HomeMy WebLinkAboutBLD06-115o� Font row
9 0
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: �Z PERMIT NUMBER:
i r% �...
SITE ADDRESS: W I IZ-'
PROJECT NAME: C(_CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSP CTION:
r. Allit
L] APPROVED
F1 APPROVED WITH
CORRECTIONS
Ok to proceed. Corrections will be
checked at next inspection
Inspector Lo4 _ Date
Ll NOT APPROVED
Call for re- inspection before
proceeding.
Approvedplans andpermit card must be on -site and available cat time of inspection. A re- inspection fee may
be assessed rfwork is not ready for inspection.
City Hall
250 Madison Street Suite 3
Port Townsend, WA 98368
Phone (360) 379 -5095 Fax (360) 344 -4619
CITY OF PORT TOWNSEND
BUILDING PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385 -2294 prior to 3:00 p.m. for next day Inspection
Permit Number: BLD06 -115 Issued: 09/14/06 Parcel Number: 949 100 001
Job Address: 237 Taylor Street Zoning: C -III
Nature of Work: Install awnine for Mezzaluna Loun e
Use of Building: Restaurant
Owner: David and Alison He Contractor: Owner
Colors/design approved by BPC06 -009
GENERAL CONDITIONS APPLY - SEE BELOW
REOUIRED INSPECTIONS
FRAMING/FINAL
Proposed Drop -In Anchor with internal threads —
owner shall ensure that the anchor is adequate for
soft brick installation or use approved machine
screw anchors or expansion anchors. See attached
details.
GENERAL CONDITIONS,
APPROVED/DATE
1. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
2. Re- inspection is required after any corrections are completed.
3. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
4. Revisions to the approved plans require submittal and approval prior to making changes in the field.
Contact the Building Department at 379 -5095 prior to making changes to the approved plans.
5. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
Call 48 Hours Before You Dig For Utility Line Locates
1 -800- 424 -5555
Page 1 of 1
N
Haller
Fountain
Park
Plac
Founta
Cafe
0
O
4)
rr�
O
-I--
Taylor Street
UICL -.
Ul 9N
in
r.-4
tp