Page 5 of 5