Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD06-117
oFVORTrpw CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. 0'7 T DATE OF INSPECTION: 9 Z)7 PERMIT NUMBER: � �l/ SITE ADDRESS: Z17-3 S 6 S PROJECT NAME: CONTRACTOR: CONTACT PERSON:— 14 PHONE: A/ 96 " </'22t53 TYPE OF INSPECTION: KIL14 t APPROVED Inspector ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection procee ing. t - Date Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready.fnr inspection. 0 0 p�v °prr °r� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT ..q INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: -" NUMBER: L ,� cl (��� -% SITE ADDRESS: I PROJECT NAME: f)ea f n c[ �� _ CONTRACTOR: CONTACT PERSON: PHONE; TYPE OF INSPECTION: ❑ APPROVED ❑ APPROVED WITH F-I NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector A LIE Date Z D Approved plans and permit card must he on -.site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. t 1 0 0 voRT CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. i - � j -7 it —7 DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: ❑ APPROVED ❑ APPROVED WITH CORRECTIONS Ok to proceed. Corrections will be checked at next inspection Inspector Date ❑ NOT APPROVED Call for re-inspection before proceeding. Approved plans andpermil card must be on-site and available at time of inspection. A re- inspection fee may be assessed if work is not rea4vjbr inspection. �powr rQ�yvn CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT } : ; INSPECTION REPORT ¢wa�For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: V PROJECT NAME: ,P 1' CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: t . ❑ AP VED i f ❑ APPROVED WITH Ll NOT APPROVED CORRECTIONS o proceed. Il be Call for re- inspection before / checked at next inspectiop ' procee ing. %� Date [nspector I:' Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. (D C � a E A � � r E 0 1 a I-to 171 C) > y C', Cdr pQ 0© Cn CnId 'v , n '[ Ov 0 o�s,anrrd� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT } " INSPECTION REPORT awn For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: �} SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: ff ❑ APPROVED ❑ APPROVED WITH CORRECTIONS Ok to proceed. Correction! checked at next inspection Inspector` F NOT APPROVED vill be Call for re- inspection before proceeding. ate Approved plans and permit card must be on -site and available at time of insI)ection. A re- inspection fee may he assessed if work is not ready for inspection. �V°NT '� CITY OF PORT TOWNSEND ` DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. / DATE OF INSPECTION: _�� PERMIT NUMBER: SITE ADDRESS: LS PROJECT NAME: CONTRACTOR: ��- .t�TL� CONTACT PERSON: PHONE: TYPE OF INSPECTION: ❑ APPROVED e0�. rd ❑ APPROVED wITH CORREC'T'IONS Ok to proceed. Corrections will be checked at next inspection Inspector f C , Date ❑ NOT APPROVED Call for re- inspection before proceeding. 6.. I _ Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. �pbRT rn�y CITY OF PORT TOWNSEND c DEVELOPMENT SERVICES DEPARTMENT •_ INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: % PERMIT NUMBER: / -`" �� SITE ADDRESS: ? _ PROJECT NAME: '1 tom' CONTRACTOR: Wet CONTACT PERSON: -i PHONE: TYPE OF INSPECTION: ❑ APPROVED �\ ❑ APPROVED WITH fl NOT APPROVED �.. CORRECTIONS - • • .. Ok to proceed. Corrections will be (.all for re- inspection before checked at next inspection proceeding. Inspector G -- _ Date C de Approved plans and permit card must he on -site and available at time of inspection. A re- inspection fee may he assessed if work is not ready.for inspection. pORTTd�y CITY OF PORT TOWNSEND G� DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3::00 PM Friday. DATE OF INSPECTION: /D - )_4 1-' PERMIT NUMBER: SITE ADDRESS: 2 5 317A O: 1 [� 15- PROJECT NAME: l7!~A 7 %7 ?� CONTRACTOR: CONTACT PERSON: PHONE:9C� TYPE OF INSPECTION: 2-C:'rk l ❑ APPROVED Cl APPROVED WITH J NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector (' __ _. - -.- ._ Date ! r Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. 0 QaRT r��y CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT ¢w�For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: P n r r _ I(1'fT CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: CI APPROVED ❑ APPROVED WITH CORRECTIONS Ok to proceed. Corrections will be F1 NOT APPROVED Call for re- inspection before 1 checked at next inspection proceeding.. Inspector �` i lnspe Date �� Approved plans and permit card must be on -site: and available at time of'inspection. A re- inspection fee may be assessed if work is not ready for inspection. poRrrn CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT r INSPECTION REPORT �wA For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: Q PERMIT NUMBER: —(r7 SITE ADDRESS: PROJECT NAME: [De r CONTRACTOR: CONTACT PERSON: r PHONE: TYPE OF INSPECTION: -' ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS �.. Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Date `� / f ,.. Inspector 3 - =. Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. 1/ • p�pOgTTp� CITY OF PORT TOWNSEND o DEVELOPMENT SERVICES DEPARTMENT .e s INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: l� ' T C)- _ PERMIT NUMBER: �� PROJECT NAME: Q f CONTRACTOR: CONTACT PERSON: PHONE: '4 TYPE OF INSPECTION • Oru ❑ APPROVED ❑ APPROVED WITH CORRECTIONS Ok to proceed. Corrections will be ri checked at next inspection Inspector Date ❑ NOT APPROVED Call for re- inspection before proceeding. Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. • Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -5095 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Dav Inspection Call 385-2294 Before 3P.M. Permit Number: BLD06 -117 Issued: 07/25/2006 Parcel Number: 955 -900 -035 Job Address: 2135 Shasta Pl. Zoning: R -1 Type: V -B Occupancy: R -3 Nature of Work: Construct 2 story sin le -famil Residence - Lot #35 Owners: KCCHA -Deardorff Contractor: Owner GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360- 417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * * * REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL — call Francesca at 355 -2294 for inspection See General Condition No. 2 Silt Fence as needed Gravel drive off mat to restrict sediment from leaving the site; 4" not required Wheel wash as needed FOOTINGS Setbacks — 10' from Shasta Pl. p /1, 5' from side p /1's, 10' from rear p /l. Footings Forms Reinforcement UFER Ground (tied to footing rebar steel) Interior Pads Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 1 of 5 0 Permit #BLD06 -117 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION WALLS Reinforcement Foundation Vents Hold Downs Anchor Bolts & Washers Holdowns — must be tied in place at time of inspection; no wetsticking GARAGE SLAB Floor to be sloped towards garage door opening for drainage Fdrainage ION DRAIN r Master Plan requires directing water to street cilities; applicant will install 6" pipe in ROW outside of pfor connection to street catch basin and tight line 4 inch pipe from homes for both foundation drainage and roof run -off to direct stormwater to catch basin. Must be ins ected pr iDr to coverin ditch & i e PLUMBING: Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint — strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Expansion tank Licensed Plumbing Contractor's Signature & License Number: Sign here FLOOR FRAMING CALL FOR INSPECTION BEFORE COVER Joists Double joistsBlock under Braced Walls — double BCis require filler block Girders Posts Hangers Block joists ends & at intermediate supports Positive Connections Treated Wood to Concrete Pressure treated plate connections Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 2 of 5 uFnlrTluF.n INCPF("TIONR 0 Permit #BLD06 -117 APPROVED /DATE SHEAR WALL NAILING (Inspection and approval required prior to cover — may require several inspections) — See plans for appropriate shear wall details. Standard Braced Wall Panels — exterior panels may be placed vertically or horizontally. Interior panel sheathing shall be placed vertically. ABWP I" story of 2 requires two inspections; vertically sheathed on both sides with structural sheathing. Engineered 24" panel — structural sheathing placed vertically per plan. WINDOW FLASHING/BUILDING PAPER Inspection of window flashing required prior to cover with building wrap; wrap shall be lapped per code and manufacturer's instructions at vertical and horizontal joints and under window flashing at bottom of window MECHANICAL Whole House Fan W/ 24 hour timer; window or wall ports required Kitchen/Bath /Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R -4) (on ducting in unheated space) FRAMING — all members and connections require inspection prior to cover Fasteners hamizers, etc. in contact with treated material must be hot dipped galvanized Walls Headers Rafters (hurricane clips) Trusses Roof Sheathing Joists (hangers) Blocking Stairs Roof Venting — eave and ridge vents Windows - escape Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at time of inspection Air Seal Fire Blocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates 1 -800 -424 -5555 Page 3 of 5 RFOITIRFP INSPECTIONS 0 Permit #BLD06 -117 APPROVED/DATE INSULATION Floor (R -30) Walls (R -2I) Attic (R -38; blown in requires thickness and R -value markers installed for every 300 feet; facing attic access, affixed to trusses, and marked with thickness of installed insulation with numbers a minimum of 1 inch) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL SEE PLANS FOR SHEETROCK ORIENTATION ON SHEAR WALLS Garage/House Separation —from plate to peak at common wall per plans or, with architect's permission, on walls and ceiling of garage (no attic access allowed in garage if sheetrock is not installed the full height of the common wall) PUBLIC WORKS FINAL — A P06 -061 Public Works Sign -Off (prior to buildingfinal) FINAL Parking — 2 space required House Numbers — 5" minimum Plumbing Mechanical /Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final — Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 4 of 5 0 Permit #BLD06 -117 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twen -four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. Revisions require submittal and approval Urior to making changes in the field. Contact the Building Department (379 -5095) prior to making changes to the approved plans. 9. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. (7/7 - /11�, & APPLICANT SIGNATURE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 5 of 5 DATE