Loading...
HomeMy WebLinkAboutBLD06-104p�pUW7Tb�h CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT r, INSPECTION REPORT Ewa For inspections, call the inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: D PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: f PHONE: TYPE OF INSPECTION: M ❑ APPROVED ❑ APPROVED wITII ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection procee 'ng. Inspector �_ Date. .. Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready far inspection. `iORT rO� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT r INSPECTION REPORT WA For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: `l Lt a o - 12:4 SITE ADDRESS: 'J� n PROJECT NAME: C:R ucd eoi j CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: AYA (r.. ❑ APPROVED WITH ❑ NOT APPROVED ED] APPROVED ra' CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector i C,C T Date 9N -- Approved plans and permit card must he on -site and available at time of inspection. A re-inspec:tion fee nrav be assessed if work is not ready for inspection. o�VOIRIT T °w CITY OF PORT TOWNSEND y DEVELOPMENT SERVICES DEPARTMENT M A INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: `l PERMIT NUMBER: SITE ADDRESS: - PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: �` h TYPE OF INSPECTION: QL1 APPROVED F1 APPROVED WITH F1 NOT APPROVED CORRECTIONS f Ok to proceed. Corrections will be Call for re- inspection before r checked at next inspection proceeding. Inspector Date Approved plans and permit card must be on -site and available at time of insl7eclion. A re- inspection fee may be. assessed if work is not ready for inspection. AT J6 "0 CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want I i, !ph7 . nspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: 1 4J4A),&PERMIT NUMBER: f SITE ADDRESS: PROJECT NAME: n L)OLLPA -CONTRACTOR: CONTACT PERSON: Pt7E: AZ TYPE OF INSPECTION: �j 10T_ rr', _Ile ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding. Inspector Date Approved plans and permit card must be on-site and available at time of inspection. A re- inspection fee mqy be assessed if work is not rear vjbr inspection. Q�Varr °�� CITY OF PORT TOWNSEND „ DEVELOPMENT SERVICES DEPARTMENT 'l INSPECTION REPORT For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: I 1 ❑y APPROVED ❑ APPROVED WITH ❑ NOT APPROVED % CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector a `� Date t Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed rf'work is not ready,for inspection. o�POArrn�ti CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360-385-2294 call by 3:0 Mth Friday. before you want the inspection. For Monday inspections, DATE OF INSPECTION: �� PERMIT NUMBER: SITE ADDRESS: CONTRACTOR: PROJECT NAME: PHONE: CONTACT PERSON: TYPE OF INSPECTION: .- s oR U APPROVED WITH F7 NOT APPROVED APPRDED CORRECTIONS Ok to proceed. Corrections will be Call for re-inspection before checked at next inspection proceeding- checked Inspector -- Date f] proved Ions and permit card must he on -.cite and available at time of inspection. A re- inspection fee rric�y pl �' he assessed if work is not ready for inspection. p�VowrT CITY OF PORT TOWNSEND „ DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: 06P PERMIT NUMBER: -,�, L _.p 662 r- SITE ADDRESS: 13 q3 3b ckmar) PROJECT NAME: Q u ta Q4 CONTRACTOR: CONTACT PERSON: PHONE: TYPE OF INSPECTION: ' �c l ❑ APP ROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector '� °�- Date Approved plans and permit card must he on -.site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. Development Services Department �1 250 Madison street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next p xt Da Inspection Call 385-2294 Before 3P.M. Permit Number: BLD�`� Issued: 06/1 9/2006 Parcel Number: 948 - 305 -006 Job Address: 1 occupancy: 391 Jackman St. Zoning: R -II Type: V -B R -3 Nature of Work: Construct Accessory Dwellin Unit Owners: Joy gale Contractor: Owner GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED, Electrical — Contact Labor & Industries @ 360- 417 -2702 TO NOTE: ACQUAINT YOURSELF WITH THE LISTED REQHERMEANRTT OF RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * * * RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed. Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks — 10' from Jackman St. p /l, 10' from 14th St. p /l., S' from side p /l, 10' from rear p/1 Footings Forms Reinforcement Holdowns MUST BE TIED IN PLACE NO WET STICKING Anchor Bolts & Washers LIFER Ground (tied to footing rebar steel) Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 4 Permit #BLD06 -104 FOUNDATION WALLS Reinforcement PLUMBING: Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint — strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Expansion tank Licensed Plumbing Contractor's Signature & License Number: Sign here MECHANICAL Whole House Fan W/ 24 hour timer Kitchen /Bath/Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R -4) (on ducting in unheated space) FRAMING — all members and connections require inspection prior to cover Fasteners han ers etc, in contact with treated material must be hot d i pped galvanized Walls Headers Rafters (hurricane clips) Roof Sheathing Joists (hangers) Blocking Roof Venting — eave and ridge vents Windows - egress Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier all 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page 2 of 4 Permit #BLD06 -104 ONE HOUR OCCUPANCY SEPARATION OF DWELLING UNITS INSULATION Floor (R -10) Walls (R -LI) Ceiling (R -30) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL FINAL Parking — 2 space required House Numbers — 5" minimum — Main House & ADU Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors in Main House & ADU Stairs, Handrails Guardrails Final — Building Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 3 of 4 � k Permit #BLD06 -104 -GENWL CO , QJSS L Contractors working on this project are required to have a Labor & Industries contractor's reydstration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval QEj2r to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. APPLICArl SIG ATU Call 48 hours before you dig for utility line locates 1 -800 -424 -5555 Page 4 of 4 DATE