Loading...
HomeMy WebLinkAboutBLD06-111^1 QOarrOw 0 0 � CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT �RyypSHav INSPECTION REPORT PERMIT NUMBER: �'- Site Address Contractor Owner Date of Inspection Worksite or Cell Phone# ❑ Shoreline Conditions ❑ SEPA Conditions • PUDA Conditions • CUP Conditions ❑ Landscaping • Parking • Occupancy Approved l� ❑ APPROVED 1 I W10 ❑ Lighting Design Review: ❑ Signage ❑ Commercial ❑ Tree Conservation ❑ Multi - family ❑ Cottage Measures ❑ Historic ❑ ESA Review /Conditions ❑ w I�� ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED ❑ SEE BELOW ❑ SEE COMMENT(S) BELOW Inspector Acknowledged by Date Date • 0 QoRr ro F CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT PERMIT NUMBER: B; L SITE ADDRESS: 1 4 5 1 U_,� 4 S CONTRACTOR: DATE OF INSPECTION: x/_- d WORKSITE OR CELL PHONE #: ' TYPE OF INSPECTION REQUESTED: W n C_ et? °C� 'P n V 2. For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ❑ APPROVED �v APPROVED WITH CORRECTIONS ❑ NOT APPROVED NOTED BELOW CALL FOR RE- INSPECTION BEFORE PROCEEDING YCA-Y. Approved ns and permit card must be on -site and available at time of inspection. A re- inspection fee may b as essed if work is not ready for inspection. %l. f�'���_. Date ?� 0 Inspector C.- 4 't` Date Acknowledgeda Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385-2294 Before 3P.M. Permit Number: BLD06 -111 Issued: 07/07/2006 Parcel Number: 989 -703 -504 Job Address: 1431 Washington St. Zoning: R -II Type: V -B Occupancy: R -3 Nature of Work: Construct front porch Owners: Robert & Fay Bruns Contractor: Owner SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360 -417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * ** REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks — 20' from Washington St, p /l, 5' from side p/1 Footings Forms Reinforcement FRAMING — all members and connections require inspection prior to cover Fasteners hangers, etc, in contact with treated material must be hot dipped galvanized Headers Beams Rafters (hurricane clips) Roof Sheathing Columns Positive Connections Blocking Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 2 FINAL House Numbers — 5" minimum Guardrail Smoke Detectors Final — Buildinc Cell If: ,� 1 ► .r 1 � _ Permit #BLD06 -111 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 22. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty-four hours notice is re uired. Public Works a roval must be received prior to schedulin2 the Building Department's final ins ection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. S. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. C___�91'1 � _5 Q APPLIC SON ATURE DATE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 2 of 2