Loading...
HomeMy WebLinkAboutBLD06-0981 parr r n� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: r ! G PEIT NUMBER: SITE ADDRESS: �l PROJECT NAME: '' w �1t `` CONTRACTOR: CONTACT PERSON: PHONE: <4 TYPE OF INSPECTION: s ❑ APPROVED ❑ APPROVED Wl'I'H ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector �' , Date Approved plans and permit card mast be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for in,syection. pour rah CITY OF PORT TOWNSEND ra DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT �w For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: Q PERMIT NUMBER: .8u)(010 ' Q SITE ADDRESS: PROJECT NAME: t(_CYl �� CONTRACTOR: CONTACT PERSON: PHONE: �� i7-3 TYPE OF INSPECTION:�I ii, rte-. ! r " Ll APPROVED ❑APPROVED WITH ".[ "" NOT APPROVED""' - CORRECTIONS Ok to proceed. Corrections will b Call for re- inspection before checked at next inspection roceeding. IL l Inspector ' C Date A Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not readv,for inspection. o�pgRTT °�y CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT 4'W For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: I Za (P PERMIT NUMBER: SITE ADDRESS: I ZX611 e. PROJECT NAME: CONTRACT R: Ej K CONTACT PERSON: ion 04 -PHONE: _ ,3 -4!j oq 1-73 TYPE OF INSPECTION: S �1" i.L ,� _ S D t) ra-j ry) LL ❑ APPROVED ❑ ^APPROVED WITH �ti ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will b Call for re- inspection before checked at next inspection �, procegding. Inspector to Ct Approved plans and permit card must be on -site and available: at time of inspection. A re- inspection fee nrav be assessed if work is not ready/Ifor inspection. o�J?ORT °� CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT wz N .s INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: Crr PERMIT NUMBER: A"-) D � � SITE ADDRESS: % `� i� �. PROJECT NAME: `-- 1fiv1 CONTRACTOR: CONTACT PERSON: PHONE: Q ❑ APPROVED ❑ APPROVED WITH fl NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. nInspector Date _ _.� Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. CITY OF PORT TOWNSEND Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -098 Issued: 06/16/2006 Parcel Number: 984 -905 -001 Job Address: 1850 Maple St. Zoning: R -II Type: V -B Occupancy: R -3 Nature of Work: Construct unheted sunroom addition to home Owners: William & Penelope James Contractor: Owner GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360- 417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * * * RFnITIRFD 1N�PFC''T1nNR% A PPR nVTi .nm A'r TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks — 10' from Maple St. p /l, 5' from side p /1, 10' from rear p/I Footings Forms Reinforcement Holdowns MUST BE TIED IN PLACE NO WET STICKING) Anchor Bolts & Washers LIFER Ground tied to footing rebar steel) Interior Pads Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 3 Permit #BLD06 -098 Shear wall nailing (TO BE INSPECTED & APPROVED PRIOR TO COVERING) EXTERIOR BRACED WALL PANELS ALTERNATE BRACED WALL PANELS FRAMING — all members and connections require inspection prior to cover Fasteners han ors etc. in contact with treated material must be hot di ed galvanized Walls Headers Rafters (hurricane clips) Roof Sheathing Joists (hangers) Blocking Roof Venting — eave and ridge vents Windows Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier DRYWALL FINAL Parking — 2 space required House Numbers — 5" minimum Smoke Detectors Final — Buildin Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 2 of 3 r 1. 2. 3 4. Permit #BLD06 -098 ►0 0 - Contractors working on this project are required to to ha�QV de roof of thisddocument t an pr or registration number and a City business license. Failure p P to work may result in job shut down while this is accomplished. Temporary erosion and sediment control (TESC) measures shall be installed on of silt fenc ng and prior to beginning construction; call 3$5 -2294. Measures shall include ins a l graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabizewith mulching, p once sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, s g' construction is complete. Applicant is responsible for protection of adjacent properties. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty-four hours notice is re uired. Public Works approval must be received Prior to schedulin the Building Department's final inspection, 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making than es plans. field. Contact the Building Department (379 -3208) prior to making change PP 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. 6 APPLICANT SIGN UR DATE Call 48 hours before you dig for utility line locates 1800- 424 -5555 Page 3 of 3