Loading...
HomeMy WebLinkAboutBLD06-096o�p°iTr CITY OF PORT TOWNSEND m DEVELOPMENT SERVICES DEPARTMENT rt = INSPECTION REPORT Awl For inspections, call the inspection Line at 360-385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ZDATE OF INSPECTION: O -_ PERMIT NUMBER: 5 SITE ADDRESS: ` -H PROJECT NAME: CONTRACTOR: I IYIb Lanid I S CONTACT PERSON: 1 G PHONE: 3 01 TYPE OF INSPECTION: .� r APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before �r checked at next inspection procee ng. inspectors C_ . Date !.a Approvedplans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. ,poR T T ° CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT r INSPECTION REPORT EwaFor inspections, call the, Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: �j-) LQ 0 a- 017 SITE ADDRESS: I PROJECT NAME: K CONTRACTOR: K�hnI26.j An CONTACT PERSON: PHONE: TYPE OF INSPECTION N F91 a � ' IX 'A t ' —v .�G ❑ APPROVED ❑ APPROVED W1TI -I ❑ NOT APPRO\ CORRECTIONS Ok to proceed. Corrections will be Call for re- inspeclion ,T. Q'--ghecked at next inspection proceeding. Inspectors Date ED before spection fee may 4.pproved plans and permit card must he on -site and available at time of inspection. A re -ir 5e assessed (f work is not ready for inspection. 9014T Tnkr CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: 0 PERMIT NUMBER: Q - SITE ADDRESS: PROJECT NAME: �M �� P� CONTRACTOR: CONTACT PERSON: � PHONE: Q ~% IL�L..r! 1'�YJ ,r. f1L.. f a(f (rte l� Ic •..a TYPE OF INSPECTION: �i�• , rc Yu ❑ APPROVED ❑APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be !Call for re- inspection before checked at next inspection proceeding. __ _. __..__..... Date Inspector � �...� �- --..._ ...� Approved plans and permit card must be on -site and available at time of inspection. A. re- inspection fee may be assessed if work is not ready.for inspection. VORr TO �a° Sys CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT y� -' `w , INSPECTION REPORT F� WA PERMIT NUMBER: - Qa SITE ADDRESS: 9 CONTRACTOR: DATE OF INSPECTION: WORKSITE OR CELL PHONE #: P 7 'E OF INSPECTION REQUESTED: l 4 `' l �a C_l, � A, For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ❑ A VED APPROVED WITH CORRECTIONS ❑ NOT APPROVED NOTED BELOW _f CALL FOR RE- INSPECTION BEFORE PROCEEDING I 12L. Approved s and permit car must be on -site and available at time of inspection. A re- inspection fee may b as essed if w is n ready for inspection. Inspector �.( Z� Date �� /'f /(v Acknowledged. C�-�` Date I- (. tips cc) FAIT U` O cor 0 9 P(e a.LC, CITY OF PORT TOWN SERVICES DEPARTMENT DEVELOPMENT SE INSPECTION REPORT PERMIT NUMBER: SITE ADDRESS: CONTRACTOR: F X06 �0� 7 a0j d- i, cc4 4_V s 2 DATE OF INSPECTION: WORKSITE OR CELL PHONE #: K__ TYPE OF INSPECTION REQUESTED: f� [1 For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ED WITH ❑ NOT APPROVED El APPROVED ❑ APPRO NOTED BELOW CORRECTIONS CALL FOR RE- INSPECTION BEFORE PROCEEDING Approved plans and permit card must be on -site and available at time of inspection. A re- inspection Date Date �p-- -- �VOINTTfl CITY OF PORT TOWNSEND ti DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT a`WA`;� For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. NSPECTIONl D PERMIT NUMBER: D ATE OF I SITE ADDRESS: % 40 Z �9 PROJECT NAME: 1'rl �.IC CONTRACTOR: ' L 6 11 � Lc� rl i S CONTACT PERSON: PHONE: _ 509 TYPE OF INSPECTION: ALL :K--- e'o u lte -T-1, 0 �u ❑ APPROVED El APPROVED WITH CORRECTIONS Ok to proceed. Correction: checked at next inspection Inspector I t A.. ❑ NOT APPROVED vill be Call for re- inspection before proceeding. Date �► t Approvedplans and permit card must he on -site and available at time of inspection. A re- inspection fee may be assessed if work is not reaciv for inspection. I] Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Pbone: (360) 379-3208 Fax: (360) 344-4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -096 Issued: 06/29/2006 Job Address: 762 — 29tli St. Zoning: R -II I Type: V -B Nature of Work: Construct sing-le-family esidence Owners: Karen McKee Contractor: Kimball Landis — KIMBALL996D3 GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360 -117 -2702 Parcel Number: 997 -501-010 Occupancy: R -3 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * * * RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks — 5' from front 291th. St. p /l, 5' from side Holcomb St. p /1. 5' from side p /l, 5' from rear p/1. Footings Forms Reinforcement Holdowns MUST BE TIED IN PLACE NO WET STICKING Anchor Bolts & Washers UFER Ground tied to footing rebar steel) Interior Pads Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 4 Permit #BLD06 -096 FOUNDATION WALLS Reinforcement Hold Downs Anchor Bolts & Washers Foundation drain Must be inspected prior to covering pipe. Foundation drains shall dischar a at arade separately from roof drains. PLUMBING: Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint— strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Expansion tank Licensed Plumbing Contractor's Signature & License Number: Sign here FLOOR FRAMING CALL FOR INSPECTION BEFORE COVER Joists Girders Posts Hangers Blocking Positive Connections Treated Wood to Concrete Pressure treated plate connections Anchor Bolts & Washers Hold downs Shear wall nailing (TO BE INSPECTED & APPROVED PRIOR TO COVERING) See Engineering for Details MECHANICAL Whole House Fan W/ 24 hour timer Kitchen /Bath/Laundry Fans Environmental Air Exhaust ducting w/ back draft dampers), Call 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page 2 of 4 • Permit #BLD06 -096 Insulation (R -4) (on ducting in unheated space) LPG Tank LPG Piping LPG Stove FRAMING — all members and connections require inspection prior to cover Fasteners han ers etc. in contact with treated material must be hot dipped galvanized Walls Headers Rafters (hurricane clips) Roof Sheathing Joists (hangers) Blocking Roof Venting — eave and ridge vents Windows - egress Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R -30) Walls (R -21 Attic (R -38) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL PUBLIC WORKS FINAL — MIP06 -045 Public Works Sign-Off (prior to building final FINAL Parking — 2 space required House Numbers — 5" minimum Plumbing Mechanical /Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors LPG Final — Building Call 48 hours before you dig for utility line locates 1- 800 -424 -5555 Page 3 of 4 • 9 Permit #BLD06 -096 GENERAL COMMONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST S PERMIT ON -SITE WITH THE APPROVED PLANS. TE AP CANT SIGNATURE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 4 of 4