Loading...
HomeMy WebLinkAboutBLD06-080Op PORT TORE c3 � ._ MC . . w "'rf'/v 4F7 / CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: —� / PERMIT NUMBER: [p SITE ADDRESS: lel"'I PROJECT NAME: )"�I' JAI CONTRACTOR: W4C6 CONTACT PERSON: Ui /l1 PHONE: Jq cS151 —�'� ` TYPE OF INSPECTION:_ar �. ❑ APPROVED ❑ APPROVED WITH ❑ NOT APPROVED CORRECTIONS Ok to proceed. Corrections will be Call for re- inspection before checked at next inspection proceeding. % r Inspector — - Date Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may be assessed if work is not ready far inspection. F-A Inspection Report Project rL bo4D( 0 Permit # _ —80 _ Date Inspector Inspection & Notes CITY OF PORT TO WNSEND PERMITACTIVITYLOG PERMIT # E5L-b 0� - 0190 DATE RECEIVED: $ — SCOPE QJF WORK: OrZ SS ja07_U_)P_e_Ad _F,'0AJE-EF_ q nil PREcs-ozz Coe PV DATE ACTION INITIALS _25LqZo� Entered into TRIPS ESA - to Planning -no evidence of ESA- Vested Date Checked for Completeness �17 I te ter -r m 'E LY9 KEVI,'J 7-0 (ALL MC_ ae�Lk C-AJ 1--, 1-5 Aj 0_1,5 -I Lr��m A �j 1�1,Aj _00.. M a �j AePi-9Z V It )kqu-(f)A)tjE:a f5lgCAL)� 5jaEOD Lr- auer_ wo-e-L- EEC 6L66�_ 04 PLAN kC-V. ffM-PLETL_h v pr�l7j.IT F - �A.PET\/ MeEEMECT To F J Le-0 0 LUID 1-70 R_ 0 TO Pk) 6 W-Ur Kl-\JIU i(ALL.CD & \\BO—Pennits\forms\BUIL,.DIVG\Pvrmit Activity Log.doc )e EtA kJE-6 A 61-) tfC-- AIF-0, r r Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone; (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Dav Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -080 Job Address: 1014 Water Street Issued: 05/18/2006 Zoning: C -111 Type: V -B Nature of Work: Install egress door between Pioneer Bldg. & Palace Hotel Owners: High Divide LLC Parcel Number: 989- 703 -903 Occupancy: R -1 Contractor: Olympic Reforestation Inc. — OLYMPI *218NN GENERAL CONDITIONS APPLY — SEE LAST PAGE SEPARATE PERMITS REQUIRED: FIRE ALARM SYSTEM TO INTERCONNECT PIONEER BLDG. & PALACE HOTEL TOGETHER Electrical — Contact Labor & Industries @ 360- 417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * * * 1?Ti !11"T'FD1 it TIV4ZP1WC9P1(11V1Q APPRnVFD1nATF FRAMING — all members and connections require inspection prior to cover Header — 2 — 6x10 DF 41 FINAL Address Numbers — 5" minimum on both buildings One hour door & assembly Exit Signs & Illumination Fire Alarm System Interconnection to be permitted Final — Building Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 2 • c: Permit #BLD06 -080 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval Quior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. APPLICANT SIGNATURE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 2 of 2 5-~ 1 1-oL DATE