HomeMy WebLinkAboutBLD06-111^1
QOarrOw 0 0
� CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
�RyypSHav INSPECTION REPORT
PERMIT NUMBER: �'-
Site Address
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Shoreline Conditions
❑ SEPA Conditions
• PUDA Conditions
• CUP Conditions
❑ Landscaping
• Parking
• Occupancy Approved
l� ❑ APPROVED 1
I
W10
❑ Lighting Design Review:
❑ Signage ❑ Commercial
❑ Tree Conservation ❑ Multi - family
❑ Cottage
Measures ❑ Historic
❑ ESA Review /Conditions
❑
w I��
❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
❑ SEE BELOW ❑ SEE COMMENT(S) BELOW
Inspector
Acknowledged by
Date
Date
• 0
QoRr ro
F CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: B; L
SITE ADDRESS: 1 4 5 1 U_,� 4 S
CONTRACTOR:
DATE OF INSPECTION: x/_- d
WORKSITE OR CELL PHONE #: '
TYPE OF INSPECTION REQUESTED: W n C_ et? °C� 'P n V 2.
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED �v APPROVED WITH CORRECTIONS ❑ NOT APPROVED
NOTED BELOW CALL FOR RE- INSPECTION
BEFORE PROCEEDING
YCA-Y.
Approved ns and permit card must be on -site and available at time of inspection. A re- inspection
fee may b as essed if work is not ready for inspection.
%l. f�'���_. Date ?� 0
Inspector C.- 4 't`
Date
Acknowledgeda
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385-2294 Before 3P.M.
Permit Number: BLD06 -111 Issued: 07/07/2006 Parcel Number: 989 -703 -504
Job Address: 1431 Washington St. Zoning: R -II Type: V -B Occupancy: R -3
Nature of Work: Construct front porch
Owners: Robert & Fay Bruns Contractor: Owner
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360 -417 -2702
NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO
RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF
CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION.
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * **
REQUIRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS
Setbacks — 20' from Washington St, p /l, 5' from side p/1
Footings
Forms
Reinforcement
FRAMING — all members and connections require inspection
prior to cover
Fasteners hangers, etc, in contact with treated material must be
hot dipped galvanized
Headers
Beams
Rafters (hurricane clips)
Roof Sheathing
Columns
Positive Connections
Blocking
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 2
FINAL
House Numbers — 5" minimum
Guardrail
Smoke Detectors
Final — Buildinc
Cell If: ,� 1 ► .r 1 � _
Permit #BLD06 -111
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
22. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty-four hours notice is re uired. Public Works a roval must be received prior to
schedulin2 the Building Department's final ins ection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
S. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
C___�91'1 � _5 Q
APPLIC SON ATURE DATE
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 2