HomeMy WebLinkAboutBLD06-080Op PORT TORE
c3 �
._ MC . .
w
"'rf'/v
4F7
/ CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: —� / PERMIT NUMBER: [p
SITE ADDRESS: lel"'I
PROJECT NAME: )"�I' JAI CONTRACTOR: W4C6
CONTACT PERSON: Ui /l1 PHONE: Jq cS151 —�'� `
TYPE OF INSPECTION:_ar
�. ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
% r
Inspector — - Date
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may
be assessed if work is not ready far inspection.
F-A
Inspection Report
Project rL bo4D(
0
Permit # _ —80 _
Date Inspector Inspection & Notes
CITY OF PORT TO WNSEND
PERMITACTIVITYLOG
PERMIT # E5L-b 0� - 0190
DATE RECEIVED: $ —
SCOPE QJF WORK:
OrZ SS ja07_U_)P_e_Ad _F,'0AJE-EF_ q nil
PREcs-ozz Coe
PV
DATE
ACTION
INITIALS
_25LqZo�
Entered into TRIPS
ESA - to Planning -no evidence of ESA-
Vested Date
Checked for Completeness
�17
I te
ter -r m 'E LY9 KEVI,'J 7-0
(ALL MC_
ae�Lk C-AJ 1--, 1-5 Aj 0_1,5
-I Lr��m
A �j 1�1,Aj _00.. M a �j
AePi-9Z V
It
)kqu-(f)A)tjE:a
f5lgCAL)�
5jaEOD Lr- auer_ wo-e-L-
EEC 6L66�_
04
PLAN kC-V. ffM-PLETL_h v pr�l7j.IT
F - �A.PET\/ MeEEMECT To
F J Le-0 0 LUID 1-70 R_ 0 TO Pk)
6 W-Ur Kl-\JIU i(ALL.CD &
\\BO—Pennits\forms\BUIL,.DIVG\Pvrmit Activity Log.doc
)e EtA kJE-6 A 61-) tfC-- AIF-0,
r r
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone; (360) 379 -3208 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Dav Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06 -080
Job Address: 1014 Water Street
Issued: 05/18/2006
Zoning: C -111 Type: V -B
Nature of Work: Install egress door between Pioneer Bldg. & Palace Hotel
Owners: High Divide LLC
Parcel Number: 989- 703 -903
Occupancy: R -1
Contractor: Olympic Reforestation Inc. — OLYMPI *218NN
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
FIRE ALARM SYSTEM TO INTERCONNECT PIONEER BLDG. & PALACE HOTEL
TOGETHER
Electrical — Contact Labor & Industries @ 360- 417 -2702
NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO
RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF
CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION.
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * * *
1?Ti !11"T'FD1 it TIV4ZP1WC9P1(11V1Q
APPRnVFD1nATF
FRAMING — all members and connections require inspection
prior to cover
Header — 2 — 6x10 DF 41
FINAL
Address Numbers — 5" minimum on both buildings
One hour door & assembly
Exit Signs & Illumination
Fire Alarm System Interconnection to be permitted
Final — Building
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 2
•
c:
Permit #BLD06 -080
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval Quior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 2
5-~ 1 1-oL
DATE