HomeMy WebLinkAboutBLD06-082O�eOgi Tp�
v �
WA
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: c > L Da 62. �_O (S-2— SITE ADDRESS: 9 I q
CONTRACTOR: J V 1 G
DATE OF INSPECTION:
WORKSITE OR CELL PHONE #: Q - 1
TYPE OF INSPECTION REQUESTED: ri 0DJ Ciao �)-)
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED 0 APPROVED WITH CORRECTIONS ❑ NOT APPROVED
NOTED BELOW CALL FOR RE- INSPECTION
_ BEFORE PROCEEDING
Approved ns and permit card must be on -site and available at time of inspection. A re- inspection
fee may bo a sessed if work is not ready for inspection.
I K Date
Inspector �(
Date
Acknowledged
of poor r6
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: y
SITE ADDRESS: Cf q I
CONTRACTOR: 1
DATE OF INSPECTION:
WORKSITE OR CELL PHONE #:
N
TYPE OF INSPECTION REQUESTED: U
af C1
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
APPROVED "N, ❑ APPROVED WITH CORRECTIONS
NOTED BELOW
❑ NOT APPROVED
CALL FOR RE- INSPECTION
BEFORE PROCEEDING
Approved plans and permit card must be on -site and available at time of inspection,
fee may be a4ssed if work is not ready for inspection.
Inspector �'
... � -� -� � � � Date
Acknowledged _ Date
A re- inspection
a,
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379.3108 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 355 -2294 Before 3P.M.
Permit Number: BLD06 -082
Issued: 05/12/2006 Parcel Number: 942- 000 -017
Job Address: 919 Hufford Pl. Zoning: R -II Type: V -B Occupancy: R -3
Nature of Work: Install kitchen in existing studio to become 287 s . ft. ADU
Owners: Kirk McDonald
Contractor: Owner
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360 -417 -2702
NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO
RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF
CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION.
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * * *
1?Fn1rTTl2FTl TNCPF.f TT()NC
APPROVED /DATE
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrester (on dishwasher, ice maker & clothes
washer)
Hose Bibs (backflow protection required)
Pipe Insulation (R -3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint — strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" — 24" above ground
Licensed Plumbing Contractor's Signature & License
Number;
Sign here
MECHANICAL
Whole House Fan
Kitchen/Bath/Laundry Fans
Call 48 hours before you dig for utility line locates
1- 800 -424 -5555
Page 1 of 3
t,
Permit #BLD06 -082
Environmental Air Exhaust ducting (w/ back draft dampers),
Insulation (R -4) (on ducting in unheated space)
LPG Stove
Gas Piping
FINAL
Parking — 2 space required
Address Numbers -- 5" minimum
Plumbing
Mechanical
Smoke Detectors
Final — Building
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 2 of 3
v
4%� Permit #BLD06 -082
! a __ m, lrc q a g_
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a Ci business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twen -four hours notice is re uired. Public Works approval must be received prior to
scheduling the Buildina Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval urior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
AP LICANT S�MIGNATM DATE
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 3 of 3