BLD06-084
ppilT Td�Y v wn CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: Q D PERMIT NUMBER: SITE ADDRESS: PROJECT NAME: CONTACT PERSON: TYPE OF INSPECTION: PHONE: _ �Q 75:101 ❑ APPROVED ❑ APPROVED WITH F1 NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. Inspector Date G/ / Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready for inspection. OF PORT r0� G Op PERMIT NUMBER: SITE ADDRESS: CONTRACTOR: DATE OF INSPECTION: CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT NOW= WORKSITE OR CELL PHONE TYPE OF INSPECTION REQUESTED: r For inspections, call the Inspection Line at 360 - 385.2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. APPROVED D APPROVED WITH CORRECTIONS D NOT APPROVED NOTED BELOW CALL FOR RE- INSPECTION BEFORE PROCEEDING Approved pla ,and perm n it card must be o-site and available at time of inspection. A re- inspection fee may be a ssed if wor i not ready for 4ispection. fnspector Date Acknowledged Date fp °pF CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT -' k INSPECTION REPORT PERMIT NUMBER: SITE ADDRESS: CONTRACTOR: ' DATE OF INSPECTION: RVA W WORKSITE OR CELL PHONE #: rn TYPE OF INSPECTION REQUESTED: r For inspections, call the Inspection Line at 360 -38S -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ❑ APPROVED 1 ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED NOTED BELOW CALL FOR RE- INSPECTION BEFORE PROCEEDING i (Nr O Approved Tans and permit card must be on -site and available at time of inspection. A re- inspection fee may b a sessed if work is not ready for inspection. �.f' tom.. Date Inspector Acknowledged % Date pOAT rah CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT awn PERMIT NUMBER: SITE ADDRESS: CONTRACTOR: DATE OF INSPECTION: 5-3 WORKSITE OR CELL PHONE #: IF" TYPE OF INSPECTION REQUESTED: _F-/)/)A,-n [AA n /, f� Lt , t� L. Y CY ( Pr For inspections, call the Inspection Line at 360 -3$5 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. © APPROVED APPROVED WITH CORRECTIONS \ ❑ NOT APPROVED NO'T'ED BELOW ) CALL FOR RE- INSPECTION BEFORE PROCEEDING Z: a 'Approved plans and pe it card must be on -site and available at time of inspection. A re- inspection fee may be (Wessel iwork is not ready for inspection. _,_) r-- — " "I i n Inspector Acknowledged ate C 2 f- Date l.'A �. 4 Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -084 Issued: 05/24/2006 Parcel Number: 984- 905 -101 Job Address: 1808 Maple St. Zoning: -EL—II Type: V -B Occupancy: R -3 Nature of Work: Construct two-story dwelling addition. Owners: Coleman White & Sally Davis Contractor: Adam Chohrach Const. — CHQHRCC998LO GENERAL CONDITIONS APPLY -- SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360 -417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * * * REQUIRED INSPECTIONS APPROVED /DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No, 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Anchor Bolts & Washers Interior Pads Foundation drain Must be inspected prior to back -fill of foundation Call 48 hours before you dig for utility line locates 1- 800 - 4245555 Page 1 of 3 I Permit #13LD06 -084 FRAMING — all members and connections require inspection prior to cover Fasteners han ers etc. in contact with treated material must be hot di ed alvanized Walls Headers Floor Joists Columns Positive Connections Rafters (hurricane clips) Roof Sheathing Joists (hangers) Blocking Roof Venting — eave and ridge vents Windows Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R -10) Walls (R -21) Ceiling - attic (R (R -38) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL Prior to tape & bed FINAL Parking — 2 space required Address Numbers -- 5" minimum Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors — interconnected & hard wired Guardrails Final — Building Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 2 of 3 1. FA Permit #BLD06 -084 Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty- our hours notice is re wired. Public Works approval must be received Prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. A SIGN TU E DATE Call 48 hours before you dig for utility line locates 1- 800- 424 -5555 Page 3 of 3